Appendix E1 Publications and Forms.pdf

PDF 95 KB Posted

Attached to
PRANG - Hangar 1 Demolition Federal contract opportunity
Solicitation number
W50S9320B5001
Issued by
Department of the Army National Guard

About this file

This document provides details regarding publications and forms related to a federal contract opportunity for demolition services at Muniz Air Base in Carolina, Puerto Rico. The solicitation will be for a firm fixed-price contract to demolish Hangar 1 of approximately 98,000 square feet as well as optional demolitions of a 2,500 square foot building and communications manholes. The contractor must adhere to technical orders and standards referenced in the performance work statement and obtain NFPA standards at their own expense. Publications listed as mandatory include operation and maintenance manuals for asphalt and concrete, temporary environmental controls, construction waste management, and demolition. Forms including an asbestos and lead submittal, police background check, and FAA notice of proposed construction are also mandatory.

View the file

Other files for this federal contract opportunity

Other files attached to PRANG - Hangar 1 Demolition, newest first.
File Type Posted
H1-54-04 FRONT - REAR ELEVATIONS.pdf PDF
H1-54-11 STAIRS - DETAILS.pdf PDF
H1-54-01 DRAWING SCHEDULE.pdf PDF
H1-54-05 RIGHT - LEFT ELEVATIONS.pdf PDF
H1-54-08 HANGAR DOOR DETAIL.pdf PDF
H1-54-10 PARACHUTE TOWER - CHIMNEY DETAILS.pdf PDF
H1-54-07 CROSS - LOGITUDINAL SECCTION.pdf PDF
H1-54-23 HEATING PLUMBING FIRST FLOOR.pdf PDF
Government Responses 24 April 2020.pdf PDF
H1-54-02 FIRST FLOOR PLAN.pdf PDF
H1-54-13 MISCELANEOUS DETAILS.pdf PDF
H1-54-13 STRUCTURAL - FIRST FLOOR.pdf PDF
H1-54-03 SECOND FLOOR PLAN.pdf PDF
H1-54-06 WALL SECTION - WINDOW DETAILS.pdf PDF
S8 BLDG_02.pdf PDF
S4 H1-54-18 STRUCRURAL TRUSS.pdf PDF
S3 H1-54-17 STRUCTURAL ROOF FRAMING PLAN.pdf PDF
S1 H1-54 15 STRUCTURAL FOUNDATION - FIRST FLOOR PLAN.pdf PDF
S5 H1-54-19 STRUCTURAL DETAILS.pdf PDF
O4 Approximate Outside Demo Areas.pdf PDF
S2 H1-54-16 STRUCTURAL SECOND FLOOR FRAMING PLAN.pdf PDF
S6 H1-54-20 STRUCTURAL COLUMN DETAILS.pdf PDF
S7 H1-54-21 STRUCTURAL BRACING DETAILS.pdf PDF
W50S9320B5001 Hangar 1 Demolition - Solicitation.pdf PDF
W50S9320B5001 Hangar 1 Demolition - Solicitation.pdf PDF
Appendix O3 Site Plan.pdf PDF
Appendix A6 Elevations Plan.pdf PDF
Synopsis Demolition Hangar 20200331.pdf PDF
Appendix B1.1 ACM Report.pdf PDF
Appendix G2 ISWMP.pdf PDF
Appendix A7.2 Existing HANGAR 1 PLUMBING.pdf PDF
Appendix B2.2 Asbestos_Plan_Building_2_Diagram.pdf PDF
Appendix A2 Demolition Site Plan.pdf PDF
Appendix B1.2 ACM Re-inspection Report.pdf PDF
Appendix A5 Second Floor Plan.pdf PDF
Appendix B2.1 Asbestos_Plan_Building_2_Description.pdf PDF
Appendix A7.3 Existing HANGHAR 1 COMM.pdf PDF
Appendix A4 First Floor Plan.pdf PDF
Appendix A7 Lighting and Power Plan.pdf PDF
Appendix F1 Key Component Waste Management Plan.pdf PDF
Appendix A7.1 Existing HANGAR 1 ELECTRIC PLAN.pdf PDF
Appendix D1 FAA Form 7460-1.pdf PDF
Appendix A1 Project Location.pdf PDF
Appendix A3 Hauling Route.pdf PDF
Appendix A8 Project Sign Details.pdf PDF
Appendix C1 Seeding Mix.pdf PDF
Appendix O1 Electric sub station to protect.pdf PDF
Appendix O2 Monitoring wells Final_SI Report_Luis Muniz ANGB_Cmprhnsv_101519_Figure_3.pdf PDF
Appendix G1 HWMP.pdf PDF
Synopsis - Demolition Hangar 1.pdf PDF
Show all 50

PRANG - Hangar 1 Demolition has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E1

APPENDIX E

Publications and Forms

E.1. The Contractor shall adhere to the intent of the publications referenced in the PWS. In addition to those, technical orders and standards that apply to the PWS are listed below. The Government has coded publications as mandatory (M) or advisory (A). The Contractor shall be guided by those publications or use those forms to the extent necessary to accomplish requirements in this PWS. The Contractor shall obtain the various referenced NFPA standards at Contractor expense. The Government, at the start of the contract, will provide hard copies of all AF and Government publications which are not available via the following internet web locations: AF publications and forms http://www.esd.whs.mil/DD/DoD-Issuances/ . The Contractor shall ensure the most current publications are utilized to include supplements or amendments to listed publications from any organizational level that may be issued during the life of the contract. The COR will forward supplements or amendments to listed publications and forms that are not available on these web sites. The Government will continue to supply Government forms needed for daily operations. Upon completion of the contract, the Contractor shall return to the Government all issued publications and unused forms.

Table E.2.

Publication No.

Section/Para/Line Title Mandatory/

Advisory Applicable Sections

UFC 3-270-01 O&M Manual: Asphalt and Concrete Pavement Maintenance and Repair

M All

UFGS 01 57 19 Temporary Environmental Controls M All

UFGS 01 74 19 Construction and Demolition Waste Management M All

UFGS 02 41 00 Demolition and Deconstruction M All UFGS 02 81 00 Transportation and Disposal of

Hazardous Materials M All

UFGS 02 82 13.00 10 Asbestos Abatement M All UFGS 02 82 16.00 20 Engineering Control of Asbestos

Containing Materials M All

UFGS 02 83 13.00 20 Lead in Construction M All UFGS 02 83 19.13 10 Lead-Based Paint Abatement M All AF Form 3000 Material Approval Submittal M All DD Form 369 Police Record Check M All FAA Form 7460-1 Notice of Proposed Construction or Alteration M All

File details come from the government source that posted it. Updated .