Attachment 02b_B300 BDOC_Drawings.pdf

PDF 516 KB Posted

Attached to
B422 BREAKROOM, B300 BDOC
Solicitation number
W50S8R27BA002
Issued by

About this file

B300 BDOC Renovation Project - Architectural and Electrical Construction Drawings

This is a set of architectural and electrical design drawings for the B300 Building Dominance Operations Center (BDOC) renovation project at Mansfield-Lahm Air National Guard Base in Mansfield, Ohio, prepared by the 179th Civil Engineering Squadron. The project encompasses selective demolition, wall repair, painting, resilient tile and carpet tile flooring replacement, limited suspended ceiling restoration, and associated electrical and communications pathway modifications to support revised room use and Government-furnished equipment installation.

The scope of work includes: removal and replacement of floor finishes with new resilient tile flooring and cove base in the BDOC and carpet tile in the Battlestaff room; wall preparation and repainting throughout both spaces; removal of the existing BDOC controller desk and associated obsolete floor-fed utility components; removal and disposal of the existing projector screen and mounting components; removal and reinstallation of existing wall-mounted monitors at revised mounting elevations; removal of existing recessed can light fixtures with ceiling surface restoration; suspension of the ceiling grid/tile with limited acoustic ceiling tile replacement; relocation of existing branch circuitry with new flush-mounted receptacles at the BDOC desk wall; provision of communications pathway rough-in and outlet boxes; provision of new recessed receptacles and surface-mounted cable management raceway at the Battlestaff presentation wall; and acoustical sealing at openings. An optional lighting upgrade (Option #1) includes replacement of existing 2x4 light fixtures with dimmable LED fixtures or LED retrofit kits with associated control modifications. The contractor must field-verify existing conditions, coordinate utility interruptions with the Government, and protect adjacent finishes and building systems during construction. Communications cabling, final terminations, and Government-furnished equipment installation shall be performed by others unless noted otherwise.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCALE:

DATE:

CHECKED:

DRAWN:

PROJ #:

9T

H C

IV

IL

E N

G

IN

EE

R

IN

G

S Q

U

AD

R O

N M

AN

SF

IE

LD

-L

AH

M A

IR

N

AT

IO

N

AL

G U

AR

D

B

AS

E

H

AR

R

IN

G

TO

N

M

EM

O R

IA

L

R O

AD

M

AN

SF

IE

LD

, O H

B3

B D

O C

R

EN

O

VA

TI

O

N

C O

VE

R

S H

EE

T

PBXP272019

CMM

XXX

10/29/26

NTS

G101

B300 BDOC RENOVATION

MANSFIELD LAHM ANG BASE

SITE MAP

NTS

N

PROJECT

LOCATION

VICINITY MAP

NTS

PROJECT

LOCATION

N

INDEX OF DRAWINGS

G101 COVER SHEET

A101 ARCHITECTURAL NOTES

E101 ELECTRICAL NOTES

GENERAL NOTES

Renovate the B300 BDOC and Battlestaff spaces including selective demolition, wall repair, painting, resilient tile flooring replacement, limited suspended ceiling restoration, and associated electrical and communications pathway modifications to support revised room use and Government-furnished equipment.

1. Contractor shall field verify existing conditions and dimensions prior to construction.

2. Contractor shall coordinate required utility interruptions and access requirements with the Government prior to execution.

3. Contractor shall protect adjacent finishes, equipment, and building systems from damage during construction.

4. Patch and restore surfaces disturbed by the work to match adjacent existing conditions where applicable.

5. Communications cabling and final terminations shall be by others unless noted otherwise.

6. Government-furnished equipment shown or referenced on the drawings shall be installed by others unless noted otherwise..

AutoCAD SHX Text

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text 0 100 200 300 400 500 600 700 800 900 1000

AutoCAD SHX Text

MUSTANG STREET

AutoCAD SHX Text

SABRE AVENUE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

GALAXY ROAD

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MUSTANG STREET

AutoCAD SHX Text

BUCKEYE STREET

AutoCAD SHX Text

179 AW BASE MAP - JULY 2022 EDITION

AutoCAD SHX Text

SABRE AVENUE

AutoCAD SHX Text H

AutoCAD SHX Text

MINUTEMAN AVENUE

AutoCAD SHX Text

MINUTEMAN AVENUE

AutoCAD SHX Text

MINUTEMAN AVENUE

AutoCAD SHX Text

HERCULES AVENUE

AutoCAD SHX Text

HERCULES AVENUE

AutoCAD SHX Text

HERCULES AVENUE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

HERCULES AVENUE

AutoCAD SHX Text

ENTRY CIRCLE

AutoCAD SHX Text

ACCESS ROAD

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 10216

AutoCAD SHX Text 10217

AutoCAD SHX Text 10218

SCALE:

DATE:

CHECKED:

DRAWN:

PROJ #:

9T

H C

IV

IL

E N

G

IN

EE

R

IN

G

S Q

U

AD

R O

N M

AN

SF

IE

LD

-L

AH

M A

IR

N

AT

IO

N

AL

G U

AR

D

B

AS

E

H

AR

R

IN

G

TO

N

M

EM

O R

IA

L

R O

AD

M

AN

SF

IE

LD

, O H

B3

B D

O C

R

EN

O

VA

TI

O

N

AR

C

H

IT

EC

TU

R

AL

N O

TE

S

PBXP272019

CMM

XXX

10/29/26

NTS

A101

CODED NOTES#

1. Area of renovation.

2. Remove existing floor finish as required, prepare substrate, furnish and install new resilient tile flooring and cove base in the BDOC.

3. Prepare and repaint walls throughout

4. Remove existing BDOC controller desk and associated obsolete floor-fed utility components. Refer to E101.

5. Existing communications floor penetration to remain;

coordinate capping and protection with project requirements.

6. Government-furnished controller desk footprint shown for reference; final installation by others.

7. Remove lower 48 inches of wall finish materials and provide new gypsum wallboard, finishing, and preparation for paint as indicated.

8. Remove and dispose of existing projector screen and associated mounting components.

9. Restore suspended ceiling grid/tile and provide limited replacement ACT as required to complete the work.

10. Remove and reinstall existing wall-mounted monitors and associated mounting hardware at revised mounting elevation as indicated.

11. Remove existing floor finish as required, prepare substrate, furnish and install new carpet tile flooring and cove base in the Battlestaff room.

12. Remove existing recessed can light fixtures and restore affected ceiling surfaces and finishes to match adjacent conditions.

13. Provide acoustical sealing at openings

AutoCAD SHX Text

BDOC

AutoCAD SHX Text

BATTLE STAFF

AutoCAD SHX Text

CLOS.

AutoCAD SHX Text

COMM.

AutoCAD SHX Text

WOMENS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

D D D

D

S

S S

SCALE:

DATE:

CHECKED:

DRAWN:

PROJ #:

9T

H C

IV

IL

E N

G

IN

EE

R

IN

G

S Q

U

AD

R O

N M

AN

SF

IE

LD

-L

AH

M A

IR

N

AT

IO

N

AL

G U

AR

D

B

AS

E

H

AR

R

IN

G

TO

N

M

EM

O R

IA

L

R O

AD

M

AN

SF

IE

LD

, O H

B3

B D

O C

R

EN

O

VA

TI

O

N

EL

EC

TR

IC

AL

N

O

TE

S

PBXP272019

CMM

XXX

10/29/26

NTS

E101

CODED NOTES#

1. Remove existing floor-fed utility components associated with the existing BDOC controller desk arrangement, including junction box, exposed whips, and miscellaneous devices no longer required.

2. Relocate existing branch circuitry and provide new flush-mounted receptacles at the BDOC desk wall as indicated.

3. Provide communications pathway rough-in and outlet boxes within finished wall surfaces at the BDOC desk wall as indicated. Communications cabling and terminations shall be by others unless noted otherwise.

4. Existing communications floor penetration to remain, coordinate capping and protection with project requirements. Coordinate with A101.

5. Provide one new recessed receptacle at the Battlestaff presentation wall for Government-furnished monitor.

6. Provide surface-mounted cable management raceway at the Battlestaff presentation wall for HDMI and associated low-voltage cabling as indicated.

7. Coordinate exact device locations with Government prior to rough-in.

8. Final connection of Government-furnished desks, monitor, UPS units, and user equipment shall be by others unless noted otherwise.

9. Remove and reinstall existing wall-mounted monitors and associated mounting hardware at revised mounting elevation as indicated.

10. Remove existing recessed can light fixtures and modify associated switching/circuitry as required to leave remaining lighting safe and operational.

11. Option #1: Replace existing 2x4 light fixtures with dimmable LED fixtures or LED retrofit kits and modify associated lighting controls, switching, and circuitry as required.

AutoCAD SHX Text

BDOC

AutoCAD SHX Text

BATTLE STAFF

AutoCAD SHX Text

CLOS.

AutoCAD SHX Text

COMM.

AutoCAD SHX Text

WOMENS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

Sheets and Views
PBXP272019 - Drawings-Cover
PBXP272019 - Drawings-A101
PBXP272019 - Drawings-E101

File details come from the government source that posted it. Updated .