This document provides details for an unrestricted invitation for bid to construct a new three-bay specialized hangar at Dane County Regional Airport - Truax Field in Madison, Wisconsin. The project scope includes demolishing an existing building and constructing a new 31,000 square foot hangar with three bays to support F-35 operations. Specific requirements include pre-conditioned aircraft air, 270VDC power, fire suppression, hangar HVAC, and space for future paint and composite facilities. The contract duration is 550 days from notice to proceed. The estimated value is between $25-100 million. The NAICS code is 236220 and bids are due on June 22, 2022. The solicitation includes options for additional paint/mix and aircraft pavement work. The document identifies mandatory brand name items and subcontracting plan requirements.
View the file
Other files for this federal contract opportunity
Show all 50
F-35 THREE BAY SPECIALIZED HANGAR has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 1
2 2
2 2
10 11
98'-5"
7'
-5
SLAB TO BE REMOVED
SLAB TO BE REMOVED
5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436
405.840.2931 | fsb-ae.com
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
FSB2020-270-00
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
NWC / JBC
F-
3- Ba y S pe cia liz ed H an ga r M ad iso n, W isc on sin
Ai r N at io na l G ua rd
C
B
A
D
C
B
A
54321
DECEMBER 23, 2021
C :\U sers\gaz\D o cum ents\M y R evit\02700_Arch_G ZalabakZ5W
7D .rvt
6/8/2022 10:27: 04 AM
COMPOSITE DEMOLITION PLAN
AD-101
JMI/TDB
GAZ
JBC
SCALE: 1/8" = 1'-0"
COMPOSITE DEMOLITION PLANA3
NN
PLANTRUE
0 4' 8' 16'
1/8" = 1'-0"
SHEET KEYNOTES
1. REMOVE EXISTING EXTERIOR WALL IN ENTIRETY
AND ALL ASSOCIATED ELEMENTS.
2. REMOVE EXISTING INTERIOR PARTITION IN
ENTIRETY AND ALL ASSOCIATED ELEMENTS.
3. REMOVE EXISTING SINGLE DOOR IN ENTIRETY AND
ALL ASSOCIATED ELEMENTS.
4. REMOVE EXISTING DOUBLE DOORS IN ENTIRETY
AND ALL ASSOCIATED ELEMENTS.
5. REMOVE EXISTING OVERHEAD ROLLING DOOR IN
ENTIRETY AND ALL ASSOCIATED ELEMENTS.
6. REMOVE EXISTING HANGAR DOOR IN ENTIRETY AND
ALL ASSOCIATED ELEMENTS.
7. REMOVE EXISTING WINDOW IN ENTIRETY AND ALL
ASSOCIATED ELEMENTS.
8. REMOVE EXISTING TOILET PARTITIONS IN ENTIRETY
AND ALL ASSOCIATED ELEMENTS.
9. REMOVE EXISTING WATER CLOSET IN ENTIRETY
AND ALL ASSOCIATED ELEMENTS.
10. REMOVE EXISTING URINAL IN ENTIRETY AND ALL
ASSOCIATED ELEMENTS IN ENTIRETY AND ALL
ASSOCIATED ELEMENTS.
11. REMOVE EXISTING SINK IN ENTIRETY AND ALL
ASSOCIATED ELEMENTS IN ENTIRETY AND ALL
ASSOCIATED ELEMENTS.
12. REMOVE EXISTING SHOWER IN ENTIRETY AND ALL
ASSOCIATED ELEMENTS.
13. REMOVE EXISTING LOCKERS IN ENTIRETY AND ALL
ASSOCIATED ELEMENTS.
GENERAL NOTES
A. REMOVE ROOFING SYSTEM AND ALL ASSOCIATED
EQUIPMENT, CURBS, AND CONDENSATION PIPING IN
ITS ENTIRETY INCLUDING ANY AND ALL ELEMENTS
NOT MENTIONED.
B. REMOVE SLAB AND FOOTING IN ENTIRETY
C. REMOVE BREATHING AIR APPARATUS AND
MOUNTING BRACKET FOR INSTALLASTION IN NEW
BUILDING
D. CONDITION OF EXISTING FACILITY DURING
PRECONSTRUCTION WALK THROUGH/SITE VISIT
MAY NOT MATCH CONDITION OF EXISTING FACILITY
AT START OF CONSTRUCTION DUE TO FACILITY
TRAINING ON INTERIOR WALLS AND DOORS.
1 ADDENDUM 2 06/08/2022
W