ATTCH 15_ 22-0503 HIANG_ADDENDUM_004.pdf
PDF 61 KB Posted
- Attached to
- UPGRADE BUILDING COMPLEX HILO
- Solicitation number
- W50SLF-22-R-0001
- Issued by
-
Department of the Army National Guard
About this file
This solicitation seeks proposals for the construction project "Upgrade Building Complex Hilo" located at the Hawaii Air National Guard in Keaukaha, Hilo, Hawaii. The project scope includes replacing windows and doors, repairing and coating the roof, installing suspended ceilings and lights, and upgrading HVAC systems for five buildings. The estimated value is between $1 million and $5 million to be fully funded by the Department of the Army National Guard. The pre-proposal conference will be held on March 25, 2022 and the response deadline is April 21, 2022. This is a total small business set-aside with a size standard of $39.5 million average annual revenue. The contractor must coordinate work access and hazardous materials handling with the 154th Civil Engineer Squadron. The project completion time is 360 calendar days from notice to proceed.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HAWAII AIR NATIONAL GUARD Addendum No. 4 (05/03/22) KEAUKAHA ANG STATION Page 1 of 1 Project No. MABE 152003
ADDENDUM NO. 4
TO THE PLANS AND SPECIFICATIONS FOR:
HAWAII AIR NATIONAL GUARD
KEAUKAHA ANG STATION, HAWWAII
PROJECT NO. MABE 152003
May 03, 2022
This addendum modifies the original Bid Documents for the Project dated January 26, 2018. The items in this addendum shall govern the work, taking precedence over previously issued specifications and drawings governing the items mentioned.
A. DRAWINGS: N/A
B. SPECIFICATIONS:
1. SECTION 07 56 00 FLUID APPLIED ROOFING SYSTEM
a. Paragraph 2.2
ADD the following notation after paragraph 2.2.2:
“2.2.3 Roof Scuttle (Basis of Design):Bilco S-20 or approved equal.
2.2.4 Safety Post (Basis of Design): Bilco LU-1 or approved equal.
2.2.5 Roof Hatch Guard (Basis of Design): Bilco RL-2-S or approved equal.”
b. Paragraph 3.6
ADD the following notation after paragraph 3.6, Form 1
“3.7 ROOF SCUTTLE
Furnish and install roof scuttle per manufacturer recommendations.
3.8 SAFETY POST
Furnish and install safety post per manufacturer recommendations.
3.9 ROOF HATCH GUARD
Furnish and install roof hatch guard per manufacturer recommendations.”
END OF ADDENDUM NO. 4