S8 BLDG_02.pdf

PDF 18 KB Posted

Attached to
PRANG - Hangar 1 Demolition Federal contract opportunity
Solicitation number
W50S9320B5001
Issued by
Department of the Army National Guard

About this file

This document outlines a federal contract opportunity for demolition services. The USPFO for Puerto Rico intends to issue an Invitation for Bid to award a firm fixed-price contract for demolition of Hangar 1 at Muniz Air Base in Carolina, Puerto Rico. Demolition includes approximately 98,000 square feet of the main building and related areas. Testing and abatement of asbestos and lead are required. Optional work includes demolition of a two-story building of approximately 2,500 square feet and demolition of communications manholes and conduits. The resulting area must be backfilled and seeded. The Department of the Army National Guard is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to PRANG - Hangar 1 Demolition, newest first.
File Type Posted
H1-54-23 HEATING PLUMBING FIRST FLOOR.pdf PDF
Government Responses 24 April 2020.pdf PDF
H1-54-02 FIRST FLOOR PLAN.pdf PDF
H1-54-13 MISCELANEOUS DETAILS.pdf PDF
H1-54-13 STRUCTURAL - FIRST FLOOR.pdf PDF
H1-54-03 SECOND FLOOR PLAN.pdf PDF
H1-54-06 WALL SECTION - WINDOW DETAILS.pdf PDF
H1-54-19 HANGAR DOOR DETAIL CANOPY.pdf PDF
H1-54-12 DOOR SHEDULE - DETAILS.pdf PDF
H1-54-14 TOILET ROOM - DETAILS.pdf PDF
H1-54-24 HEATING PLUMBING SECOND FLOOR PLAN.pdf PDF
H1-54-25 HEATING DETAILS.pdf PDF
H1-54-04 FRONT - REAR ELEVATIONS.pdf PDF
H1-54-11 STAIRS - DETAILS.pdf PDF
H1-54-01 DRAWING SCHEDULE.pdf PDF
S7 H1-54-21 STRUCTURAL BRACING DETAILS.pdf PDF
S4 H1-54-18 STRUCRURAL TRUSS.pdf PDF
S3 H1-54-17 STRUCTURAL ROOF FRAMING PLAN.pdf PDF
S1 H1-54 15 STRUCTURAL FOUNDATION - FIRST FLOOR PLAN.pdf PDF
S5 H1-54-19 STRUCTURAL DETAILS.pdf PDF
O4 Approximate Outside Demo Areas.pdf PDF
S2 H1-54-16 STRUCTURAL SECOND FLOOR FRAMING PLAN.pdf PDF
W50S9320B5001 Hangar 1 Demolition - Solicitation.pdf PDF
W50S9320B5001 Hangar 1 Demolition - Solicitation.pdf PDF
Appendix A7 Lighting and Power Plan.pdf PDF
Appendix F1 Key Component Waste Management Plan.pdf PDF
Appendix A7.1 Existing HANGAR 1 ELECTRIC PLAN.pdf PDF
Appendix D1 FAA Form 7460-1.pdf PDF
Appendix A1 Project Location.pdf PDF
Appendix E1 Publications and Forms.pdf PDF
Appendix A3 Hauling Route.pdf PDF
Appendix A8 Project Sign Details.pdf PDF
Appendix C1 Seeding Mix.pdf PDF
Appendix O1 Electric sub station to protect.pdf PDF
Appendix O2 Monitoring wells Final_SI Report_Luis Muniz ANGB_Cmprhnsv_101519_Figure_3.pdf PDF
Appendix G1 HWMP.pdf PDF
Appendix O3 Site Plan.pdf PDF
Appendix A6 Elevations Plan.pdf PDF
Synopsis Demolition Hangar 20200331.pdf PDF
Appendix B1.1 ACM Report.pdf PDF
Appendix G2 ISWMP.pdf PDF
Appendix A7.2 Existing HANGAR 1 PLUMBING.pdf PDF
Appendix B2.2 Asbestos_Plan_Building_2_Diagram.pdf PDF
Appendix A2 Demolition Site Plan.pdf PDF
Appendix B1.2 ACM Re-inspection Report.pdf PDF
Appendix A5 Second Floor Plan.pdf PDF
Appendix B2.1 Asbestos_Plan_Building_2_Description.pdf PDF
Appendix A7.3 Existing HANGHAR 1 COMM.pdf PDF
Appendix A4 First Floor Plan.pdf PDF
Synopsis - Demolition Hangar 1.pdf PDF
Show all 50

PRANG - Hangar 1 Demolition has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

29'-6"

12'-0"16'-0"

18'-0"

50'-0"

18'-4"

14'-10"

19'-4"

6" 3'-4"

File details come from the government source that posted it. Updated .