This is an invitation for bid for the construction of an F-35 three-bay specialized hangar at Dane County Regional Airport in Madison, Wisconsin. The project scope includes demolishing an existing 19,875 square foot building and constructing a new 31,000 square foot three-bay hangar facility to support F-35 operations such as fuel cell maintenance, indoor washing, and weapons loading training. The facility will also include administrative offices and shops. The contract is valued between $25-100 million and will be a fixed-price contract awarded to the responsive, responsible lowest bidder. The solicitation includes a base bid for construction and two options for a paint/mix addition and aircraft rated pavement. A site visit will be held and bids are due by August 2nd, 2022. The North American Industry Classification for this project is 236220 and the contracting agency is the Department of the Army National Guard.

View the file

Other files for this federal contract opportunity

Other files attached to F-35 THREE BAY SPECIALIZED HANGAR, newest first.
File Type Posted
Bid Opening Attendance Sheet.pdf PDF
Question and Answer Set 4_Question 2_Custom Graphic.pdf PDF
00_FSB2020-270-00_WI-ANG_3-Bay_ADD NO. 04_2022.06.28_Narrative.pdf PDF
01_ITEM 01.2-1_ADD 04_PROJECT TOC.pdf PDF
03_ITEM 01.2-3_ADD 04_Section 07 21 13.pdf PDF
05_ITEM 01.2-5_ADD 04_Section 08 33 13.pdf PDF
07_ITEM 01.2-7_ADD 04_Section 09 90 00.pdf PDF
09_ITEM 01.2-9_ADD 04_Section 11 94 00.01.pdf PDF
14_ITEM 01.3-4_ADD 04_02700SF104.pdf PDF
16_ITEM 01.3-6_ADD 04_02700SF106.pdf PDF
18_ITEM 01.3-8_ADD 04_02700SF504.pdf PDF
19_ITEM 01.3-9_ADD 04_02700A-002.pdf PDF
28_ITEM 01.3-18_ADD 04_02700EP702.pdf PDF
W50S9F22B0001 Solicitation - Amend 0004.pdf PDF
W50S9F22B0001 Solicitation - Amend 0002.pdf PDF
02_ITEM 01.2-2_ADD 03_Section 03 30 00.pdf PDF
06_ITEM 01.2-6_ADD 03_Section 10 51 13.pdf PDF
14_ITEM 01.3-4_ADD 03_02700C-402.pdf PDF
19_ITEM 01.3-9_ADD 03_02700SF508.pdf PDF
20_ITEM 01.3-10_ADD 03_02700A-002.pdf PDF
23_ITEM 01.3-13_ADD 03_02700A-500.pdf PDF
28_ITEM 01.3-18_ADD 03_02700A-600.pdf PDF
31_ITEM 01.3-21_ADD 03_02700A-701.pdf PDF
37_ITEM 01.3-27_ADD 03_02700FA601.pdf PDF
FSB2020-270-00 - WI-ANG - 3-Bay Hangar - Addendum 003 Combined Drawings.pdf PDF
24_ITEM 01.3-14_ADD 03_02700A-501.pdf PDF
04_ITEM 01.2-3_ADD 02_Section 01 78 00.pdf PDF
12_ITEM 01.2-13_ADD 02_Section 32 12 15.13.pdf PDF
13_ITEM 01.2-14_ADD 02_Section 32 12 16.16.pdf PDF
21_ITEM 01.3-7_ADD 02_02700S-002.pdf PDF
23_ITEM 01.3-9_ADD 02_02700SF102.pdf PDF
24_ITEM 01.3-10_ADD 02_02700SF103.pdf PDF
25_ITEM 01.3-11_ADD 02_02700SF104.pdf PDF
32_ITEM 01.3-18_ADD 02_02700A-140.pdf PDF
33_ITEM 01.3-19_ADD 02_02700A-201.pdf PDF
45_ITEM 01.3-31_ADD 02_02700EP102.pdf PDF
48_ITEM 01.3-34_ADD 02_02700EP702.pdf PDF
49_ITEM 01.3-35_ADD 02_02700ET101.pdf PDF
FSB2020-270-00 - WI-ANG - 3-Bay Hangar - Addendum 002 Combined Drawings.pdf PDF
03_ITEM 01.2-2_ADD 02_Section 01 50 00.pdf PDF
07_ITEM 01.2-7_ADD 02_Section 07 27 26.pdf PDF
11_ITEM 01.2-12_ADD 02_Section 26 42 13.pdf PDF
18_ITEM 01.3-4_ADD 02_02700C-401.pdf PDF
B.07.Pre-Proposal Slides - F-35 3-Bay Hangar.pdf PDF
ATTACHMENT 1a - FSB2020-270-00 - WI-ANG - 3-Bay Hangar - ADD 01 COMBINED DRAWINGS (1 of 2).pdf PDF
ATTACHMENT 1b - FSB2020-270-00 - WI-ANG - 3-Bay Hangar - ADD 01 COMBINED DRAWINGS (2 of 2).pdf PDF
ATTACHMENT 3 - Volume 4 - WI ANG F-35 3-Bay CD Specs ADD 01 (2 of 2).pdf PDF
ATTACHMENT 5 - 20220208 Single Source Determination - Andover - Redacted.pdf PDF
ATTACHMENT 8 - SFS Form 12 - Template.xls XLS spreadsheet
ATTACHMENT 9 - Volume 6 - WI ANG F-35 3-Bay GBCI ADD 01.pdf PDF
Show all 50

F-35 THREE BAY SPECIALIZED HANGAR has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MEANS OF EGRESS REQUIREMENTS - 2018 NFPA 101 (U.N.O.)

SPECIAL PURPOSE INDUSTRIAL

(AIRCRAFT HANGARS)

OCCUPANT LOAD

FACTOR

BUSINESS USE

GENERAL PURPOSE

INDUSTRIAL USE

STORAGE/ MECHANICAL

USE

MAX. PROBABLE # OF

OCCUPANTS PRESENT

AT ANY TIME PER NFPA

101, TABLE 7.3.1.2

150 GROSS

(TABLE 7.3.1.2)

100 GROSS

(TABLE 7.3.1.2)

500 GROSS

(TABLE 7.3.1.2)

COMMON PATH

OF TRAVEL

100'

(TABLE 40.2.5.1)

100' (38.2.5.3.1)

100' (40.2.5)

100' (42.2.5)

MAXIMUM TRAVEL

DISTANCE TO EXITS

EXTERIOR INTERVAL

150' (40.6.2.2)

300' (38.2.6.3)

250'

(TABLE 40.2.6.1)

400'

(TABLE 42.2.6)

MINIMUM EXIT ACCESS

CORRIDOR WIDTH

44" (38.2.3.2)

36" (7.3.4.1)

36" (7.3.4.1)

50' (40.6.4)

50' (38.2.5.2.1)

50'

(TABLE 40.2.5.1)

100'

(TABLE 42.2.5)

MAXIMUM DEAD END

CORRIDOR LENGTH

MINIMUM NUMBER

OF EXITS

(40.6.2.1)

PER OCCUPANT

LOAD

(40.2.4.1.1)

CODE SUMMARY

OCCUPANCIES (IBC 2018)

ITEM 2018 IBC REQUIREMENT (U.N.O.)

GENERAL

BUSINESS, GROUP B (304.1) - OFFICE AREAS, ACCESSORY AREAS

HIGH HAZARD GROUP H-2 - SUPPORT SHOP (ALTERNATE BID)

STORAGE, GROUP S-1 (311.2) - MECHANICAL, ELECTRICAL AND

STORAGE AREAS.

STORAGE, GROUP S-2 (311.3) - LAUNDRY ROOMS

OCCUPANCIES (NFPA 101, 2018) BUSINESS (6.1.11) - OFFICE AREAS

SPECIAL PURPOSE INDUSTRIAL, SPI (40.1.2.1.2) - HANGAR AREAS

CONSTRUCTION TYPE TYPE II-B (IBC, TABLE 601)

ALLOWABLE HEIGHT/STORIES UNLIMITED HEIGHT (UFC, 4-211-01, 3-3.1.7)/3 STORIES (IBC, TABLE 504.4)

ALLOWABLE AREA UNLIMITED ONE STORY (IBC 507.4)

ADAAG FULLY COMPLIANT

FIRE PROTECTION SYSTEMS

AIRCRAFT SERVICING AREA WET PIPE SPRINKLER SYSTEM (UFC 3-600-01 FIRE PROTECTION)

ADMINISTRATION AND SHOPS WET PIPE SPRINKLER SYSTEM (UFC 3-600-01 FIRE PROTECTION)

FIRE RESISTANCE REQUIREMENTS

BOILER ROOMS, FURNACE

ROOMS, AND GENERAL

STORAGE ROOMS OVER 100 SF

1 HOUR OR AUTOMATIC FIRE EXTINGUISHING SYSTEM

(TABLE 509)

NON-LOADBEARING EXTERIOR

WALLS

0 HOUR (TABLE 602)

HANGAR COLUMNS 0 HOUR (UFC 4-211-01, 3-3.1.2)

FLOOR CONSTRUCTION 0 HOUR (TABLE 601)

ROOF CONSTRUCTION 0 HOUR (TABLE 601)

FIRE SEPARATION REQUIREMENTS

BUILDING DATA

BUILDING AREA

GROUND FLOOR

HANGAR BAYS

ADMINISTRATIVE AREAS

ACCESSORY STO AND MECH

16,574 SQUARE FEET

2,838 SQUARE FEET

3,559 SQUARE FEET

BUILDING CODES AND STANDARDS

INTERNATIONAL MECHANICAL CODE 2018

INTERNATIONAL BUILDING CODE 2018

NATIONAL ELECTRICAL CODE 2020

NFPA 101 LIFE SAFETY CODE 2018

MINIMUM EGRESS WIDTH 0.2" PER OCCUPANT (NFPA 101, TABLE 7.3.3.1)

EXIT ENCLOSURES 1 HOUR (NFPA 101, 7.1.3.2.1), 1 HOUR DOORS (NFPA 101, 8.3.2.2)

BETWEEN AIRCRAFT SERVICING

AREAS AND ALL OTHER OPERATIONS

1 HOUR (UFC 04-211-01, 3-3.1.2)

DRAFT CURTAINS RECTANGULAR ROOF POCKETS, MAX. 7,500 SF (UFC 4-211-01, 3-3.1.10)

BETWEEN ALL OTHER OCCUPANCIES NOT REQUIRED - MIXED USE NONSEPARATED PER 508.3.2

TOTAL (GROSS SQUARE FEET) 22,968 SQUARE FEET

NFPA 409, STANDARD FOR AIRCRAFT HANGARS 2016

NATIONAL FIRE CODES (NFPA) LATEST EDITIONS

ICC/ANSI A117.1 2003

UNIFORM FEDERAL ACCESSIBILITY STANDARD (UFAS)

UFC 3-600-01, FIRE PROT. ENGINEERING FOR FACILITIES

UFC 1-200-01, GENERAL BUILDING REQUIREMENTS

UFC 4-010-01, MINIMUM ANTI-TERRORISM STANDARDS

ADDITIONAL UNIFIED FACILITY CRITERIA

ACCESSIBILITY FOR FIREFIGHTING

ALL WEATHER ACCESS MUST BE PAVED TO WITHIN 10M

(33 FT) FROM THE BUILDING (UFC 4-211-01, 3-3.1.11)

FIRE DEPARTMENT ACCESS ROADS

MUST COMPLY WITH NFPA 1 (18.2.3.5.1) ACCESS

ROADS SHALL HAVE AN UNOBSTRUCTED WIDTH OF

NOT LESS THAN 20 FT.

PORTABLE FIRE EXTINGUISHERS - 2018 NFPA 10 (U.N.O.)

EXTINGUISHER SELECTION

MAX TRAVEL DISTANCE

CLASSIFICATION OF

HAZARD

EXTRA (HIGH) 5.4.1.3 HANGAR

BAY

ORDINARY (MODERATE) 5.4.1.2 -

STORAGE, SUPPORT SHOP

4A:60B:C

B: 50 FEET (TABLE 6.3.1.1)

LIGHT (LOW) 5.4.1.1

OFFICE AREAS

20A:120B:C

B: 50 FEET (TABLE 6.3.1.1)

4A:60B:C

B: 50 FEET (TABLE 6.3.1.1)

FIRE PROTECTION ROOM 1 HOUR (UFC 4-211-01, 3-6.7)

INTERNATIONAL PLUMBING CODE 2018

UFC 4-021-01, DESIGN AND O&M: MASS NOTIFICATION

SYSTEMS

PER OCCUPANT

LOAD

ADJACENT BETWEEN AIRCRAFT

MAINTENANCE BAYS 2 HOURS FIGURE 3.1

PLUMBING MATRIX

WATER CLOSETS/URINALS

(MALE)

B

WATER CLOSETS (FEMALE)

LAVATORIES (MALE)

LAVATORIES (FEMALE)

1.4

0.38

0.93

0.23

S

0.35

0.22

0.35

0.22

1.75

0.60

1.28

0.45

REQUIRED PROVIDED

TOTAL PLUMBING FIXTURES

SERVICE SINKS

DRINKING FOUNTAINS

1 1 1 2

0.45 0.02 0.47 1

WATER CLOSETS (UNISEX)

LAVATORIES (UNISEX)

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

FSB2020-270-00

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

NWC / JBC

F-

3- Ba y S pe cia liz ed H an ga r M ad iso n, W isc on sin

Ai r N at io na l G ua rd

C

B

A

D

C

B

A

54321

DECEMBER 23, 2021

C :\U sers\gaz\D o cum ents\M y R evit\02700_Arch_G ZalabakZ5W

7D .rvt

6/8/2022 10:26: 55 AM

CODE SUMMARY

G-102

JBC

JRT/JBC

MP

OCCUPANCY AREA SCHEDULE

IBC Occupancy Classification

NFPA

Occupancy

Classification

ROOM

AREA

IBC Occupant Load Factor

NFPA

Occupant

Load Factor

IBC

Occupant

Load

NFPA

Occupant

Load REMARKSNUMBER NAME

B BUSINESS

B BUSINESS Business 102 VEST 50 SF 150 SF 150 SF 0.33 0.36 B BUSINESS Business 103 SHARED OFFICE 300 SF 150 SF 150 SF 2.00 1.88 B BUSINESS Business 104 FUEL OPEN

OFFICE

509 SF 150 SF 150 SF 3.40 3.35

B BUSINESS Business 105 VEST 120 SF 150 SF 150 SF 0.80 0.84 B BUSINESS Business 106 CORR 826 SF 150 SF 150 SF 5.50 5.27 B BUSINESS Business 107 CLASSROOM 602 SF 150 SF 150 SF 4.01 3.99 B BUSINESS Business 108 OFFICE 117 SF 150 SF 150 SF 0.78 0.78 B BUSINESS Business 109 RR W 164 SF 150 SF 150 SF 1.09 0.89 B BUSINESS Business 110 WING WEAPONS

MGR

125 SF 150 SF 150 SF 0.83 0.82

B BUSINESS Business 111 RR M 164 SF 150 SF 150 SF 1.09 0.95 B BUSINESS Business 112 FUEL SUPERVISOR 135 SF 150 SF 150 SF 0.90 0.81 B BUSINESS Business 113 BREAK/ TRAINING 551 SF 150 SF 150 SF 3.67 3.47 B BUSINESS Business 114 VEST 159 SF 150 SF 150 SF 1.06 1 B BUSINESS Business 115 OFFICE 125 SF 150 SF 150 SF 0.83 0.85 B BUSINESS Business 116 VINYL OPEN

OFFICE

492 SF 150 SF 150 SF 3.28 3.24

B BUSINESS Business 120A VEST 73 SF 150 SF 150 SF 0.48 0.58 B BUSINESS Business 120B CORR 717 SF 150 SF 150 SF 4.78 5.46 B BUSINESS Business 121 ELEC 78 SF 150 SF 150 SF 0.52 0.38 B BUSINESS Business 127 VEST 98 SF 150 SF 150 SF 0.66 0.64 B BUSINESS Business 130 CLEAN M RR 286 SF 150 SF 150 SF 1.90 1.93 B BUSINESS Business 131 CLEAN M LR 88 SF 150 SF 150 SF 0.59 0.58 B BUSINESS Business 132 CLEAN SHOWER M 51 SF 150 SF 150 SF 0.34 0.34 B BUSINESS Business 133 DIRTY SHOWER M 57 SF 150 SF 150 SF 0.38 0.38 B BUSINESS Business 134 DIRTY LR M 179 SF 150 SF 150 SF 1.19 1.19 B BUSINESS Business 135 DIRTY SHOWER M 56 SF 150 SF 150 SF 0.37 0.37 B BUSINESS Business 136 CLEAN W RR 254 SF 150 SF 150 SF 1.69 1.68 B BUSINESS Business 137 CLEAN W LR 88 SF 150 SF 150 SF 0.58 0.36 B BUSINESS Business 138 CLEAN SHOWER W 56 SF 150 SF 150 SF 0.37 0.37 B BUSINESS Business 139 DIRTY LR W 102 SF 150 SF 150 SF 0.68 0.68 B BUSINESS Business 140 DIRTY SHOWER W 61 SF 150 SF 150 SF 0.41 0.41 B BUSINESS Business 141 DIRTY RR UNISEX 49 SF 150 SF 150 SF 0.33 0.33 B BUSINESS Business 142 DIRTY VEST 247 SF 150 SF 150 SF 1.64 1.64

B BUSINESS: 32 6,976 SF 46.51 45.82

S-1 STORAGE

S-1 STORAGE Industrial 101 WEAPONS

TRAINING

6,314 SF 500 SF 500 SF 12.63 13.17

S-1 STORAGE Storage 117A MOTHER'S ROOM 83 SF 300 SF 0.28 S-1 STORAGE Storage 117B JAN 66 SF 300 SF 0.22 S-1 STORAGE Storage 118 FUEL MAINT.

GENERAL

STORAGE

275 SF 300 SF 0.92

S-1 STORAGE Industrial 119 FUEL CELL 4,782 SF 500 SF 500 SF 9.56 9.96 S-1 STORAGE Storage 124 MECH 709 SF 300 SF 2.36 S-1 STORAGE Storage 125 FIRE 730 SF 300 SF 2.43 S-1 STORAGE Storage 126 TOOLS 916 SF 300 SF 3.05 S-1 STORAGE Industrial 128 WASH BAY 4,878 SF 500 SF 500 SF 9.76 9.97 S-1 STORAGE Storage 129 JAN. 300 SF S-1 STORAGE Storage 143 MASK WASHING 30 SF 300 SF 0.10 S-1 STORAGE Storage 145 ELEC 309 SF 300 SF 1.03 S-1 STORAGE Storage 146 COMM 209 SF 300 SF 0.70

S-1 STORAGE: 13 19,301 SF 43.04 33.1

S-2 STORAGE

S-2 STORAGE Storage 122 FUEL 91 SF 300 SF 300 SF 0.30 0.23 S-2 STORAGE Storage 123 WASH 89 SF 300 SF 300 SF 0.30 0.23

S-2 STORAGE: 2 180 SF 0.60 0.46

TOTAL: 47 26,457 SF 90.15 79.38

1 ADDENDUM 1 04/22/2022

2 ADDENDUM 2 06/08/2022

W

IS C O NS IN

A R C H I T E C T

JASON T.

HOLUBY

A-13101

OKLAHOMA CITY

OK

File details come from the government source that posted it. Updated .