Appendix F1 Key Component Waste Management Plan.pdf

PDF 91 KB Posted

Attached to
PRANG - Hangar 1 Demolition Federal contract opportunity
Solicitation number
W50S9320B5001
Issued by
Department of the Army National Guard

About this file

This document contains the key components of a preliminary waste management plan for a federal contract opportunity to demolish Hangar 1 at Muniz Air Base in Carolina, Puerto Rico. The plan outlines procedures for waste prevention and management, including designating staff responsibilities, regular waste management meetings, approaches for recycling and reuse of materials, waste characterization and estimated quantities, identification of landfill and salvage facilities to use, and anticipated cost savings from recycling and waste diversion. Specific requirements include procedures for separating, temporarily storing, and transporting recyclable materials from the demolition site.

View the file

Other files for this federal contract opportunity

Other files attached to PRANG - Hangar 1 Demolition, newest first.
File Type Posted
H1-54-23 HEATING PLUMBING FIRST FLOOR.pdf PDF
Government Responses 24 April 2020.pdf PDF
H1-54-02 FIRST FLOOR PLAN.pdf PDF
H1-54-13 MISCELANEOUS DETAILS.pdf PDF
H1-54-01 DRAWING SCHEDULE.pdf PDF
H1-54-05 RIGHT - LEFT ELEVATIONS.pdf PDF
H1-54-08 HANGAR DOOR DETAIL.pdf PDF
H1-54-10 PARACHUTE TOWER - CHIMNEY DETAILS.pdf PDF
H1-54-07 CROSS - LOGITUDINAL SECCTION.pdf PDF
H1-54-13 STRUCTURAL - FIRST FLOOR.pdf PDF
H1-54-03 SECOND FLOOR PLAN.pdf PDF
H1-54-06 WALL SECTION - WINDOW DETAILS.pdf PDF
H1-54-19 HANGAR DOOR DETAIL CANOPY.pdf PDF
H1-54-12 DOOR SHEDULE - DETAILS.pdf PDF
H1-54-14 TOILET ROOM - DETAILS.pdf PDF
H1-54-24 HEATING PLUMBING SECOND FLOOR PLAN.pdf PDF
H1-54-25 HEATING DETAILS.pdf PDF
S3 H1-54-17 STRUCTURAL ROOF FRAMING PLAN.pdf PDF
S1 H1-54 15 STRUCTURAL FOUNDATION - FIRST FLOOR PLAN.pdf PDF
S5 H1-54-19 STRUCTURAL DETAILS.pdf PDF
O4 Approximate Outside Demo Areas.pdf PDF
S2 H1-54-16 STRUCTURAL SECOND FLOOR FRAMING PLAN.pdf PDF
S6 H1-54-20 STRUCTURAL COLUMN DETAILS.pdf PDF
S7 H1-54-21 STRUCTURAL BRACING DETAILS.pdf PDF
W50S9320B5001 Hangar 1 Demolition - Solicitation.pdf PDF
Appendix A7 Lighting and Power Plan.pdf PDF
Appendix A7.1 Existing HANGAR 1 ELECTRIC PLAN.pdf PDF
Appendix D1 FAA Form 7460-1.pdf PDF
Appendix A1 Project Location.pdf PDF
Appendix E1 Publications and Forms.pdf PDF
Appendix A2 Demolition Site Plan.pdf PDF
Appendix B1.2 ACM Re-inspection Report.pdf PDF
Appendix A5 Second Floor Plan.pdf PDF
Appendix B2.1 Asbestos_Plan_Building_2_Description.pdf PDF
Appendix A7.3 Existing HANGHAR 1 COMM.pdf PDF
Appendix A4 First Floor Plan.pdf PDF
Appendix A3 Hauling Route.pdf PDF
Appendix A8 Project Sign Details.pdf PDF
Appendix C1 Seeding Mix.pdf PDF
Appendix O1 Electric sub station to protect.pdf PDF
Appendix O2 Monitoring wells Final_SI Report_Luis Muniz ANGB_Cmprhnsv_101519_Figure_3.pdf PDF
Appendix G1 HWMP.pdf PDF
Appendix O3 Site Plan.pdf PDF
Appendix A6 Elevations Plan.pdf PDF
Synopsis Demolition Hangar 20200331.pdf PDF
Appendix B1.1 ACM Report.pdf PDF
Appendix G2 ISWMP.pdf PDF
Appendix A7.2 Existing HANGAR 1 PLUMBING.pdf PDF
Appendix B2.2 Asbestos_Plan_Building_2_Diagram.pdf PDF
Synopsis - Demolition Hangar 1.pdf PDF
Show all 50

PRANG - Hangar 1 Demolition has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F1

APPENDIX F

Key Components of the Preliminary Waste Management Plan

*Denotes Key Components required for preliminary Waste Management Plan.

a. Name of individuals on the Contractor's staff responsible for waste prevention and management.

b. Actions that will be taken to reduce solid waste generation, including coordination with subcontractors to ensure awareness and participation.

c. Description of the regular meetings to be held to address waste management.

*d. Description of the specific approaches to be used in recycling/reuse of the various materials generated, including the areas on site and equipment to be used for processing, sorting, and temporary storage of wastes.

*e. Characterization, including estimated types and quantities, of the waste to be generated.

*f. Name of landfill and/or incinerator to be used and the estimated costs for use, assuming that there would be no salvage or recycling on the project.

*g. Identification of local and regional reuse programs, including non-profit organizations such as schools, local housing agencies, and organizations that accept used materials such as materials exchange networks and Habitat for Humanity. Include the name, location, and phone number for each reuse facility to be used, and provide a copy of the permit or license for each facility.

*h. List of specific waste materials that will be salvaged for resale or recycled. Identify the recycling facilities by name, location, and phone number, including a copy of the permit or license for each facility.

i. Identification of materials that cannot be recycled/reused with an explanation or justification, to be approved by the Contracting Officer.

j. Description of the means by which any waste materials identified in item (h) above will be protected from contamination.

*k. Description of the means of transportation of the recyclable materials (whether materials will be site-separated and self-hauled to designated centers, or whether mixed materials will be collected by a waste hauler and removed from the site).

*l. Anticipated net cost savings determined by subtracting Contractor program management costs and the cost of disposal from the revenue generated by sale of the materials and the incineration and/or landfill cost avoidance.

File details come from the government source that posted it. Updated .