RFI 02 response_attachment_B300 BDOC 09 65 00.pdf
PDF 42 KB Posted
- Attached to
- B422 BREAKROOM, B300 BDOC
- Solicitation number
- W50S8R27BA002
About this file
This document is Section 09 65 00 of a federal specification for resilient flooring installation and materials, effective November 2024.
The specification establishes comprehensive requirements for luxury vinyl tile, wall base, mouldings, adhesives, and related flooring accessories for federal construction projects. Products must conform to multiple ASTM standards covering vinyl composition tile, rubber flooring, cork tile, linoleum, sheet vinyl, and solid vinyl tile. Luxury vinyl tile must meet ASTM F1700 Class III standards with specified wear layer thickness (minimum 0.020 to 0.030 inches) and overall thickness options ranging from 0.098 to 0.375 inches, designed for heavy commercial use with rolling desk chair traffic. Wall base must conform to ASTM F1861 in rubber or vinyl composition, available in 4 or 6-inch heights. All floor covering materials and adhesives must be certified for indoor air quality through FLOORSCORE, UL 2818 (GREENGUARD) Gold, or SCS Global Services Indoor Advantage Gold certification programs. Adhesives must be asbestos-free and comply with CDPH Section 01350 or SCAQMD Rule 1168 emissions requirements. The specification requires critical radiant flux testing of minimum 0.22 to 0.45 watts per square centimeter per ASTM E648 or NFPA 253 for corridor and exit flooring.
Installation requirements mandate surface preparation per ASTM F710 with floors flat to within 3/16 inch in 10 feet, moisture and alkalinity testing per ASTM F1869 or F2170, and bond testing per manufacturer instructions. Submittals requiring government approval include shop drawings, product data, samples, test reports for moisture and alkalinity, and certifications for indoor air quality and sustainable harvesting. Contractors must maintain environmental conditions of 70-85 degrees Fahrenheit for three days before, during, and two days after installation. Extra materials must be provided at rates of 5 tiles or square feet per 1000 units installed, with 20 linear feet of wall base supplied from the same production lot as installed materials.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 09 65 00
RESILIENT FLOORING
11/24
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN FOREST FOUNDATION (AFF)
ATFS STANDARDS (2021) American Tree Farm System Standards of Sustainability
ASTM INTERNATIONAL (ASTM)
ASTM D2240 (2015; E 2017) Standard Test Method for Rubber Property - Durometer Hardness
ASTM D4078 (2002; R 2015) Water Emulsion Floor Polish
ASTM D5603 (2001; R 2008) Rubber Compounding Materials - Recycled Vulcanizate Particulate Rubber
ASTM E648 (2023) Standard Test Method for Critical Radiant Flux of Floor-Covering Systems Using a Radiant Heat Energy Source
ASTM F710 (2022) Standard Practice for Preparing Concrete Floors to Receive Resilient Flooring
ASTM F1066 (2023) Standard Specification for Vinyl Composition Floor Tile
ASTM F1303 (2004; R 2021) Standard Specification for Sheet Vinyl Floor Covering with Backing
ASTM F1344 (2021a) Standard Specification for Rubber Floor Tile
ASTM F1482 (2021) Standard Practice for Installation and Preparation of Panel Type Underlayments to Receive Resilient Flooring
ASTM F1516 (2023) Standard Practice for Sealing Seams of Resilient Flooring Products by the Heat Weld Method (when Recommended)
ASTM F1700 (2024) Standard Specification for Solid Vinyl Floor Tile
ASTM F1859 (2021a) Standard Specification for Rubber Sheet Floor Covering Without Backing
ASTM F1860 (2021) Standard Specification for Rubber Sheet Floor Covering With Backing
ASTM F1861 (2021) Standard Specification for Resilient Wall Base
ASTM F1869 (2023) Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride
ASTM F1913 (2004; R 2014) Vinyl Sheet Floor Covering Without Backing
ASTM F2034 (2008; R 2013) Sheet Linoleum Floor Covering
ASTM F2169 (2015; R 2020; E 2020) Standard Specification for Resilient Stair Treads
ASTM F2170 (2019a) Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in situ Probes
ASTM F2195 (2018; R 2023) Linoleum Floor Tile
ASTM F3008 (2013; R 2020) Standard Specification for Cork Floor Tile
ASTM F3261 (2020) Standard Specification for Resilient Flooring in Modular Format with Rigid Polymeric Core
CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (CDPH)
CDPH SECTION 01350 (2017; Version 1.2) Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources using Environmental Chambers
CSA GROUP (CSA)
CSA Z809-16 (R2021) Sustainable Forest Management
FOREST STEWARDSHIP COUNCIL (FSC)
FSC STD 01 001 (2015) Principles and Criteria for Forest Stewardship
GREEN SEAL (GS)
GS-36 (2013) Adhesives for Commercial Use
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 253 (2011) Standard Method of Test for Critical Radiant Flux of Floor Covering Systems Using a Radiant Heat Energy Source
PROGRAMME FOR ENDORSEMENT OF FOREST CERTIFICATION (PEFC)
PEFC ST 2002:2013 (2015) PEFC International Standard Chain of Custody of Forest Based Products Requirements
SCIENTIFIC CERTIFICATION SYSTEMS (SCS)
SCS SCS Global Services (SCS) Indoor Advantage
SOCIETY FOR PROTECTIVE COATINGS (SSPC)
SSPC Guide 21 (2015) Guide to Evaluation of Slip and Fall Resistance of Flooring Surfaces
SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD)
SCAQMD Rule 1168 (2022) Adhesive and Sealant Applications
SUSTAINABLE FOREST INITIATIVE (SFI)
SFI 22 (2022) Standards and Rules for Forest Management, Fiber Sourcing, Chain of Custody, and Certified Sourcing
TILE COUNCIL OF NORTH AMERICA (TCNA)
TCNA A326.3 (2022) American National Standard Test Method for Measuring Dynamic Coefficient of Friction of Hard Surface Flooring Materials
UL SOLUTIONS (UL)
UL 2818 (2022) GREENGUARD Certification Program For Chemical Emissions For Building Materials, Finishes And Furnishings
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Resilient Flooring and Accessories ; G
SD-03 Product Data
Resilient Flooring and Accessories ; G
Adhesives
Luxury Vinyl Tile
Recycled content for Luxury Vinyl Tile ; S
Wall Base
Mouldings
SD-04 Samples
Resilient Flooring and Accessories ; G
SD-06 Test Reports
Moisture, Alkalinity, and Bond Tests ; G
SD-07 Certificates
Indoor Air Quality for Luxury Vinyl Tile ; S
Indoor Air Quality for Wall Base ; S
Indoor Air Quality for Adhesives ; S
SD-08 Manufacturer's Instructions
Surface Preparation ; G
Installation ; G
SD-10 Operation and Maintenance Data
Resilient Flooring and Accessories ; G
1.3 CERTIFICATES
1.3.1 Indoor Air Quality
Submit required indoor air quality certifications and validations in one submittal package.
1.3.1.1 Floor Covering Materials
Provide [Vinyl Composition Tile][Sheet Vinyl Flooring][Rubber Tile][Rubber Sheet Flooring][ Luxury Vinyl Tile ][Solid Vinyl Tile] [Sheet Linoleum][Linoleum Tile][Cork Flooring], and wall base products certified to meet indoor air quality requirements by FLOORSCORE, UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification by other third-party programs. Provide current product certification documentation from certification body.
1.3.1.2 Adhesives, Caulking, and Sealants
Provide asbestos-free products certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification or validation by other third-party programs that products meet the requirements of this Section. Provide current product certification documentation from certification body. When product does not have certification, provide validation that product meets the indoor air quality product requirements cited herein.
1.3.2 Certified Sustainably Harvested Wood
Provide wood certified as sustainably harvested by FSC STD 01 001 , ATFS STANDARDS, CSA Z809-16 , SFI 22 Standards and Rules, or other third party program certified by PEFC ST 2002:2013 . Provide a letter of Certification of Sustainably Harvested Wood signed by the wood supplier.
Identify certifying organization and their third party program name and indicate compliance with chain-of-custody program requirements. Submit sustainable wood certification data; identify each certified product on a line item basis. Submit copies of invoices bearing certification numbers.
1.4 DELIVERY, STORAGE, AND HANDLING
Deliver materials to the building site in original unopened containers bearing the manufacturer's name, style name, pattern color name and number, production run, project identification, and handling instructions. Store materials in a clean, dry, secure, and well-ventilated area with ambient air temperature maintained above 68 degrees F and below 85 degrees F , stacked according to manufacturer's recommendations. Protect materials from the direct flow of heat from hot-air registers, radiators and other heating fixtures and appliances.
Observe ventilation and safety procedures specified in the MSDS. Do not store [_____] near materials that may offgas or emit harmful fumes, such as kerosene heaters, fresh paint, or adhesives.
1.5 ENVIRONMENTAL REQUIREMENTS
Maintain areas to receive resilient flooring at a temperature above 70 degrees F and below 85 degrees F for 3 days before application, during application and 2 days after application, unless otherwise directed by the flooring manufacturer for the flooring being installed. Maintain a minimum temperature of 55 degrees F thereafter. Provide adequate ventilation to remove moisture from area and to comply with regulations limiting concentrations of hazardous vapors.
1.6 SCHEDULING
Schedule resilient flooring application after the completion of other work which would damage the finished surface of the flooring.
1.7 WARRANTY
Provide manufacturer's standard performance guarantees or warranties that extend beyond a one year period.
1.8 EXTRA MATERIALS
Provide extra flooring material of each color and pattern at the rate of [ [_____] [ 5] tiles for each 1000 tiles ] [and] [[_____] [5] square feet for each 1000 square feet of sheet flooring] installed. Provide extra wall base material composed of 20 linear feet of each type, color and pattern.
Package all extra materials in original properly marked containers bearing the manufacturer's name, brand name, pattern color name and number, production run, and handling instructions. Provide extra materials from the same lot as those installed. Leave extra stock at the site in location assigned by Contracting Officer.
PART 2 PRODUCTS
2.1 LUXURY VINYL TILE [TYPE [_____]]
Conform to ASTM F1700 Class III printed film with a minimum wear layer thickness [ 0.020 inch (20 mil) ][ 0.030 inch (30 mil)] [_____] and minimum overall thickness [[ 0.098 inch ] [or] [ 0.118 inch ]] [ 0.197 inch [ with non slip/skid backing]][ 0.375 inch [ with non slip/skid backing]][ 3 mm [_____] inch [ with non slip/skid backing] ] , Type [A (smooth)] [ B (embossed) ] . Provide heavy commercial, glue-down luxury vinyl tile suitable for continuous office use and rolling desk chair traffic. Provide [ [1 24 by 24 ] [_____] inch square ][ [12] [16] [18] [24] [36] [_____] inch square] [_____] tile. [ Provide tile with concealed water-blocking interlocking joints.][ Provide tile with a factory protective finish that enhances cleanability , stain resistance, and durability. Provide flooring recommened by the manufacturer for heavy commercial traffic and rolling loads. ]
[ Provide Luxury Vinyl Tile containing a minimum of 35 percent recycled content. Provide data identifying percentage of recycled content for Luxury Vinyl Tile . ]
[ Provide certification of indoor air quality for Luxury Vinyl Tile . ]
[ Provide ASTM F3261 solid core[ tile ][and][ plank ]flooring with rigid polymeric core[ and concealed interlocking edges] and minimum overall thickness[ 0.187 inch ][ [_____] inch ]. ]
2.2 WALL BASE
Conform to ASTM F1861, [[ Type TS (vulcanized thermoset rubber)] [or] [ Type TP (thermoplastic rubber) ]] [, or] [Type TV (thermoplastic vinyl)] , [Style A (straight - installed with carpet)] [,] [and] [ Style B (coved -installed with resilient flooring) ] [, ] [and] [Style C (butt toe cove installed with 1/8 inch thick flooring)] . Provide [ 4] [6] inch high and a minimum 1/8 inch thick wall base. Provide [preformed] [ job formed ] corners in matching height, shape, and color. .]
[ Provide certification of indoor air quality for Wall Base . ]
2.3 MOULDINGS
Provide tapered mouldings of [[vinyl] [or] [rubber]] [[_____]-colored anodized aluminum] [ clear anodized aluminum ] and types as recommended by flooring manufacturer for both flooring edges , interruptions, and transitions to adjacent of flooring materials finishes specified . Provide vertical lip on moulding of maximum 1/4 inch . Provide bevel change in level between 1/4 and 1/2 inch with a slope no greater than 1:2. Provide mouldings and edge trim at exposed flooring terminations, transitions, and at location where flooring abuts existing equipment or construciton designated to remain.
2.4 ADHESIVES
Provide asbestos-free adhesives for flooring, base and accessories as recommended by the manufacturer and comply with local indoor air quality standards. Submit manufacturer's descriptive data, documentation stating physical characteristics, and mildew and germicidal characteristics.
Provide non-aerosol adhesive products used on the interior of the building (defined as inside of the weatherproofing system) that meet either emissions requirements of CDPH SECTION 01350 (limit requirements for either office or classroom spaces regardless of space type) or VOC content requirements of SCAQMD Rule 1168 . Provide aerosol adhesives used on the interior of the building that meet either emissions requirements of
CDPH SECTION 01350 (use the office or classroom requirements, regardless of space type) or VOC content requirements of GS-36. Provide certification or validation of indoor air quality for adhesives .
2.5 SURFACE PREPARATION MATERIALS
Provide asbestos-free surface preparation materials, such as panel type underlayment, lining felt, leveling compounds, and floor crack fillers as recommended by the flooring manufacturer for the subfloor conditions.
Comply with ASTM D5603 and ASTM F1482 for panel type underlayment products.
2.6 POLISH/FINISH
Do not provide Provide polish or finish unless as recommended by the manufacturer for the selected product. Where recommended by the manufacturer, provide product and application in accordance with manufacturer’s written instructions. and conform to ASTM D4078 for polish. Confirm that polish finishes meet dry and wet coefficient of friction per TCNA A326.3 , SSPC Guide 21 , as applicable.
2.7 CAULKING AND SEALANTS
Provide asbestos-free caulking and sealants in accordance with Section
07 92 00 JOINT SEALANTS.
2.8 ACCESSORIES
Provide accessories necessary to complete transitions, coves, terminations, caps, accent bands, and trim as recommended by the resilient flooring and accessories manufacturers in writing. Provide accessories necessary to complete transitions, coves, terminations, caps, trim, and exposed flooring edges as recommended by the resilient flooring and accessories manufacturers in writing. Provide accessories required to produce clean and durable terminations at floor penetrations, fixed equipment, and other conditions where flooring cannot extend continuously beneath existing items designated to remain.
2.9 MANUFACTURER'S COLOR, PATTERN, AND TEXTURE
Provide color, pattern and texture for resilient flooring and accessories selected by the Government from manufacturer's standard colors and patterns [in accordance with Section 09 06 00 SCHEDULES FOR FINISHES] [as indicated on the drawings] [selected from manufacturer's standard colors] [[_____].
Color listed is not intended to limit the selection of equal colors from other manufacturers] . [ Provide floor patterns as specified on the [drawings Sheet No. [_____]] [_____].] Provide flooring in any one continuous area or replacement of damaged flooring in continuous area from same production run with same shade and pattern. Submit scaled drawings indicating patterns (including location of patterns and colors) and dimensions. Submit manufacturer's descriptive data and [ three ] [_____] samples of each indicated color and type of flooring, base, mouldings, [heat welding bead] , and accessories sized a minimum 6 by 9 inch . [Submit welded-seam samples of seamless-installation with resilient flooring and accessories samples for each seamless resilient sheet type, color, and pattern; place seam at center of 6 by 9 inch sample run lengthwise with sample applied over a board prepared by the flooring installer.] Submit Data Package 1 in accordance with Section 01 78 23 OPERATION AND
MAINTENANCE DATA.
2.10 FIRE RESISTANCE TESTING REQUIREMENTS
Provide a minimum average critical radiant flux of [0.22][0.45] watts per square centimeter for flooring in corridors and exits when tested in accordance with ASTM E648 or NFPA 253 .
PART 3 EXECUTION
3.1 EXAMINATION
Examine and verify that site conditions are in agreement with the design package. Report all conditions that will prevent a proper installation .
Do not take any corrective action without written permission from the Government. Work will proceed only when conditions have been corrected and accepted by the installer. Submit manufacturer's printed installation instructions for all flooring materials and accessories, including preparation of substrate, seaming techniques, and recommended adhesives.
3.2 SURFACE PREPARATION
Provide a smooth, true, level plane for surface preparation of the flooring, except where indicated as sloped. Floor to be flat to within 3/16 inch in 10 feet . Prepare subfloor in accordance with flooring manufacturer's printed instructions. Prepare the surfaces of lightweight concrete slabs (as defined by the flooring manufacturer) as recommended by the flooring manufacturer. Comply with ASTM F710 for concrete subfloor preparation. Before any work under this section is begun, correct all defects such as rough or scaling concrete, chalk and dust, cracks, low spots, high spots, uneven surfaces, residual adhesive, and failed or unsuitable existing coatings. Repair all damaged portions of concrete slabs as recommended by the flooring manufacturer. Remove coatings, paint, varnish, oils, release agents, sealers, waxes, adhesives, and other materials that would impair adhesion or otherwise prevent proper installation, as required by the flooring manufacturer. Provide floor fills, patching compounds, leveling compounds, and other surface preparation materials as recommended by the flooring manufacturer for existing substrate conditions. Floor fills or toppings may be required as recommended by the flooring manufacturer. Install underlayments, when required by the flooring manufacturer, in accordance with manufacturer's printed installation instructions. Comply with ASTM F1482 for panel type underlayments. Before any work under this section is begun, correct all defects such as rough or scaling concrete, chalk and dust, cracks, low spots, high spots, and uneven surfaces. Repair all damaged portions of concrete slabs as recommended by the flooring manufacturer. Remove concrete curing and sealer compounds from the slabs, other than the type that does not adversely affect adhesion. Remove paint, varnish, oils, release agents, sealers, waxes, and adhesives, as required by the flooring product in accordance with manufacturer's printed installation instructions.
3.3 MOISTURE, ALKALINITY, AND BOND TESTS
Determine the suitability of the concrete subfloor for receiving the resilient flooring with regard to moisture content and pH level by moisture and alkalinity tests. Conduct moisture testing in accordance with ASTM F1869 or ASTM F2170, unless otherwise recommended by the flooring manufacturer. Conduct alkalinity testing as recommended by the flooring manufacturer. Determine the compatibility of the resilient flooring adhesives to the concrete floors by a bond test in accordance with the flooring manufacturer's printed installation instructions.
Submit copy of test reports for moisture and alkalinity content of concrete slab, and bond test stating date of test, person conducting the test, and the area tested.
3.4 GENERAL INSTALLATION
Do not install building construction materials that show visual evidence of biological growth.
Comply with manufacturer's written instructions for installing resilient sheet flooring and for unrolling and stabilizing flooring materials and accessories prior to installation . [ Minimize the number of seams in sheet flooring, especially in high traffic or conspicuous locations. Avoid cross seams.]
3.5 PLACING LUXURY VINYL TILES
[ Install luxury vinyl tile flooring using [ glue down ] [loose lay (room perimeter adhesive only)] installation. ] Install flooring and accessories in accordance with manufacturer's printed installation instructions. Prepare and apply adhesives in accordance with manufacturer's printed installation instructions for installation method specified. Keep tile lines and joints square, symmetrical, tight, and even. Keep each floor in true, level plane, except where slope is indicated. Vary edge width as necessary to maintain full-size tiles in the field, no edge tile to be less than one-half the field tile size, except where irregular shaped rooms make it impossible. Cut flooring to fit around all permanent fixtures, built-in furniture and cabinets, pipes, and outlets , and existing equipment designated to remain . Cut, fit, and scribe edge tile to walls and partitions after field flooring has been applied. Provide clean, straight, and durable terminations at interruptions in flooring, including locations where flooring abuts fixed equipment that remains in place during construction. Install transition and edge accessories as required for a complete installation.
3.6 PLACING MOULDINGS
Provide mouldings where flooring termination is higher than the adjacent finished flooring and at transitions between different flooring materials. When required, locate mouldings under door centerline.
Mouldings are not required at doorways where thresholds are provided.
[Secure mouldings with adhesive as recommended by the manufacturer.
Prepare and apply adhesives in accordance with manufacturer's printed installation instructions.] [ Anchor aluminum mouldings to floor surfaces as recommended by the manufacturer. ]
3.7 PLACING WALL BASE
Install wall base in accordance with manufacturer's printed installation instructions. Prepare and apply adhesives in accordance with manufacturer's printed installation instructions. Tighten base joints and make even with adjacent resilient flooring. Fill voids along the top edge of base at masonry walls with caulk. Roll entire vertical surface of base with hand roller, and press toe of base with a straight piece of wood to ensure proper alignment. Avoid excess adhesive in corners.
3.8 CLEANING
Immediately upon completion of installation of flooring in a room or an area, dry and clean the flooring and adjacent surfaces to remove all surplus adhesive. Clean flooring as recommended in accordance with manufacturer's printed maintenance instructions and within the recommended time frame. As required by the manufacturer, apply the recommended number of coats and type of polish and finish in accordance with manufacturer's printed instructions.
3.9 PROTECTION
From the time of installation until acceptance, protect flooring from damage as recommended by the flooring manufacturer. Protect flooring from rolling loads, construction traffic, moisture, staining, indentation, and damage from moving equipment or furnishings. Remove and replace flooring which becomes damaged, loose, broken, or curled and wall base which is not tight to wall or securely adhered.
-- End of Section --
File details come from the government source that posted it. Updated .