43_ITEM 01.3-29_ADD 02_02700EG101.pdf

PDF 638 KB Posted

Attached to
F-35 THREE BAY SPECIALIZED HANGAR Federal contract opportunity
Solicitation number
W50S9F-22-B-0001
Issued by
Department of the Army National Guard

About this file

This document provides details for an unrestricted invitation for bid for construction services. The bid is for a three-bay specialized hangar at Dane County Regional Airport - Truax Field in Madison, Wisconsin to support F-35 operations. Services required include demolishing an existing building and constructing a new 31,000 square foot hangar with three bays, associated administrative and shop spaces, aircraft air and power systems, fire suppression, HVAC, lighting protection, and security systems. The project also includes two options to add a paint/mix addition and aircraft rated pavement. Bids are due on June 22, 2022 and the contract duration is 550 days. The estimated value is between $25-100 million. The solicitation is posted on SAM.gov and a pre-bid conference will be held on site.

View the file

Other files for this federal contract opportunity

Other files attached to F-35 THREE BAY SPECIALIZED HANGAR, newest first.
File Type Posted
02_ITEM 01.2-2_ADD 04_Section 04 20 00.pdf PDF
04_ITEM 01.2-4_ADD 04_Section 07 24 00.pdf PDF
10_ITEM 01.2-10_ADD 04_Section 32 13 14.13.pdf PDF
15_ITEM 01.3-5_ADD 04_02700SF105.pdf PDF
17_ITEM 01.3-7_ADD 04_02700SF503.pdf PDF
23_ITEM 01.3-13_ADD 04_02700A-503.pdf PDF
25_ITEM 01.3-15_ADD 04_02700ES101.pdf PDF
26_ITEM 01.3-16_ADD 04_02700EP102.pdf PDF
27_ITEM 01.3-17_ADD 04_02700EP701.pdf PDF
03_ITEM 01.2-3_ADD 03_Section 05 50 13.pdf PDF
09_ITEM 01.2-9_ADD 03_Section 26 05 26.00 40.pdf PDF
11_ITEM 01.3-1_ADD 03_02700G-002.pdf PDF
13_ITEM 01.3-3_ADD 03_02700C-401.pdf PDF
15_ITEM 01.3-5_ADD 03_02700C-404.pdf PDF
16_ITEM 01.3-6_ADD 03_02700C-601.pdf PDF
18_ITEM 01.3-8_ADD 03_02700SF103.pdf PDF
33_ITEM 01.3-23_ADD 03_02700IG-500.pdf PDF
34_ITEM 01.3-24_ADD 03_02700FX102.pdf PDF
36_ITEM 01.3-26_ADD 03_02700FA102.pdf PDF
MAT MGMT PPLAN_Approval for 3-Bay Hangar.pdf PDF
W50S9F22B0001 Solicitation - Ammend 0001.pdf PDF
Questions and Answers 1.pdf PDF
01_FSB2020-270-00_WI-ANG_3-Bay_ADD NO. 02_2022.06.08_Narrative.pdf PDF
05_ITEM 01.2-4_ADD 02_Section 03 30 00.pdf PDF
06_ITEM 01.2-5_ADD 02_Section 04 20 00.pdf PDF
09_ITEM 01.2-10_ADD 02_Section 09 06 00.pdf PDF
10_ITEM 01.2-11_ADD 02_Section 11 94 10.pdf PDF
14_ITEM 01.2-15_ADD 02_Section 32 13 14.13.pdf PDF
15_ITEM 01.3-1_ADD 02_02700G-102.pdf PDF
16_ITEM 01.3-2_ADD 02_02700C-101.pdf PDF
19_ITEM 01.3-5_ADD 02_02700C-402.pdf PDF
20_ITEM 01.3-6_ADD 02_02700S-001.pdf PDF
28_ITEM 01.3-14_ADD 02_02700SF210.pdf PDF
29_ITEM 01.3-15_ADD 02_02700SF502.pdf PDF
30_ITEM 01.3-16_ADD 02_02700AD-101.pdf PDF
35_ITEM 01.3-21_ADD 02_02700A-402.pdf PDF
36_ITEM 01.3-22_ADD 02_02700A-500.pdf PDF
37_ITEM 01.3-23_ADD 02_02700A-501.pdf PDF
38_ITEM 01.3-24_ADD 02_02700A-702.pdf PDF
42_ITEM 01.3-28_ADD 02_02700ES101.pdf PDF
03_ITEM 01.2-2_ADD 02_Section 01 50 00.pdf PDF
07_ITEM 01.2-7_ADD 02_Section 07 27 26.pdf PDF
11_ITEM 01.2-12_ADD 02_Section 26 42 13.pdf PDF
F-35 3-Bay Hangar Site Visit Attendance.pdf PDF
B.07.Pre-Proposal Slides - F-35 3-Bay Hangar.pdf PDF
Supplemental Site Visit Instructions.pdf PDF
ATTACHMENT 2 - Volume 4 - WI ANG F-35 3-Bay CD Specs ADD 01 (1 of 2).pdf PDF
ATTACHMENT 6 - 20220208 Single Source Determination - Marshall Best - Redacted.pdf PDF
ATTACHMENT 8 - SFS Form 12 - Template.xls XLS spreadsheet
ATTACHMENT 9 - Volume 6 - WI ANG F-35 3-Bay GBCI ADD 01.pdf PDF
Show all 50

F-35 THREE BAY SPECIALIZED HANGAR has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F-

A

F-35A

F-

A

F-35A

F-35A

F-35A

F-

A

F-35A

F-

A

F-35A

F-35A

F-35A

SG 3-1

SG 3-2

SG 3-3

SG 3-4

4 4

GROUNDING ROD

(TYP)

GROUNDING

TEST WELL

(TYP)

#4/0 BARE CU

GROUNDINNG

COUNTERPOISE

(TYP)

SG 2-14 SG 2-24

SG 2-3

4 SG 2-4

SG 1-14 SG 1-2

SG 1-3

4 SG 1-4

#3/0 TO

EMGB

#3/0 TO

EMGB

#3/0 TO

EMGB

#3/0 TO

EMGB

4EGB

2EGB

1EGB3

3EGB

TMGB

EMGB3

BUILDING STEEL

CONNECTION

(TYPICAL)

A

A B

B

C

C

E

E

F

F

G

G

J

J

D

D

K

K

L

L

M

M

H

A4

EG101

#3/0 TO

EMGB

#3/0 TO

EMGB

#3/0 TO

EMGB

#3/0 TO

EMGB

#3/0 TO

EMGB

#3/0 TO

EMGB

#3/0 TO

EMGB

#3/0 TO

EMGB

#3/0 TO

EMGB

#3/0 TO

EMGB

#3/0 TO

EMGB

A

A B

B

C

C

E

E

D

D

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

FSB2020-270-00

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

NWC / JBC

F-

3- Ba y S pe cia liz ed H an ga r M ad iso n, W isc on sin

Ai r N at io na l G ua rd

C

B

A

D

C

B

A

54321

DECEMBER 23, 2021N

N

PROJECT

KEYPLAN

A

PLAN TRUE

C :\U sers\aoo\D o cum ents\M y R evit\02700_Elec_A O genche.rvt

6/7/2022 11:01: 18 AM

ELECTRICAL GROUNDING

PLAN

EG101

WCM

GPN

GPN

0 8' 16' 32'

1/16" = 1'-0"

GENERAL NOTES

SHEET KEYNOTES

SCALE: 1/16" = 1'-0"

ELECTRICAL GROUNDING PLANA1

1. 3/4" X 10' COPPER CLAD STEEL GROUND ROD.

REFER TO EG502 FOR DETAIL.

2. GROUND TEST WELL. REFER TO EG502 DETAIL D4

FOR DETAIL .

3. GROUND BUS BAR. REFER TO EG502 FOR DETAIL.

4. STATIC GROUNDING RECEPTACLE ASSEMBLY

FOR AIRCRAFT GROUNDING. REFER TO EG501

FOR DETAIL.

5. BUILDING STEEL BOND TO GROUNDING

COUNTERPOISE. REFER TO EG502 FOR DETAIL.

6. IF BID ALTERNATE 1 IS ACCEPTED, GROUND

RODS WITH THIS KEYNOTE WILL SHIFT AS

SHOWN IN DETAIL 2 OF THIS SHEET.

7. SHIFTED RODS FROM DETAIL 1 OF THIS SHEET.

GROUND RODS ARE CONNECTED TO THE

GROUNDING COUNTERPOISE AS SHOWN IN

DETAIL 2 OF THIS SHEET.

8. BOND CT CABINET TO COUNTERPOISE SYSTEM

USING #4/0 COPPER.

A. PROVIDE GROUNDING COUNTERPOISE LOOP

AROUND PERIMETER OF BUILDING. USE #4/0

BARE COPPER. WHERE SIDEWALK IS PRESENT,

GROUNDING CONDUCTOR WILL BE A MINIMUM OF

12" BEYOND SIDEWALK. WHERE SIDEWALKS ARE

NOT PRESENT, GROUNDING CONDUCTOR WILL

BE 12" AWAY FROM BUILDING. BURY CONDUCTOR

36" BELOW FINISHED GROUND AND CONNECT TO

GROUND RODS.

B. ALL UNDERGROUND CONNECTIONS SHALL BE

EXOTHERMIC UNO.

C. ALL TELECOMMUNICATION GROUNDING BUS

BARS SHALL BE BONDED TO BUILDING STEEL

USING #3/0 CU.

D. ALL ELECTRICAL GROUNDING BUS BARS SHALL

BE BONDED TO BUILDING STEEL USING #3/0 CU.

E. REFER TO EG501 & EG502 FOR GROUNDING

DETAILS.

SCALE: 1/16" = 1'-0"

ELECTRICAL GROUNDING PLAN -BID OPTION 1A4

1 ADDENDUM 1 04/22/2022

2 ADDENDUM 2 06/08/2022

W

IS C O NS IN

P R

O F

E

S S I O N A L

E N G

I N E

E R

JOHN T

LITTLE

E-47833

EDMOND

OK

File details come from the government source that posted it. Updated .