ATTCH 10_88127 - Drawings - Mechanical R02 - Certified.pdf

PDF 9 MB Posted

Attached to
UPGRADE BUILDING COMPLEX HILO Federal contract opportunity
Solicitation number
W50SLF-22-R-0001
Issued by
Department of the Army National Guard

About this file

This document provides details of a federal contract opportunity for construction services. The U.S. Property and Fiscal Officer for Hawaii will award a firm fixed-price contract to upgrade five buildings at the 291st Combat Communications Squadron in Hilo, Hawaii. Work includes replacing windows and doors, repairing and coating roofs, installing ceilings and lights, and upgrading HVAC systems. The base value is estimated between $1-5 million, to be funded by SRM funds. The contract includes three options and has a period of performance of 360 days from notice to proceed. The NAICS code is 236220 and it is set aside for small businesses with average annual revenue under $39.5 million. The pre-proposal conference is March 25th and proposals are due April 21st. The source selection will be conducted per FAR Part 15.

View the file

Other files for this federal contract opportunity

Other files attached to UPGRADE BUILDING COMPLEX HILO, newest first.
File Type Posted
4. Q&A for Solicitation RFP W50SLF-22-R-0001 (10-May-2022).pdf PDF
4. Q&A for Solicitation RFP W50SLF-22-R-0001 (9-May-2022).pdf PDF
Solicitation RFP W50SLF22R0001 (5.5.2022 Conformed Document).pdf PDF
ATTCH 15_ 22-0503 HIANG_ADDENDUM_004.pdf PDF
4. Q&A for Solicitation RFP W50SLF-22-R-0001 (4-May-2022).pdf PDF
Solicitation Amendment W50SLF22R0001 0003.pdf PDF
ATTCH 12_22-0427_HIANG_ADDENDUM_003.pdf PDF
Solicitation Amendment W50SLF22R0001 0002.pdf PDF
4. Q&A for Solicitation RFP W50SLF-22-R-0001 (28-Apr-2022).pdf PDF
ATTCH 14_22-0428-HIANG-Drwgs-ADD_3.pdf PDF
Solicitation RFP W50SLF22R0001 (Conformed Document).pdf PDF
ATTCH 13_ 22-0428_HIANG_ADDENDUM_003.pdf PDF
4. Q&A for Solicitation RFP W50SLF-22-R-0001 (13-Apr-2022).pdf PDF
Solicitation Amendment W50SLF22R0001 0001.pdf PDF
5. A10-KTR Laydown Area.xlsx XLSX spreadsheet
4. Q&A for Solicitation RFP W50SLF-22-R-0001 (12-Apr-2022).pdf PDF
3. Pre-Proposal Meeting PPT Upgrade Bldg Complex Hilo.pptx PPTX presentation
2. Attendance Sheet - Upgrade Bldg Complex Hilo.pdf PDF
4. Q&A for Solicitation RFP W50SLF-22-R-0001 (27-Mar-2022).pdf PDF
1. MFR - Pre-Proposal Conference Site Visit.pdf PDF
Solicitation RFP W50SLF22R0001.pdf PDF
ATTCH 11_22-0128-HILO-ARCH-FINAL-PERMIT.pdf PDF
ATTCH 3_Appendix F - Calcs (FOUO).pdf PDF
ATTCH 1_SOW_MABE152003 Upgrade Building Complex Hilo.docx DOCX document
EXHIBIT C_Reference_Questionnaire_Package.docx DOCX document
ATTCH 6_Addendum 01 - Drawings.pdf PDF
ATTCH 5_Addendum 01 - Clarification Minor Construction_dwgs.pdf PDF
EXHIBIT B_Subcontractor Information and Consent Form.docx DOCX document
EXHIBIT A_Performance Relevancy Questionnaire.docx DOCX document
ATTCH 9_88127 - Basis of Design - Mechanical.pdf PDF
ATTCH 7_Addendum 02 - SOW Add Haz Matl Survey Info.pdf PDF
EXHIBIT D_Letter of Commitment.docx DOCX document
ATTCH 8_Narrative of changes (Mech).pdf PDF
ATTCH 4_Appendix G - Specs FINAL.pdf PDF
ATTCH 2_Appendix B - Drawings FINAL.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S c a l e

F o r

M i c r o f i l m i n g

I n c h e s

M i l l i m e t e r s

1 1312111098765432

I

H

G

F

E

D

C

B

A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file

HONOLULU, HAWAII

ENGINEERS ARCHITECTS & CONSULTANTS

Project No. - MABE152003

UPGRADE BUILDING

HAWAII AIR NATIONAL GUARD

KEAUKAHA ANG STATION, HAWAII

COMPLEX, HILO

01/28/220 FINAL SUBMITTAL BS

MABE 15200391701

C O

P Y

R I G

H T

05/01/2017 A. QUEVEDO

J. CHORIKI B. SEABAUGH

MECHANICAL LEGEND & ABBREVIATIONS

M-001 0

91701_M001.dwg

B U

R N

M

D

O N

N E

L L

E

N G

I N

E E

R I N

G

C

O M

P A

N Y

I N

C

DETAIL NUMBER

SCALE

TITLE

M

S

MECHANICAL ABBREVIATIONS

24x12

24x12 OV

12Ø

AFF

AHU

ARV

BOD

BW

CA

CD

CHR

CHS

CU

CRU

CFM

CUH

CONC

DH

DN

DOAS

DSS

EL

ELL

EA

EG

ER

ERC

EXIST

F

FCU

FF

FOB

FOT

GH

INV EL

L

LDP

LR

MA

MJ

MW

NC

NO

OA

OB

PB

PSIA

PSIG

RED

RMJ

RA

RG

RL

RS

SCH

SR

SO

STM

ST

SA

SRC

SR

SW

TOA

TOC

TOD

TOS

UH

VAV

V

WE

WN

RECTANGULAR DUCT DIMENSION - IN

OVAL DUCT DIMENSION - IN

ROUND DUCT DIMENSION - IN

ABOVE FINISHED FLOOR

AIR HANDLING UNIT

AIR RELEASE VALVE

BOTTOM OF DUCT

BUTT WELD

CONDENSER AIR

CONDENSATE DRAIN

CHILLED WATER RETURN

CHILLED WATER SUPPLY

CONDENSING UNIT

COMPUTER ROOM UNIT

CUBIC FEET PER MINUTE

CABINET UNIT HEATER

CONCENTRIC

DOOR HEATER

DOWN

DEDICATED OUTSIDE AIR HANDLING UNIT

DUCTLESS SPLIT SYSTEM

ELEVATION

ELBOW

EXHAUST AIR

EXHAUST GRILLE

EXHAUST REGISTER

ELECTRIC REHEAT COIL

EXISTING

FAN

FAN COIL UNIT

FLAT FACED

FLAT ON BOTTOM

FLAT ON TOP

GRAVITY HOOD

INVERT ELEVATION

LOUVER

LOCAL DISPLAY PANEL

LONG RADIUS

MIXED AIR

MECHANICAL JOINT

MAKE-UP WATER

NORMALLY CLOSED (FAIL POSITION)

NORMALLY OPEN (FAIL POSITION)

OUTSIDE AIR

OPPOSED BLADE

PARALLEL BLADE

POUNDS PER SQUARE INCH ABSOLUTE

POUNDS PER SQUARE INCH GAUGE

REDUCER-REDUCING

RESTRAINED MECHANICAL JOINT

RETURN AIR

RETURN AIR GRILLE

REFRIGERANT LIQUID

REFRIGERANT SUCTION

SCHEDULE

SHORT RADIUS

SLIP ON

STEAM

STEAM TRAP

SUPPLY AIR

SPRING RETURN CLOSED

SUPPLY REGISTER

SOCKET WELD

TEMPERED OUTSIDE AIR

TOP OF CONCRETE

TOP OF DUCT

TOP OF STEEL

UNIT HEATER

VARIABLE AIR VOLUME

VENT

WELD END

WELD NECK

GENERAL NOTES:

1. LEGEND IS GENERAL IN NATURE AND MAY INDICATE MORE INFORMATION THAN IS

APPLICABLE TO PROJECT. SEE DRAWINGS FOR SPECIFIC SYMBOLS AND

ABBREVIATIONS.

2. PROVIDE ALL MATERIALS, VALVES, HANGERS, ETC. AND EQUIPMENT AND

PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE

MECHANICAL SYSTEMS AS INDICATED ON THE DRAWINGS, AS SPECIFIED AND AS

REQUIRED BY CODE.

3. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE

WITH MANUFACTURERS RECOMMENDATIONS, CONTRACT DOCUMENTS, AND

APPLICABLE CODES AND REGULATIONS.

4. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH STRUCTURAL,

CIVIL, ELECTRICAL WORK, ETC., SHOWN ON OTHER CONTRACT DOCUMENT

DRAWINGS.

5. MAINTAIN A MINIMUM OF 6'-8" CLEARANCE TO UNDERSIDE OF PIPES, CONDUITS,

ETC., THROUGHOUT ACCESS ROUTES AND IN MECHANICAL ROOMS.

6. LOCATE ALL MECHANICAL EQUIPMENT FOR UNOBSTRUCTED ACCESS TO UNIT

ACCESS PANELS, CONTROLS, AND VALVING.

7. VERIFY DIMENSIONS AND CONNECTION SIZE WITH FURNISHED EQUIPMENT

8. ALL ELEVATIONS ARE ABOVE FINISHED FLOOR TO BOTTOM OF DUCT, PIPE, OR

PIPE INSULATION UNLESS NOTED OTHERWISE.

9. OUTSIDE AIR DUCTWORK AT INTAKE LOUVERS SHALL BE SLOPED TOWARDS THE

BUILDING EXTERIOR WALL.

10. PIPES ARE OFFSET FOR CLARITY. CONTRACTOR SHALL ROUTE PIPES AS TIGHT

TO STRUCTURE AS POSSIBLE. INSTALL VALVES IN ACCESSIBLE LOCATIONS FOR

MAINTENANCE. CONTRACTOR SHALL COORDINATE PIPE ELEVATIONS WITH

OTHER DISCIPLINES AS REQUIRED.

11. THE EXISTING CONDITIONS INDICATED ON THESE DRAWINGS ARE TAKEN FROM

THE BEST INFORMATION AVAILABLE, FROM VISUAL SITE OBSERVATIONS, AND

AVAILABLE DRAWINGS. THE INFORMATION IS SHOWN TO HELP ESTABLISH THE

EXTENT OF THE WORK TO BE DONE. THE CONTRACTOR SHALL VERIFY ALL

ACTUAL CONDITIONS AND THE INTENT OF THE WORK INDICATED ON THESE

DRAWINGS.

12. PATCH ALL PENETRATIONS ASSOCIATED WITH REMOVAL OF EXISTING

EQUIPMENT, DUCTWORK, PIPING, ETC.

13. ALL TAKEOFF DUCTS TO DIFFUSERS, REGISTERS, AND GRILLES ARE EQUAL TO

THE NECK SIZE UNLESS OTHERWISE NOTED.

14. INSTALL ALL CONDENSING UNITS WITH MANUFACTURER RECOMMENDED

MINIMUM CLEARANCE.

15. LOCATE TRANSFER AIR DUCTS AND OPENINGS 24" ABOVE HIGHEST CEILING

ELEVATION UNLESS OTHERWISE NOTED.

16. OCCUPANCY SENSORS AND CO2 SENSORS SHALL BE PROVIDED BY DIVISION 23.

WIRE OCCUPANCY SENSORS AND CO2 SENSORS BACK TO CORRESPONDING

DOAS UNITS AS SCHEDULED FOR VENTILATION CONTROL.

17. PROVIDE STRUCTURAL EQUIPMENT PADS IN ACCORDANCE WITH DETAIL IN

STRUCTURAL DRAWINGS.

18. ALL FERROUS MATERIALS USED FOR PIPE HANGERS, ANCHORS, AND OTHER

SUPPORTS, SHALL BE HOT-DIPPED GALVANIZED PER UFC 3-440-05N. JOINTS AND

DAMAGED SURFACES SHALL BE TOUCHED UP WITH A FIELD APPLIED ZINC-RICH

COMPOUND.

19. CONTRACTOR SHALL BALANCE ALL DIFFUSERS TO FLOW RATE SHOWN ON PLANS.

20. LOCATE ALL MECHANICAL EQUIPMENT FOR UNOBSTRUCTED ACCESS TO UNIT

ACCESS PANELS, CONTROLS, AND VALVING.

21. DUCT DIMENSIONS INDICATED REFER TO SHEET METAL DIMENSIONS. SHEET

METAL SIZE SHALL BE AIR OPENING DIMENSIONS PLUS THE THICKNESS OF

ACOUSTICAL LINER WHERE LINER IS INSTALLED. WHERE LINER IS NOT INSTALLED,

AIR OPENING SIZE AND SHEET METAL SIZE SHALL BE THE SAME.

22. DUCT STATIC PRESSURE CLASSIFICATION: UNLESS OTHERWISE INDICATED,

CONSTRUCT DUCTS ON THE DISCHARGE SIDE OF FANS TO HAVE A 1.0 IN. W.C.

POSITIVE PRESSURE AND DUCTS ON THE INLET SIDE OF FANS TO HAVE A 1.0 IN.

W.C. NEGATIVE PRESSURE CLASSIFICATION.

23. COORDINATE ALL WALL AND ROOF PENETRATIONS WITH STRUCTURAL AND

ARCHITECTURAL PLANS.

24. INSTALL TEMPERATURE CONTROLS AT 48" ABOVE FINISHED FLOOR AND

COORDINATE WITH OTHER DEVICES LOCATED ON WALLS. COORDINATE WITH

ARCHITECTURAL WALL FINISHES AND INTERIOR FURNITURE PLACEMENT.

SECTION

DESIGNATOR

INDICATES PERSPECTIVE

AND LIMITS OF SECTION

DRAWING WHERE

SECTION IS SHOWN

INDICATES

LIMITS OF

DETAIL

DETAIL

DESIGNATOR

DRAWING WHERE

DETAIL IS SHOWN

ROUND FLEXIBLE DUCT

5'-0" MAX LENGTH

NEW WORK

EXISTING

TO REMAIN DEMOLITION

EXISTING

LOUVERS AND SCREEN

915x610

[36x24]

HUMIDISTAT

THERMOSTAT

H

LINEAR SLOT DIFFUSER

ROUND DIFFUSER

SQUARE OR RECT. DIFFUSER

RETURN OR EXHAUST AIR DUCT SECTION

SUPPLY OR OUTSIDE AIR DUCT SECTION

POINT OF CHANGE IN DUCT

CONSTRUCTION (BY STATIC

PRESSURE CLASS "N" SUPERSCRIPT

INDICATES NEGATIVE PRESSURE.)

SQUARE OR RECTANGULAR TO

ROUND TRANSITION

DROP IN RESPECT TO AIR-FLOW

RISE IN RESPECT TO AIR-FLOW

R

D

TEE W/TURNING VANES

RECTANGULAR ELBOW W/TURNING VANES

FLEXIBLE DUCT CONNECTION

HEAT STOP FOR FIRE RATED CLG

DAMPERS: (SD)

SMOKE-

FIRE/SMOKE (F/SD)-

FIRE DAMPER:

SHOW VERTICAL (WALL)

SHOW HORIZ. (FLOOR)

ACCESS DOOR (AD), ACCESS PANEL (AP)

BACKDRAFT DAMPER

MANUAL BALANCE DAMPER

CONTROL DAMPER, MOTOR OPERATED

HVAC LEGEND

BD

AD

AD

AD

S

AD

CONSTRUCTION INTERFACE

APPLICATION

SPEC. TYPE

SA-A

(2)150-8Ø

NECK SIZE - IN

CFM

NUMBER OF DEVICES SHARING SAME

CHARACTERISTICS (OPTIONAL)

AIR DISTRIBUTION DEVICE IDENTIFICATION

DETAIL CALLOUT SYMBOL

SECTION CUT SYMBOL

DETAIL/SECTION TITLE

T

SECURITY MANBARS

CARBON DIOXIDE SENSOR

C2

DIFFERENTIAL PRESSURE SENSOR

DP

M003

A1

M001

A1

SCALE:

A1

DETAIL TITLE

NOT TO SCALE

DSP DUCT STATIC PRESSURE SENSOR

OS OCCUPANCY SENSOR

EXP:4/30/22

EXIST. SUPPLY &

MAINTENANCE

BLDG. 704

EXIST. COMMUNICATIONS

BLDG. 705

EXIST. CLASSROM ATC &

TESTING ROOMS

BLDG. 703

EXIST. ADMIN.

BLDG. 701

EXIST. AUTOMOTIVE MAINTENANCE

SUPPORT EQUIPMENT SHOP

BLDG. 702

314°35' → 600.00 (182 882)

134°35' ← 600.00 (182 882)

MD101

F6

MD101

F6

MD101

F6

MD101

F6

MD103

G6

MD102

I2

S c a r

M i c r o f i l m i n g

I n c h e s

M i l l i m e t e r s

1 1312111098765432

I

H

G

F

E

D

C

B

A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file

HONOLULU, HAWAII

ENGINEERS ARCHITECTS & CONSULTANTS

Project No. - MABE 152003

UPGRADE BUILDING

HAWAII AIR NATIONAL GUARD

KEAUKAHA ANG STATION, HAWAII

COMPLEX, HILO

MABE 15200391701

01/28/220 FINAL SUBMITTAL BS

C O

P Y

R I G

HVAC OVERALL DEMO PLAN

MD100 0

88127_MD100.dwg

B U

R N

D

O N

N E

L L

E

N G

I N

E E

R I N

G

C

O M

P A

N Y

I N

C

1. FOR GENERAL NOTES, LEGEND, AND ABBREVIATIONS SEE DRAWING

M-001.

2. REMOVE POWER FEED FROM ALL HVAC EQUIPMENT TO BREAKER IN

PANELBOARD INCLUDING STARTERS, DISCONNECTS, MOTOR-RATED

SWITCHES AND CONDUCTORS.

GENERAL NOTES

SCALE:

I6

HVAC OVERALL DEMO PLAN

1/32" = 1'-0"

SCALE IN FEET

16'0 64'32'

KEYPLAN

1 2

S c a r

M i c r o f i l m i n g

I n c h e s

M i l l i m e t e r s

1 1312111098765432

I

H

G

F

E

D

C

B

A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file

HONOLULU, HAWAII

ENGINEERS ARCHITECTS & CONSULTANTS

Project No. - MABE 152003

UPGRADE BUILDING

HAWAII AIR NATIONAL GUARD

KEAUKAHA ANG STATION, HAWAII

COMPLEX, HILO

MABE 15200391701

01/28/220 FINAL SUBMITTAL BS

C O

P Y

R I G

HVAC DEMO PLAN B701, B703, B704 & B705

MD101 0

88127_MD101.dwg

B U

R N

D

O N

N E

L L

E

N G

I N

E E

R I N

G

C

O M

P A

N Y

I N

C

DEMO EXISTING HVAC EQUIPMENT, DUCTWORK, PIPING, CONTROLS,

SUPPORTS, AND OTHER ASSOCIATED APPURTENANCES.

REMOVE POWER FEED FROM ALL HVAC EQUIPMENT TO BREAKER IN

PANELBOARD INCLUDING STARTERS, DISCONNECTS, MOTOR-RATED

SWITCHES AND CONDUCTORS.

REMOVE HVAC EQUIPMENT AND DUCTWORK THEN TEMPORARILY CAP

PENETRATION TO BE REUSED.

KEY NOTES

1. FOR GENERAL NOTES, LEGEND, AND ABBREVIATIONS SEE DRAWING M-001.

GENERAL PLAN NOTES

MD401

G9

S E

E

B

U I L D

I N

G

E

X T

E N

S I O

N

O

N

M

D

MD401

I3

SCALE:

F6

HVAC OVERALL DEMO PLAN

NOT TO SCALE

SCALE:

I3

HVAC ROOF DEMO PLAN

NOT TO SCALE

SCALE:

I9

B705 SITE DEMO PLAN

NOT TO SCALE

MD101

I3

1 2

MD101

I3

1 2

KEYPLAN

BUILDING 704

BUILDING 701

BUILDING 703

BUILDING 705

S c a r

M i c r o f i l m i n g

I n c h e s

M i l l i m e t e r s

1 1312111098765432

I

H

G

F

E

D

C

B

A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file

HONOLULU, HAWAII

ENGINEERS ARCHITECTS & CONSULTANTS

Project No. - MABE 152003

UPGRADE BUILDING

HAWAII AIR NATIONAL GUARD

KEAUKAHA ANG STATION, HAWAII

COMPLEX, HILO

MABE 15200391701

01/28/220 FINAL SUBMITTAL BS

C O

P Y

R I G

HVAC DEMO PLAN B704 EXTENSION

MD102 0

88127_MD102.dwg

B U

R N

D

O N

N E

L L

E

N G

I N

E E

R I N

G

C

O M

P A

N Y

I N

C

DEMO EXISTING HVAC EQUIPMENT, DUCTWORK, PIPING, CONTROLS,

SUPPORTS, AND OTHER ASSOCIATED APPURTENANCES.

REMOVE POWER FEED FROM ALL HVAC EQUIPMENT TO BREAKER IN

PANELBOARD INCLUDING STARTERS, DISCONNECTS, MOTOR-RATED SWITCHES

AND CONDUCTORS.

REMOVE HVAC EQUIPMENT AND DUCTWORK THEN TEMPORARILY CAP

PENETRATION TO BE REUSED.

KEY NOTES

1. FOR GENERAL NOTES, LEGEND, AND ABBREVIATIONS SEE DRAWING M-001.

GENERAL PLAN NOTES

SCALE:

B2

HVAC B704 ELEVATION DEMO PLAN

NOT TO SCALE

SCALE:

I2

HVAC B704 EXTENSION DEMO PLAN

NOT TO SCALE SCALE:

I9

HVAC B704 ROOF DEMO PLAN

NOT TO SCALE

1 2

KEYPLAN

MD102

B2 a r

M i c r o f i l m i n g

I n c h e s

M i l l i m e t e r s

1 1312111098765432

I

H

G

F

E

D

C

B

A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file

HONOLULU, HAWAII

ENGINEERS ARCHITECTS & CONSULTANTS

Project No. - MABE 152003

UPGRADE BUILDING

HAWAII AIR NATIONAL GUARD

KEAUKAHA ANG STATION, HAWAII

COMPLEX, HILO

MABE 15200391701

01/28/220 FINAL SUBMITTAL BS

C O

P Y

R I G

HVAC DEMO PLAN B702

MD103 0

88127_MD103.dwg

B U

R N

D

O N

N E

L L

E

N G

I N

E E

R I N

G

C

O M

P A

N Y

I N

C

DEMO EXISTING HVAC EQUIPMENT, DUCTWORK, PIPING, CONTROLS,

SUPPORTS, AND OTHER ASSOCIATED APPURTENANCES.

REMOVE POWER FEED FROM ALL HVAC EQUIPMENT TO BREAKER IN

PANELBOARD INCLUDING STARTERS, DISCONNECTS, MOTOR-RATED SWITCHES

AND CONDUCTORS.

KEY NOTES

1. FOR GENERAL NOTES, LEGEND, AND ABBREVIATIONS SEE DRAWING M-001.

GENERAL PLAN NOTES

SCALE:

G6

HVAC B702 DEMO PLAN

NOT TO SCALE

1 2

KEYPLAN

1 2 a r

M i c r o f i l m i n g

I n c h e s

M i l l i m e t e r s

1 1312111098765432

I

H

G

F

E

D

C

B

A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file

HONOLULU, HAWAII

ENGINEERS ARCHITECTS & CONSULTANTS

Project No. - MABE 152003

UPGRADE BUILDING

HAWAII AIR NATIONAL GUARD

KEAUKAHA ANG STATION, HAWAII

COMPLEX, HILO

MABE 15200391701

01/28/220 FINAL SUBMITTAL BS

C O

P Y

R I G

HVAC ENLARGED DEMO PLANS

MD401 0

88127_MD401.dwg

B U

R N

D

O N

N E

L L

E

N G

I N

E E

R I N

G

C

O M

P A

N Y

I N

C

DEMO EXISTING HVAC EQUIPMENT, DUCTWORK, PIPING, CONTROLS,

SUPPORTS, AND OTHER ASSOCIATED APPURTENANCES.

REMOVE POWER FEED FROM ALL HVAC EQUIPMENT TO BREAKER IN

PANELBOARD INCLUDING STARTERS, DISCONNECTS, MOTOR-RATED SWITCHES

AND CONDUCTORS.

EXISTING COMPRESSED AIR SYSTEM TO REMAIN.

KEY NOTES

1. FOR GENERAL NOTES, LEGEND, AND ABBREVIATIONS SEE DRAWING M-001.

GENERAL PLAN NOTES

SCALE:

I3

HVAC B704 ENLARGED DEMO PLAN

NOT TO SCALE

SCALE:

G9

HVAC B705 ENLARGED DEMO PLAN

NOT TO SCALE

1 2

KEYPLAN

1 2

EXIST. SUPPLY &

MAINTENANCE

BLDG. 704

EXIST. COMMUNICATIONS

BLDG. 705

EXIST. CLASSROM ATC &

TESTING ROOMS

BLDG. 703

EXIST. ADMIN.

BLDG. 701

EXIST. AUTOMOTIVE MAINTENANCE

SUPPORT EQUIPMENT SHOP

BLDG. 702

314°35' → 600.00 (182 882)

134°35' ← 600.00 (182 882)

M-102

D5

M-101

D5

M-102

I6

M-103

I6

M-101

I6

S c a r

M i c r o f i l m i n g

I n c h e s

M i l l i m e t e r s

1 1312111098765432

I

H

G

F

E

D

C

B

A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file

HONOLULU, HAWAII

ENGINEERS ARCHITECTS & CONSULTANTS

Project No. - MABE152003

UPGRADE BUILDING

HAWAII AIR NATIONAL GUARD

KEAUKAHA ANG STATION, HAWAII

COMPLEX, HILO

01/28/220 FINAL SUBMITTAL BS

MABE 15200391701

C O

P Y

R I G

HVAC OVERALL FLOOR PLAN

M-100 0

88127_M100.dwg

B U

R N

D

O N

N E

L L

E

N G

I N

E E

R I N

G

C

O M

P A

N Y

I N

C

1. FOR GENERAL NOTES, LEGEND, AND ABBREVIATIONS SEE DRAWINGS

M-001.

GENERAL NOTES

SCALE:

HVAC OVERALL FLOOR PLAN

1/32" = 1'-0"

SCALE IN FEET

16'0 64'32'

KEYPLAN

LUBRICATION

BAY

REPAIR BAY

REPAIR BAY

SHOP AREA

OFFICE

PARTS &

ISSUE

VEHICLE

DISPATCH &

DRIVERS

OFFICE

TOOLS &

STORAGE

UTILITY ROOM

MEN

WOMEN

BATTERY

RM.

JAN.

STORAGE

WASH &

PAINT BAY

CORR.

1 2 3 4 5 6 7 8 9 10

EE

DD

CC

BB

AA

STORAGE

OFFICES

EF-02

INTAKE THRU

DOOR LOUVER

INTAKE THRU

DOOR LOUVER

INTAKE THRU

DOOR LOUVER

INTAKE THRU

DOOR LOUVER

EF-05

L-04 12x12

140 CFM EA

FCU-18

L-05 12x12

25 CFM OA

6x6 OA

CU-DSS-01

FCU-19

6x6 OA

FCU-20

6x6 OA

FCU-21

L-08 12x12

30 CFM OA

6x6 OA

L-02 28x12

520 CFM EA

EF-03

6x6 EA

EA-G

280-12x6

EA-G

100-6x6

EA-G

140-8x6

8x6EA

RS/RL

M

BD

BD

BD

M

T

T

T

T

FCU-18

FCU-19 FCU-20

FCU-21

12x6 EA

12x6 EA

12x12 EA

CD4CD 4

CD

T

EF-05

DDC

PANEL

7 8

J

H

G1

G

F

E

SQUAD

ADMIN/PERSONNEL

CONF. ROOM

DOAS-04

10x8 OA

16x8 OA

10x8 OA

6x6 OA

FCU-04

12x12 RA

20x12 SA

12x12 SA

FCU-05

10x10 RA

HP-01

SEE M-102

OA-A

(2)280-8Ø

OA-A

50-6Ø

RA-B

NA-10x10

SA-A

480-10Ø

SA-A

(2)425-10Ø

SA-A

(2)665-12Ø

RA-B

(2)NA-12x12

10x8 OA

12x12 RA

12x12 SA

RS/RL

8x12 RA

RA-B

(2)NA-12x8

8x12 RA

10x10 SA

10x10 SA

10x10 SA

18x12 SA

24x12 RA

24x12 RA

T

FCU-05

CD4

T

FCU-04

S c a r

M i c r o f i l m i n g

I n c h e s

M i l l i m e t e r s

1 1312111098765432

I

H

G

F

E

D

C

B

A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file

HONOLULU, HAWAII

ENGINEERS ARCHITECTS & CONSULTANTS

Project No. - MABE152003

UPGRADE BUILDING

HAWAII AIR NATIONAL GUARD

KEAUKAHA ANG STATION, HAWAII

COMPLEX, HILO

01/28/220 FINAL SUBMITTAL BS

MABE 15200391701

C O

P Y

R I G

HVAC FLOOR PLAN

BUILDINGS 701 AND 702

M-101 0

91701_M101.dwg

B U

R N

D

O N

N E

L L

E

N G

I N

E E

R I N

G

C

O M

P A

N Y

I N

C

SCALE:

D4

BUILDING 701 - HVAC FLOOR PLAN

1/8" = 1'-0"

SCALE:

I6

BUILDING 702 - HVAC FLOOR PLAN

1/8" = 1'-0"

1. FOR GENERAL NOTES, LEGEND, AND ABBREVIATIONS SEE DRAWING

M-001.

2. INSTALL ALL OUTDOOR CONDENSING UNITS WITH MANUFACTURER

RECOMMENDED MINIMUM CLEARANCE.

3. FOR GENERAL DETAILS SEE DRAWINGS M-501 THRU M-504.

4. CONTRACTOR SHALL COORDINATE BRANCH CIRCUITING

REFRIGERANT PIPE SIZES AND ACCESSORIES WITH EQUIPMENT

MANUFACTURER.

5. REFRIGERANT PIPING SHOWN IS FOR REFERENCE ONLY AND

DEMONSTRATES DESIRED ROUTING. SIZES ARE FOR REFERENCE

ONLY. ROUTING AND SIZES ARE FOR THE BASIS OF DESIGN

MANUFACTURER AND MAY VARY FROM THE INSTALLED

MANUFACTURER'S REQUIREMENTS. CONTRACTOR SHALL BE

RESPONSIBLE FOR DESIGNING FULL REFRIGERANT PIPING PLAN AND

COORDINATING WITH OTHER DISCIPLINES.

6. CONTRACTOR SHALL BE RESPONSIBLE FOR ADDED REFRIGERANT

BASED ON INSTALLED PIPING LENGTHS.

7. LIQUID AND SUCTION PIPING SHALL BE INSULATED PER

MANUFACTURER'S RECOMMENDATIONS.

8. CONDENSATE DRAIN PIPING SHALL BE DWV COPPER TUBING

CONFORMING TO ASTM B306 AND INSTALLED WITH A SLOPE OF NOT

LESS THAN 1% TOWARDS DISCHARGE.

GENERAL NOTES

16'8'4'0

SCALE IN FEET

KEYPLAN

16'8'4'0

SCALE IN FEET

LOCATE IN EXISTING WALL PENETRATION.

CONNECT TO DUCTWORK IN PLENUM SPACE ABOVE

(SEE M-110).

SIZE AND ROUTE REFRIGERANT LINES PER

MANUFACTURERS INSTRUCTIONS.

SIZE AND ROUTE CONDENSATE DRAIN LINES PER

MANUFACTURERS INSTRUCTIONS. PENETRATE WALLS IN

PLENUM SPACE, DOWN EXTERIOR SIDE OF WALL,

DISCHARGE INTO GRAVEL, AND TERMINATE WITH A 45

DEGREE ELBOW WITH SMOOTH BORE CORROSION

RESISTANT OUTLET POINTING DOWN.

ROUTE REFRIGERANT PIPING ABOVE GRADE, ALONG

THE GROUND, UP THE EXTERIOR SIDE OF WALL, AND

PENETRATE WALL IN PLENUM SPACE.

KEY NOTES

SQ. MAINT.

OFFICER

SQUADRON

MAINTENANCE

MANAGEMENT

SQUADRON

UNIT SUPPLY

ARMS

STORAGE RM

SQUADRON

SUPPLY

OFFICER

SQ. SUPPLY

ADMIN.

OFFICE

FRAME

JAN.

SERVICE

ROOM

MEN

WOMEN

ISSUE ROOM

9 10 11 12 13 14

L

K

J

H

G1

G

F

EF-08

L-11 12x12

130 CFM EA

EF-09

L-12 12x12

130 CFM EA

INTAKE THRU

DOOR LOUVER

INTAKE THRU

DOOR LOUVER

EF-07

L-10 12x12

100 CFM EA

INTAKE THRU

DOOR LOUVER

EF-10

10x10 EA

20x10 TOILET EXHAUST

DUCT UP THRU ROOF

INTAKE THRU

DOOR LOUVER

EF-06

L-09 12x14

190 CFM EA

210-6Ø

OA-D

FCU-06

10x10 RA

DOAS-02

16x8 OA

10x8 OA

8x8 OA

FCU-07

FCU-09

18x14 SA18x10 SA10x10 SA

8x8 SA

160-6Ø

SA-A

FCU-10

240-6x10 OA

THRU ROOF

SEE M-103

8x8 RA

FCU-08

NA-8x6

RA-B

12x8 RA

8x6 RA

8x6 SA

10x8 SA

NA-8x6

RA-B

145-6Ø

SA-A

6x6 OA

EA-C

(2)375-10x10

RA-F

(3)NA-10x10

SA-D

(3)475-10Ø

OA-A

140-6Ø

SA-A

(2)430-10Ø

RA-B

(2)NA-10x10

RA-B

NA-8x8

SA-A

260-8Ø

(3)50-6Ø

OA-A

NA-22x22

TA-G

10x10 EA

10x10 RA

10x10 RA

18x12 RA

18x16 RA

10x10 SA 10x10 SA

6x6 OA 6x6 OA

8x6 OA

8x6 OA

10x8 SA

RS/RL

M

T

T

T

T

FCU-07

FCU-06

FCU-09

FCU-08

T

FCU-10

CD 4 CD 4

CD 4

T

EF-09

SQUADRON

ATC OFFICER

ATC

SIMULATOR

ROOM

WEIGHT

ROOM

WEIGHT ROOM

1 2 3 4

E

D

C

DOAS-01

12x8 OA

FCU-01

12x10 RA

12x10 SA

12x10 SA

12x10 RA

8x8 OA

6x6 OA

SEE M-101

NA-12x8

RA-B

FCU

-03

12x10 SA

12x8 RA

OA-A

60-6Ø

OA-A

(2)140-6Ø

SA-A

610-10Ø

SA-A

610-10Ø

NA-12x10

RA-B

NA-12x10

RA-B

FCU-02

8x6 OA

8x6 OA 6x6 OA 6x6 OA

OA-A

50-6Ø

SA-A

565-12Ø

10x10 SA

18x12 SA

12x10 SA

RA-B

NA-12x10

SA-A

395-8Ø

RS/RL

T T

FCU-02

FCU-03

EF-15

L-17 12x12

130 CFM EA

CD 4 CD4 CD4

T

FCU-01

S c a r

M i c r o f i l m i n g

I n c h e s

M i l l i m e t e r s

1 1312111098765432

I

H

G

F

E

D

C

B

A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file

HONOLULU, HAWAII

ENGINEERS ARCHITECTS & CONSULTANTS

Project No. - MABE152003

UPGRADE BUILDING

HAWAII AIR NATIONAL GUARD

KEAUKAHA ANG STATION, HAWAII

COMPLEX, HILO

01/28/220 FINAL SUBMITTAL BS

MABE 15200391701

C O

P Y

R I G

HVAC FLOOR PLAN

BUILDINGS 703 AND 704

M-102 0

91701_M102.dwg

B U

R N

D

O N

N E

L L

E

N G

I N

E E

R I N

G

C

O M

P A

N Y

I N

C

SCALE:

D5

BUILDING 703 - HVAC FLOOR PLAN

1/8" = 1'-0"

SCALE:

I5

BUILDING 704 - HVAC FLOOR PLAN

1/8" = 1'-0"

INSTALL EXHAUST FAN INSIDE BUILDING PLENUM SPACE

USING PENETRATION THROUGH EXISTING CLERESTORY

WINDOW OPENING. SEE M-111.

INSTALL THROUGH EXISTING ROOF PENETRATION.

SIZE AND ROUTE REFRIGERANT LINES PER

MANUFACTURERS INSTRUCTIONS.

SIZE AND ROUTE CONDENSATE DRAIN LINES PER

MANUFACTURERS INSTRUCTIONS. PENETRATE WALLS IN

PLENUM SPACE, DOWN EXTERIOR SIDE OF WALL,

DISCHARGE INTO GRAVEL, AND TERMINATE WITH A 45

DEGREE ELBOW WITH SMOOTH BORE CORROSION

RESISTANT OUTLET POINTING DOWN.

16'8'4'0

SCALE IN FEET

KEYPLAN

16'8'4'0

SCALE IN FEET

1. FOR GENERAL NOTES, LEGEND, AND ABBREVIATIONS SEE DRAWING

M-001.

2. INSTALL ALL OUTDOOR CONDENSING UNITS WITH MANUFACTURER

RECOMMENDED MINIMUM CLEARANCE.

3. FOR GENERAL DETAILS SEE DRAWINGS M-501 THRU M-504.

4. CONTRACTOR SHALL COORDINATE BRANCH CIRCUITING

REFRIGERANT PIPE SIZES AND ACCESSORIES WITH EQUIPMENT

MANUFACTURER.

5. REFRIGERANT PIPING SHOWN IS FOR REFERENCE ONLY AND

DEMONSTRATES DESIRED ROUTING. SIZES ARE FOR REFERENCE

ONLY. ROUTING AND SIZES ARE FOR THE BASIS OF DESIGN

MANUFACTURER AND MAY VARY FROM THE INSTALLED

MANUFACTURER'S REQUIREMENTS. CONTRACTOR SHALL BE

RESPONSIBLE FOR DESIGNING FULL REFRIGERANT PIPING PLAN AND

COORDINATING WITH OTHER DISCIPLINES.

6. CONTRACTOR SHALL BE RESPONSIBLE FOR ADDED REFRIGERANT

BASED ON INSTALLED PIPING LENGTHS.

7. LIQUID AND SUCTION PIPING SHALL BE INSULATED PER

MANUFACTURER'S RECOMMENDATIONS.

8. CONDENSATE DRAIN PIPING SHALL BE DWV COPPER TUBING

CONFORMING TO ASTM B306 AND INSTALLED WITH A SLOPE OF NOT

LESS THAN 1% TOWARDS DISCHARGE.

GENERAL NOTES

KEY NOTES

GROUND RADIO/

RADAR/FLIGHT

FACILITIES MAINT.

RADIO RELAY/

TELEPHONE

MAINT.

COMMUNICATIONS

CENTER

RADIO

OPERATIONS

CLASSROOM

MAINTENANCE

NCMO/WLC/CP

COMM.

OFFICER

SWITCHB'D

ROOM

CRYPTO

MAINT.

MESSAGE

CENTER

CRYPTO

ROOM

MECHANICAL

ROOM

VEST.

AHTE

9 10 11 12 13 14

E

D

C

B

A

DOAS-03

SEE M-102

FCU-11

20x10 RA

10x10 RA

16x10 SA

105-6Ø

SA-A

NA-6x6

RA-B

6x6 SA

6x6 RA

6x6 OA

NA-8x6

RA-B

8x6 SA

8x6 RA

FCU-15

12x10 SA

12x12 RA

6x6 OA

L-13 30x12

805 CFM OA

DDC

FCU-16

10x10

SA

18x10 SA

18x12 RA

10x10 RA

HP-02

FCU

-17

20x12 SA

24x12 RA

12x12 SA

8x6 OA

(2)NA-10x10

RA-B

FCU-13

(2)400-8Ø

SA-A

50-6Ø

OA-A

190-6Ø

SA-A

560-12Ø

SA-A

NA-12x12

RA-B

(2)475-10Ø

SA-A

(2)NA-10x10

RA-B

(2)NA-12x12

RA-B

(2)645-12Ø

SA-A

175-6Ø

OA-A

170-6Ø

OA-A

70-6Ø

OA-A

60-6Ø

OA-A

80-6Ø

OA-A

10x10

SA

145-6Ø

SA-A

L-14 32x12

600 CFM EA

6x8 SA

FCU-14

200-8x6

SA-D

6x8 SA

10x8 SA

6x8 SA

NA-8x6

RA-B

16x10 OA

NA-8x8

RA-F

10x10 RA

6x6 OA

6x6 OA

50-6Ø

OA-A

8x6 OA

6x6 OA

6x6 OA

10x6 OA

70-6Ø

OA-A

80-6Ø

OA-A

10x6 OA

M

12x12 RA

DSP

M

T

T

T

T

T

T

FCU-11

T

FCU-12

FCU-15

FCU-13

FCU-14

FCU-17

FCU-16

INTAKE THRU

DOOR LOUVER

16x12 OA

10x10 OA

50-6x6

EA-G

10x8 OA

RS/RL

HP-03

CD 4

CD4

CD4

FCU-12

CD4

M

T

EF-14

OS OS

EF-14

S c a r

M i c r o f i l m i n g

I n c h e s

M i l l i m e t e r s

1 1312111098765432

I

H

G

F

E

D

C

B

A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file

HONOLULU, HAWAII

ENGINEERS ARCHITECTS & CONSULTANTS

Project No. - MABE152003

UPGRADE BUILDING

HAWAII AIR NATIONAL GUARD

KEAUKAHA ANG STATION, HAWAII

COMPLEX, HILO

01/28/220 FINAL SUBMITTAL BS

MABE 15200391701

C O

P Y

R I G

HVAC FLOOR PLAN

BUILDING 705

M-103 0

91701_M103.dwg

B U

R N

D

O N

N E

L L

E

N G

I N

E E

R I N

G

C

O M

P A

N Y

I N

C

SCALE:

I6

BUILDING 705 - HVAC FLOOR PLAN

1/8" = 1'-0"

INSTALL NEW EXHAUST FAN THROUGH EXISTING ROOF

PENETRATION AND DUCT INTO PLENUM SPACE. SEE

SHEET M-111.

INSTALL EXHAUST AIR GRILLE TO BOOT IN PLENUM

SPACE.

SIZE AND ROUTE REFRIGERANT LINES PER

MANUFACTURERS INSTRUCTIONS.

SIZE AND ROUTE CONDENSATE DRAIN LINES PER

MANUFACTURERS INSTRUCTIONS. PENETRATE WALLS IN

PLENUM SPACE, DOWN EXTERIOR SIDE OF WALL,

DISCHARGE INTO GRAVEL, AND TERMINATE WITH A 45

DEGREE ELBOW WITH SMOOTH BORE CORROSION

RESISTANT OUTLET POINTING DOWN.

ROUTE REFRIGERANT PIPING ABOVE GRADE, ALONG

THE GROUND, UP THE EXTERIOR SIDE OF WALL, AND

PENETRATE WALL IN PLENUM SPACE.

16'8'4'0

SCALE IN FEET

KEYPLAN

1. FOR GENERAL NOTES, LEGEND, AND ABBREVIATIONS SEE DRAWING

M-001.

2. INSTALL ALL OUTDOOR CONDENSING UNITS WITH MANUFACTURER

RECOMMENDED MINIMUM CLEARANCE.

3. FOR GENERAL DETAILS SEE DRAWINGS M-501 THRU M-504.

4. CONTRACTOR SHALL COORDINATE BRANCH CIRCUITING

REFRIGERANT PIPE SIZES AND ACCESSORIES WITH EQUIPMENT

MANUFACTURER.

5. REFRIGERANT PIPING SHOWN IS FOR REFERENCE ONLY AND

DEMONSTRATES DESIRED ROUTING. SIZES ARE FOR REFERENCE

ONLY. ROUTING AND SIZES ARE FOR THE BASIS OF DESIGN

MANUFACTURER AND MAY VARY FROM THE INSTALLED

MANUFACTURER'S REQUIREMENTS. CONTRACTOR SHALL BE

RESPONSIBLE FOR DESIGNING FULL REFRIGERANT PIPING PLAN AND

COORDINATING WITH OTHER DISCIPLINES.

6. CONTRACTOR SHALL BE RESPONSIBLE FOR ADDED REFRIGERANT

BASED ON INSTALLED PIPING LENGTHS.

7. LIQUID AND SUCTION PIPING SHALL BE INSULATED PER

MANUFACTURER'S RECOMMENDATIONS.

8. CONDENSATE DRAIN PIPING SHALL BE DWV COPPER TUBING

CONFORMING TO ASTM B306 AND INSTALLED WITH A SLOPE OF NOT

LESS THAN 1% TOWARDS DISCHARGE.

GENERAL NOTES

KEY NOTES

J

G1

G

F

EF-11

L-16 16x16

285 CFM EA

M

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

L-17 16x20

420 CFM OA

L-06 12x12

25 CFM OA

L-07 12x12

25 CFM OA

BDBD

2 2

M

KEYPLAN

S c a r

M i c r o f i l m i n g

I n c h e s

M i l l i m e t e r s

1 1312111098765432

I

H

G

F

E

D

C

B

A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file

HONOLULU, HAWAII

ENGINEERS ARCHITECTS & CONSULTANTS

Project No. - MABE152003

UPGRADE BUILDING

HAWAII AIR NATIONAL GUARD

KEAUKAHA ANG STATION, HAWAII

COMPLEX, HILO

01/28/220 FINAL SUBMITTAL BS

MABE 15200391701

C O

P Y

R I G

HVAC ROOF PLAN

BUILDINGS 701 AND 702

M-110 0

91701_M110.dwg

B U

R N

D

O N

N E

L L

E

N G

I N

E E

R I N

G

C

O M

P A

N Y

I N

C

SCALE:

I4

BUILDINGS 702 - HVAC ROOF PLAN

1/8" = 1'-0"

INSTALL EXHAUST FAN INSIDE BUILDING PLENUM SPACE

USING PENETRATION THROUGH EXISTING CLERESTORY

WINDOW OPENING.

CONNECT TO DUCTWORK IN PLENUM SPACE BELOW

(SEE M-101).

INSTALL LOUVER IN EXISTING CLERESTORY WINDOW

OPENING (SEE ARCHITECTURAL).

KEY NOTES

1. FOR GENERAL NOTES, LEGEND, AND ABBREVIATIONS SEE DRAWING

M-001.

2. FOR GENERAL DETAILS SEE DRAWINGS M-501 THRU M-504.

GENERAL NOTES

16'8'4'0

SCALE IN FEET

SCALE:

D4

BUILDINGS 701 - HVAC ROOF PLAN

1/8" = 1'-0"

16'8'4'0

SCALE IN FEET

9 10 11 12 13 14

L

K

J

H

G1

G

F

E

D

C

B

A

M503

I1

M503

I1

EF-13

EF-12

L-15 16x16

165 CFM EA

M

M

S c a r

M i c r o f i l m i n g

I n c h e s

M i l l i m e t e r s

1 1312111098765432

I

H

G

F

E

D

C

B

A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file

HONOLULU, HAWAII

ENGINEERS ARCHITECTS & CONSULTANTS

Project No. - MABE152003

UPGRADE BUILDING

HAWAII AIR NATIONAL GUARD

KEAUKAHA ANG STATION, HAWAII

COMPLEX, HILO

01/28/220 FINAL SUBMITTAL BS

MABE 15200391701

C O

P Y

R I G

HVAC ROOF PLAN

BUILDINGS 704 AND 705

M-111 0

91701_M111.dwg

B U

R N

D

O N

N E

L L

E

N G

I N

E E

R I N

G

C

O M

P A

N Y

I N

C

SCALE:

I4

BUILDINGS 704 AND 705 - HVAC ROOF PLAN

1/8" = 1'-0"

NEW DUCT WORK THRU EXISTING ROOF PENETRATION.

INSTALL EXHAUST FAN INSIDE BUILDING PLENUM SPACE

USING PENETRATION THROUGH EXISTING CLERESTORY

WINDOW OPENING.

DUCT DOWN THROUGH EXISTING ROOF PENETRATION

WITH DUCT BOOT INTO PLENUM SPACE.

10x20 EA GOOSENECH WITH INSECT SCREEN THROUGH

EXISTING PENETRATION.

6x10 OA GOOSENECH WITH INSECT SCREEN THROUGH

EXISTING PENETRATION.

KEY NOTES

1. FOR GENERAL NOTES, LEGEND, AND ABBREVIATIONS SEE DRAWING

M-001.

2. FOR GENERAL DETAILS SEE DRAWINGS M-501 THRU M-504.

GENERAL NOTES

16'8'4'0

SCALE IN FEET

KEYPLAN

a r

M i c r o f i l m i n g

I n c h e s

M i l l i m e t e r s

1 1312111098765432

I

H

G

F

E

D

C

B

A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file

HONOLULU, HAWAII

ENGINEERS ARCHITECTS & CONSULTANTS

Project No. - MABE152003

UPGRADE BUILDING

HAWAII AIR NATIONAL GUARD

KEAUKAHA ANG STATION, HAWAII

COMPLEX, HILO

01/28/220 FINAL SUBMITTAL BS

MABE 15200391701

C O

P Y

R I G

11/07/2017 J. CHORIKI

AIR FLOW DIAGRAMS

BUILDINGS 701, 702, AND 703

M-201 0

91701_M-201.dwg

B U

R N

D

O N

N E

L L

E

N G

I N

E E

R I N

G

C

O M

P A

N Y

I N

C

SCALE:

D9

AIR FLOW DIAGRAM - BUILDING 703

N/A

1. FOR GENERAL NOTES, LEGEND, AND ABBREVIATIONS SEE DRAWING

M-001.

GENERAL NOTES

SCALE:

I5

AIR FLOW DIAGRAM - BUILDING 702

N/A

CFM

OA

DOAS-01

WEIGHT ROOM

CFM

CFM

CFM

CFM

CFM

CFM

150 CFM

PRESSURIZATION

FCU-01 FCU-02

SIMULATOR ROOM

CFM

CFM

CFM

50 CFM

PRESSURIZATION

FCU-03

SQUADRON

ATC OFFICES

CFM

CFM

CFM

60 CFM

PRESSURIZATION

CFM

OA

DOAS-04

CFM

CFM

CFM

50 CFM

PRESSURIZATION

FCU-05

SQUADRON

ADMIN PERSONNEL

CFM

CFM

CFM

CFM

CFM

CFM

275 CFM

PRESSURIZATION

FCU-04

CONFERENCE ROOM

CFM

SCALE:

D2

AIR FLOW DIAGRAM - BUILDING 701

N/A

OFFICE - 011

CFM

CFM

FCU-18

CFM

OA

25 CFM

PRESSURIZATION

VEHICLE DISPATCH

& DRIVERS

CFM

CFM

FCU-19

CFM

OA

25 CFM

PRESSURIZATION

OFFICE - 014

CFM

CFM

FCU-20

CFM

OA

25 CFM

PRESSURIZATION

OFFICES - 020

CFM

CFM

FCU-21

CFM

OA

30 CFM

PRESSURIZATION

MEN - 08

CFM

CFM

WOMEN - 07

CFM

CFM

JANITOR CLOSET

CFM

CFM

CFM

BATTERY ROOM

CFM

CFM

CFM

CFM

CFM

CFM

CFM

CFM

OA

CORRIDOR

EF-11

EF-03

EF-02

UTILITY

ROOM

CFM

CFM

OA

CFM

CFM

EF-05

CFM

OA

REPAIR BAYS

CFM

EF-15

a r

M i c r o f i l m i n g

I n c h e s

M i l l i m e t e r s

1 1312111098765432

I

H

G

F

E

D

C

B

A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file

HONOLULU, HAWAII

ENGINEERS ARCHITECTS & CONSULTANTS

Project No. - MABE152003

UPGRADE BUILDING

HAWAII AIR NATIONAL GUARD

KEAUKAHA ANG STATION, HAWAII

COMPLEX, HILO

01/28/220 FINAL SUBMITTAL BS

MABE 15200391701

C O

P Y

R I G

11/07/2017 J. CHORIKI

AIR FLOW DIAGRAMS

BUILDINGS 704 AND 705

M-202 0

91701_M-202.dwg

B U

R N

D

O N

N E

L L

E

N G

I N

E E

R I N

G

C

O M

P A

N Y

I N

C

1. FOR GENERAL NOTES, LEGEND, AND ABBREVIATIONS SEE DRAWING

M-001.

GENERAL NOTES

SQUADRON UNIT

SUPPLY & ISSUE RM

CFM

CFM

CFM

FCU-06

165 CFM

PRESSURIZATION

CFM

OA

DOAS-02

CFM

SQUADRON MAINT.

MANAGEMENT

CFM

CFM

CFM

FCU-07

100 CFM

PRESSURIZATION

CFM

SQ SUPPLY

ADMIN OFFICE

CFM

CFM

CFM

20 CFM

PRESSURIZATION

CFM

SQ SUPPLY

OFFICER

CFM

CFM

CFM

20 CFM

PRESSURIZATION

CFM

FCU-08

SQ MAINT

OFFICER

CFM

CFM

CFM

FCU-09

30 CFM

PRESSURIZATION

CFM

CFM

FRAME

ROOM

CFM

CFM

OA

CFM

CFM

JANITOR

CLOSET

CFM

CFM

OA

CFM

CFM

SERVICE

ROOM

CFM

CFM

OA

CFM

CFM

MEN

CFM

CFM

OA

CFM

CFM

WOMEN

CFM

CFM

OA

CFM

CFM

TRAINING

ROOM

CFM

CFM

FCU-10

SCALE:

D5

AIR FLOW DIAGRAM - BUILDING 704

N/A

EF-09

EF-08EF-07

EF-10

EF-06

EF-12

NCMO/WLC/SP

CFM

CFM

FCU-11

80 CFM

PRESSURIZATION

CFM

OA

DOAS-03

CFM

COMM. OFFICER

CFM

CFM

10 CFM

PRESSURIZATION

RADIO OPERATIONS

CLASSROOM

CFM

CFM

CFM

FCU-12

15 CFM

PRESSURIZATION

CFM

MAINTENANCE

CFM

CFM

CFM

FCU-13

25 CFM

PRESSURIZATION

CFM

COMMUNICATIONS

CENTER

CFM

CFM

CFM

FCU-15

65 CFM

PRESSURIZATION

CFM

RADIO RELAY/

TELEPHONE MAINT.

CFM

CFM

CFM

FCU-16

110 CFM

PRESSURIZATION

CFM

GROUND RADIO/

RADAR/FLIGHT

FACILITIES MAINT.

CFM

CFM

CFM

FCU-17

150 CFM

PRESSURIZATION

CFM

CFM

EF-13

CFM

CFM

CFM

CFM

CFM

CFM

PLENUM

CFM

CFM

OA

CFM

CFM

EF-14

CFM

CFM

CFM

CFM

FCU-14

CRYPTO.

MAINT.

CRYPTO.

ROOM

MECHANICAL

ROOM

MESSAGE

CENTER

CFM

CFM

10 CFM

PRESSURIZATION

CFM

SWITCHB'D

ROOM

CFM

CFM

10 CFM

PRESSURIZATION

CFM

CFM

SCALE:

I5

AIR FLOW DIAGRAM - BUILDING 705

N/A

CFM

OA

240 CFM

PRESSURIZATION

SCALE:

C1

DUCTWORK CONNECTED TO EXTERIOR LOUVER

NONE

HANGER ROD

FLEX CONNECTION

VIBRATION ISOLATOR

FLEX CONNECTION

MOUNTING BRACKET OR

CHANNEL, USE UNIT

FACTORY INSTALLED

MOUNTING BRACKET

WHERE APPLICABLE

FAN COIL OR

EXHAUST FAN

LOUVER

EXTERIOR

WALL

SLOPE DUCTWORK CONNECTED

TO LOUVER TOWARDS THE

BUILDING EXTERIOR

AIR COOLED CONDENSING UNIT

CHARGING VALVE

LIQUID PIPING

INSULATED SUCTION PIPING

FILTER-DRIER

SIGHT GLASS

INSTALL SENSING BULB

45° ABOVE BOTTOM OF

PIPING, AS CLOSE TO

COIL AS POSSIBLE

CONDENSATE

DRAIN

NOTE:

CONTRACTOR IS RESPONSIBLE FOR COORDINATING

REFRIGERANT LIQUID AND SUCTION PIPING, SIZES, ROUTING,

AND ALL ACCESSORIES WITH EQUIPMENT MANUFACTURER.

MAINTAIN UNIFORM SLOPE TO PREVENT OIL FROM POOLING IN

LOW POINTS IN THE REFRIGERANT PIPING SYSTEM.

1.

EVAPORATOR COIL

THERMOSTATIC

EXPANSION VALVE

EQUALIZATION LINE

PROVIDE OIL TRAP ON

8'-0" OR GREATER LIFT

PITCH IN DIRECTION OF FLOW

REFRIGERATION DUTY FULL

PORT BALL VALVE (TYP.)

1-1/2" MIN. TO 3" MAX.

INSTALLED 6" NOMINAL

WITH MATERIAL TAUT

SHEET METAL AS

SPECIFIED FOR

DUCTWORK

AIRFLOW

J = 45°

L = 1/4 W, 4" MIN.

Ø = 30° MAX.

NOTES:

1. TAKEOFF ON BOTH SIDES OR SINGLE SIDE AS REQUIRED BY PLANS.

2. SEE SMACNA MANUAL FOR TAP-IN DETAILS.

3. WHEN FITTING HAS ONLY ONE SIDE SLOPED FOR A SINGLE SIDE

TAKE-OFF, THE TAP-IN SHALL BE INSTALLED IN SLOPED SIDE.

4. CLINCH LOCK CONNECTION TO DUCT SHALL HAVE CORNER SEALS. (SEE

SMACNA MANUAL

5. EXTRACTORS, SCOOPS, DEFLECTORS OR DAMPERS THAT PROTRUDE

INTO THE MAIN DUCT SHALL NOT BE USED. BALANCING DAMPERS SHALL

BE LOCATED TO PREVENT PROTRUSION INTO THE MAIN DUCT AND TO

PROVIDE STABLE AIR FLOW AND MINIMAL NOISE WHEN ADJUSTED.

6. PROVIDE 2" DUCT ON EITHER SIDE OF DAMPER LOCATION TO ALLOW

OPERATION OF DAMPER WITHOUT DAMAGE TO INSULATION.

L

J

W

Ø

1" FLANGE

AND HEM

ALTERNATE

POSITION

OF BOLT

BOLT ON 4"

CENTERS

1" x 1/8"

BAND IRON

FLEXIBLE MATERIAL

AS SPECIFIED

1-1/2"

POCKET

SLIP

DUCT

WASHER

SHEET METAL AS

SPECIFIED FOR

DUCTWORK

FLANGED

CONNECTION ON

FAN SIDE.

VIBRATION ISOLATORHANGER ROD

CEILING

UNIT DIFFUSER/FACE

UNIT MOUNTING

BRACKET

FAN COIL UNIT

NOTE:

PROVIDE SEISMIC RESTRAINTS AS REQUIRED PER SECTION 13 45 00.00 10.

1.

NOTE:

PROVIDE SEISMIC RESTRAINTS AS REQUIRED PER SECTION 13 48 00.00 10

1.

VAV-01

CEILING TILE 1/4" - 20 x 1/2"

GALVANIZED

MACHINE

SCREWS

18 GAUGE SHEET

METAL ANGLE

WITH WHITE

ENAMEL FINISH

WHITE VINYL ADHESIVE LABEL WITH

1/2" HIGH BLACK PRE-PRINTED LETTERS

FRONT PANEL SIDE PANEL

NOTES:

1. PROVIDE FOR ALL MECHANICAL EQUIPMENT LOCATED ABOVE CEILING.

2. LOCATE EACH NAMEPLATE DIRECTLY UNDER THE DEVICE IT IDENTIFIES.

3. LETTERING ON BOTH SIDES OF NAMEPLATE.

SCALE:

C6

DX SPLIT SYSTEM PIPING DETAIL

NONE

SCALE:

I6

RECTANGULAR FLEXIBLE CONNECTION DETAIL

NONE

RADIUS

CORNERS

SCALE:

F1

CEILING MOUNTED CASSETTE FAN COIL DETAIL

NONE SCALE:

F5

INLINE EXHAUST FAN AND DUCTED FAN COIL DETAIL

NONE

SCALE:

D10

TYPICAL BRANCH DUCT TAKE-OFF

NONE

SCALE:

I1

DEVICE NAMEPLATE DETAIL

NONE

OA CONNECTION

(WHERE APPPLICABLE)

BALANCING DAMPER WITH

LOCKING QUADRANT

SCALE:

I10

LOW PRESSURE TEE DUCT FITTING

NONE

DIMENSION IS EQUAL TO +

DIMENSIONS, SEE PLANS FOR SIZES

(MAX)30°

AIRFLOW

15° (RECOMMENDED)

AIRFLOW

AIRFLOW

AIRFLOW

C

B

D

C

D

B

A

B

A C D

C D

TURNING VANES @ 45° (TYP.)

TURNING VANES @ 45° (TYP.)

BRANCH DUCT, SEE

PLAN FOR SIZE

RECTANGULAR DUCT,

SEE PLAN FOR SIZE

S c a r

M i c r o f i l m i n g

I n c h e s

M i l l i m e t e r s

1 1312111098765432

I

H

G

F

E

D

C

B

A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file

HONOLULU, HAWAII

ENGINEERS ARCHITECTS & CONSULTANTS

Project No. - MABE152003

UPGRADE BUILDING

HAWAII AIR NATIONAL GUARD

KEAUKAHA ANG STATION, HAWAII

COMPLEX, HILO

01/28/220 FINAL SUBMITTAL BS

MABE 15200391701

C O

P Y

R I G

MECHANICAL DETAILS

M-501 0

91701_M501.dwg

B U

R N

D

O N

N E

L L

E

N G

I N

E E

R I N

G

C

O M

P A

N Y

I N

C

OPPOSED BLADE

DAMPER

RECTANGULAR

EXHAUST DUCT, SEE

PLANS FOR SIZE.

SIDE WALL GRILLE SEE PLANS

FOR SIZE

1.5 x W

OR

1.0 x W

W

W

TURNING

VANES

W

W

25 [1"]

R

R

25 [1"] 25 [1"]

NOTE:

1. USE THIS DESIGN WHERE SQUARE 90° ELBOWS

ARE SHOWN ON DRAWINGS OR IF SPACE DOES

NOT PERMIT RADIUS 90° ELBOWS.

RECTANGULAR DUCT

MAX. SLOPE 25

IN 100 [1" IN 4"]

ROUND

DUCT

RECTANGULAR TO

ROUND

TRANSITION

RADIUSED 90 ELBOW

SQUARE 90

ELBOW (NOTE 1)

TURNING VANES

DETAIL

FRAME 1

HINGE POSITION 1

FRAME 2

HINGE POS. 2

FRAME 3

HINGE POS. 3

DOOR A

DOOR B

LESS

BACK

DOOR NO. NO.

METAL GAGE

SIZE HINGES LOCKS

FRAME DOOR

2" W.G. 12" x12" 2 1-S 24 26

STATIC 16" x 20" 2 2-S 22 24

AND 24" x 24" 3 2-S 22 24

3" W.G.

12" x 12" 2 1-S 22 22

STATIC

16" x 20" 2 1-S, 1-T, 1-B 20 20

24" x 24" 3 2-S, 1-T, 1-B 20 20

B - BOTTOM

S - SIDE

T - TOP

DUCT

ACCESS PANEL

GASKET

DUCT

SASH LOCK

FRAME 2

DUCT

BUTT HINGE 1" x 1", OR PIANO HINGE

VIEW PORT IF SPECIFIED

LOCK TYPE 2

LOCK

TYPE 1

PANEL IS DUCT GAGE (MIN.)

WITH SCREWS AT 8" MAX. SPACING

SPIN-IN FITTING OR 45° BOOT

AS INDICATED WITH DAMPER

SUPPLY DUCT

FLEX DUCT

(MAX LENGTH = 5 FEET)

DIFFUSER DAMPER

SECTION (WHERE

SCHEDULED OR SPECIFIED)

T-BAR

CEILING

SUPPLY DIFFUSER

90° SHEET

METAL ELBOW

DRAW BAND

DIFFUSER DAMPER

SECTION (WHERE

SCHEDULED OR SPECIFIED)

T-BAR

CEILING

SUPPLY DIFFUSER

90° SHEET

METAL ELBOW

DRAW BAND

OPTION 1 OPTION 2

AIR FLOW

DUCT

AIR FLOW

DUCT

GRIDS AND DAMPERS MUST NOT DAMAGE LINERS

NOTE:

ADJUSTABLE DAMPER

SUPPLY OUTLET

ADJUSTABLE DAMPER

SUPPLY OUTLET

QUALIZING GRID (WHEN

SPECIFIED ALTERNATIVE

TO EXTRACTOR)

REGISTER AND DIFFUSER CONTAIN VOLUME

CONTROL AT GRILLE. GRILLE

HAS NO VOLUME CONTROL.

GRILLE FLANGES MUST

COVER DUCT FLANGES.

R=W

W

BEAD OR CROSSBREAK

IF REQUIRED

SEAMS ON ALL

CORNERS

STANDARD RADIUS ELBOW R=W.

WHERE SPACE PERMITS INSTALL FULL

RADIUS ELBOW WITH R= 1 1/2 W.

R S GA

SINGLE VANE SCH.

SMALL

LARGE

2" 1.5" 24

4.5" 2.25" 22

45°

45°

S

S S S S

W

W

D

S= D/6 (MIN.2")

W/S= NO. OF SPACES

R= 1 1/4 S

R

BOLT, SCREW OR

WELD TO DUCT

SCREW EVERY

SIXTH VANE

SCALE:

D1

DUCT ACCESS DOORS

NONE SCALE:

D6

LOW VELOCITY DUCT LAYOUT

NONE

NOTE: INSTALL PER OPTION 1 OR 2 FOR INDIVIDUAL INSTALLATIONS AS REQUIRED

TO MAINTAIN A BEND RADIUS OF THE FLEXIBLE DUCT EQUAL TO OR GREATER

THAN ONE DUCT DIAMETER. SEAL ALL CONNECTIONS WITH STAINLESS STEEL

BAND CLAMPS AND DUCT SEALANT.

BALANCING DAMPER WITH LOCKING QUADRANT.

PROVIDE 2" DUCT EXTENSION TO ALLOW OPERATION OF

DAMPER WITHOUT DAMAGE TO INSULATION.

SCALE:

D11

SIDE WALL GRILLE DETAILS

NONE

SCALE:

I1

DIFFUSER, GRILLE, & REGISTER CONNECTIONS

NONE

SCALE:

F8

FLEXIBLE DUCT AT DIFFUSER

NONE

SCALE:

B11

STANDARD CURVE AIR DUCT ELBOW

NONE

SCALE:

I6

RECTANGULAR AIR DUCT ELBOW TURNING VANES

NONE

NOTES:

2 X D

6"

D

BOOT SHALL BE SAME

RECTANGULAR SIZE AS GRILLE.

BOOT SHALL BE CONSTRUCTED

OF GALVANIZED STEEL WITH 1

INCH THICK DUCT LINER.

DIRECT EXHAUST BOOT OPENING

AWAY FROM ADJACENT

MECHANICAL EQUIPMENT.

1.

2.

3.

EXHAUST AIR

GRILLE

CEILING

SCALE:

I10

EXHAUST AIR GRILLE/BOOT

NONE

S c a r

M i c r o f i l m i n g

I n c h e s

M i l l i m e t e r s

1 1312111098765432

I

H

G

F

E

D

C

B

A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file

HONOLULU, HAWAII

ENGINEERS ARCHITECTS & CONSULTANTS

Project No. - MABE152003

UPGRADE BUILDING

HAWAII AIR NATIONAL GUARD

KEAUKAHA ANG STATION, HAWAII

COMPLEX, HILO

01/28/220 FINAL SUBMITTAL BS

MABE 15200391701

C O

P Y

R I G

MECHANICAL DETAILS

M-502 0

91701_M502.dwg

B U

R N

D

O N

N E

L L

E

N G

I N

E E

R I N

G

C

O M

P A

N Y

I N

C

50" DIA.

MAX.

STRAP IS PLACED

UNDER A BOTTOM

REINFORCEMENT

STRAP HANGERS

HANGER

STRAPS

TRAPEZE HANGERS

STRAP OR ANGLE

ROD

SIZE BOLT(S)

FOR LOAD

SECURE

WIRE

BAND OF SAME

SIZE AS HANGER

STRAP

1" MIN.

SCREWS MAY BE OMITTED

IF HANGER LOOPS

LOAD

RATED

FASTENERS

ROD

STRAP

HANGER RODS,

WIRES OR

STRAPS

HANGERS

MUST NOT

DEFORM

DUCT SHAPE

24" DIA.

MAX.

10" DIA.

MAX.

ALTERNATE

LOCATION (VERIFY

UPPER TRAPEZE

LOAD CAPACITY)

REINFORCEMENT MAY BE USED

FOR ATTACHMENT IF IT QUALIFIES

FOR BOTH DUTIES DO NOT EXCEED

ALLOWABLE LOAD LIMITS

ONE HALF-ROUND MAY

BE USED IF DUCT SHAPE

IS MAINTAINED.

BAND

ANGLES

NUTS

6"

MAXIMUM

SCREWS

PITCH 1% 1/8"/FT TYPE "M"

COPPER (TYP)

C

UNIT DRAIN PAN

INTERNAL OPERATING

NEGATIVE

STATIC PRESSURE

B

A

2" MIN. SIZE,

SLOPE TO EQUIP.

DRAIN

AHU CABINET WALL

NPT DRAIN CONNECTION

ADAPTER

HAND-TIGHT

CLEANOUT PLUG

FAN INLET

PRESSURE

(NEGATIVE)

RETURN BEND

(CLOSED)

1. DIMENSION EQUAL TO MAXIMUM FAN INLET PRESSURE. +1" W.C. MINIMUM

2. DIMENSION EQUAL TO /2 (MIN.)

3. INCREASE PAD THICKNESS AS REQUIRED TO ACHIEVE REQUIRED

TRAP DEPTH. 4" MINIMUM

NOTES:

DRAW THRU

UNIT

A

C

A B

14 GAUGE SHIELD 455 [18"]

LONG TO PROTECT

INSULATION

HEAVY DUTY

CLEVIS HANGER

HANGER ROD

LOCKING NUT

SUPPORT NUT

INSULATION

PIPE

SCALE:

E1

LOWER DUCT HANGAR ATTACHMENT DETAIL

NONE

SCALE:

I6

HVAC CONDENSATE TRAP DRAIN

NONE

SCALE:

G11

PIPE HANGER - CLEVIS TYPE

NONE

1/2" MESH BIRD

SCREEN,

COATED GALV

OR 316

STAINLESS

STEEL

FLASHING

22 GAUGE

DUCT

LOCK JOINT

WOOD BLOCKING (TYP.)

WOOD CANT (TYP.)

CAP SHEET

OVER ROOFING

EXIST ROOF

1/2" ALL AROUND

OUTSIDE AIR DUCT

EXIST ROOF JOINT (TYP.)

M

I N

FLASHING AND

COUNTER

FLASHING

R

A

D

22 GAUGE

GALV BOLTS

METAL SCREEN

FRAME

NOTES:

1. PER UFC 3-440-05N, PAINT GALVANIZED STEEL DUCTWORK FOR

OUTDOOR USE WITH ONE COAT OF POLYAMIDE EPOXY PRIMER

AND ONE COAT OF POLYAMIDE EPOXY EXTERIOR TOP COAT.

2. USE GALVANIZED SHEET STEEL FOR DUCTWORK - (26 GAUGE) FOR

MAXIMUM SIDE DUCT UP TO 12" AND (24 GAUGE) FOR MAXIMUM

SIDE DUCT SIZE 13" TO 30".

MAXIMUM HORIZONTAL PIPE

HANGER AND SUPPORT SPACING

NOMINAL PIPE

OR

TUBE DIA.

STANDARD WEIGHT

AND HEAVIER

STEEL PIPE

WATER

SERVICE

VAPOR

SERVICE

COPPER TUBE

WATER

SERVICE

VAPOR

SERVICE

IN. FT. FT. FT. FT.

NOTES:

1. FOR SPACING SUPPORTS INCORPORATING TYPE 40

SHIELDS, SEE TABLE 5, MSS SP-69.

2. DOES NOT APPLY WHERE SPAN CALCULATIONS ARE

MADE OR WHERE THERE ARE CONCENTRATED LOADS

BETWEEN SUPPORTS SUCH AS FLANGES, VALVES,

SPECIALTIES, ETC, OR CHANGES IN DIRECTION

REQUIRING ADDITIONAL SUPPORTS.

3. FIRE PROTECTION PIPING: FOLLOW REQUIREMENTS

OF THE NATIONAL FIRE PROTECTION ASSOCIATION.

4. CAST IRON AND DUCTILE IRON PIPE: MIN. OF ONE (1)

HANGER PER PIPE SECTION CLOSE TO JOINT ON THE

BARREL ALSO AT CHANGE OF DIRECTION AND

BRANCH CONNECTIONS.

CAST IRON PRESSURE PIPE: 12 FT. MAX. SPACING.

CAST IRON SOIL PIPE: 10 FT. MAX. SPACING.

5. EXTRACTED FROM MSS SP-69, 1983, WITH

PERMISSION OF THE PUBLISHER, THE

MANUFACTURER'S STANDARDIZATION SOCIETY.

6. THIS TABLE PROVIDED FOR REFERENCE ONLY.

PROVIDE HANGER AND SUPPORT SPACING IN

ACCORDANCE WITH MSS SP-58, SP-69 AND

SPECIFICATIONS.

7. SPACING FOR HYDRAULIC PIPING SHALL MATCH

THAT INDICATED FOR WATER SERVICE.

1/4 5 5

3/8 7 8 5 6

1/2 7 8 5 6

3/4 7 9 5 7

1 7 9 6 8

1 1/4 7 9 7 9

1 1/2 9 12 8 10

2 10 13 8 11

2 1/2 11 14 9 13

3 12 15 10 14

3 1/2 13 16 11 15

4 14 17 12 16

MIN. ROD DIAMETER FOR

SINGLE ROD HANGERS

NOMINAL PIPE

OR TUBING DIA.

IN.

1/4 THROUGH 2

2 1/2, 3, 3 1/2

4, 5

8, 10, 12

16, 18

20, 24, 30

NOMINAL ROD DIAMETER

A

IN.

3/8

1/2

5/8

3/4

7/8

1 1/4

B

IN.

3/8

1/2

1/2

5/8

3/4

NOTES:

1. COLUMN A FOR USE WITH STD. WT. STEEL PIPE,

CAST IRON PRESS. PIPE, CAST IRON SOIL PIPE AND

GLASS PIPE.

2. COLUMN B FOR USE WITH COPPER TUBE, PLASTIC

PIPE AND FIBERGLASS REINFORCED PIPE.

3. EXTRACTED FROM MSS SP-69, 1983, WITH

PERMISSION OF THE PUBLISHER. THE

MANUFACTURERS STANDARDIZATION SOCIETY.

4. THIS TABLE PROVIDED FOR REFERENCE ONLY.

PROVIDE HANGER RODS IN ACCORDANCE WITH

MSS SP-58, SP-69 AND SPECIFICATIONS.

SCALE:

I1

ROOF GOOSENECK

NONE

S c a r

M i c r o f i l m i n g

I n c h e s

M i l l i m e t e r s

1 1312111098765432

I

H

G

F

E

D

C

B

A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file

HONOLULU, HAWAII

ENGINEERS ARCHITECTS & CONSULTANTS

Project No. - MABE152003

UPGRADE BUILDING

HAWAII AIR NATIONAL GUARD

KEAUKAHA ANG STATION, HAWAII

COMPLEX, HILO

01/28/220 FINAL SUBMITTAL BS

MABE 15200391701

C O

P Y

R I G

MECHANICAL DETAILS

M-503 0

91701_M503.dwg

B U

R N

D

O N

N E

L L

E

N G

I N

E E

R I N

G

C

O M

P A

N Y

I N

C

3/8"

1/4"

3/8"

PIPE SLEEVE

BACKUP MATERIAL

SEALANT

INSULATION

CENTER OF PIPE

INSULATION

SEALANT

BACKUP MATERIAL

FLOOR

PIPE SLEEVE

PROVIDE SLEEVE FOR FLOOR

PENETRATION WITH 2" MORE

CLEARANCE. FILL CLEARANCE

WITH FIREPROOF MASTIC.

CENTER OF PIPE

PIPE

3/8"

PIPE

ESCUTCHEON

INTERIOR SIDE OF

EXTERIOR WALL

EXTERIOR SIDE

INTERIOR SIDE

ELEVATION

SECTION

MULTIPLE SECTION

RUBBER SEAL (SEE

SPECIFICATIONS)

PIPE

WALL SLEEVE

WALL

SLEEVE

CONTINUOUS SEALANT

AS SPECIFIED

Ø PIPE THRU WALL

INSTALL SUCH THAT

PIPE SEAL MAY BE

TIGHTENED FROM

INTERIOR SIDE

1/2Ø HEADED STUDS @ 12"

SPACED RADIALLY

AROUND SLEEVE (4 MIN.)

NOTE:

EA

SEE PLANS FOR EXHAUST FAN LOCATIONS AND UNIT

DESIGNATION. SEE SCHEDULES FOR PERFORMANCE DATA.

EXHAUST GRILLE, SEE

HVAC PLANS FOR SIZE,

TYPE AND FLOW RATE

BACKDRAFT DAMPER

EXTERIOR WALL, SEE ARCHITECTURAL

DRAWINGS FOR CONSTRUCTION DETAILS

EXHAUST FAN (EF)

ADHESIVE MASONRY ANCHOR

COORDINATE SIZE AND NUMBER

REQUIRED WITH FAN FURNISHED

INSTALL MECHANICAL GASKET

OR CAULK WATERTIGHT

NOTE 1

CEILING

T Y

P I C

A L

C

E I L

I N

G

H E

I G

H

RAISED OR

FINISHED

FLOOR

DEVICE MOUNTING NOTES:

1.

2.

3.

THERMOSTATS AND OTHER WALL-MOUNTED DEVICES SHALL BE MOUNTED WITHIN 12" OF DOOR FRAME.

COORDINATE WITH ARCHITECTURAL DRAWINGS. WHERE DEVICES ARE SHOWN ADJACENT TO THE DOOR ON THE

HINGE-SIDE OF THE DOOR, AND THE DOOR SWINGS IN A MANNER THAT SHALL BLOCK THE DEVICE, MOUNT THE

DEVICE 12" BEYOND THE DOOR SWING.

COORDINATE MOUNTING LOCATION WITH OTHER TRADES TO ENSURE A UNIFORM MOUNTING AND

AESTHETICALLY-PLEASING APPEARANCE. DIMENSIONS SHOWN ON ARCHITECTURAL DRAWINGS SHALL GOVERN.

MOUNTING HEIGHT INDICATED IN LEGEND AND ON THE DRAWINGS SHALL BE THE DISTANCE MEASURED FROM

THE CENTER OF THE DEVICE TO THE FINISHED FLOOR.

12" MAX.

S F

T

NOTE 3

NOTE 2

SCALE:

E1

PIPE PENETRATIONS THROUGH VARIOUS STRUCTURES

NONE SCALE:

E7

HYDROSTATIC SEAL FOR PIPES THRU EXTERIOR WALLS

NONE

SCALE:

I1

SIDE WALL CENTRIFUGAL EXHAUST FAN

NONE SCALE:

I7

TYPICAL DEVICE MOUNTING DETAIL

NONE

EA

EXHAUST FAN

BACKDRAFT DAMPER

BIRDSCREEN

ROOF CURB, COORDINATE

W/EQUIPMENT FURNISHED

SEE ARCHITECTURAL DWGS

FOR FLASHING DETAILS

SCALE:

E11

CENTRIFUGAL ROOF EXHAUST FAN

NONE

S c a r

M i c r o f i l m i n g

I n c h e s

M i l l i m e t e r s

1 1312111098765432

I

H

G

F

E

D

C

B

A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file

HONOLULU, HAWAII

ENGINEERS ARCHITECTS & CONSULTANTS

Project No. - MABE152003

UPGRADE BUILDING

HAWAII AIR NATIONAL GUARD

KEAUKAHA ANG STATION, HAWAII

COMPLEX, HILO

01/28/220 FINAL SUBMITTAL BS

MABE 15200391701

C O

P Y

R I G

MECHANICAL DETAILS

M-504 0

91701_M504.dwg

B U

R N

D

O N

N E

L L

E

N G

I N

E E

R I N

G

C

O M

P A

N Y

I N

C

LEGEND & SYMBOLS

C

SEE "ACTUATOR, PNEUMATIC"

PRESSURE GAGE

FILTER

POSITIVE POSITIONER

XX-C

COIL, HEATING

COIL, PRECOOL

COIL, PREHEAT

COIL, COOLING, DIRECT-EXPANSION

COIL, COOLING

CHILLER

FAN

AFMA

P

W-X-Y-Z

REV

DIR

DDC

W-X-Y-Z

SEE "DEVICE SYMBOL, GENERIC"

VALVE, BALANCING

BOILER

AIR FLOW MEASUREMENT ARRAY,

WITH FLOW TRANSMITTER

ACTUATOR, PNEUMATIC

WITH POSITIVE POSITIONER

PRESSURE GAGE

AND LOCALLY MOUNTED

M

PP

ACTUATOR, ELECTRIC

ACTUATOR, PNEUMATIC

WITH LOCALLY MOUNTED

PRESSURE GAGE

MOTOR STARTER

MS-#

MAIN AIR

MOTORM#

DAMPER, PARALLEL BLADE

DAMPER, OPPOSED BLADE

NORMALLY OPEN OR CLOSED AS SHOWN

NORMALLY OPEN OR CLOSED AS SHOWN

DAMPER, BALANCING

## : DEVICE NUMBER

DEVICE SYMBOL, GENERIC

REV : REVERSE CONTROL ACTION

DIR : DIRECT CONTROL ACTION, OR

MULTIPLE OUTPUT DEVICE WHERE AT LEAST 1

OUTPUT IS ALWAYS SAFETY INTERLOCK

DDC : DIRECT DIGITAL CONTROL

DEVICE SYMBOL, CONTROLLER

GENERIC USAGE TO SHOW LOCATION OF DEVICE;

PROCESS OR DEVICE BEING MEASURED OR

CONTROLLED; SIGNAL TYPE; MODIFIERS AND

OTHER APPLICATION INFORMATION

USED TO REPRESENT SENSORS, INSTRUMENTS

W-X-Y-Z : (SEE ABBREVIATIONS AND ACRONYMS)

SAFETIES, AND OTHER CONTROL DEVICES

DEVICE SYMBOL, GENERIC

VARIABLE FREQUENCY DRIVE

XX = PROCESS/DEVICE BEING CONTROLLED

C = 4-20 mA, VDC, or SNVT CONTROL SIGNAL

SS = START/STOP COMMAND

S = STATUS FEEDBACK (ON/OFF)

XX-S

VFD

XX-SS

NC

V-##

NO

COM

NC

V-##

COM

NO

V-##

FL

NC/NO

V-##

THERMOWELL IN PIPE

THERMOSTAT WITH SPECIFIED I/O FUNCTIONS

TEMPERATURE SENSOR, POINT

SEE "DEVICE SYMBOL, GENERIC"

STAT

TEMPERATURE SENSOR, AVERAGING

or TEMPERATURE LOW LIMIT / FREEZESTAT

SEE "DEVICE SYMBOL, GENERIC"

TEMPERATURE GAGE

SMOKE DETECTOR, DUCT-MOUNTED

RESET BUTTON FOR SAFETY RESET

SEE "DEVICE SYMBOL, GENERIC"

RST-BUT

PRESSURE SWITCH, DIFFERENTIAL, WITH GAGE

H = HIGH PRESSURE TAP

L = LOW PRESSURE TAP

SEE "DEVICE SYMBOL, GENERIC"

PUMP

LOCAL DISPLAY PANEL

## = SEQUENTIAL NUMBER

(WHEN MORE THAN 1 LDP)

LDP

W-X-Y-Z

W-X-Y-Z : (SEE ABBREVIATIONS AND ACRONYMS)

GENERIC USAGE TO SHOW LOCATION OF DEVICE;

PROCESS OR DEVICE BEING MEASURED OR

CONTROLLED; SIGNAL TYPE; MODIFIERS AND

OTHER APPLICATION INFORMATION

SHELL AND TUBE

HEAT EXCHANGER

CONTROL SIGNAL LINE, LOW VOLTAGE

1. THE CONTROL DIAGRAMS AND SCHEMATICS ILLUSTRATE THE FUNCTIONAL REQUIREMENTS AND

CONTROL RELATIONSHIPS, ALL ACCESSORIES AND DEVICES MAY NOT BE SHOWN IN DETAIL

2. THE SPECIFICATIONS SHOULD BE CONSULTED FOR DETAILED REQUIREMENTS.

1.

2.

3.

4.

CELLS WITH "<___>" SHALL BE DETERMINED BY THE

CONTRACTOR

SPACES WHERE NO ENTRY IS REQUIRED CONTAIN " ~ "

AN ALARM PRIORITY OF CRITICAL (CRIT) INDICATES

THAT THE ALARM SHALL REMAIN IN ALARM UNTIL

ACKNOWLEDGED BY A SYSTEM OPERATOR AND UNTIL

THE ALARM CONDITION NO LONGER EXISTS.

AN ALARM PRIORITY OF INFORMATIONAL (INFO)

INDICATES THAT THE ALARM SHALL REMAIN IN ALARM

UNTIL THE ALARM CONDITION NO LONGER EXISTS OR

THE ALARM IS ACKNOWLEDGED.

HUMIDIFIER

FLOW METERFM

P

H

L

DX

H

PC

PH

P

P

T

CT

CURRENT TRANSFORMER/SWITCH

PP

MAIN

AIR

VALVE, WITH SPRING FAILSAFE

NO = NORMALLY OPEN

NC = NORMALLY CLOSED

## = VALVE NUMBER AS SHOWN

IN VALVE SCHEDULE

VALVE

FL = FAIL IN LAST POSITION

## = VALVE NUMBER AS SHOWN

IN VALVE SCHEDULE

VALVE, 3-WAY DIVERTING

WITH SPRING FAILSAFE

NO = NORMALLY OPEN

NC = NORMALLY CLOSED

COM = COMMON PORT

## = VALVE NUMBER AS SHOWN

IN VALVE SCHEDULE

VALVE, 3-WAY DIVERTING

WITH SPRING RETURN FAILSAFE

NO = NORMALLY OPEN

NC = NORMALLY CLOSED

COM = COMMON PORT

## = VALVE NUMBER AS SHOWN

IN VALVE SCHEDULE

2P TWO-POSITION (CONTROL SIGNAL)

ADJ ADJUSTABLE/ADJUSTMENT

AFMA AIRFLOW MEASUREMENT ARRAY

AI ANALOG INPUT

ALM ALARM

AO ANALOG OUTPUT

BI BINARY INPUT

BLDG BUILDING

BLR BOILER

BO BINARY OUTPUT

BUT BUTTON

BYP BYPASS

C COMMAND (MODULATING CONTROL SIGNAL)

CF CONDENSER FAN

CH CHILLER

CHW CHILLED WATER

CHS CHILLED WATER SUPPLY

CHR CHILLED WATER RETURN

CLD CLOSED

CLG COOLING

CO CARBON MONOXIDE

CO2 CARBON DIOXIDE

COM COMMON

COMP COMPRESSOR

COV CHANGE OF VALUE

CP CONFIGURATION PROPERTY

CSR CURRENT SENSING RELAY

CT COOLING TOWER

CT CURRENT TRANSFORMER/SWITCH

CTF COOLING TOWER FAN

CWR CONDENSER WATER RETURN

CWS CONDENSER WATER SUPPLY

CW CONDENSER WATER

D DAMPER

DA DISCHARGE AIR

DB DEADBAND

DDC DIRECT DIGITAL CONTROL(LER)

DIFF DIFFERENCE

DIR DIRECT (CONTROL ACTION)

DIS DISABLE

DISP DISPLAY

DPT DEW POINT TEMPERATURE

DX DIRECT EXPANSION (UNIT)

EA EXHAUST AIR

ECM ELECTRICALLY COMMUTATED MOTOR

ECO ECONOMIZER

EF EXHAUST FAN

ENA ENABLE

EP ELECTRIC TO PNEUMATIC TRANSDUCER

EPS ELECTRIC TO PNEUMATIC SWITCH

F FLOW

FACP FIRE ALARM CONTROL PANEL

FL FAIL IN LAST POSITION

FLT FILTER

H2 HYDROGEN

HL HIGH LIMIT

HTG HEATING

HUM HUMIDIFIER

HW HOT WATER

HWR HOT WATER RETURN

HWS HOT WATER SUPPLY

HX HEAT EXCHANGER

I/O INPUT/OUTPUT

IR INFRARED

L LEVEL

LDP LOCAL DISPLAY PANEL

LL LOW LIMIT

LVG LEAVING

M MOTOR or MAIN

M&C MONITORING & CONTROL (SOFTWARE)

MA MIXED AIR

MINOA MINIMUM OUTSIDE AIR

MS MOTOR STARTER

MUW MAKE-UP WATER

N/A NOT APPLICABLE

NC NORMALLY CLOSED

nci NETWORK CONFIGURATION INPUT

NO NORMALLY OPEN

NVI NETWORK VARIABLE INPUT

NVO NETWORK VARIABLE OUTPUT

OA OUTSIDE AIR

OCC OCCUPIED

ODT ON DELAY TIMER

OL OVERLOAD

OPN OPEN

OVRD OVERRIDE

OWS OPERATOR WORKSTATION

P PRESSURE

PID PROPORTIONAL INTEGRAL DERIVATIVE (CONTROL)

PMP PUMP

PP POSITIVE POSITIONER

PWR POWER

R RELAY

RA RETURN AIR

RE RELIEF AIR

REV REVERSE (CONTROL ACTION)

REF RELIEF FAN

RF RETURN FAN

RH RELATIVE HUMIDITY

RH REHEAT

RM ROOM

RQST REQUEST

RST RESET

RT RATE

S STATUS

SA SUPPLY AIR

SEC SECONDARY

SF SUPPLY FAN

SHUTDN SHUTDWON

SMK SMOKE

SNVT STANDARD NETWORK VARIABLE TYPE

SO SHUT-OFF

SP SETPOINT

SS START/STOP COMMAND

STAT THERMOSTAT

SYS SYSTEM

SCHD SCHEDULER

T TEMPERATURE

TAP TAP, PRESSURE

TRB TROUBLE

TSTAT THERMOSTAT

UNOCC UNOCCUPIED

UV ULTRA VIOLET LIGHT

V VALVE

VAV VARIABLE AIR VOLUME

VFD VARIABLE FREQUENCY DRIVE

VIB VIBRATION

WB WET BULB (TEMPERATURE)

XFMR TRANSFORMER

ZN ZONE

PLATE AND FRAME

HEAT EXCHANGER

ABBREVIATIONS & ACRONYMS

"HVAC CONTROLS" GENERAL NOTES:

SHEETS M-602 - M-606

"POINTS LIST SCHEDULE" GENERAL

NOTES: SHEETS M-602 - M-606

ELECTRIC-TO-PNEUMATIC TRANSDUCER

ELECTRIC-TO-PNEUMATIC SWITCH

(SOLENOID ACTUATED PNEUMATIC VALVE)

VDC OR mA INPUT / 3-15 PSI OUTPUT

## = SEQUENTIAL NUMBER

## = SEQUENTIAL NUMBER

(WHEN MORE THAN 1 EPS)

(WHEN MORE THAN 1 EP)

EP

EPS

DIFFERENTIAL PRESSURE SENSORDP

DSP

DUCT STATIC PRESSURE

ESS

EMERGENCY SHUTOFF SWITCH

S c a r

M i c r o f i l m i n g

I n c h e s

M i l l i m e t e r s

1 1312111098765432

I

H

G

F

E

D

C

B

A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file

HONOLULU, HAWAII

ENGINEERS ARCHITECTS & CONSULTANTS

Project No. - MABE152003

UPGRADE BUILDING

HAWAII AIR NATIONAL GUARD

KEAUKAHA ANG STATION, HAWAII

COMPLEX, HILO

01/28/220 FINAL SUBMITTAL BS

MABE 15200391701

C O

P Y

R I G

HVAC CONTROLS

LEGENDS AND ABBREVIATIONS

M-601 0

91701_M601.dwg

B U

R N

D

O N

N E

L L

E

N G

I N

E E

R I N

G

C

O M

P A

N Y

I N

C

SCALE:

C3

CONTROLS SYSTEM ARCHITECTURE - B701, 703, 704, & 705

NONE

GENERAL NOTES

1. FOR GENERAL NOTES, LEGEND, AND ABBREVIATIONS SEE

DRAWING M-001.

2. FOR CONTROLS SPECIFIC GENERAL NOTES, LEGEND, AND

ABBREVIATIONS, SEE DRAWING M-601.

3. SYSTEM ARCHITECTURE IS SCHEMATIC. CONTRACTOR

SHALL PROVIDE ADDITIONAL DEVICES AS REQUIRED FOR A

COMPLETE AND FUNCTIONAL SYSTEM IN COMPLIANCE WITH

SPECIFICATION SECTION 23 09 23.13 20.

4. CONTRACTOR IS RESPONSIBLE FOR SELECTING FINAL

DETAILS OF THE ARCHITECTURE AND ENSURING THAT THE

SYSTEM (DEVICES AND NETWORK) MEETS THE BANDWIDTH

AND COMMUNICATIONS SPEEDS REQUIRED FOR A

PROPERLY OPERATING SYSTEM.

5. 120 VOLT SINGLE PHASE POWER CONNECTION JUNCTION

BOXES HAVE BE PROVIDED FOR USE TO POWER DDC SYSTEM

COMPONENTS. THESE JUNCTION BOXES ARE SHOWN ON THE

ELECTRICAL POWER PLAN DRAWINGS. THE DDC CONTROLS

CONTRACTOR IS RESPONSIBLE FOR ALL POWER WIRING AND

COMPONENTS DOWNSTREAM OF THESE JUNCTION BOXES

AND VERIFYING THE QUANTITY AND LOCATION OF THE

JUNCTION BOXES IS ADEQUATE. ADDITIONAL POWER

CONNECTIONS ARE THE RESPONSIBILITY OF THE DDC

CONTROLS CONTRACTOR.

6. HVAC CONTROLS FOR THESE BUILDINGS ARE DESIGNED TO BE

STANDALONE SYSTEMS AND ARE NOT INTENDED FOR

CONNECTION TO A CAMPUS WIDE SYSTEM. IF SUCH A

CONNECTION IS DESIRED IN THE FUTURE, ADDITIONAL

CONTROLS COMPONENTS MAY BE REQUIRED AND SHALL BE

COORDINATED WITH SITE UTILITIES.

7. VRF SYSTEMS SHALL BE PROVIDED WITH A MEDIA

CONVERTER, IF NEEDED, TO INTERFACE WITH THE BUILDING

NETWORK CONTROLLER VIA NON-PROPRIETARY PROTOCOL.

VRF SYSTEM

CONTROLLER

COMMUNICATION BUS

BUILDING NETWORK

CONTROLLER

B705 MECHANICAL ROOM

DOAS UNITS

OPERATOR

LAPTOP

(BY OTHERS)

VRF UNITS

EXHAUST

AND SUPPLY

FANS

SCALE:

H3

CONTROLS SYSTEM ARCHITECTURE - B702

NONE

DUCTLESS

SPLIT

SYSTEM

COMMUNICATION BUS

BUILDING NETWORK

CONTROLLER

B702 MECHANICAL ROOM

OPERATOR

LAPTOP

(BY OTHERS)

FAN COIL

UNITS

EXHAUST

AND SUPPLY

FANS

BY OTHERS NEW

BY OTHERS NEW

VISUAL DISPLAY

PANEL

VISUAL DISPLAY

PANEL

MEDIA

CONVERTER

S c a r

M i c r o f i l m i n g

I n c h e s

M i l l i m e t e r s

1 1312111098765432

I

H

G

F

E

D

C

B

A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file

HONOLULU, HAWAII

ENGINEERS ARCHITECTS & CONSULTANTS

Project No. - MABE152003

UPGRADE BUILDING

HAWAII AIR NATIONAL GUARD

KEAUKAHA ANG STATION, HAWAII

COMPLEX, HILO

01/28/220 FINAL SUBMITTAL BS

MABE 15200391701

C O

P Y

R I G

HVAC CONTROLS

M-602 0

91701_M602.dwg

B U

R N

D

O N

N E

L L

E

N G

I N

E E

R I N

G

C

O M

P A

N Y

I N

C

SEQUENCE OF OPERATION DEDICATED OUTSIDE AIR SYSTEM (DOAS) AHU

DX

OA-T

OA-F

T

AFMA

D…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .