RFI and Response document (as of 18 Nov 26).pdf
PDF 73 KB Posted
- Attached to
- B422 BREAKROOM, B300 BDOC
- Solicitation number
- W50S8R27BA002
About this file
This document is a Questions and Answers record for federal contract solicitation W50S8R-27-B-A002 issued by the 179th Cyberspace Wing, an Air Force entity located in Mansfield, Ohio, as of November 18, 2026.
RFI 01 addresses bid submission procedures. The bid opening date is confirmed as December 10, 2026 at 1:00 PM EST, with the solicitation amended and uploaded to SAM.gov. Sealed bids delivered via commercial carrier (FedEx, UPS, or mail) are acceptable if received on-base prior to the bid opening date and time. Bids should be addressed to: 179th Cyberspace Wing – Attn: Gordon Strom, 1947 Harrington Memorial Road, Mansfield, Ohio 44903. An authorized on-base individual will sign for and take custody of delivered packages and notify the Contracting Office; bids not received prior to the opening date and time will be marked late.
RFI 02 addresses product specifications for construction/renovation work in buildings B300 and B422. For carpet tile flooring in B300, contractors must provide products complying with Section 09 68 00 specifications. Resilient flooring and cove base in B300 and B422 must comply with Section 09 65 00. Ceiling tile for B422 must comply with new specification section 09 51 00 (Acoustical Ceilings), with contractors required to procure ceiling tile for grid modifications associated with new wall installation. For the B422 sink replacement, existing domestic water shutoffs are located within the sink base cabinet at the wall stub-out, with existing plumbing intended to remain in place; contractors must coordinate any temporary water shutdowns required for sink removal and replacement.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Requests for Information (RFI’s) and Responses – Solicitation #: W50S8R-27-B-A002
(as of 18 Nov 26)
RFI 01
1. Bid opening date. Block 13A of the SF 1442 and the SAM.gov notice text appear to show different bid opening dates (Wednesday, December 9, 2026 and Thursday, December 10, 2026, both at 1:00 PM EST). Please confirm the correct date and time for bid opening.
2. Commercial carrier delivery. Section 00 21 00, paragraph 5, describes hand-carried bids delivered to the main gate at 1947 Harrington Memorial Rd. Will a sealed bid delivered by a commercial carrier (for example, FedEx or UPS) before the bid opening time be accepted as timely? If so, please advise the exact delivery address, how the outer envelope should be marked, and who will sign for and take custody of the package.
RESPONSE:
- Bid opening date is 10 Dec 2026 (solicitation has been amended/uploaded to SAM.gov)
- Yes, bids delivered through normal mail or a carrier are acceptable, and should be addressed in the same manner as hand-delivered bids:
o 179th Cyberspace Wing – Attn: Gordon Strom o 1947 Harrington Memorial Rd.
o Mansfield, Ohio 44903
A individual authorized to receipt deliveries on-base will sign for package, and notify the Contracting Office of delivery. Note: if delivery of bid package is not received on base prior to bid opening date and time, as noted in solicitation, the bid will be marked “Late”.
RFI 02
1. Please provide carpet tile spec in B300 – manufacturer, style, and size
RESPONSE: Contractor shall provide carpet tile flooring products, including size and performance characteristics, complying with Section 09 68 00.
2. Please provide resilient floor spec in B300 and B422 - manufacturer, style, and size
RESPONSE: Contractor shall provide resilient flooring products, including size and performance characteristics, complying with Section 09 65 00.
3. Please provide cove base spec in B300 and B422 – manufacturer, style, and size
RESPONSE: Contractor shall provide resilient flooring products, including size and performance characteristics, complying with Section 09 65 00.
4. Please provide ceiling tile spec in B422 – manufacturer, style, and size. Or is there attic stock we can use?
RESPONSE: See added spec section 09 51 00, Acoustical Ceilings for ceiling tile requirements.
Contractor to procure ceiling tile as required for grid modification associated with the new wall.
5. B422 sink – are the water shutoffs in the cabinet or above the ceiling?
RESPONSE: Existing domestic water shutoffs are located within the sink base cabinet at the wall stub-out. Existing plumbing is intended to remain in place.
Contractor shall coordinate any temporary shutdowns required to complete sink removal and replacement.
File details come from the government source that posted it. Updated .