Appendix D1 FAA Form 7460-1.pdf

PDF 347 KB Posted

Attached to
PRANG - Hangar 1 Demolition Federal contract opportunity
Solicitation number
W50S9320B5001
Issued by
Department of the Army National Guard

About this file

This document contains a Notice of Proposed Construction or Alteration form and instructions for its completion to be filed with the Federal Aviation Administration. Key details include that the form is used to provide notice of proposed construction or alteration of structures that may impact navigable airspace. Details requested on the form include contact information, location of proposed construction using latitude and longitude, height of proposed structure, distance and direction to nearest airport, and a full description of the proposal. The instructions provide guidance on completing each item and details on filing the notice at least 45 days before start of construction so the FAA can conduct an aeronautical study if necessary.

A related federal contract opportunity notice involves a solicitation for demolition services at Muniz Air Base in Carolina, Puerto Rico. Services required include demolition of the main 98,000 square foot hangar building and related areas, with options to demolish additional structures. Testing and abatement of asbestos and lead is included. The work will result in backfilling and seeding the area. The opportunity is listed as a pre-solicitation by the USPFO Puerto Rico to award a firm-fixed price contract for the work.

View the file

Other files for this federal contract opportunity

Other files attached to PRANG - Hangar 1 Demolition, newest first.
File Type Posted
H1-54-23 HEATING PLUMBING FIRST FLOOR.pdf PDF
Government Responses 24 April 2020.pdf PDF
H1-54-02 FIRST FLOOR PLAN.pdf PDF
H1-54-13 MISCELANEOUS DETAILS.pdf PDF
H1-54-13 STRUCTURAL - FIRST FLOOR.pdf PDF
H1-54-03 SECOND FLOOR PLAN.pdf PDF
H1-54-06 WALL SECTION - WINDOW DETAILS.pdf PDF
H1-54-19 HANGAR DOOR DETAIL CANOPY.pdf PDF
H1-54-12 DOOR SHEDULE - DETAILS.pdf PDF
H1-54-14 TOILET ROOM - DETAILS.pdf PDF
H1-54-24 HEATING PLUMBING SECOND FLOOR PLAN.pdf PDF
H1-54-25 HEATING DETAILS.pdf PDF
H1-54-04 FRONT - REAR ELEVATIONS.pdf PDF
H1-54-11 STAIRS - DETAILS.pdf PDF
H1-54-01 DRAWING SCHEDULE.pdf PDF
S7 H1-54-21 STRUCTURAL BRACING DETAILS.pdf PDF
S8 BLDG_02.pdf PDF
S4 H1-54-18 STRUCRURAL TRUSS.pdf PDF
S3 H1-54-17 STRUCTURAL ROOF FRAMING PLAN.pdf PDF
S1 H1-54 15 STRUCTURAL FOUNDATION - FIRST FLOOR PLAN.pdf PDF
S5 H1-54-19 STRUCTURAL DETAILS.pdf PDF
O4 Approximate Outside Demo Areas.pdf PDF
S2 H1-54-16 STRUCTURAL SECOND FLOOR FRAMING PLAN.pdf PDF
W50S9320B5001 Hangar 1 Demolition - Solicitation.pdf PDF
W50S9320B5001 Hangar 1 Demolition - Solicitation.pdf PDF
Appendix A7 Lighting and Power Plan.pdf PDF
Appendix F1 Key Component Waste Management Plan.pdf PDF
Appendix A7.1 Existing HANGAR 1 ELECTRIC PLAN.pdf PDF
Appendix A1 Project Location.pdf PDF
Appendix E1 Publications and Forms.pdf PDF
Appendix A3 Hauling Route.pdf PDF
Appendix A8 Project Sign Details.pdf PDF
Appendix C1 Seeding Mix.pdf PDF
Appendix O1 Electric sub station to protect.pdf PDF
Appendix O2 Monitoring wells Final_SI Report_Luis Muniz ANGB_Cmprhnsv_101519_Figure_3.pdf PDF
Appendix G1 HWMP.pdf PDF
Appendix O3 Site Plan.pdf PDF
Appendix A6 Elevations Plan.pdf PDF
Synopsis Demolition Hangar 20200331.pdf PDF
Appendix B1.1 ACM Report.pdf PDF
Appendix G2 ISWMP.pdf PDF
Appendix A7.2 Existing HANGAR 1 PLUMBING.pdf PDF
Appendix B2.2 Asbestos_Plan_Building_2_Diagram.pdf PDF
Appendix A2 Demolition Site Plan.pdf PDF
Appendix B1.2 ACM Re-inspection Report.pdf PDF
Appendix A5 Second Floor Plan.pdf PDF
Appendix B2.1 Asbestos_Plan_Building_2_Description.pdf PDF
Appendix A7.3 Existing HANGHAR 1 COMM.pdf PDF
Appendix A4 First Floor Plan.pdf PDF
Synopsis - Demolition Hangar 1.pdf PDF
Show all 50

PRANG - Hangar 1 Demolition has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTICE OF PROPOSED CONSTRUCTION OR ALTERATION

§ 77.7 Form and time of notice.

(a) If you are required to file notice under §77.9, you must submit to the FAA a completed FAA Form 7460–1, Notice of Proposed Construction or Alteration. FAA Form 7460–1 is available at FAA regional offices and on the Internet.

(b) You must submit this form at least 45 days before the start date of the proposed construction or alteration or the date an application for a construction permit is filed, whichever is earliest.

(c) If you propose construction or alteration that is also subject to the licensing requirements of the Federal Communications Commission (FCC), you must submit notice to the FAA on or before the date that the application is filed with the FCC.

(d) If you propose construction or alteration to an existing structure that exceeds 2,000 ft. in height above ground level (AGL), the FAA presumes it to be a hazard to air navigation that results in an inefficient use of airspace. You must include details explaining both why the proposal would not constitute a hazard to air navigation and why it would not cause an inefficient use of airspace.

(e) The 45-day advance notice requirement is waived if immediate construction or alteration is required because of an emergency involving essential public services, public health, or public safety. You may provide notice to the FAA by any available, expeditious means. You must file a completed FAA Form 7460–1 within 5 days of the initial notice to the FAA. Outside normal business hours, the nearest flight service station will accept emergency notices.

§ 77.9 Construction or alteration requiring notice.

If requested by the FAA, or if you propose any of the following types of construction or alteration, you must file notice with the FAA of:

(a) Any construction or alteration that is more than 200 ft. AGL at its site.

(b) Any construction or alteration that exceeds an imaginary surface extending outward and upward at any of the following slopes:

(1) 100 to 1 for a horizontal distance of 20,000 ft. from the nearest point of the nearest runway of each airport described in paragraph (d) of this section with its longest runway more than 3,200 ft. in actual length, excluding heliports.

(2) 50 to 1 for a horizontal distance of 10,000 ft. from the nearest point of the nearest runway of each airport described in paragraph (d) of this section with its longest runway no more than 3,200 ft. in actual length, excluding heliports.

(3) 25 to 1 for a horizontal distance of 5,000 ft. from the nearest point of the nearest landing and takeoff area of each heliport described in paragraph (d) of this section.

(c) Any highway, railroad, or other traverse way for mobile objects, of a height which, if adjusted upward 17 feet for an Interstate Highway that is part of the National System of Military and Interstate Highways where overcrossings are designed for a minimum of 17 feet vertical distance, 15 feet for any other public roadway, 10 feet or the height of the highest mobile object that would normally traverse the road, whichever is greater, for a private road, 23 feet for a railroad, and for a waterway or any other traverse way not previously mentioned, an amount equal to the height of the highest mobile object that would normally traverse it, would exceed a standard of paragraph (a) or (b) of this section.

(d) Any construction or alteration on any of the following airports and heliports:

(1) A public use airport listed in the Airport/Facility Directory, Alaska Supplement, or Pacific Chart Supplement of the U.S.

Government Flight Information Publications;

(2) A military airport under construction, or an airport under construction that will be available for public use;

(3) An airport operated by a Federal agency or the DOD.

(4) An airport or heliport with at least one FAA-approved instrument approach procedure.

(e) You do not need to file notice for construction or alteration of:

(1) Any object that will be shielded by existing structures of a permanent and substantial nature or by natural terrain or topographic features of equal or greater height, and will be located in the congested area of a city, town, or settlement where the shielded structure will not adversely affect safety in air navigation;

(2) Any air navigation facility, airport visual approach or landing aid, aircraft arresting device, or meteorological device meeting FAA-approved siting criteria or an appropriate military service siting criteria on military airports, the location and height of which are fixed by its functional purpose;

(3) Any construction or alteration for which notice is required by any other FAA regulation.

(4) Any antenna structure of 20 feet or less in height, except one that would increase the height of another antenna structure.

Mail Processing Center

Federal Aviation Administration Southwest Regional Office

Obstruction Evaluation Group 10101 Hillwood Parkway Fort Worth, TX 76177 Fax: (817) 222-5920

Website: https://oeaaa.faa.gov

PLEASE TYPE or PRINT

INSTRUCTIONS FOR COMPLETING FAA FORM 7460-1

ITEM #1. Please include the name, address and phone number of a personal contact point as well as the company name.

ITEM #2. Please include the name, address and phone number of a personal contact point as well as the company name.

ITEM #3. New Construction would be a structure that has not yet been built.

Alteration is a change to an existing structure such as the addition of a side mounted antenna, a change to the marking and lighting, a change to power and/or frequency, or a change to the height. The nature of the alteration shall be included in ITEM #21 “Complete Description of Proposal”.

Existing would be a correction to the latitude and/or longitude, a correction to the height, or if filing on an existing structure which has never been studied by the FAA. The reason for the notice shall be included in ITEM #21 “Complete Description of Proposal”.

ITEM #4. If Permanent, so indicate. If Temporary, such as a crane or drilling derrick, enters the estimated length of time the temporary structure will be up.

ITEM #5. Enter the date that construction is expected to start and the date that construction should be completed.

ITEM #6. Please indicate the type of structure. DO NOT LEAVE BLANK.

ITEM #7. In the event that obstruction marking and lighting is required, please indicate type desired. If no preference, check “other” and indicate “no preference” DO NOT LEAVE BLANK. NOTE: High Intensity lighting shall be used only for structures over 500’ AGL. In the absence of high intensity lighting for structures over 500’ AGL, marking is also required.

ITEM #8. If this is an existing tower that has been registered with the FCC, enter the FCC Antenna Structure Registration number here.

ITEM #9 and #10. Latitude and longitude must be geographic coordinates, accurate to within the nearest second or to the nearest hundredth of a second if known. Latitude and longitude derived solely from a hand-held G P S instrument is NOT acceptable. A hand-held GPS is only accurate to within 100 meters (328 feet) 95 percent of the time. This data, when plotted, should match the site depiction submitted under ITEM #20.

ITEM #11. NAD 83 is preferred; however, latitude and longitude may be submitted in NAD 27. Also, in some geographic areas where NAD 27 and NAD 83 are not available other datum may be used. It is important to know which datum is used. DO NOT LEAVE BLANK.

ITEM #12. Enter the name of the nearest city and state to the site. If the structure is or will be in a city, enter the name of that city and state.

ITEM #13. Enter the full name of the nearest public-use (not private-use) airport or heliport or military airport or heliport to the site.

ITEM #14. Enter the distance from the airport or heliport listed in #13 to the structure.

ITEM #15. Enter the direction from the airport or heliport listed in #13 to the structure.

ITEM #16. Enter the site elevation above mean sea level and expressed in whole feet rounded to the nearest foot (e.g. 17’3” rounds to 17’, 17’6” rounds to 18’). This data should match the ground contour elevations for site depiction submitted under ITEM #20.

ITEM #17. Enter the total structure height above ground l e v e l in whole feet rounded to the next highest f o o t (e.g. 17’3” rounds to 18’).

The total structure height shall include anything mounted on top of the structure, such as antennas, obstruction lights, lightning rods, etc.

ITEM #18. Enter the overall height above mean sea level and expressed in whole feet. This will be the total of ITEM #16 + ITEM #17.

ITEM #19. If an FAA aeronautical study was previously conducted, enter the previous study number.

ITEM #20. Enter the relationship of the structure to roads, airports, prominent terrain, existing structures, etc. Attach an 8-1/2” x 11” non-reduced copy of the appropriate 7.5 minute U.S. Geological Survey (USGS) Quadrangle Map MARKED WITH A PRECISE INDICATION OF THE SITE LOCATION. To obtain maps, contact USGS at 1-888-275-8747 or via internet at “http://store.usgs.gov”. If available, attach a copy of a documented site survey with the surveyor’s certification stating the amount of vertical and horizontal accuracy in feet.

ITEM #21.

• For transmitting stations, include maximum effective radiated power (ERP) and all frequencies.

• For antennas, include the type of antenna and center of radiation (Attach the antenna pattern, if available).

• For microwave, include azimuth relative to true north.

• For overhead wires or transmission lines, include size and configuration of wires and their supporting structures (Attach depiction).

• For each pole/support, include coordinates, site elevation, and structure height above ground level or water.

• For buildings, include site orientation, coordinates of each corner, dimensions, and construction materials.

• For alterations, explain the alteration thoroughly.

• For existing structures, thoroughly explain the reason for notifying the FAA (e.g. corrections, no record or previous study, etc.).

Filing this information with the FAA does not relieve the sponsor of this construction or alteration from complying with any other federal, state or local rules or regulations. If you are not sure what other rules or regulations apply to your proposal, contact local/state aviation’s and zoning authorities.

Paperwork Reduction Work Act Statement: This information is collected to evaluate the effect of proposed construction or alteration on air navigation and is not confidential. Providing this information is mandatory or anyone proposing construction or alteration that meets or exceeds the criteria contained in 14 CFR, part 77. We estimate that the burden of this collection is an average 19 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, completing and reviewing the collection of information. A federal agency may not conduct or sponsor, and a person is not required to respond to, nor shall a person be subject to a penalty for failure to comply with a collection of information subject to the requirements of the Paperwork Reduction Act unless that collection of information displays a currently valid OMB Control Number. The OMB control number associated with this collection is 2120-0001. Comments concerning the accuracy of this burden and suggestions for reducing the burden should be directed to the FAA at:

800 Independence Ave SW, Washington, DC 20591, Attn: Information Collection Clearance Officer, ASP-110.

Fcrm 7460-1 (5/17) Superseded Previous Edition Electronic Version (Adobe) NSN: 0052-00-012-0009 file:///E:/

Please Type or Print on This Form Form Approved OMB No.2120-0001

Expiration Date: 10/31/2017

Failure To Provide All Requested Information May Delay Processing of Your Notice

U.S. Department of Transportation Notice of Proposed Construction or Alteration Federal Aviation Administration

FOR FAA USE ONLY

Aeronautical Study Number

1. Sponsor (person, company, etc. proposing this action):

Attn. of:

Name:

Address:

City: State: Zip:

Telephone: Fax:

9. Latitude: 0 , , "

10. Longitude: , ,

11. Datum: NAD 83 NAD 27 Other

12. Nearest: City: State

13. Nearest Public-use (not private-use) or Military Airport or Heliport:

14. Distance from #13. to Structure:

15. Direction from #13. to Structure:

16. Site Elevation (AMSL): ft.

17. Total Structure Height (AGL): ft.

18. Overall Height (#16 + #17) (AMSL): ft.

19. Previous FAA Aeronautical Study Number (if applicable):

-OE

20. Description of Location: (Attach a USGS 7.5 minute Quadrangle Map with the precise site marked and any certified survey)

2. Sponsor's Representative (if other than #1):

Attn. of:

Name:

Address:

City: State: Zip:_______________

Telephone: Fax:

3. Notice of: New Construction Alteration Existing

4. Duration: Permanent Temporary ( months, days)

5. Work Schedule: Beginning End

6. Type: Antenna Tower Crane Building Power Line Landfill Water Tank Other

7. Marking/Painting and/or Lighting Preferred:

Red Lights and Paint Dual - Red and Medium Intensity White-Medium Intensity Dual - Red and high Intensity White -High Intensity Other

8. FCC Antenna Structure Registration Number (if applicable):

21. Complete Description of Proposal:

Frequency/Power (kW)

Notice is required by 14 Code of Federal Regulations, part 77 pursuant to 49 U.S.C., Section 44718. Persons who knowingly and willingly violate the notice requirements of part 77 are subject to a civil penalty of $1,000 per day until the notice is received, pursuant to 49 U.S.C., Section 46301(a)

I hereby certify that all of the above statements made by me are true, complete, and correct to the best of my knowledge. In addition, I agree to mark and/or light the structure in accordance with established marking & lighting standards as necessary.

Date Typed or Printed Name and Title of Person Filing Notice Signature

FAA Form 7460-1 (5/17) Supersedes Previous Edition NSN: 0052-00-012-0009

Mail Processing Center Federal Aviation Administration Southwest Regional Office Obstruction Evaluation Group 2601 Meacham Boulevard Fort Worth TX 76193 Fax 817 3217765 Phone 817 3217750 Website httpsoeaaafaagov:
Aeronautical Study Number:
9 Latitude:
0:
New Construction: Off
Alteration: Off
Existing: Off
Permanent: Off
Temporary: Off
Antenna Tower: Off
Crane: Off
Building: Off
Power Line: Off
Landfill: Off
Water Tank: Off
Other: Off
Red Lights and Paint: Off
WhiteMedium Intensity: Off
White High Intensity: Off
Dual Red and Medium Intensity: Off
Dual Red and high Intensity: Off
Other_2: Off
9 Latitude 0 0 10 Longitude 11 Datum NAD 83 NAD 27 Other 12 Nearest City State 13 Nearest Publicuse not privateuse or Military Airport or Heliport 14 Distance from 13 to Structure 15 Direction from 13 to Structure 16 Site Elevation AMSL ft 17 Total Structure Height AGL ft 18 Overall Height 16 17 AMSL ft 19 Previous FAA Aeronautical Study Number if applicable OE 20 Description of Location Attach a USGS 75 minute Quadrangle Map with the precise site marked and any certified survey:
10 Longitude:
0_2:
1:
2:
undefined:
Name:
Address:
undefined_2:
12 Nearest City:
State:
City:
State_2:
Zip:
13 Nearest Publicuse not privateuse or Military Airport or Heliport:
Telephone:
Fax:
14 Distance from 13 to Structure:
15 Direction from 13 to Structure:
Name_2:
ft:
ft_2:
Address 1:
Address 2:
ft_3:
City_2:
State_3:
Zip_2:
OE:
Telephone_2:
Fax_2:
months:
5 Work Schedule Beginning:
End:
undefined_3:
8 FCC Antenna Structure Registration Number if applicable:
21 Complete Description of Proposal:
21 Complete Description of Proposal_2:
21 Complete Description of Proposal_3:
21 Complete Description of Proposal_4:
21 Complete Description of Proposal_5:
21 Complete Description of Proposal_6:
21 Complete Description of Proposal_7:
21 Complete Description of Proposal_8:
21 Complete Description of Proposal_9:
21 Complete Description of Proposal_10:
21 Complete Description of Proposal_11:
21 Complete Description of Proposal_12:
21 Complete Description of Proposal_13:
21 Complete Description of Proposal_14:
Date:
Typed or Printed Name and Title of Person Filing Notice:
Signature:
Complete Description:
Text3:
Text4:
Text5:
Text6:
Text7:
Text8:
Text9:
Text10:
Text11:
Text12:
Text13:
Text14:
Text15:
Text16:
Check Box17: Off
Check Box18: Off
Check Box19: Off

File details come from the government source that posted it. Updated .