RFI and Response document (as of 23 Nov 26).pdf
PDF 74 KB Posted
- Attached to
- B422 BREAKROOM, B300 BDOC
- Solicitation number
- W50S8R27BA002
About this file
This document is a Questions and Answers file containing Requests for Information (RFIs) and official responses for federal solicitation W50S8R-27-B-A002, issued as of November 23, 2026. The solicitation involves construction or renovation work at the 179th Cyberspace Wing located at 1947 Harrington Memorial Road, Mansfield, Ohio 44903. The corrected bid opening date is December 10, 2026 at 1:00 PM EST. Sealed bids may be delivered by commercial carrier (FedEx, UPS, or mail) addressed to 179th Cyberspace Wing, Attention Gordon Strom, and must arrive on-base prior to the bid opening date and time to be considered timely; an authorized on-base individual will sign for delivery and notify the Contracting Office.
The RFIs address technical specifications and project logistics across two contract line items (CLIN 0001 and CLIN 0002). Regarding finish materials, the contractor must provide carpet tile flooring complying with Section 09 68 00; resilient flooring and cove base products complying with Section 09 65 00; and acoustical ceiling tiles complying with Section 09 51 00, with the contractor responsible for procuring ceiling tile as required for grid modification associated with new wall construction. Existing domestic water shutoffs for the B422 kitchenette sink are located within the sink base cabinet, with existing plumbing to remain in place and the contractor coordinating any temporary water shutdowns needed for sink removal and replacement. A pre-bid site visit was held on November 17, 2026, with to-scale drawings provided for both CLINs; demolition of walls and flooring in the B422 kitchenette area may proceed during normal business hours with no requirement for after-hours or weekend work, as the area will be cordoned off and affected occupants will relocate to alternative work locations.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Requests for Information (RFI’s) and Responses – Solicitation #: W50S8R-27-B-A002
(as of 23 Nov 26)
RFI 01
1. Bid opening date. Block 13A of the SF 1442 and the SAM.gov notice text appear to show different bid opening dates (Wednesday, December 9, 2026 and Thursday, December 10, 2026, both at 1:00 PM EST). Please confirm the correct date and time for bid opening.
2. Commercial carrier delivery. Section 00 21 00, paragraph 5, describes hand-carried bids delivered to the main gate at 1947 Harrington Memorial Rd. Will a sealed bid delivered by a commercial carrier (for example, FedEx or UPS) before the bid opening time be accepted as timely? If so, please advise the exact delivery address, how the outer envelope should be marked, and who will sign for and take custody of the package.
RESPONSE:
- Bid opening date is 10 Dec 2026 (solicitation has been amended/uploaded to SAM.gov)
- Yes, bids delivered through normal mail or a carrier are acceptable, and should be addressed in the same manner as hand-delivered bids:
o 179th Cyberspace Wing – Attn: Gordon Strom o 1947 Harrington Memorial Rd.
o Mansfield, Ohio 44903
A individual authorized to receipt deliveries on-base will sign for package, and notify the Contracting Office of delivery. Note: if delivery of bid package is not received on base prior to bid opening date and time, as noted in solicitation, the bid will be marked “Late”.
RFI 02
1. Please provide carpet tile spec in B300 – manufacturer, style, and size
RESPONSE: Contractor shall provide carpet tile flooring products, including size and performance characteristics, complying with Section 09 68 00.
2. Please provide resilient floor spec in B300 and B422 - manufacturer, style, and size
RESPONSE: Contractor shall provide resilient flooring products, including size and performance characteristics, complying with Section 09 65 00.
3. Please provide cove base spec in B300 and B422 – manufacturer, style, and size
RESPONSE: Contractor shall provide resilient flooring products, including size and performance characteristics, complying with Section 09 65 00.
4. Please provide ceiling tile spec in B422 – manufacturer, style, and size. Or is there attic stock we can use?
RESPONSE: See added spec section 09 51 00, Acoustical Ceilings for ceiling tile requirements.
Contractor to procure ceiling tile as required for grid modification associated with the new wall.
5. B422 sink – are the water shutoffs in the cabinet or above the ceiling?
RESPONSE: Existing domestic water shutoffs are located within the sink base cabinet at the wall stub-out. Existing plumbing is intended to remain in place.
Contractor shall coordinate any temporary shutdowns required to complete sink removal and replacement.
RFI 03
1. Will there be a measurements meeting or is there to-scale drawings available?
RESPONSE: Pre-bid/site visit on 17 Nov was opportunity to take measurements and view project sites. Attached are to-scale drawings of areas for both CLIN 0001 and 0002.
RFI 04
1. B422 Kitchenette – Can the demolition of walls and flooring be done after hours or weekends?
RESPONSE: There shouldn’t be a need for after-hours or weekend work. The area will be cordoned off. Contractor does not have to account for “distracting workers in the area”. The occupants on that side of the wall/hallway will be making alternative work location plans.