Attachment 01b_B422 Breakroom_Drawings.pdf

PDF 596 KB Posted

Attached to
B422 BREAKROOM, B300 BDOC
Solicitation number
W50S8R27BA002
Issued by

About this file

This document is a set of architectural drawings and specifications for a kitchenette renovation project at Mansfield-Lahm Air National Guard Base, Building B422, located in Mansfield, Ohio. The project number is PBXP272018, dated November 5, 2026, and prepared by the 179th Civil Engineering Squadron.

The renovation scope includes selective demolition of existing half-height and full-height walls, removal of existing casework, countertop, sink, and cabinets, and removal of existing floor finishes and cove base. Construction work requires installation of new full-height partition walls, new casework with solid surface countertop and 4-inch backsplash, a new single-bowl sink with gooseneck faucet, new resilient tile flooring and cove base, wall preparation and painting throughout the renovated space, and modifications to the suspended ceiling grid and tiles. Electrical work includes providing new receptacles with associated branch circuitry, GFCI protection for countertop receptacles, one new dedicated branch circuit for countertop/appliance receptacles, relocation of existing devices impacted by renovation, replacement of existing light fixtures with new 2x2 LED fixtures, and modification of associated wiring and connections. The contractor must field-verify existing conditions and dimensions prior to construction, coordinate utility interruptions with the Government, protect adjacent finishes and building systems from damage, and coordinate exact device locations with the Government prior to rough-in. The Government will remove existing appliances unless noted otherwise, and communications outlets will be relocated or modified only if impacted by the work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCALE:

DATE:

CHECKED:

DRAWN:

PROJ #:

9T

H C

IV

IL

E N

G

IN

EE

R

IN

G

S Q

U

AD

R O

N M

AN

SF

IE

LD

-L

AH

M A

IR

N

AT

IO

N

AL

G U

AR

D

B

AS

E

H

AR

R

IN

G

TO

N

M

EM

O R

IA

L

R O

AD

M

AN

SF

IE

LD

, O H

B4

K

IT

C H

EN

ET

TE

R

EN

O

C O

VE

R

S H

EE

T

PBXP272018

CMM

XXX

11/5/26

NTS

G101

B422 KITCHENETTE RENO

MANSFIELD LAHM ANG BASE

SITE MAP

NTS

N

PROJECT

LOCATION

VICINITY MAP

NTS

PROJECT

LOCATION

N

INDEX OF DRAWINGS

G101 COVER SHEET

AD101 DEMO PLAN

A101 RENO PLAN

E101 ELECTRICAL PLAN

GENERAL NOTES

Renovate the B422 kitchenette including selective demolition, partition reconfiguration, new casework, countertop, sink, resilient tile flooring, painting, ceiling modifications, LED lighting replacement, and associated electrical, communications, and mechanical adjustments.

1. Contractor shall field verify existing conditions and dimensions prior to construction.

2. Contractor shall coordinate required utility interruptions and access requirements with the Government prior to execution.

3. Contractor shall protect adjacent finishes, equipment, and building systems from damage during construction.

4. Patch and restore surfaces disturbed by the work to match adjacent existing conditions where applicable.

5. Existing appliances shall be removed by the Government unless noted otherwise.

6. Communications outlets and associated devices shall be relocated or modified only if impacted by the work.

7. Electrical work shall include required branch circuit modifications and a new circuit for countertop/appliance receptacles.

AutoCAD SHX Text

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text 0 100 200 300 400 500 600 700 800 900 1000

AutoCAD SHX Text

MUSTANG STREET

AutoCAD SHX Text

SABRE AVENUE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

GALAXY ROAD

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MUSTANG STREET

AutoCAD SHX Text

BUCKEYE STREET

AutoCAD SHX Text

179 AW BASE MAP - JULY 2022 EDITION

AutoCAD SHX Text

SABRE AVENUE

AutoCAD SHX Text H

AutoCAD SHX Text

MINUTEMAN AVENUE

AutoCAD SHX Text

MINUTEMAN AVENUE

AutoCAD SHX Text

MINUTEMAN AVENUE

AutoCAD SHX Text

HERCULES AVENUE

AutoCAD SHX Text

HERCULES AVENUE

AutoCAD SHX Text

HERCULES AVENUE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

HERCULES AVENUE

AutoCAD SHX Text

ENTRY CIRCLE

AutoCAD SHX Text

ACCESS ROAD

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 10216

AutoCAD SHX Text 10217

AutoCAD SHX Text 10218

CHECKED:

DRAWN:

PROJ #:

9T

H C

IV

IL

E N

G

IN

EE

R

IN

G

S Q

U

AD

R O

N M

AN

SF

IE

LD

-L

AH

M A

IR

N

AT

IO

N

AL

G U

AR

D

B

AS

E

H

AR

R

IN

G

TO

N

M

EM

O R

IA

L

R O

AD

M

AN

SF

IE

LD

, O H

B4

K

IT

C H

EN

ET

TE

R

EN

O

D

EM

O P

LA

N

PBXP272018

CMM

XXX

11/5/2026

NTS

AD101

CODED NOTES#

1. Area of renovation.

2. Demolish existing half-height wall and full-height wall as indicated to accommodate new layout.

3. Remove existing casework, countertop, sink, faucet, and upper cabinets.

4. Remove existing floor finish and cove base within renovation limits.

5. Remove/relocate devices affected by demolition. Refer to electrical drawings.

6. Modify suspended ceiling grid/tile as required for wall demolition and reconstruction.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CHECKED:

DRAWN:

PROJ #:

9T

H C

IV

IL

E N

G

IN

EE

R

IN

G

S Q

U

AD

R O

N M

AN

SF

IE

LD

-L

AH

M A

IR

N

AT

IO

N

AL

G U

AR

D

B

AS

E

H

AR

R

IN

G

TO

N

M

EM

O R

IA

L

R O

AD

M

AN

SF

IE

LD

, O H

B4

K

IT

C H

EN

ET

TE

R

EN

O

R

EN

O P

LA

N

PBXP272018

CMM

XXX

11/5/2026

NTS

A101

CODED NOTES#

1. Provide new full-height partition wall as indicated.

2. Provide new casework, solid surface countertop, and

4-inch backsplash.

3. Provide new single-bowl sink and gooseneck faucet.

4. Provide new resilient tile flooring and cove base within renovation limits.

5. Prepare and paint walls throughout renovated room.

6. Modify suspended ceiling grid/tile as required to complete the work.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

S

DATA

SCALE:

DATE:

CHECKED:

DRAWN:

PROJ #:

9T

H C

IV

IL

E N

G

IN

EE

R

IN

G

S Q

U

AD

R O

N M

AN

SF

IE

LD

-L

AH

M A

IR

N

AT

IO

N

AL

G U

AR

D

B

AS

E

H

AR

R

IN

G

TO

N

M

EM

O R

IA

L

R O

AD

M

AN

SF

IE

LD

, O H

B4

K

IT

C H

EN

ET

TE

R

EN

O

EL

EC

TR

C

IC

AL

P

LA

N

PBXP272018

CMM

XXX

11/5/2026

NTS

E101

CODED NOTES#

1. Provide new receptacles and associated branch circuitry as indicated.

2. Provide GFCI protection for countertop receptacles where required.

3. Provide one new branch circuit for countertop/appliance receptacles.

4. Relocate existing devices impacted by renovation as required.

5. Replace existing light fixtures within the renovated kitchenette with new 2x2 LED fixtures.

6. Modify associated wiring, devices, and connections as required for a complete and operational installation.

7. Coordinate exact device locations with Government prior to rough-in.

Sheets and Views
PBXP272018 - Drawings-Cover
PBXP272018 - Drawings-AD101
PBXP272018 - Drawings-A101
PBXP272018 - Drawings-E101

File details come from the government source that posted it. Updated .