This file is a Pre-Bid Conference presentation slide deck for Invitation for Bid (IFB) W50S8R-27-B-A002, issued by the United States Property & Fiscal Officer for Ohio on behalf of the 179th Cyberspace Wing, Air National Guard, located in Mansfield, Ohio. The solicitation encompasses two firm-fixed price construction projects: Project No. PBXP 272018 for renovation of Building 422's second floor breakroom with expansion and upgrades (CLIN 0001), and Project No. PBXP 272019 for renovation of Building 300 BDOC and Battelstaff rooms (CLIN 0002), with CLIN 0003 as an optional task associated with B300 BDOC. This solicitation is a 100% small business set-aside under NAICS Code 236220 with a $45 million size standard, with project magnitude estimated between $0.00 and $150,000. The bid opening was scheduled for December 10, 2026, at 1:00 PM EST at the facility, with award anticipated prior to December 31, 2026. Bidders must arrive at least 15 minutes prior to bid closing and hand-carry all bid documents to the Contracting Officer; late bids will not be accepted.

The presentation outlines critical requirements including completion of all bid package documentation per Section 00 10 00 Notes with required signatures, bid schedules, CLINs, Section 00 45 00 representations and certifications, and Section 01 00 00 general contract conditions. A bid bond is required per FAR 52.228-1, and performance and payment bonds are required per FAR 52.228-15. Bidders must comply with current Department of Labor construction wage rates, which will be updated ten days prior to bid opening. Award will be made without discussion to the responsible bidder whose bid is most advantageous considering price and responsibility. All requests for information must be submitted through the Contracting Officer, Gordon Strom (gordon.strom.1@us.af.mil), using the RFI template provided in Section 00 21 00, with responses posted non-attributively to SAM.gov. Working conditions require all on-site workers to undergo background investigations for security clearance, daily safety briefings, vehicle inspections at base entry, and coordination with the Contracting Officer's Representative for delivery driver access.

View the file

Other files

File Type Posted
RFI 03 response_B422 Breakroom Dimensions.pdf PDF
RFI and Response document (as of 23 Nov 26).pdf PDF
RFI 03 response_B300 BDOC Dimensions.pdf PDF
W50S8R27BA002 0003_Amendment 03.pdf PDF
RFI and Response document (as of 18 Nov 26).pdf PDF
RFI 02 response_attachment_B422 Breakroom 09 65 00.pdf PDF
RFI 02 response_attachment_B300 BDOC 09 68 00.pdf PDF
W50S8R27BA002 0003_Amendment 03 (conformed copy).pdf PDF
RFI 02 response_attachment_B300 BDOC 09 65 00.pdf PDF
RFI 02 response_attachment_B422 Breakroom 09 51 00.pdf PDF
Pre-Bid attendance.pdf PDF
Pre-Bid Conference minutes.pdf PDF
Attachment 01c_B422 Breakroom_Specifications.pdf PDF
W50S8R27BA002 0002_Amendment 02.pdf PDF
RFI and Response document (as of 13 Nov 26).pdf PDF
W50S8R27BA002 0002_Amendment 02 (conformed copy).pdf PDF
Attachment 02c_B300 BDOC_Specifications.pdf PDF
Contractor Access form.pdf PDF
W50S8R27BA002 0001_Amendment 01 (conformed copy).pdf PDF
W50S8R27BA002 0001_Amendment 01.pdf PDF
Attachment 02a_B300 BDOC_SOW.pdf PDF
Exhibit B_Checklist for Bid Bonds.pdf PDF
Attachment 02b_B300 BDOC_Drawings.pdf PDF
Attachment 01a_B422 Breakroom_SOW.pdf PDF
W50S8R27BA002_B422 Breakroom and B300 BDOC.pdf PDF
Exhibit A_Sealed Bid Checklist_Reminders.pdf PDF
Attachment 01b_B422 Breakroom_Drawings.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B422 Breakroom; B300 BDOC

IFB: W50S8R-27-B-A002

PRE-BID/SITE VISIT CONFERENCE

17 November 2026

U N I T E D S T A T E S P R O P E R T Y & F I S C A L O F F I C E R for O H I O Module 4 2008

Before we get started… Subcontractors Presence is not a Government endorsement Conversations Past, present, future Pictures Allowed…Ask before taking Parameters Red-lines

KEY PERSONNEL

Contracting Officer Gordon Strom – 179th Contracting Contracting Officers Representative Capt Clayton McCarthy – 179th CW/Deputy Base Civil Engineer Joe Logan – 179th Civil Engineering Other Personnel

SCOPE

Firm-Fixed Price Construction Project Project No: PBXP 272018 – Renovation of B422 second floor breakroom; expansion and upgrades.

Project No: PBXP 272019 – Renovate B300 BDOC and Battelstaff rooms.

INVITATION FOR BID (IFB)

Small business set-aside (100%) NAISC 236220 $45 Million Size Standard $0.00 and $150,000 Public Bid Opening 10 Dec @ 1:00 PM This Bldg. and room Arrive minimum 15 minutes prior to bid closing, to ensure all bid documents are submitted to Contracting Officer no later than bid opening time (if hand-carrying bid).

Late bids will not be accepted.

SUBMISSION REQUIREMENTS

SEE SECTION 00 10 00 NOTES AND SECTION 00 21 00 INSTRUCTIONS, CONDITIONS, AND NOTICE TO OFFERORS.

CLIN 0001 is B422 Breakroom; CLIN 0002 is B300 BDOC. CLIN 0003 is an option associated with B300 BDOC (see statement of work).

Note any post-award requirements in Section 01 00 00.

PRICE

As a result of this solicitation, the Government intends to award a Firm Fixed Price (FFP) contract resulting from this solicitation to the responsible bidder whose bid, conforming to the invitation for bids, will be most advantageous to the Government, considering price & Responsibility.

CONSTRUCTION WAGE RATES/BONDS

Most current DOL Construction Wage rates will apply Wage determination will be updated 10 days prior to bid opening, if there is an updated wage determination.

BID BOND:

Required SEE 52.228-1 ***IMPORTANT: ensure bid bond is submitted as specified in Section 00 10 00 Notes, 4.(c).***

Performance and Payment Bond Required SEE 52.228-15

IMPORTANT REMINDERS

IFB Award will be made without discussion

READ ENTIRE SOLICITATION REQUIREMENTS CAREFULLY

Ensure Bid Package is Complete and all signatures are present (sec 00 10 00 note 4) Plus Bid Schedule/CLIN filled out Ensure Section 00 45 00 Reps/Certs are completed Read Section 01 00 00 General Contract Conditions Anticipate Award prior to 31 Dec 2026.

SOLICITATION QUESTIONS

Submit ALL RFI’s (requests for information) to the Contracting Officer at the email show below. DO NOT contact 179th Civil Engineering personnel or any other Government employee directly. Doing so will only delay your answer. ALL questions shall come through the Contracting Office. RFI format within solicitation shall be used by contractor for all questions; template sent out with solicitation Email: gordon.strom.1@us.af.mil ***ALL RFI’s need to come from prime contractor submitting bid; please ensure subcontractors are sending you their RFI’s, for you to submit contracting officer***

ANSWERS TO QUESTIONS

All Questions/Requests are answered and distributed on a Non-Attribution Basis and will be posted to Contract Opportunities on SAM.gov website.

Addendums will be issued for RFI’s answered and any applicable documents will be posted to noted website.

Amendments will be issued for any Solicitation changes and will be posted to noted website.

Check Web Site Regularly And Don’t Forget To Refresh Web Page Submit all questions/RFI’s NO LATER THAN 5th business day prior to bid due date.

Give more time if expected response is likely to lead to impactful changes to solicitation.

HELPFUL WEBSITES

https://sam.gov/ Home will have links to Contract Opportunities, SAM registration and wage determinations.

SS 2011 Module 5

IFB DUE DATE

10 Dec 26 @ 1:00 PM EST Will only be changed by issuing an Amendment to IFB

General Working Conditions There should not be any unreasonable mitigated access to/from work site. However, note current Security gate/installation access procedures. Clean-up as needed to prevent Foreign Object Debris (FOD) from roadways (including mud clods, etc), if applicable.

Daily safety briefings by site superintendent.

All vehicles entering the base will be inspected daily.

All on-site workers for any duration shall require a background investigation (Security access form); specific clearance guidance will be provided post-award/pre-construction meeting).

Delivery drivers may require security clearance or front gate pass; however, they shall be coordinated through COR (will cover more in-depth during pre-construction meeting).

General Conditions Electricity and water available will provided in reasonable amounts to facilitate construction. Note specification requirements for use of utilities.

Primary access to projects site shall be through front gate.

Access to and from B300 may require additional procedures; if applicable, these will be addressed during post-award/pre-construction meeting.

END OF PRESENTATION