About this file
This document provides details for an unrestricted invitation for bid for construction services. The solicitation seeks a contractor to construct a new three-bay hangar facility at Dane County Regional Airport - Truax Field in Madison, Wisconsin to support F-35 operations. Scope of work includes demolishing an existing building and constructing a 31,000 square foot hangar with specialized capabilities for fuel cell maintenance, indoor washing, surface coating operations, and weapons load training. The project is valued between $25-100 million. The base award includes construction, with optional additions for a paint/mix room and aircraft-rated pavement. The contract term is 550 days from notice to proceed. The pre-bid conference will be held on-site with registration required. Bids are due in accordance with FAR Subpart 14.4 and DFARS Subpart 214.4, with the bid opening conducted publicly. The NAICS code is 236220 and size standard is $39.5 million. Responsible bidders must be registered in SAM.gov, where the solicitation and plans are posted.
View the file
Other files for this federal contract opportunity
Show all 50
F-35 THREE BAY SPECIALIZED HANGAR has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F-
A
F-35A
F-
A
F-35A
F-
A
F-35A
F-
A
F-35A
FUEL
CELL
MATCHLINE
SEE A1 /
FX101
117B
117A
120B
WASH
BAY
H
H
G
G
F
F
E
ED
C
C
B
BA
A
144.2
144.1
FDC
12" STAINLESS
LEAD-IN REF.
C-601 FOR CONT.
OUTLINE OF
25' HIGH CLEAR
ZONE
BID OPTION #1
144.3
AIR SHOWER
TO WP-1
SPRINKLERS
BOOTH CONTROL
VALVEVS
B2
FX401
5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436
405.840.2931 | fsb-ae.com
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
FSB2020-270-00
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
NWC / JBC
F-
3- Ba y S pe cia liz ed H an ga r M ad iso n, W isc on sin
Ai r N at io na l G ua rd
C
B
A
D
C
B
A
54321
DECEMBER 23, 2021N
N
PROJECT
KEYPLAN
A
PLAN TRUE
C :\U sers\jtm \D o cum ents\M y R evit\02700_FP_jm o bbsXYN
BH
.rvt
6/15/2022 12:27 :05 PM
FIRE SUPPRESSION PLAN -
SECTOR 2
FX102
LFO
JME
JME
0 4' 8' 16'
1/8" = 1'-0"
SCALE: 1/8" = 1'-0"
FIRE SUPPRESSION PLAN - SECTOR 2A1
FIRE PROTECTION DESIGN SCHEDULE - SECTOR 2
NUMBER NAME HAZARD NOTE
117A MOTHER'S ROOM LH 1
117B JAN OH 1
118 FUEL MAINT./ GENERAL
STORAGE
EH 1
119 FUEL CELL HANGAR 2
120A VEST LH 1
120B CORR. LH 1
121 ELEC. OH 1, 5
122 FUEL EH 1
123 WASH OH 1
124 MECH OH 1
125 FIRE PROTECTION OH 1
126 TOOLS OH 1
127 VEST LH 1
128 WASH BAY HANGAR 2
129 JAN. OH 1
130 CLEAN M RR LH 1
131 CLEAN M LR LH 1
132 CLEAN SHOWER M LH 1
133 DIRTY SHOWER M LH 1
134 DIRTY LR M LH 1
135 DIRTY SHOWER M LH 1
136 CLEAN W RR LH 1
137 CLEAN W LR LH 1
138 CLEAN SHOWER W LH 1
139 DIRTY LR W LH 1
140 DIRTY SHOWER W LH 1
141 DIRTY RR UNISEX LH 1
142 DIRTY VEST. LH 1
143 MASK WASHING OH 1
144 PAINT/SAND/MIX EH 1,4
144.1 CLEAN ROOM EH 1,4
144.2 DIRTY ROOM EH 1,4
144.3 AIR SHOWER OH 1,4
145 ELECT OH 1, 5
146 COMM. OH 1, 3, 5
NOTES:
1. PROVIDE WET PIPE SPRINKLER PROTECTION IN
ACCORDANCE WITH NFPA 13 AND UFC 3-600-01 WITH A
DESIGN DENSITY AND DESIGN AREA PER UFC 3-600-01,
TABLE 9-3, FOR THE HAZARD CLASSIFICATION LISTED IN
THE SPRINKLER DESIGN SCHEDULE.
2. PROVIDE SINGLE-INTERLOCK PREACTION SPRINKLER
SYSTEM IN ACCORDANCE WITH NFPA 13, UFC 3-600-01,
AND UFC 4-211-01 AS MODIFIED BY THE EXEMPTION
MEMORANDUM. DESIGN DENSITY AND DESIGN AREA
SHALL BE 0.40 GPM OVER 3500 SF. PREACTION SPRINKLER
SYSTEM SHALL BE RELEASED BY A SINGLE OPTICAL
FLAME DETECTOR.
3. PROVIDE CONCEALED SIDEWALL SPRINKLERS.
4. BID OPTION 1. PAINT BOOTH SHALL BE PER NFPA 33.
PROVIDE CONTROL VALVE W / TS ON WALL OUTSIDE OF
CLASSIFIED AREA AT 5' AFF FOR SPRINKLERS SERVING
PACKAGED PAINT BOOTH AND ASSOCIATED EXHAUST
DUCT. PROVIDE THIN PAPER OR CELLOPHANE BAGS ON
PAINT BOOTH AND DUCT SPRINKLERS PER NFPA 13, AND
GASKETED ACCESS DOORS ON DUCT. PROVIDE
SPRINKLER (S) FOR PACKAGED MIX ROOM AND SANDING
BOOTH PER NFPA 13. PROVIDE SPRINKLERS IN ROOM
WHERE PAINT BOOTHS RESIDE.
5. DO NOT ROUTE PIPING OVER ELECTRICAL EQUIPMENT OR
THRU ROOM.
GENERAL NOTES
A. THE DESIGN AND INSTALLATION OF THE FIRE
PROTECTION SYSTEM SHALL BE IN STRICT
ACCORDANCE WITH UFC 4-211-01 AS MODIFIED BY
THE 21 JAN 2022 MEMORANDUM ON THE USAF
EXEMPTION TO IMPLEMENT SUNDOWN POLISY FOR
FOAM FIRE SUPPRESSION SYSTEMS; UFC 4-021-01;
ECB 2018-17; UFC 3-600-01; NFPA 13; NFPA 70;
NFPA 20; NFPA 72; NFPA 90A; ADOPTED STATE
AND LOCAL CODES, AND THE CONTRACT
DOCUMENTS.
B. PROVIDE AUTOMATIC SPRINKLER SYSTEM
IN ACCORDANCE WITH UFC-3-600-01
REQUIREMENTS WITH DESIGN DENSITY AND
DESIGN AREA FOR THE HAZARD CLASSSIFICATION
LISTED IN THE FIRE PROTECTION DESIGN
SCHEDULE.
1 ADDENDUM 1 04/22/2022
2 ADDENDUM 3 06/14/2022
W
IS C O NS IN
P R
O F
E
S S I O N A L
E N G
I N E
E R
LIANE F
OZMUN
E-48073
OKLAHOMA CITY
OK
File details come from the government source that posted it. Updated .