About this file

This document provides details for an unrestricted invitation for bid to construct a new three-bay specialized hangar at Dane County Regional Airport - Truax Field in Madison, Wisconsin. The project scope includes demolishing an existing building and constructing a new 31,000 square foot hangar with three bays to support F-35 operations. Specific requirements include pre-conditioned aircraft air, 270VDC power, fire suppression, hangar HVAC, and space for future paint and composite facilities. The contract duration is 550 days from notice to proceed. The estimated value is between $25-100 million. The NAICS code is 236220 and bids are due on June 22, 2022. The solicitation includes options for additional paint/mix and aircraft pavement work. The document identifies mandatory brand name items and subcontracting plan requirements.

View the file

Other files for this federal contract opportunity

Other files attached to F-35 THREE BAY SPECIALIZED HANGAR, newest first.
File Type Posted
Bid Opening Attendance Sheet.pdf PDF
Question and Answer Set 4_Question 2_Custom Graphic.pdf PDF
00_FSB2020-270-00_WI-ANG_3-Bay_ADD NO. 04_2022.06.28_Narrative.pdf PDF
01_ITEM 01.2-1_ADD 04_PROJECT TOC.pdf PDF
03_ITEM 01.2-3_ADD 04_Section 07 21 13.pdf PDF
05_ITEM 01.2-5_ADD 04_Section 08 33 13.pdf PDF
07_ITEM 01.2-7_ADD 04_Section 09 90 00.pdf PDF
09_ITEM 01.2-9_ADD 04_Section 11 94 00.01.pdf PDF
14_ITEM 01.3-4_ADD 04_02700SF104.pdf PDF
16_ITEM 01.3-6_ADD 04_02700SF106.pdf PDF
18_ITEM 01.3-8_ADD 04_02700SF504.pdf PDF
19_ITEM 01.3-9_ADD 04_02700A-002.pdf PDF
28_ITEM 01.3-18_ADD 04_02700EP702.pdf PDF
W50S9F22B0001 Solicitation - Amend 0004.pdf PDF
W50S9F22B0001 Solicitation - Amend 0002.pdf PDF
02_ITEM 01.2-2_ADD 03_Section 03 30 00.pdf PDF
06_ITEM 01.2-6_ADD 03_Section 10 51 13.pdf PDF
14_ITEM 01.3-4_ADD 03_02700C-402.pdf PDF
19_ITEM 01.3-9_ADD 03_02700SF508.pdf PDF
20_ITEM 01.3-10_ADD 03_02700A-002.pdf PDF
23_ITEM 01.3-13_ADD 03_02700A-500.pdf PDF
28_ITEM 01.3-18_ADD 03_02700A-600.pdf PDF
31_ITEM 01.3-21_ADD 03_02700A-701.pdf PDF
37_ITEM 01.3-27_ADD 03_02700FA601.pdf PDF
FSB2020-270-00 - WI-ANG - 3-Bay Hangar - Addendum 003 Combined Drawings.pdf PDF
24_ITEM 01.3-14_ADD 03_02700A-501.pdf PDF
04_ITEM 01.2-3_ADD 02_Section 01 78 00.pdf PDF
12_ITEM 01.2-13_ADD 02_Section 32 12 15.13.pdf PDF
13_ITEM 01.2-14_ADD 02_Section 32 12 16.16.pdf PDF
21_ITEM 01.3-7_ADD 02_02700S-002.pdf PDF
23_ITEM 01.3-9_ADD 02_02700SF102.pdf PDF
24_ITEM 01.3-10_ADD 02_02700SF103.pdf PDF
25_ITEM 01.3-11_ADD 02_02700SF104.pdf PDF
32_ITEM 01.3-18_ADD 02_02700A-140.pdf PDF
33_ITEM 01.3-19_ADD 02_02700A-201.pdf PDF
45_ITEM 01.3-31_ADD 02_02700EP102.pdf PDF
48_ITEM 01.3-34_ADD 02_02700EP702.pdf PDF
49_ITEM 01.3-35_ADD 02_02700ET101.pdf PDF
FSB2020-270-00 - WI-ANG - 3-Bay Hangar - Addendum 002 Combined Drawings.pdf PDF
W50S9F22B0001 Solicitation - Ammend 0001.pdf PDF
Questions and Answers 1.pdf PDF
01_FSB2020-270-00_WI-ANG_3-Bay_ADD NO. 02_2022.06.08_Narrative.pdf PDF
F-35 3-Bay Hangar Site Visit Attendance.pdf PDF
Supplemental Site Visit Instructions.pdf PDF
ATTACHMENT 1a - FSB2020-270-00 - WI-ANG - 3-Bay Hangar - ADD 01 COMBINED DRAWINGS (1 of 2).pdf PDF
ATTACHMENT 1b - FSB2020-270-00 - WI-ANG - 3-Bay Hangar - ADD 01 COMBINED DRAWINGS (2 of 2).pdf PDF
ATTACHMENT 3 - Volume 4 - WI ANG F-35 3-Bay CD Specs ADD 01 (2 of 2).pdf PDF
ATTACHMENT 5 - 20220208 Single Source Determination - Andover - Redacted.pdf PDF
ATTACHMENT 2 - Volume 4 - WI ANG F-35 3-Bay CD Specs ADD 01 (1 of 2).pdf PDF
ATTACHMENT 6 - 20220208 Single Source Determination - Marshall Best - Redacted.pdf PDF
Show all 50

F-35 THREE BAY SPECIALIZED HANGAR has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 1

2 2

2 2

10 11

98'-5"

7'

-5

SLAB TO BE REMOVED

SLAB TO BE REMOVED

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

FSB2020-270-00

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

NWC / JBC

F-

3- Ba y S pe cia liz ed H an ga r M ad iso n, W isc on sin

Ai r N at io na l G ua rd

C

B

A

D

C

B

A

54321

DECEMBER 23, 2021

C :\U sers\gaz\D o cum ents\M y R evit\02700_Arch_G ZalabakZ5W

7D .rvt

6/8/2022 10:27: 04 AM

COMPOSITE DEMOLITION PLAN

AD-101

JMI/TDB

GAZ

JBC

SCALE: 1/8" = 1'-0"

COMPOSITE DEMOLITION PLANA3

NN

PLANTRUE

0 4' 8' 16'

1/8" = 1'-0"

SHEET KEYNOTES

1. REMOVE EXISTING EXTERIOR WALL IN ENTIRETY

AND ALL ASSOCIATED ELEMENTS.

2. REMOVE EXISTING INTERIOR PARTITION IN

ENTIRETY AND ALL ASSOCIATED ELEMENTS.

3. REMOVE EXISTING SINGLE DOOR IN ENTIRETY AND

ALL ASSOCIATED ELEMENTS.

4. REMOVE EXISTING DOUBLE DOORS IN ENTIRETY

AND ALL ASSOCIATED ELEMENTS.

5. REMOVE EXISTING OVERHEAD ROLLING DOOR IN

ENTIRETY AND ALL ASSOCIATED ELEMENTS.

6. REMOVE EXISTING HANGAR DOOR IN ENTIRETY AND

ALL ASSOCIATED ELEMENTS.

7. REMOVE EXISTING WINDOW IN ENTIRETY AND ALL

ASSOCIATED ELEMENTS.

8. REMOVE EXISTING TOILET PARTITIONS IN ENTIRETY

AND ALL ASSOCIATED ELEMENTS.

9. REMOVE EXISTING WATER CLOSET IN ENTIRETY

AND ALL ASSOCIATED ELEMENTS.

10. REMOVE EXISTING URINAL IN ENTIRETY AND ALL

ASSOCIATED ELEMENTS IN ENTIRETY AND ALL

ASSOCIATED ELEMENTS.

11. REMOVE EXISTING SINK IN ENTIRETY AND ALL

ASSOCIATED ELEMENTS IN ENTIRETY AND ALL

ASSOCIATED ELEMENTS.

12. REMOVE EXISTING SHOWER IN ENTIRETY AND ALL

ASSOCIATED ELEMENTS.

13. REMOVE EXISTING LOCKERS IN ENTIRETY AND ALL

ASSOCIATED ELEMENTS.

GENERAL NOTES

A. REMOVE ROOFING SYSTEM AND ALL ASSOCIATED

EQUIPMENT, CURBS, AND CONDENSATION PIPING IN

ITS ENTIRETY INCLUDING ANY AND ALL ELEMENTS

NOT MENTIONED.

B. REMOVE SLAB AND FOOTING IN ENTIRETY

C. REMOVE BREATHING AIR APPARATUS AND

MOUNTING BRACKET FOR INSTALLASTION IN NEW

BUILDING

D. CONDITION OF EXISTING FACILITY DURING

PRECONSTRUCTION WALK THROUGH/SITE VISIT

MAY NOT MATCH CONDITION OF EXISTING FACILITY

AT START OF CONSTRUCTION DUE TO FACILITY

TRAINING ON INTERIOR WALLS AND DOORS.

1 ADDENDUM 2 06/08/2022

W

IS C O NS IN

A R C H I T E C T

JASON T.

HOLUBY

A-13101

OKLAHOMA CITY

OK

File details come from the government source that posted it. Updated .