Appendix O2 Monitoring wells Final_SI Report_Luis Muniz ANGB_Cmprhnsv_101519_Figure_3.pdf

PDF 2 MB Posted

Attached to
PRANG - Hangar 1 Demolition
Solicitation number
W50S9320B5001
Issued by

About this file

This document provides details of a forthcoming solicitation for demolition services at Muniz Air Base in Puerto Rico. The United States Property and Fiscal Officer for Puerto Rico intends to issue an invitation for bid seeking firm fixed-price proposals to demolish Hangar 1 and related areas totaling approximately 98,000 square feet. Testing and abatement of asbestos and lead will be required. Optional work includes demolition of a 2,500 square foot two-story building, communications manholes, and conduits. Upon completion, the area will be backfilled and seeded. The solicitation is expected to be issued under contract number W50S9320B5001 for demolition at the Puerto Rico Air National Guard's Muniz Air Base in Carolina, Puerto Rico.

View the file

Other files

File Type Posted
H1-54-25 HEATING DETAILS.pdf PDF
H1-54-07 CROSS - LOGITUDINAL SECCTION.pdf PDF
H1-54-11 STAIRS - DETAILS.pdf PDF
H1-54-24 HEATING PLUMBING SECOND FLOOR PLAN.pdf PDF
H1-54-02 FIRST FLOOR PLAN.pdf PDF
H1-54-13 MISCELANEOUS DETAILS.pdf PDF
Government Responses 24 April 2020.pdf PDF
H1-54-13 STRUCTURAL - FIRST FLOOR.pdf PDF
H1-54-06 WALL SECTION - WINDOW DETAILS.pdf PDF
H1-54-12 DOOR SHEDULE - DETAILS.pdf PDF
H1-54-03 SECOND FLOOR PLAN.pdf PDF
H1-54-04 FRONT - REAR ELEVATIONS.pdf PDF
H1-54-19 HANGAR DOOR DETAIL CANOPY.pdf PDF
H1-54-14 TOILET ROOM - DETAILS.pdf PDF
H1-54-23 HEATING PLUMBING FIRST FLOOR.pdf PDF
H1-54-01 DRAWING SCHEDULE.pdf PDF
H1-54-05 RIGHT - LEFT ELEVATIONS.pdf PDF
H1-54-10 PARACHUTE TOWER - CHIMNEY DETAILS.pdf PDF
H1-54-08 HANGAR DOOR DETAIL.pdf PDF
S6 H1-54-20 STRUCTURAL COLUMN DETAILS.pdf PDF
S8 BLDG_02.pdf PDF
S4 H1-54-18 STRUCRURAL TRUSS.pdf PDF
S7 H1-54-21 STRUCTURAL BRACING DETAILS.pdf PDF
S1 H1-54 15 STRUCTURAL FOUNDATION - FIRST FLOOR PLAN.pdf PDF
S3 H1-54-17 STRUCTURAL ROOF FRAMING PLAN.pdf PDF
O4 Approximate Outside Demo Areas.pdf PDF
S5 H1-54-19 STRUCTURAL DETAILS.pdf PDF
S2 H1-54-16 STRUCTURAL SECOND FLOOR FRAMING PLAN.pdf PDF
W50S9320B5001 Hangar 1 Demolition - Solicitation.pdf PDF
W50S9320B5001 Hangar 1 Demolition - Solicitation.pdf PDF
Appendix C1 Seeding Mix.pdf PDF
Appendix A6 Elevations Plan.pdf PDF
Appendix B1.1 ACM Report.pdf PDF
Appendix E1 Publications and Forms.pdf PDF
Appendix F1 Key Component Waste Management Plan.pdf PDF
Appendix A8 Project Sign Details.pdf PDF
Appendix A7.2 Existing HANGAR 1 PLUMBING.pdf PDF
Appendix G2 ISWMP.pdf PDF
Appendix A3 Hauling Route.pdf PDF
Appendix O1 Electric sub station to protect.pdf PDF
Appendix A7 Lighting and Power Plan.pdf PDF
Appendix A7.1 Existing HANGAR 1 ELECTRIC PLAN.pdf PDF
Appendix A1 Project Location.pdf PDF
Appendix G1 HWMP.pdf PDF
Synopsis Demolition Hangar 20200331.pdf PDF
Appendix D1 FAA Form 7460-1.pdf PDF
Appendix B2.2 Asbestos_Plan_Building_2_Diagram.pdf PDF
Appendix O3 Site Plan.pdf PDF
Appendix B1.2 ACM Re-inspection Report.pdf PDF
Appendix A2 Demolition Site Plan.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATE: 7/2/2019FIGURE: 3

PROJECT: \DO_0009_Phase4_PFC\z_GIS\PuertoRico\Projects\SI\Figure 3 PRL 1 2 3 4 11 12 Soil Sediment Results_11x17.mxd

PUERTO RICO MUÑIZ ANGB

SOIL AND SEDIMENT ANALYTICAL

RESULTS – PRL 1, 2, 3, 4, 11, AND 12

PUERTO RICO MUÑIZ AIR

NATIONAL GUARD BASE

CAROLINA, PUERTO RICO

Area Shown

NOTES:

LEGEND:

* Source: Common Installation Picture (CIP) geodatabase provided by ANG GeoBase on 08/22/2017.

1. Sanitary Sewer and OWS locations adapted from Base Utility maps

2. Surface Water flow arrows adapted from:

Puerto Rico Air National Guard (PRANG) 2016. Muñiz Air National Guard Base (ANGB) Storm Water Pollution Prevention Plan (SWPPP). September.

3. Groundwater flow arrows adapted from:

TEC-Weston JV 2018. Draft Final Remedial Investigation Report for Muñiz ANGB, Carolina, Puerto Rico. November.; Metcalf & Eddy 1994. Final Site Investigation Report, 156th TFG/140thACWS, PRANG. September.;

Wood 2018. Final Quarterly Monitoring Report, 156th Airlift Wing, PRANG, Muñiz ANGB, Carolina, Puerto Rico. July. Groundwater potentially under tidal influence.

4. Background Source: ESRI World Imagery (DigitalGlobe, 01/2018).

MW-SJU01-01

MW-SJU03-01

SJU10-SW1

SJU11-SW1

SJU12-SW1

SJU01-SB1

SJU01-SB2

SJU02-SB1

SJU03-SB1

SJU03-SB2

SJU04-SB1

SJU07-SB1

SJU12-SD1

TU018-MW002

TU018-MW003

TU018-MW004

MW08-07

OW012-MW002

OW012-MW003

OW012-MW004

TU018-

MW001

TU018-MW005

TU018-MW006

TU020-MW001

TU020-MW002

TU020-MW003

TU020-MW004

S6-MW1

S6-MW2

S6-MW3

S6-MW4

S6-MW5

S6-MW6

S6-MW7

S6-MW8

MW31-02

MW31-10

MW31-11

PZ-4

MW31-08

MW05-01

MW08-02

MW08-06

MW08-10

MW08-11

MW08-05

RW8-01

RW8-02

RW8-03

PZ-5

MW08-01

MW08-03

MW08-04

MW08-08

SI Monitoring Well

Soil Boring

Surface Water Sample

Sediment Sample

Existing Monitoring Well

Other Existing Monitoring Well

Sanitary Sewer Line

Oil/Water Separator

Potential Release Location (PRL)

Installation Boundary*

Fence*

PRL11-

Stormwater Outfall 017

PRL12-

Stormwater Outfall 018

PRL03-

Building 3

(Current Fire Station)

PRL07- Apron

PRL04- Building 15 (Fire House AFFF Storage Building)

PRL02- Building 2 (Former Fire Station)

PRL01- Building 1 (Maintenance Hangar)

0 50 10025 Feet

0 20 4010 Meters

Estimated Groundwater Flow

Estimated Surface Water Flow

Estimated Groundwater Flow adapted from TEC-Weston (2018)

SJU01-SB1 Location Identifier μg/kg

PFOS 1,260

PFOA 1,260

PFBS 1,260,000

PFHpA NA

PFHxS NA

PFNA NA

Soil Screening

Criteriaa aEPA residential risk-based soil screening level determined using the EPA RSL calculator and May 2019 EPA RSL tables

TABLE NOTES:

PFOS = Perfluorooctanesulfonic acid

PFOA = Perfluorooctanoic acid

PFBS = Perfluorobutanesulfonic acid

PFHpA = Perfluoroheptanoic acid

PFHxS = Perfluorohexanesulfonic acid

PFNA = Perfluorononanoic acid

BOLD = Detected concentration

BOLD+highlight = exceeds criteria

SJU12-SD1 REG DUP

μg/kg μg/kg

Sample Date 5/30/2019 5/30/2019

Sample Depth NA NA

PFOS 1.2 J 0.96 J

PFOA 0.38 U 0.37 U

PFBS 0.34 U 0.33 U

PFHpA 0.38 U 0.37 U

PFHxS 0.15 J 0.12 J

PFNA 0.18 J 0.37 U

SJU03-SB1 REG REG

μg/kg μg/kg

Sample Date 5/28/2019 5/28/2019

Sample Depth 0.0 – 2.0 3.5 – 4.0

PFOS 55 46

PFOA 3.7 1.6

PFBS 0.094 J 0.19 U

PFHpA 9.2 1.1

PFHxS 8 1.7

PFNA 6.8 1.7

SJU03-SB2 REG REG

μg/kg μg/kg

Sample Date 5/22/2019 5/23/2019

Sample Depth 0.0 – 2.0 4.5 – 5.0

PFOS 57 2.9

PFOA 0.55 0.21 J

PFBS 0.18 J 0.21 U

PFHpA 0.34 0.24 U

PFHxS 3.9 J 0.63

PFNA 0.27 0.24 U

SJU04-SB1 REG DUP REG

μg/kg μg/kg μg/kg

Sample Date 5/22/2019 5/22/2019 5/22/2019

Sample Depth 0.0 – 2.0 0.0 – 2.0 4.5 – 5.0

PFOS 1.1 2 4.4

PFOA 0.23 U 0.11 J 0.24 U

PFBS 0.2 U 0.2 U 0.21 U

PFHpA 0.23 J 0.29 J 0.34 J

PFHxS 0.22 J 0.25 J 0.27 J

PFNA 0.23 U 0.22 U 0.24 U

SJU02-SB1 REG REG

μg/kg μg/kg

Sample Date 5/22/2019 5/22/2019

Sample Depth 0.0 – 2.0 4.5 – 5.0

PFOS 77 130

PFOA 2.4 14

PFBS 0.21 J 0.16 J

PFHpA 2 2

PFHxS 5.7 12

PFNA 0.75 0.82

SJU01-SB2 REG REG

μg/kg μg/kg

Sample Date 5/22/2019 5/22/2019

Sample Depth 0.0 – 2.0 4.7 – 5.2

PFOS 440 790

PFOA 11 23

PFBS 4.3 2.7

PFHpA 13 11

PFHxS 54 69

PFNA 2.1 2.2

SJU01-SB1 REG REG

μg/kg μg/kg

Sample Date 5/24/2019 5/24/2019

Sample Depth 0.0 – 2.0 4.5 – 5.0

PFOS 0.23 J 0.48 J

PFOA 0.19 U 0.2 U

PFBS 0.17 U 0.18 U

PFHpA 0.19 U 0.2 U

PFHxS 0.19 U 0.063 J

PFNA 0.19 U 0.2 U

F-5

File details come from the government source that posted it. Updated .