ATTACHMENT 7A - Questions_ Answers 2.docx
DOCX document 20 KB Posted
- Attached to
- ADAL Civil Engineering, Buildings 151 & 119
- Solicitation number
- W50S8Q-20-B-0004
- Issued by
-
Department of the Army National Guard
About this file
This document contains questions and answers related to a solicitation for project number WAAR152202 to remodel and add to two civil engineering buildings at Springfield Air National Guard Base in Ohio. Key details include that the project involves remodeling buildings 151 and 119A/B to update mechanical, electrical, plumbing, communications, security, and finishes. The construction duration is 360 calendar days from notice to proceed. The solicitation is set aside for competitive 8(a) contractors and encourages all responsible offerors to participate. The NAICS code is 236220 with a $39.5 million size standard. The estimated value is between $5-10 million. The pre-bid conference is September 1, 2020 and bids are due September 24, 2020. Interested contractors must register in SAM to receive solicitation documents through Beta.SAM.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions & Answers 2 ADAL CE, Bldgs 151 & 119 W50S8Q-20-B-0004 Q1. Roof drain locations on existing roof (drawing A-104) Are we to assume all the way heights and widths are as all details are leading to page (A-504) detail 2 on A-504?
A. Confirmed that roof deck contains slope of roof. Please meet requirements of roof insulation at R-30 min. ½” crickets required at roof equipment, penetrations, parapets where needed to provide proper slope for drainage.
Q2. Is the contractor to provide the server rack and cabinets shown on drawing T402? If so, can a specification for these be provided? What equipment are we to provide in these racks/cabinets?
A. Items to include in the rack are shown in detail 1 on T-502. The rack is specified in 27 10 00, section 2.4.2.b. Other elements noted in the detail are specified in 27 10 00, sections 2.4.3 and 2.4.4.
Q3. The existing roof has walk pads from the ladder to 7 in front of the large Mechanical units. Should the new roof system have these? (Picture attached)
A. Project intention is to match the existing roof system.
Q4. Just noticed Detail Drawing A-504, Detail 2 shows extruded insulation on the wall. You cannot adhere the EPDM membrane to extruded insulation. Should this be isocyanurate insulation?
A. Yes, Isocyanurate rigid insulation board shall be installed.
Q5. Will there be a revision to the door schedule to include identification for the frames?
A. See attached sheet A-601, frame types were shown in RTA or Final B3 submittal drawings.
Q6. Cannot find a finish schedule for BLDG 119. Asking for the Corps to please provide if available.
A. There is no specific finish schedule for B119. Floor plans on sheet A-102 call out level of finish work for existing spaces.
Q7. Finish schedule identifies carpet type #2, but not included in the interior finish legend. Requesting finished floorplans.
A. CT-2 shall equal CT1 on finishes.
Q8. Requesting interior elevations for bathrooms. Need wall tile and heights if possible.
A. Tile layout on walls to match existing, T-3 main (equals PP-1, PP-3 of attached ASK 01), T-2 accent tile (equals PP-2 of attached ASK01).
Q9. Requesting floor plan for floor & wall finishes for mixed tile applications for layout.
A. Tile layout for rooms 2, 42, 75, 77, and 78 shall match existing pattern, VCT-1 is main (field) tile and VCT-2 is accent tile.
Q10. Requesting photos & more information of the existing mezzanine to be removed per coded note D20 on AD-101 & D4 AD-103.
A. Project intent is to remove the existing mezzanine platform and any framing that may be additional to support the mezzanine but not structural to the facility. D4 is indicating a new opening for door 66. Layout sketch of existing mezzanine in B119 attached. Photo of mezzanine can be found on AD106, photo 119-5.
File details come from the government source that posted it. Updated .