20-B-0004 ATTACHMENT 6C - A-104 Architectural Roof Plan.pdf

PDF 255 KB Posted

Attached to
ADAL Civil Engineering, Buildings 151 & 119
Solicitation number
W50S8Q-20-B-0004
Issued by

About this file

This document provides details for a federal solicitation seeking construction services. The 178th Wing Contracting Office at Springfield Air National Guard Base is soliciting offers for Project No. WAAR152202, which involves remodeling and additions to two civil engineering buildings at the base. The project scope includes mechanical, electrical, plumbing, communications, security, and finish work upgrades to Building 151, as well as remodeling of Buildings 119a and 119b. The total contract value is estimated between $5-10 million. The North American Industry Classification code is 236220. The solicitation is set aside for small businesses participating in the 8(a) Business Development Program. The pre-bid conference is scheduled for September 1st, 2020, with bids due on September 24th, 2020. The contract performance period is 360 calendar days. Interested parties must register in the System for Award Management to receive solicitation documents from the Federal Business Opportunities website.

View the file

Other files

File Type Posted
BID ABSTRACT 20-B-0004.pdf PDF
Sign-In Bid Opening 20-B-0004.pdf PDF
W50S8Q-20-B-0004-0003 ADAL CE SPANGB.pdf PDF
ADAL Amendment 0002.pdf PDF
ATTACHMENT 7A - Questions_ Answers 2.docx DOCX document
ATTACHMENT 7C - Typical Existing Restroom Elevations.pdf PDF
ATTACHMENT 7B - A-601 - Arch Door_Window Schedules.pdf PDF
ATTACHMENT 7D - B119 Mezz Location.pdf PDF
ATTACHMENT 6B - A0-5 Layout.pdf PDF
Site Visit SignIn Sheet 01 Sept 2020 (1).pdf PDF
20-B-0004 ATTACHMENT 6D - Arch Specs pg 12 08 71 00.pdf PDF
ATTACHMENT 6A - Questions Answers.docx DOCX document
20-B-0004 Site Visit SignIn Sheet 01 Sept 2020 (4).pdf PDF
ADAL Amemdment 0001.pdf PDF
20-B-0004 Site Visit MFR.docx DOCX document
W50S8Q-20-B-0004 ADAL CE SPANGB 25AUG.pdf PDF
ATTACHMENT 3B - DRAWINGS (CIVIL SET).pdf PDF
ATTACHMENT 3J - CORRECTIONS (A102 A104 A601 AD102 F501).pdf PDF
ATTACHMENT 4 - Base Entry Request.pdf PDF
JA for Brand Names -Advantor Monaco Lochinvar-redo 18 Aug 20.pdf PDF
ATTACHMENT 3H - DRAWINGS (STRUCT SET).pdf PDF
ATTACHMENT 3C - DRAWINGS (ELECTRICAL SET).pdf PDF
ATTACHMENT 2A - SPEC BOOK VOL I.pdf PDF
ATTACHMENT 3A - DRAWINGS (ARCH SET).pdf PDF
ATTACHMENT 3I - DRAWINGS (TECHNOLOGY SET).pdf PDF
ATTACHMENT 1 - SUMMARY OF WORK.docx DOCX document
ATTACHMENT 3D - DRAWINGS (FIRE PROTECTION SET).pdf PDF
ATTACHMENT 5 - RFI.doc DOC document
ATTACHMENT 2B - SPEC BOOK VOL II.pdf PDF
ATTACHMENT 3G - DRAWINGS (PLUMBING SET).pdf PDF
ATTACHMENT 3F - DRAWINGS (MECHANICAL SET).pdf PDF
ATTACHMENT 3E - DRAWINGS (GEN SET).pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A-301

A-301 A12

A14

1/ 4"

1'

-0

1/4" / 1'-0"

A13

A13

AREA A

AREA B

AREA A

AREA B

A12

A14

A26

A26

2" / 1'-0"2" / 1'-0"

A26 A26A26

A-504

A-504

A-504

A-504

A-504

________ 6 A-504

A-504

A-504

A-504

AREA A ROOF

AREA B ROOF

A-301

A32

A32

A32

D.S.D.S.

D.S.

A14

A32

A12

A-504 ________6

A-504

A12A12

A13

A14

A14A14

A32

A12A12

A35

A35

A13

A14

A32

A35

N

CHKD:

DRWN:

PROJ:

DESN:

A

B

C

D

E

F

2 3 4 5 6 7

Bar measures 1 inch, otherwise drawing is not to scale

C op yr ig ht : T et ra

T ec h

5'-4" 10'-8" 21'-4"

SCALE: 3/32" = 1'-0"

9/ 8/

2 :

:4

PM

C :\U se rs

\ja so n.

hu ns uc ke r\D oc um en ts

\A -S

PR

IN

G

FI

EL

D

A N

G B

LD

G

_v

_j as on

.h un su ck er .rv t

200-11652-18005

J. HUNSUCKER

T. HOURIGAN

Q. BIAGI

A-104

SP

R

IN

G

FI

EL

D -B

EC

KL

EY

A

N G

B, O

H

IO

A N

G

AD

AL

C

IV

IL

E

N G

IN

EE

R

IN

G B

U

IL

D

IN

G S

W

AA

R

AR

C

H

IT

EC

TU

R

AL

R O

O F

PL

AN

SCALE: 3/32" = 1'-0"

ROOF PLAN

ROOF GENERAL NOTES

1. REPAIR AND REPLACE ROOFING SYSTEM AND STRUCTURE

DAMAGED BY IMPROPER STORAGE, CONSTRUCTION

ACTIVITIES, OR LACK OF ADEQUATE TEMPORARY

PROTECTION. THIS ALSO INCLUDES INTERIOR DAMAGE TO

FINISHES, EQUIPMENT, FURNISHINGS, ETC. RESULTING FROM

LEAKS.

2. VERIFY SIZE, LOCATION AND NUMBER OF ROOF

PENETRATIONS INCLUDING VENTS, PIPES, CURBS, ROOF

DRAINS, CONDUITS, ETC. PRIOR TO FLASHING AND SEALING

PENETRATIONS WHETHER OR NOT INDICATED ON THE

DRAWINGS.

3. REFER TO MECHANICAL DRAWINGS TO COORDINATE ROOF

PENETRATION LOCATIONS.

4. METAL GUTTERS SLOPE MIN 1/16" PER FOOT.

5. AT EXISTING ROOF AREAS THAT WILL REQUIRE NEW EPDM

MEMBRANE ROOF SYSTEM, REFER TO DETAILS ON A-504 FOR

ROOF PENETRATIONS, EQUIPMENT CURB FLASHING AND

TYPICAL ROOF DETAILS.

6. REFER TO SHEET S-002 FOR PROJECT WIND LOAD DATA.

7. NEW ROOF SLOPES TO MATCH EXISTING AT THE EXISTING

ROOF SECTIONS INDICATING NEW ROOFING.

8. REPAIR EXISTING DECK AND INSTALL DECK REPLACEMENT AS

REQUIRED ON ALL SINGLE-PLY MEMBRANE ROOF AREAS.

MATCH IN KIND REPLACEMENT DECK MATERIAL AT ALL

ABANDONED OPENINGS AT NEW ROOF DESIGN.

KEYNOTES

A12 APPLY NEW FULLY ADHERED WHITE FACED, 90 MIL, EPDM

RUBBER MEMBRANE ON 1/2" COVERBOARD ON TAPERED RIGID

POLYISO INSULATION BOARD (R-30 MIN. 5") ON EXISTING DECK.

A13 PRE-FINISHED, KYNAR COATED, ALUMINUM GUTTER AND

DOWNSPOUTS TO SPLASH BLOCK BELOW.

A14 APPLY NEW FULLY ADHERED WHITE FACED, 90 MIL, EPDM

RUBBER MEMBRANE ON 1/2" COVERBOARD ON RIGID POLYISO

INSULATION BOARD (R-30 MIN. 5") OVER 1 1/2" METAL DECK

ROOF SYSTEM.

A26 EXISTING STANDING SEAM METAL ROOF SYSTEM AND

EXISTING DECK TO REMAIN.

A32 PROVIDE AND INSTALL NEW PRE-FINSHED ALUMINUM COPING

CAP TO MATCH IN COLOR AND IN PROFILE.

A35 ALL EXSITING ROOFTOP EQUIPMENT, ROOF PENETRATIONS

AND FLAHSING TO BE INSTALLED PER ROOFING

MANUFACTURER'S DETAILS.

RAINWATER DATA

DAYTON, OHIO

10 YR 7.0 IN / HR

100 YR 10.0 IN / HR

AREAS ROUNDED FOR DRAINAGE CALCULATIONS ONLY. CONTRACTOR SHALL

DEVELOP TAKE OFF QUANTITIES INDEPENDENTLY

SQUARE FOOTAGE GUTTER DS MAX DISTANCE

AREA A ROOF: 1,000 5" X 6" 4" X 4" 40' O.C.

AREA B ROOF: 940 5" X 6" 4" X 4" 40' O.C.

M

AR

K D

AT

E

D E S

C R

IP

T I

O N

BY

1 2 /1

3/

TY

P E

B -3

S U

BM

IT

TA

L

Sheets
A-104 - ARCHITECTURAL ROOF PLAN

File details come from the government source that posted it. Updated .