Attachment 01b_B422 Breakroom_Drawings.pdf
PDF 596 KB Posted
- Attached to
- B422 BREAKROOM, B300 BDOC
- Solicitation number
- W50S8R27BA002
About this file
This document is a set of architectural drawings and specifications for a kitchenette renovation project at Mansfield-Lahm Air National Guard Base, Building B422, located in Mansfield, Ohio. The project number is PBXP272018, dated November 5, 2026, and prepared by the 179th Civil Engineering Squadron.
The renovation scope includes selective demolition of existing half-height and full-height walls, removal of existing casework, countertop, sink, and cabinets, and removal of existing floor finishes and cove base. Construction work requires installation of new full-height partition walls, new casework with solid surface countertop and 4-inch backsplash, a new single-bowl sink with gooseneck faucet, new resilient tile flooring and cove base, wall preparation and painting throughout the renovated space, and modifications to the suspended ceiling grid and tiles. Electrical work includes providing new receptacles with associated branch circuitry, GFCI protection for countertop receptacles, one new dedicated branch circuit for countertop/appliance receptacles, relocation of existing devices impacted by renovation, replacement of existing light fixtures with new 2x2 LED fixtures, and modification of associated wiring and connections. The contractor must field-verify existing conditions and dimensions prior to construction, coordinate utility interruptions with the Government, protect adjacent finishes and building systems from damage, and coordinate exact device locations with the Government prior to rough-in. The Government will remove existing appliances unless noted otherwise, and communications outlets will be relocated or modified only if impacted by the work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCALE:
DATE:
CHECKED:
DRAWN:
PROJ #:
9T
H C
IV
IL
E N
G
IN
EE
R
IN
G
S Q
U
AD
R O
N M
AN
SF
IE
LD
-L
AH
M A
IR
N
AT
IO
N
AL
G U
AR
D
B
AS
E
H
AR
R
IN
G
TO
N
M
EM
O R
IA
L
R O
AD
M
AN
SF
IE
LD
, O H
B4
K
IT
C H
EN
ET
TE
R
EN
O
C O
VE
R
S H
EE
T
PBXP272018
CMM
XXX
11/5/26
NTS
G101
B422 KITCHENETTE RENO
MANSFIELD LAHM ANG BASE
SITE MAP
NTS
N
PROJECT
LOCATION
VICINITY MAP
NTS
PROJECT
LOCATION
N
INDEX OF DRAWINGS
G101 COVER SHEET
AD101 DEMO PLAN
A101 RENO PLAN
E101 ELECTRICAL PLAN
GENERAL NOTES
Renovate the B422 kitchenette including selective demolition, partition reconfiguration, new casework, countertop, sink, resilient tile flooring, painting, ceiling modifications, LED lighting replacement, and associated electrical, communications, and mechanical adjustments.
1. Contractor shall field verify existing conditions and dimensions prior to construction.
2. Contractor shall coordinate required utility interruptions and access requirements with the Government prior to execution.
3. Contractor shall protect adjacent finishes, equipment, and building systems from damage during construction.
4. Patch and restore surfaces disturbed by the work to match adjacent existing conditions where applicable.
5. Existing appliances shall be removed by the Government unless noted otherwise.
6. Communications outlets and associated devices shall be relocated or modified only if impacted by the work.
7. Electrical work shall include required branch circuit modifications and a new circuit for countertop/appliance receptacles.
AutoCAD SHX Text
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text 0 100 200 300 400 500 600 700 800 900 1000
AutoCAD SHX Text
MUSTANG STREET
AutoCAD SHX Text
SABRE AVENUE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
GALAXY ROAD
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MUSTANG STREET
AutoCAD SHX Text
BUCKEYE STREET
AutoCAD SHX Text
179 AW BASE MAP - JULY 2022 EDITION
AutoCAD SHX Text
SABRE AVENUE
AutoCAD SHX Text H
AutoCAD SHX Text
MINUTEMAN AVENUE
AutoCAD SHX Text
MINUTEMAN AVENUE
AutoCAD SHX Text
MINUTEMAN AVENUE
AutoCAD SHX Text
HERCULES AVENUE
AutoCAD SHX Text
HERCULES AVENUE
AutoCAD SHX Text
HERCULES AVENUE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
HERCULES AVENUE
AutoCAD SHX Text
ENTRY CIRCLE
AutoCAD SHX Text
ACCESS ROAD
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 10216
AutoCAD SHX Text 10217
AutoCAD SHX Text 10218
CHECKED:
DRAWN:
PROJ #:
9T
H C
IV
IL
E N
G
IN
EE
R
IN
G
S Q
U
AD
R O
N M
AN
SF
IE
LD
-L
AH
M A
IR
N
AT
IO
N
AL
G U
AR
D
B
AS
E
H
AR
R
IN
G
TO
N
M
EM
O R
IA
L
R O
AD
M
AN
SF
IE
LD
, O H
B4
K
IT
C H
EN
ET
TE
R
EN
O
D
EM
O P
LA
N
PBXP272018
CMM
XXX
11/5/2026
NTS
AD101
CODED NOTES#
1. Area of renovation.
2. Demolish existing half-height wall and full-height wall as indicated to accommodate new layout.
3. Remove existing casework, countertop, sink, faucet, and upper cabinets.
4. Remove existing floor finish and cove base within renovation limits.
5. Remove/relocate devices affected by demolition. Refer to electrical drawings.
6. Modify suspended ceiling grid/tile as required for wall demolition and reconstruction.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CHECKED:
DRAWN:
PROJ #:
9T
H C
IV
IL
E N
G
IN
EE
R
IN
G
S Q
U
AD
R O
N M
AN
SF
IE
LD
-L
AH
M A
IR
N
AT
IO
N
AL
G U
AR
D
B
AS
E
H
AR
R
IN
G
TO
N
M
EM
O R
IA
L
R O
AD
M
AN
SF
IE
LD
, O H
B4
K
IT
C H
EN
ET
TE
R
EN
O
R
EN
O P
LA
N
PBXP272018
CMM
XXX
11/5/2026
NTS
A101
CODED NOTES#
1. Provide new full-height partition wall as indicated.
2. Provide new casework, solid surface countertop, and
4-inch backsplash.
3. Provide new single-bowl sink and gooseneck faucet.
4. Provide new resilient tile flooring and cove base within renovation limits.
5. Prepare and paint walls throughout renovated room.
6. Modify suspended ceiling grid/tile as required to complete the work.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
S
DATA
SCALE:
DATE:
CHECKED:
DRAWN:
PROJ #:
9T
H C
IV
IL
E N
G
IN
EE
R
IN
G
S Q
U
AD
R O
N M
AN
SF
IE
LD
-L
AH
M A
IR
N
AT
IO
N
AL
G U
AR
D
B
AS
E
H
AR
R
IN
G
TO
N
M
EM
O R
IA
L
R O
AD
M
AN
SF
IE
LD
, O H
B4
K
IT
C H
EN
ET
TE
R
EN
O
EL
EC
TR
C
IC
AL
P
LA
N
PBXP272018
CMM
XXX
11/5/2026
NTS
E101
CODED NOTES#
1. Provide new receptacles and associated branch circuitry as indicated.
2. Provide GFCI protection for countertop receptacles where required.
3. Provide one new branch circuit for countertop/appliance receptacles.
4. Relocate existing devices impacted by renovation as required.
5. Replace existing light fixtures within the renovated kitchenette with new 2x2 LED fixtures.
6. Modify associated wiring, devices, and connections as required for a complete and operational installation.
7. Coordinate exact device locations with Government prior to rough-in.
| Sheets and Views |
| PBXP272018 - Drawings-Cover |
| PBXP272018 - Drawings-AD101 |
| PBXP272018 - Drawings-A101 |
| PBXP272018 - Drawings-E101 |
File details come from the government source that posted it. Updated .