Pre-Bid Conference minutes.pdf

PDF 123 KB Posted

Attached to
B422 BREAKROOM, B300 BDOC
Solicitation number
W50S8R27BA002
Issued by

About this file

This document is Pre-Bid Conference and Site Visit Minutes for solicitation W50S8R-27-B-A002, issued by the 179th Contracting Wing (179 CW), Mansfield Ohio Air National Guard on November 17, 2026. The solicitation covers renovation work for B422 Breakroom and B300 BDOC (Battle Operations and Decision Center).

The pre-bid conference established critical procedural requirements for bid submission and RFI process. All Requests for Information (RFI) must be submitted in writing using the RFI format found in section 00 21 00 of the solicitation, with a deadline of at least 5 business days prior to the bid opening date. RFI responses will be provided on a non-attribution basis exclusively through the SAM.gov Contracting Opportunities website, along with any solicitation amendments or addendums. If pertinent RFIs submitted within the stated solicitation timeframe are not answered timely, the bid opening date will be extended via solicitation amendment at the Contracting Officer's discretion. Contractors are prohibited from contacting 179th personnel directly; all RFI submissions and project-related inquiries must be directed to Contracting Officer Gordon Strom (gordon.strom.1@us.af.mil), with subcontractors required to route RFIs through their prime contractor. Bid hand-delivery must occur no later than bid closing time at the same location as the pre-bid conference, and contractors planning mail delivery must ensure receipt on base prior to the bid opening date and time. Contractors planning to attend bid opening must submit a base access form within 5 business days of bid opening. The site visit provided access to both work areas, including the BDOC, Battlestaff rooms, mechanical rooms with breaker panels, and the breakroom renovation area.

View the file

Other files

File Type Posted
RFI 03 response_B422 Breakroom Dimensions.pdf PDF
RFI and Response document (as of 23 Nov 26).pdf PDF
RFI 03 response_B300 BDOC Dimensions.pdf PDF
W50S8R27BA002 0003_Amendment 03.pdf PDF
RFI and Response document (as of 18 Nov 26).pdf PDF
RFI 02 response_attachment_B422 Breakroom 09 65 00.pdf PDF
RFI 02 response_attachment_B300 BDOC 09 68 00.pdf PDF
W50S8R27BA002 0003_Amendment 03 (conformed copy).pdf PDF
RFI 02 response_attachment_B300 BDOC 09 65 00.pdf PDF
RFI 02 response_attachment_B422 Breakroom 09 51 00.pdf PDF
Pre-Bid attendance.pdf PDF
Pre-Bid Conference-slides.pptx PPTX presentation
Attachment 01c_B422 Breakroom_Specifications.pdf PDF
W50S8R27BA002 0002_Amendment 02.pdf PDF
RFI and Response document (as of 13 Nov 26).pdf PDF
W50S8R27BA002 0002_Amendment 02 (conformed copy).pdf PDF
Attachment 02c_B300 BDOC_Specifications.pdf PDF
Contractor Access form.pdf PDF
W50S8R27BA002 0001_Amendment 01 (conformed copy).pdf PDF
W50S8R27BA002 0001_Amendment 01.pdf PDF
Attachment 02a_B300 BDOC_SOW.pdf PDF
Exhibit B_Checklist for Bid Bonds.pdf PDF
Attachment 02b_B300 BDOC_Drawings.pdf PDF
Attachment 01a_B422 Breakroom_SOW.pdf PDF
W50S8R27BA002_B422 Breakroom and B300 BDOC.pdf PDF
Exhibit A_Sealed Bid Checklist_Reminders.pdf PDF
Attachment 01b_B422 Breakroom_Drawings.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W50S8R-27-B-A002 - PRE-BID CONFERENCE - SITE VISIT MINUTES

179 CW/MSC – Memorandum For Record 17 November 2026

SUBJECT: Pre-Bid Conference, Site Visit Solicitation: W50S8R-27-B-A002, B422 BREAKROOM, B300 BDOC

Location and/or Unit: 179th CW, Mansfield Ohio ANG

1. The site visit was conducted on 17 Nov 26, @ 10:00am. List of contractor attendees is attached.

The following Government personnel were present:

a. Gordon Strom, 179CW Contracting Officer

b. Clayton McCarthy, 179CW Deputy Base Civil Engineer

2. Everyone was welcomed; handouts of slide show presentation were provided. The following was discussed (slides attached):

a. Subcontractors present (or not present) are not to be considered as an endorsement by the Government; they are welcome to attend, interact with other contractors as they choose.

b. Any contractors present who have performed work for the Government are to keep discussions and conversations specific to this project only – no sidebar conversations or inquiries related to past, present or future work is to be a topic of discussion. The same applies to any relationships any contractor personnel may have with other Government personnel who they may know from previous experience.

c. Pictures are authorized. B300 will have some stipulations on what areas can be photographed.

d. Bid opening will be in same building/same room as the pre-bid conference. Contractors are cautioned – should they choose to hand-walk bid package to bid opening, to ensure they hand-deliver package to Contracting Officer no later than bid closing time. Time for contractors to gain base access should be accounted for. Contractors shall ensure they submit access form within 5 business days of bid opening, to ensure they have base access to attend (if planning to attend).

• If planning to have bid delivered through mail service, it is the contractor’s responsibility to ensure their bid is delivered on base prior to the bid opening date and time.

e. Ensure solicitation is read thoroughly. Note the complete bid package submission requirements.

f. Submission of RFI’s should be in as timely a manner as possible, and will be answered in as expeditiously a manner as possible. In the event that pertinent RFI(s) submitted within the

W50S8R-27-B-A002 - PRE-BID CONFERENCE - SITE VISIT MINUTES

stated timeframes of solicitation are not answered in a timely manner, the bid opening date will most likely be extended to accommodate, via solicitation amendment (Contracting Officer determination). Any questions asked/responded to during site visit shall be submitted through RFI process, if contractor determines need for Government response to be in writing.

g. ALL RFI’s will be answered on a non-attribution basis; Contracting Opportunities (via

SAM.gov site) will be sole site/source for obtaining answers/supporting documents if applicable, as well as any official solicitation amendments and/or addendums.

h. All were reminded that RFI’s shall be in writing (utilizing RFI format in section 00 21 00 of solicitation), and due no later than at least 5 business days prior to bid due date (bid opening day/time).

i. Contractors (primes and any subcontractors) SHALL NOT contact 179th personnel. All

RFI’s/contact related to this project is restricted to submission to the Contracting Officer (Gordon Strom). Subcontractors shall route their RFI’s through prime contractor.

j. Contractors shall ensure BOTH the specifications and the drawings are reviewed, and that disciplines that impact each other’s efforts are coordinating where necessary.

k. Contractors were reminded to check SAM.gov daily (at least once a day), for solicitation updates.

3. Site visits followed pre-bid conference, where the following was noted.

a. B300 BDOC

• Attendees were given access both areas (BDOC and Battlestaff rooms), and also mechanical room where breaker panel exists.

b. B422 Breakroom

• Attendees were given access breakroom area/viewed entire work area to be renovated, and breaker panel located on other side of breakroom wall.

Note: If there are any questions related to these minutes or any aspect of this project, please contact Gordon Strom via email gordon.strom.1@us.af.mil (questions asked over the phone will be taken out of courtesy; however, the Government will only be responsible for those that are answered in writing).

Ensure that you receive a response when submitting RFI, that it has been received. Also note SAM updates, to ensure all RFI’s have been answered.

GORDON STROM, GS-12, DAF

Contracting Officer mailto:gordon.strom.1@us.af.mil

Location and/or Unit: 179th CW, Mansfield Ohio ANG