F-35 THREE BAY SPECIALIZED HANGAR Federal contract opportunity
Solicitation number
W50S9F-22-B-0001
Issued by
Department of the Army National Guard

About this file

This solicitation is for the construction of an F-35 three bay specialized hangar. The project involves demolishing an existing 19,875 square foot building and constructing a new 31,000 square foot three bay hangar with associated shop and administrative spaces at Dane County Regional Airport in Madison, Wisconsin. The hangar bays will include pre-conditioned aircraft air, 270 VDC aircraft power, fire suppression, and hangar bay HVAC. The facility will also require a lightning protection system, fall protection, and an Advantor security system. This project has a NAICS code of 236220 with a size standard of $39.5 million. The contract duration is 550 days from notice to proceed. The solicitation includes a base bid for construction and two options, one for a paint/mix addition and one for aircraft rated pavement. The bid opening will be conducted in accordance with FAR Subpart 14.4. Interested contractors must register in SAM and check the site regularly for any amendments.

View the file

Other files for this federal contract opportunity

Other files attached to F-35 THREE BAY SPECIALIZED HANGAR, newest first.
File Type Posted
Bid Opening Attendance Sheet.pdf PDF
Question and Answer Set 4_Question 2_Custom Graphic.pdf PDF
00_FSB2020-270-00_WI-ANG_3-Bay_ADD NO. 04_2022.06.28_Narrative.pdf PDF
01_ITEM 01.2-1_ADD 04_PROJECT TOC.pdf PDF
03_ITEM 01.2-3_ADD 04_Section 07 21 13.pdf PDF
05_ITEM 01.2-5_ADD 04_Section 08 33 13.pdf PDF
07_ITEM 01.2-7_ADD 04_Section 09 90 00.pdf PDF
09_ITEM 01.2-9_ADD 04_Section 11 94 00.01.pdf PDF
14_ITEM 01.3-4_ADD 04_02700SF104.pdf PDF
16_ITEM 01.3-6_ADD 04_02700SF106.pdf PDF
18_ITEM 01.3-8_ADD 04_02700SF504.pdf PDF
19_ITEM 01.3-9_ADD 04_02700A-002.pdf PDF
28_ITEM 01.3-18_ADD 04_02700EP702.pdf PDF
W50S9F22B0001 Solicitation - Amend 0004.pdf PDF
W50S9F22B0001 Solicitation - Amend 0002.pdf PDF
02_ITEM 01.2-2_ADD 03_Section 03 30 00.pdf PDF
06_ITEM 01.2-6_ADD 03_Section 10 51 13.pdf PDF
14_ITEM 01.3-4_ADD 03_02700C-402.pdf PDF
19_ITEM 01.3-9_ADD 03_02700SF508.pdf PDF
20_ITEM 01.3-10_ADD 03_02700A-002.pdf PDF
23_ITEM 01.3-13_ADD 03_02700A-500.pdf PDF
28_ITEM 01.3-18_ADD 03_02700A-600.pdf PDF
31_ITEM 01.3-21_ADD 03_02700A-701.pdf PDF
37_ITEM 01.3-27_ADD 03_02700FA601.pdf PDF
FSB2020-270-00 - WI-ANG - 3-Bay Hangar - Addendum 003 Combined Drawings.pdf PDF
24_ITEM 01.3-14_ADD 03_02700A-501.pdf PDF
04_ITEM 01.2-3_ADD 02_Section 01 78 00.pdf PDF
12_ITEM 01.2-13_ADD 02_Section 32 12 15.13.pdf PDF
13_ITEM 01.2-14_ADD 02_Section 32 12 16.16.pdf PDF
21_ITEM 01.3-7_ADD 02_02700S-002.pdf PDF
23_ITEM 01.3-9_ADD 02_02700SF102.pdf PDF
24_ITEM 01.3-10_ADD 02_02700SF103.pdf PDF
25_ITEM 01.3-11_ADD 02_02700SF104.pdf PDF
32_ITEM 01.3-18_ADD 02_02700A-140.pdf PDF
33_ITEM 01.3-19_ADD 02_02700A-201.pdf PDF
45_ITEM 01.3-31_ADD 02_02700EP102.pdf PDF
48_ITEM 01.3-34_ADD 02_02700EP702.pdf PDF
49_ITEM 01.3-35_ADD 02_02700ET101.pdf PDF
FSB2020-270-00 - WI-ANG - 3-Bay Hangar - Addendum 002 Combined Drawings.pdf PDF
03_ITEM 01.2-2_ADD 02_Section 01 50 00.pdf PDF
07_ITEM 01.2-7_ADD 02_Section 07 27 26.pdf PDF
11_ITEM 01.2-12_ADD 02_Section 26 42 13.pdf PDF
18_ITEM 01.3-4_ADD 02_02700C-401.pdf PDF
B.07.Pre-Proposal Slides - F-35 3-Bay Hangar.pdf PDF
ATTACHMENT 1a - FSB2020-270-00 - WI-ANG - 3-Bay Hangar - ADD 01 COMBINED DRAWINGS (1 of 2).pdf PDF
ATTACHMENT 1b - FSB2020-270-00 - WI-ANG - 3-Bay Hangar - ADD 01 COMBINED DRAWINGS (2 of 2).pdf PDF
ATTACHMENT 3 - Volume 4 - WI ANG F-35 3-Bay CD Specs ADD 01 (2 of 2).pdf PDF
ATTACHMENT 5 - 20220208 Single Source Determination - Andover - Redacted.pdf PDF
ATTACHMENT 8 - SFS Form 12 - Template.xls XLS spreadsheet
ATTACHMENT 9 - Volume 6 - WI ANG F-35 3-Bay GBCI ADD 01.pdf PDF
Show all 50

F-35 THREE BAY SPECIALIZED HANGAR has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OVERHEAD COILING

DOOR JAMB GUIDES

STEEL ANGLE

BY MANF.

OVERHEAD

COILING DOOR

CMU

R E:

F

LO

O R

P

LA

N

C M

U

EXPANSION

ANCHOR BOLT

CONT SEALANT, BOTH SIDES

DOUBLE JAMB STUDS TYP

AT ALL JAMBS (CLIP

TOGETHER AT 12" OC VERT)

ALUMINUM

WINDOW

SYSTEM

R E:

F

LO

O R

P

LA

N S

PA

R

TI

TI

O N

2" 4 1/2"

1/

2"

6"

3/8" 2"

HEAD/SILL

INSULATED

OUTSIDE GLAZING

JAMB

INSULATED

OUTSIDE GLAZING

HEAD/JAMB/SILL

INT 1/4" GLZ

SHIM AS REQUIRED

@ EXT: LOW EXPANSION FOAM FILL

IN PERIMETER FRAME JOINT CAVITY

@INT: SHIM AS REQUIRED

FABRIC HANGAR DOOR

WEATHER TIGHT SEAL

PROVIDED BY FABRIC DOOR

MFR

MFR

EXTRUSION

VERTICAL

INSULATED METAL

WALL PANEL

INSULTED METAL

SOFFIT PANEL

CFMF

CFMF

CHANNEL

DOOR CLEAR HEIGHT

121'-8 1/2"

6'

1/

2"

GROUND FLOOR

100'-0"

PAVING (REFER TO CIVIL)

SLAB OF GRADE

WITH RIDGE AT

CENTER OF DOOR

FABRIC HANGAR DOOR

FLOOR SEAL WITH

SAFETY EDGE

1/4" / 1'-0"1/4" / 1'-0"

SCHEDULED WINDOW

SHIM & CAULK

SCHEDULED FLOOR

CONC. FLOOR SLAB

SHIM & CAULK

SCHEDULED WINDOW

GYP BD

PLYWOOD BLOCKING

6" CFMF W/ SOUND BATT

INSUL.

6" CFMF W/ SOUND

BATT INSUL.

SCHEDULED WINDOW

6" CFMF BOX BEAM

PLYWOOD BLOCKING

GYP BD

SHIM AND SEALANT

5/8" GYP BD

(2 LAYERS)

FIRE SEALANT

6" CH STUD

6" CHANNEL

BEAM

ANGLE

8" BOND BEAM

1" SHAFT

LINER

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

FSB2020-270-00

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

NWC / JBC

F-

3- Ba y S pe cia liz ed H an ga r M ad iso n, W isc on sin

Ai r N at io na l G ua rd

C

B

A

D

C

B

A

54321

DECEMBER 23, 2021

C :\U sers\gaz\D o cum ents\M y R evit\02700_Arch_G ZalabakZ5W

7D .rvt

6/8/2022 10:27: 19 AM

DETAILS

A-501

JMI

BDR

JBC

SCALE: 3" = 1'-0"

NOT USEDD2 SCALE: 3" = 1'-0"

JAMB DETAILD3SCALE: 3" = 1'-0"

NOT USEDD1

SCALE: 3" = 1'-0"

STOREFRONT, HEAD, JAMB, SILL DETAILSA3

SCALE: 1 1/2" = 1'-0"

HEAD DETAILB1

SCALE: 1 1/2" = 1'-0"

SILL DETAILA1 3" 9"6"0

3" = 1'-0"

6" 1'-6"1'0

1 1/2" = 1'-0"

SCALE: 1 1/2" = 1'-0"

WINDOW SILL DETAILB3 SCALE: 1 1/2" = 1'-0"

WINDOW JAMB DETAILB4 SCALE: 1 1/2" = 1'-0"

WINDOW HEAD DETAILB5

SCALE: 1 1/2" = 1'-0"

SECTION DETAILA5

1 ADDENDUM 2 06/08/2022

W

IS C O NS IN

A R C H I T E C T

JASON T.

HOLUBY

A-13101

OKLAHOMA CITY

OK

File details come from the government source that posted it. Updated .