This document summarizes a federal solicitation for construction services. The 178th Wing Contracting Office at Springfield Air National Guard Base is seeking bids to remodel and add onto civil engineering buildings 151 and 119, which will include mechanical, electrical, plumbing, communications, security, and finish work. The construction duration is 360 calendar days with adequate time for inspection and punch list. The total contract value is estimated between $5-10 million. The North American Industry Classification code is 236220 with a size standard of $39.5 million average annual revenue. A pre-bid conference will be held on September 1st and bids are due September 24th, as outlined in the solicitation available through Beta.SAM. The solicitation is an 8(a) set-aside and all responsible offerors are encouraged to participate.

View the file

Other files

File Type Posted
BID ABSTRACT 20-B-0004.pdf PDF
Sign-In Bid Opening 20-B-0004.pdf PDF
W50S8Q-20-B-0004-0003 ADAL CE SPANGB.pdf PDF
ADAL Amendment 0002.pdf PDF
ATTACHMENT 7A - Questions_ Answers 2.docx DOCX document
ATTACHMENT 7C - Typical Existing Restroom Elevations.pdf PDF
ATTACHMENT 7B - A-601 - Arch Door_Window Schedules.pdf PDF
ATTACHMENT 7D - B119 Mezz Location.pdf PDF
ATTACHMENT 6B - A0-5 Layout.pdf PDF
Site Visit SignIn Sheet 01 Sept 2020 (1).pdf PDF
20-B-0004 ATTACHMENT 6D - Arch Specs pg 12 08 71 00.pdf PDF
ATTACHMENT 6A - Questions Answers.docx DOCX document
20-B-0004 Site Visit SignIn Sheet 01 Sept 2020 (4).pdf PDF
ADAL Amemdment 0001.pdf PDF
20-B-0004 ATTACHMENT 6C - A-104 Architectural Roof Plan.pdf PDF
20-B-0004 Site Visit MFR.docx DOCX document
W50S8Q-20-B-0004 ADAL CE SPANGB 25AUG.pdf PDF
ATTACHMENT 3B - DRAWINGS (CIVIL SET).pdf PDF
ATTACHMENT 3J - CORRECTIONS (A102 A104 A601 AD102 F501).pdf PDF
ATTACHMENT 4 - Base Entry Request.pdf PDF
JA for Brand Names -Advantor Monaco Lochinvar-redo 18 Aug 20.pdf PDF
ATTACHMENT 3H - DRAWINGS (STRUCT SET).pdf PDF
ATTACHMENT 3C - DRAWINGS (ELECTRICAL SET).pdf PDF
ATTACHMENT 2A - SPEC BOOK VOL I.pdf PDF
ATTACHMENT 3A - DRAWINGS (ARCH SET).pdf PDF
ATTACHMENT 3I - DRAWINGS (TECHNOLOGY SET).pdf PDF
ATTACHMENT 1 - SUMMARY OF WORK.docx DOCX document
ATTACHMENT 3D - DRAWINGS (FIRE PROTECTION SET).pdf PDF
ATTACHMENT 5 - RFI.doc DOC document
ATTACHMENT 2B - SPEC BOOK VOL II.pdf PDF
ATTACHMENT 3G - DRAWINGS (PLUMBING SET).pdf PDF
ATTACHMENT 3E - DRAWINGS (GEN SET).pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FS

LS

PS

TS

PG

PA

PITCH

AV

MV

S

S

CO

CO2

NO2

RS

SP

H

TS

T

T

DP

PIPE TURNED TOWARD

PIPE TURNED AWAY

PIPE TEE TURNED AWAY

FLEXIBLE CONNECTOR

UNION

FLANGES

REDUCER (CONCENTRIC)

REDUCER (ECCENTRIC)

PIPE CAP/CLEAN OUT

FLUID FLOW DIRECTION

PIPE GUIDE

PIPE ANCHOR

PIPE PITCH DIRECTION

AUTOMATIC CONTROL VALVE (2-WAY)

AUTOMATIC CONTROL VALVE (3-WAY)

BACKFLOW PREVENTION VALVE

BALANCING VALVE

FLOW MEASUREMENT STATION

RELIEF VALVE

AIR VENT (AUTO)

AIR VENT (MANUAL)

VACUUM BREAKER

PRESSURE GAUGE

THERMOMETER

WATER HAMMER ARRESTOR

ISOLATION/SHUT-OFF/MANUAL VALVE

GLOBE VALVE

BUTTERFLY VALVE

GATE VALVE

GLOBE ANGLE VALVE

PLUG VALVE

PRESSURE REDUCING VALVE

PRESSURE REGULATING VALVE

SOLENOID VALVE ONE-WAY (ELECTRIC)

STRAINER

PIPE TEE TURNED TOWARD

GAUGE CONNECTION (TEST PLUG)

PIPE PLUG

BALL VALVE

FLOW SENSOR

LEVEL SENSOR

PRESSURE SENSOR

TEMPERATURE SENSOR

FILTER

CHECK VALVE

PIPING SYMBOLS

STRAINER WITH BLOW OFF VALVE AND

NIPPLE

EQUIPMENT DRAIN VALVE

PUMP

STEAM TRAP

SV

MPCR

MPS

LPCR

LPS

HPCR

HPS

MEDIUM PRESSURE STEAM

HIGH PRESSURE STEAM

LIQUID PETROLEUM

LOW PRESSURE STEAM

LP

LOW PRESSURE CONDENSATE RETURN

REFRIGERANT SUCTION

MEDIUM PRESSURE CONDENSATE RETURN

STEAM RELIEF VENT

REFRIGERANT LIQUID

PUMPED CONDENSATE RETURN

NATURAL GAS

VACUUMVAC

RS

RL

G

PCR

GLYCOL WATER RETURN

GLYCOL WATER SUPPLY

HIGH PRESSURE CONDENSATE RETURN

CONDENSER WATER RETURN

CONDENSER WATER SUPPLY

ICE WATER RETURN

ICE WATER SUPPLY

HOT WATER SUPPLY

HOT WATER RETURN

COOLING TOWER WATER SUPPLY

CONDENSATE DRAIN

COOLING TOWER WATER RETURN

CHILLED WATER SUPPLY

CHILLED WATER RETURN

HWS

IWS

HWR

IWR

GWR

GWS

CD

CWR

CWS

CTS

CHWS

CTR

CHWR

MECHANICAL PIPING

CHEMICAL FEED

BOILER BOTTOM BLOW DOWN

BOILER SURFACE BLOW DOWN

COMPRESSED AIR

BOILER FEED WATER

CF

BBD

BSD

BFW

A

REFRIGERANT HOT GASRHG

(FIRST FIGURE IS SIDE SHOWN)

RECTANGLE DUCT SIZE

SUPPLY DUCT TURNED TOWARD

FIRE DAMPER & ACCESS DOOR

VOLUME DAMPER

DUCT (FLEXIBLE ROUND)

TRANSITION (SQUARE-TO-ROUND)

MOTOR OPERATED CONTROL DAMPER

AIR OUTLET/INLET TYPE

ROUND DUCT (RIGID)

EXHAUST

BACKDRAFT DAMPER

FLEXIBLE CONNECTION

(CFM)

TURNING VANES

SUPPLY DUCT TURNED AWAY

AD

MOD

FD

BD

12x12

SUPPLY OR OUTDOOR AIR

DOOR GRILLE

AIRFLOW (SUPPLY/OUTSIDE AIR)

HVAC SYMBOLS

RETURN OR TRANSFER

AIRFLOW (RETURN/EXHAUST)

DG

A

3/4" DOOR UNDERCUT

DCO

12ø

12/12ø

OVAL DUCT

CEILING MOUNTED ACCESS PANELAP

SMOKE DAMPER & ACCESS DOOR

AD SD

COMBINATION FIRE/SMOKE DAMPER &

ACCESS DOOR

AD FSD

SMOKE DETECTOR

(FIRST FIGURE IS SIDE SHOWN)

AIR FLOW MEASURING STATION

A F

M S

-X

TEMPERATURE SENSOR

CARBON MONOXIDE (CO) SENSOR

STATIC PRESSURE SENSOR

HUMIDISTAT

NITROGEN DIOXIDE (NO2) SENSOR

ROOM SENSOR

GENERAL SYMBOLS

CARBON DIOXIDE (CO2) SENSOR

THERMOSTAT

INSULATED BASE THERMOSTAT

SWITCH

DIFFERENTIAL PRESSURE SENSOR

NEW CONNECTION TO EXISTING

EXISTING TO REMAIN

EXISTING TO BE REMOVED

NEW TO BE INSTALLED

GENERAL MECHANICAL NOTES

1. THE MECHANICAL CONTRACTOR SHALL EXAMINE ALL CONTRACT DOCUMENTS AND IS REQUIRED TO DO ALL WORK WHICH IS SHOWN ON THE DRAWINGS, STATED IN THE SPECIFICATIONS, OR REASONABLY IMPLIED AS NECESSARY TO COMPLETE THEIR DIVISION OF WORK FOR THIS PROJECT REGARDLESS OF WHERE IN THE CONTRACT DOCUMENTS THE WORK IS REPRESENTED. MECHANICAL CONTRACTOR TO COORDINATE WORK WITH ALL OTHER TRADES. ALL OTHER TRADE DOCUMENTS ARE TO BE CONSIDERED PART OF THIS CONTRACTORS DOCUMENTS WITH RESPECT TO COORDINATION OF WORK BETWEEN TRADES OF WORK.

2. ABBREVIATIONS AND SYMBOLS INDICATED HERE AND NOT USED IN THE CONTRACT DOCUMENTS DO NOT APPLY TO THIS PROJECT. ADDITIONAL ABBREVIATIONS MAY BE INDICATED IN THE CONTRACT DOCUMENTS.

3. THESE DRAWINGS ARE DESIGN DRAWINGS AND ARE DIAGRAMMATIC, THEY MAY NOT SHOW ALL PHYSICAL ARRANGEMENTS, OFFSETS, BENDS, OR ELBOWS WHICH MAY BE REQUIRED FOR PROPER INSTALLATION OF VARIOUS MATERIALS, EQUIPMENT, PIPING AND DUCTWORK SYSTEMS IN ALLOTTED SPACES. EXAMINE THESE AND OTHER AVAILABLE DRAWINGS TO DETERMINE SPACE LIMITATIONS AND INTERFERENCES. MAKE ANY MINOR CHANGES IN LOCATIONS OF EQUIPMENT, PIPING, AND DUCTWORK FROM THAT SHOWN ON DRAWINGS AND FOR ALL PHYSICAL DETAILS REQUIRED FOR INSTALLATION. COST FOR ADAPTING WORK TO JOB SITE CONDITIONS SHALL NOT BE

CONSIDERED AS BASIS OF AN EXTRA COST TO CONTRACT.

4. ELEVATION OF PIPING AND DUCTWORK INDICATED ON THESE DRAWINGS ARE TO BE USED AS GUIDELINES TO ASSIST WITH INSTALLATIONS. MINOR CHANGES TO THESE ELEVATIONS MAY BE NECESSARY TO ELIMINATE UNFORESEEN

INTERFERENCES. ANY CHANGE IN ELEVATION SHALL BE APPROVED PRIOR TO CHANGE.

5. ANY AND ALL INFORMATION SHOWN ON THESE DRAWINGS WITH RESPECT TO EXISTING STRUCTURES, UTILITIES, AND MECHANICAL SYSTEMS, IS AS EXACT AS COULD BE SECURED. THE INFORMATION IS NOT WARRANTED NOR GUARANTEED ACCURATE, FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO PROCEEDING WITH WORK.

6. ACCURATE AND LEGIBLE AS-BUILT DRAWING MARKUPS SHALL BE MAINTAINED AT THE JOB SITE, AND BE SUBMITTED PRIOR TO FINAL PAYMENT FOR THE CREATION OF FINAL RECORD DRAWINGS.

7. ALL NEW AND EXISTING ROOFING SYSTEMS SHALL BE PROTECTED FROM DAMAGE DURING CONSTRUCTION ACTIVITIES.

8. TEMPORARILY PATCH ALL ROOF OPENINGS WATERTIGHT UNTIL FINAL CLOSURE CAN BE MADE.

9. VERIFY ALL EQUIPMENT LOCATIONS AND PIPE AND DUCT ROUTING WITH OWNER PRIOR TO INSTALLATION AND COORDINATE WITH ALL OTHER TRADES.

10. SEQUENCE OF WORK AND/OR PLACE OF COMMENCEMENT OF WORK SHALL BE APPROVED PRIOR TO WORK BEING STARTED. SCHEDULED SHUTDOWNS SHALL BE CLOSELY COORDINATED WITH EXISTING OPERATIONS.

11. MAINTAIN 3'-0" CLEAR HORIZONTALLY IN FRONT OF ALL ELECTRICAL EQUIPMENT.

12. COORDINATE POWER REQUIREMENTS FOR ALL POWER TO MECHANICAL EQUIPMENT INCLUDING CONTROL SYSTEM WITH ELECTRICAL CONTRACTOR AND INSURE ALL COSTS ASSOCIATED WITH SUCH ARE INCLUDED IN THE PROJECT BID COST. PROVIDE ELECTRICAL POWER, TRANFORMERS, RELAYS, ETC. AS NECESSARY TO ALL HVAC AND MECHANICAL CONTROLS.

13. PROVIDE MANUFACTURER'S RECOMMENDED CLEARANCES ON ALL EQUIPMENT.

ABBREVIATIONS

AMPS

AIR BLOWLOWN

ALTERNATE BID ITEM

DUCTLESS SPLIT SYSTEM

AIR COOLED CONDENSER

AIR COOLED CONDENSING UNIT

AIR COOLED CHILLER

AIR COMPRESSOR

AIR CONDITIONING UNIT

AUTOMATIC CONTROL VALVE

AIR DROP

AIR FILTER OR AIR FOIL

AFTER COOLER

ABOVE FINISHED FLOOR

AUTHORITY HAVING JURISDICTION

AIR HANDLING UNIT

ALUMINUM

AIR MIXING DEVICE

AIR NATIONAL GUARD

APPROXIMATELY

AIR SEPARATOR

AMERICAN SOCIETY FOR TESTING AND MATERIALS

AIR TERMINAL

ABSORPTION CHILLER

BUILDING AUTOMATION SYSTEM

BOOSTER COIL

BACKDRAFT DAMPER

BOOSTER HUMIDIFIER

BRAKE HORSEPOWER

CONTINUOUS BLOWDOWN HEAT RECOVERY

SYSTEM

BACKWARD INCLINED

BOILER BLOWDOWN SEPARATOR

BACKFLOW PREVENTION DEVICE

BRASS

BRONZE

BLACK (MILD) STEEL

BRANCH SELECTOR BOX

BUFFER TANK

BRITISH THERMAL UNIT

BRITISH THERMAL UNIT PER HOUR

BUTTWELD

CONVECTOR

COMBUSTION AIR

COMPRESSED AIR DRYER

COMPRESSED AIR FILTER

COOLING COIL OR CONTROLS CONTRACTOR

CEILING DIFFUSER

CUBIC FEET PER MINUTE

CAST IRON

COMPRESSOR

CONDENSATE

CONTRACTING OFFICER'S REPRESENTATIVE

COMPUTER ROOM AIR CONDITIONING UNIT

CONDENSATE RETURN PUMP

CENTRIFUGAL SEPARATOR

COOLING TOWER

CLOSE TO CEILING

CLOSE TO COLUMN

CLOSE TO WALL

COPPER

CABINET UNIT HEATER

DOOR AIR CURTAIN

DECIBELS, BAND A

DUST COLLECTOR

DOUBLE CHECK VALVE ASSEMBLY BPD

DIRECT DIGITAL CONTROL

DESICCANT DEHUMIDIFIER

DEMOLISH

DESTRATIFICATION FAN

DIVISION OF FACILITIES DEVELOPMENT

DIAMETER

A

AB

ABI

AC

ACC

ACCU

ACH

ACOMP

ACU

ACV

AD

AF

AFC

AFF

AHJ

AHU

AL

AMD

ANG

APPROX

AS

ASTM

AT

AWC

BAS

BC

BDD

BH

BHP

BHR

BI

BLD

BPD

BRS

BRZ/BZ

BS

BSB

BT

BTU

BTUH

BW

C

CA

CAD

CAF

CC

CD

CFM

CI

COMP

COND

COR

CRAC

CRP

CS

CT

CTCLG

CTCLM

CTW

CU

CUH

DAC

DBA

DC

DCVA

DDC

DDH

DEMO

DF

DFD

DIA

DIMENSION

DISCHARGE

DAMPER

DOWN

DEPARTMENT OF DEFENSE

DRY COOLER

DRAWING

DIRECT EXPANSION

EXISTING

EXHAUST AIR

ENTERING AIR TEMPERATURE

ELECTRIC BASEBOARD HEATER

EVAPORATIVE COOLER OR ELECTRICAL

CONTRACTOR

ELECTRIC DUCT HEATER

EXHAUST FAN

EFFICIENCY

ENTERING FLUID TEMPERATURE

EXHAUST GRILLE

ETHYLENE GLYCOL

ELECTRIC HEATING COIL

EXPANSION JOINT

ELEVATION

ELECTRIC

END OF MAIN

ETHYLENE PROPYLENE DIENE MONOMER

AIR-TO-AIR HEAT EXCHANGER

EXTERNAL STATIC PRESSURE

EXPANSION TANK

EXISTING TO REMAIN

ELECTRIC WALL HEATER

ENTERING WATER TEMPERATURE

FAHRENHEIT

FORCED AIR FURNACE

FLUID COOLER

FAN COIL UNIT

FUME EXTRACTOR

FULL LOAD AMPS

FLOOR

FLOW METER

FUEL OIL PUMP

FEET PER MINUTE

FIBERGLASS REINFORCED PLASTIC

FLASH TANK OR FEET

FINNED TUBE CONVECTOR

FEET WATER COLUMN PRESSURE

GAUGE

GALLON

GENERAL CONTRACTOR

GLYCOL FILL TANK

GALLONS PER MINUTE

GRAVITY ROOF VENTILATOR

GALVANIZED STEEL

HEIGHT

HUMIDIFICATION BOILER

HEATING COIL

HEAD (FT)

HYDROSTATIC DESIGN BASIS

HEAT PUMP OR HORSEPOWER

ERV HEAT PUMP COIL

HOSE REEL

ROTARY AIR-TO-AIR EXCHANGER

HUMIDIFIER

HOT WATER BOILER

FLUID HEAT EXCHANGER

HERTZ

IN ACCORDANCE WITH

INSIDE DIAMETER

INVERT ELEVATION

INTERNATIONAL FUEL GAS CODE

INTAKE HOOD

INCH

DIM

DISCH

DMPR

DN

DOD

DRC

DWG

DX

E

EA

EAT

EBH

EC

EDH

EF

EFF

EFT

EG

EGLY

EHC

EJ

EL

ELEC

EOM

EPDM

ERV

ESP

ET

ETR

EWH

EWT

°F

FAF

FC

FCU

FE

FLA

FLR

FM

FOP

FPM

FRP

FT

FTC

FTWC

GA

GAL

GC

GFT

GPM

GRV

GS

H

HB

HC

HD

HDB

HP

HPC

HR

HRW

HUM

HWB

HX

HZ

IAW

ID

IE

IFGC

IH

IN

INCHES WATER COLUMN PRESSURE

INFRARED HEATER

KITCHEN HOOD

KILOWATT

LOUVER OR LENGTH

LEAVING AIR TEMPERATURE

POUNDS

LINEAR DIFFUSER

LEAVING FLUID TEMPERATURE

LIQUIFIED PETROLEUM GAS

LEVEL SWITCH

LEAVING WATER TEMPERATURE

MAXIMUM ALLOWABLE DIFFERENTIAL PRESSURE

MAKE-UP AIR UNIT

MAXIMUM ALLOWABLE WORKING PRESSURE

MAXIMUM

THOUSANDS BTU'S PER HOUR

MECHANICAL CONTRACTOR OR MECHANICAL

COUPLING

MINIMUM CIRCUIT AMPACITY

MOTOR CONTROL CENTER

MANUFACTURER

MINIMUM

MILLION BTU PER HOUR

MINIMUM OVER CURRENT PROTECTION

MANUFACTURERS STANDARDIZATION SOCIETY

MATERIAL

NOT APPLICABLE

NORMALLY CLOSED

NATIONAL FIRE PROTECTION ASSOCIATION

NO-HUB

NOT IN CONTRACT

NORMALLY OPEN

NOMINAL

NET POSITIVE SUCTION HEAD

NPSH AVAILABLE

NPSH REQUIRED

OUTSIDE AIR

ON CENTER

OUTSIDE DIAMETER

OPEN ENDED DUCT

HYDRONIC PUMP OR PRESSURE

PLUMBING CONTRACTOR

PRESSURE POWERED CONDENSATE PUMP

PRESSURE DROP/DIFFERENTIAL

PROPYLENE GLYCOL

PHASE

POUND PER HOUR

PROPELLER

PRESSURE REDUCING VALVE

POUNDS PER SQUARE INCH

PSI ABSOLUTE

PSI DIFFERENTIAL

PSI GAGE

PACKAGED TERMINAL AIR CONDITIONER

PACKAGED TERMINAL HEAT PUMP

POLYVINYL CHLORIDE

RETURN AIR

RADIANT CEILING PANEL

REFRIGERATED DEHUMIDIFIER

RETURN GRILLE

RELIEF HOOD

REVOLUTIONS PER MINUTE

RESISTIVE THERMAL DEVICE

ROOF TOP UNIT

RADIANT FLOOR HEATING ZONE

SUPPLY AIR

SOUND ATTENUATING DEVICE

SECURITY BARRIER

STANDARD CFM

SCHEDULE

SLOT DIFFUSER/SOLDER

INWC

IR

KH

KW

L

LAT

LB

LD

LFT

LPG

LS

LWT

MADP

MAU

MAWP

MAX

MBH

MC

MCA

MCC

MFR

MIN

MMBH

MOCP

MSS

MTL

NA

NC

NFPA

NH

NIC

NO

NOM

NPSH

NPSHA

NPSHR

OA

OC

OD

OED

P

PC

PCP

PD

PG

PH

PPH

PROP

PRV

PSI

PSIA

PSID

PSIG

PTAC

PTHP

PVC

RA

RCP

RDH

RG

RH

RPM

RTD

RTU

RZ

SA

SAD

SB

SCFM

SCH

SD

STEAM FILTER OR SUPPLY FAN

SUPPLY GRILLE

SHEET

SEAMLESS

SNOW MELTING SYSTEM DISTRIBUTION

MANIFOLD

STATIC PRESSURE

SPECIFICATIONS

SQUARE

SAFETY RELIEF VALVE

STAINLESS STEEL

STEAM TRAP

STANDARD

STEEL

SOLVENT WELD

SOCKET WELD

TEMPERATURE

TRANSFER AIR

TEMPERATURE CONTROL PANEL

TOTAL DEVELOPED HEAD

TOTAL DISSOLVED SOLIDS

TEMPERATURE

TRANSFER GRILLE

THREADED

TECHNOLOGY MANAGEMENT CENTER

THERMOSTATIC MIXING VALVE

TONS COOLING

TYPICAL

UNIT COOLER

UNIFIED FACILITIES CRITERIA

UNDERGROUND

UNIT HEATER

UNLESS NOTED OTHERWISE

UP THRU ROOF

UNIT VENTILATOR OR ULTRAVIOLET

VOLTS

VENT AIR

VEHICLE EXHAUST REEL

VARIABLE FREQUENCY DRIVE

VIBRATION ISOLATORS

VALVE

VARIABLE REFRIGERANT FLOW

WATTS OR WIDTH

WATER COLUMN

WATER COOLED CONDENSER

WATER COOLED CHILLER

WATER FILTER

WATER INLET VALVE

WATER HAMMER ARRESTOR

SF

SG

SHT

SMLS

SMS

SP

SPEC

SQ

SRV

SS

ST

STD

STL

SV

SW

T

TA

TCP

TDH

TDS

TEMP

TG

TH

TMC

TMV

TONR

TYP

UC

UFC

UGD

UH

UNO

UTR

UV

V

VA

VER

VFD

VI

VLV

VRF

W

WC

WCC

WCH

WF

WIV

WHA

CHKD:

DRWN:

PROJ:

DESN:

A

B

C

D

E

F

2 3 4 5 6 7

Bar measures 1 inch, otherwise drawing is not to scale

C o p yr ig h t:

T e tr a T e c h

/1

/2

:1 :4

P

M C

R e vi t L o c a l\4

-1

.0

-1

-M

-C e n tr a l-ch a rl e s.

s tr in g e r.

rv t

4269900-170410.01

BGD

CCS

KML

M-001

O h io

A ir

N a ti o n a l G u a rd

S P

R

IN

G F

IE

L D

A N

G B

-A D

A L C

E B

L D

G S

N O

T E

S

S Y

M B

O L

S A

N D

A B

B R

E V

IA

T

IO

N

S

M A

R K

D A

T E

D E

S C

R

IP

T

IO

N B

Y

/1

/1

T

Y P

E B

S

U B

M

IT

T A

L

T

TT

T

S

S

S T

T

T

T

RH(E)

RH(E)

RH(E)

RH(E)

AT(E)

AT(E)

AT(E)

EF(E)

CUH(E)

UH(E)

CUH(E)

AT(E)

EF(E)

MAU(E)

RH(E)

RH(E)

RH(E)

RH(E)

CUH(E)

CUH(E)

24/24

26/18 16/14

"D

6"D

12/6

8/8

17'-0"

17'-0"

12/6

GENERAL HVAC DEMOLITION NOTES

1. COMPLETELY DEMOLISH ALL EXISTING DUCTWORK AS SHOWN WITH

BOLD DASHED LINES, INCLUDING ALL ABANDONED AND UNUSED

ACCESSORIES, INSULATION, HANGER SUPPORTS, ETC. FOR REMAINING

DUCT SYSTEM. PLUG OR CAP ALL OPENINGS CREATED BY DUCT

DEMOLITION. TEST DUCTWORK AS SPECIFIED, AND INSULATE OR PAINT

SAME AS NEW WORK. PATCH EXISTING WALLS, ROOFS, CEILINGS, AND

FLOORS DISTURBED BY DEMOLITION TO ORIGINAL CONDITION.

2. COMPLETELY DEMOLISH ALL EXISTING EQUIPMENT AS SHOWN WITH

BOLD DASHED LINES, INCLUDING ALL ABANDONED AND UNUSED

ACCESSORIES, INSULATION, HANGERS, SUPPORTS, BASES, CONTROLS,

ETC. PATCH EXISTING WALLS, ROOFS, CEILINGS, AND FLOORS

DISTURBED BY DEMOLITION TO ORIGINAL CONDITION.

3. DELIVER INDICATED EQUIPMENT TO OWNER'S DESIGNATED STORAGE

SPACE ON SITE, PLUG OR CAP ALL EQUIPMENT OPENINGS TO PREVENT

DIRT AND MOISTURE FROM ENTERING EQUIPMENT.

4. REINSTALL INDICATED EQUIPMENT, SAME AS NEW WORK, IN NEW

LOCATION WHERE INDICATED. COMPLETELY CLEAN AND RESTORE

EQUIPMENT TO GOOD OPERATING CONDITION.

5. INSTALL TEMPORARY COVERS OVER EXISTING EXTERIOR ENVELOPE

OPENINGS CREATED BY REMOVED EQUIPMENT/DUCT. COVER SHALL BE

WATERTIGHT, AND MEET OSHA AND OWNER REQUIREMENTS.

COMPLETELY REMOVE TEMPORARY COVER WHEN OPENINGS ARE

PATCHED TO FINAL CONDITION. REPAIR ANY DAMAGE TO EXISTING

BUILDING COMPONENTS CAUSED BY TEMPORARY COVER.

6. WHERE BRANCH DUCTWORK IS SHOWN TO BE DEMOLISHED BACK TO

THE MAIN DUCT AND THE EXISTING MAIN DUCT OPENING IS NOT TO BE

RE-USED, CAP AND SEAL THE MAIN DUCT BRANCH OPENING AIRTIGHT.

K

L

3 4 5

7 8 9 10 11 12 13 14 15 16 17

/1 MD101B/1 MD101B

UH-11(E)

DUST

COLLECTOR(E)

ø

(E

4ø(E) 6ø(E) 4ø(E)

4ø (E ø

(E

7ø(E) 6ø(E) ø

(E

5ø(E)

4ø(E)

4ø(E)

4ø(E)

4ø(E)4ø(E)

14ø(E)

EF(E)

EF(E)

EF(E)

10ø(E)

10ø(E) 10ø(E) ø

(E

10ø(E)

10ø(E)

L(E)

FD (E)FD (E)

FD (E) FD (E)

18x18(E)

18x18(E)

18x18(E)

18x18(E)

12x12(E)

8x8(E)

12x12(E)

UH-10(E)

ACCU(E)

CRAC(E)

AIR

COMPRESSOR(E)

AIR

DRYER(E)

7.001 7.001 7.001

7.001

7.001

7.001

7.002 7.002

7.002

7.002 7.002

7.002

7.004

7.004 7.006

7.008

7.003

MOD (E)

SG(E)SG(E)

SG(E)SG(E)

SG(E)SG(E) SG(E)SG(E)

SG(E)SG(E)

SG(E)SG(E)

TG(E)TG(E)

TG(E)TG(E)

SG(E)SG(E)

L(E)L(E)

SG(E)SG(E)

SG(E)SG(E)

TG(E)TG(E)

TG(E)TG(E)

RG(E)RG(E)

RG(E)RG(E)

RG(E)RG(E)

RG(E)RG(E)

SG(E)SG(E)

RG(E)RG(E)

RG(E)RG(E)

RG(E)RG(E)

MOD (E)

CD(E)CD(E)

CD(E)CD(E)

CD(E)CD(E)

SG(E)SG(E)

CD(E)CD(E)

CD(E)CD(E)

N

CHKD:

DRWN:

PROJ:

DESN:

A

B

C

D

E

F

2 3 4 5 6 7

Bar measures 1 inch, otherwise drawing is not to scale

C o p yr ig h t:

T e tr a T e c h

4' 8' 16'

SCALE: 1/8" = 1'-0"

/1

/2

:1 :1

P

M C

R e vi t L o c a l\4

-1

.0

-1

-M

-C e n tr a l-ch a rl e s.

s tr in g e r.

rv t

4269900-170410.01

BGD

CCS

KML

MD101A

O h io

A ir

N a ti o n a l G u a rd

S P

R

IN

G F

IE

L D

A N

G B

-A D

A L C

E B

L D

G S

F

IR

S T

F L

O O

R H

V A

C D

E M

O L

IT

IO

N P

L A

N

A R

E A

A

KEYED NOTES

7.001 DEMOLISH INFRA-RED SYSTEM INCLUDING RADIANT HEATER, CONTROLS,

AND VENTING. PATCH ALL PENETRATIONS THRU INTERIOR AND EXTERIOR

WALLS.

7.002 DEMOLISH EXISTING MAKE-UP AIR UNIT AND ASSOCIATED RETURN

/EXHAUST DUCT SHOWN AS BOLD AND DASHED. SUPPLY AND OUTSIDE AIR

DUCT TO REMAIN.

7.003 DISASSEMBLE 4" DUST COLLECTOR TO ALLOW SPACE FOR NEW MAKE-UP

AIR UNIT. DUST COLLECTOR DUCT TO BE RE-ASSEMBLED AND RE-ROUTED

AFTER INSTALLATION OF NEW UNIT. SEE M-101A.

7.004 DEMOLISH EXISTING CRAC UNIT SERVING TELECOM ROOM AND

ASSOCIATED CONDENSING UNIT, REFRIGERATION PIPING, DUCTWORK,

GRILLES, AND CONTROLS. RECLAIM REFRIGERANT AND REPORT AMOUNT

RECLAIMED TO GOVERNMENT. PATCH ANY PENETRATIONS.

7.006 DEMOLISH EXISTING SUPPLY AND RETURN DUCT, FAN POWERED VAV

BOXES, GRILLES, DIFFUSERS, AND CONTROLS SERVING EXISTING RTU AS

SHOWN BOLD AND DASHED.

7.008 DEMOLISH EXISTING CABINET UNIT HEATER AND ASSOCIATED DUCT AND

CONTROLS AS SHOWN BOLD AND DASHED.

1/8" = 1'-0"1

FIRST FLOOR HVAC DEMOLITION PLAN - AREA A

M A

R K

D A

T E

D E

S C

R

IP

T

IO

N B

Y

/1

/1

T

Y P

E B

S

U B

M

IT

T

S

S

S

S

S

S

S

S

S

S T

T

T

S

S

T

T

UH(E)

SF(E)

AT(E)

AT(E)

AT(E)

AT(E)

AT(E)

AT(E)

AT(E)

AT(E)

AT(E)

AT(E)

EF(E)

CUH(E)

AT(E)

AT(E)

RCP(E)

RCP(E)

AT(E)

AT(E)

AT(E)

AT(E)

AT(E)

CUH(E)

AT(E)

AT(E)

AT(E)

AT(E)

AT(E)

AT(E)

EF(E) ON

ROOF

AT(E)

CUH(E)

34/14

OV

O V

24/10

10"D

12"D

16/14 10/14

16/14

12"D

12"D

20/12

"D

10"D

24/6

10"D

24/6

10"D

"D

24/8

24/824/8

34/1424/1414/14

24/12

24/12

"D

"D

"D

"D

"D

"D

26/14

12"D12"D

24/10

12"D12"D

24/6

12/12

"D

"D

O V

10"D

12"D 10"D

8"D

12/6

8"D

"D

"D

D

8"D

11'-4"

24/10

8" D

18/12

6"D

14/8

14/8 11'-4"

12/6

11'-4"

R13'-4"30/14

OV

10"D

10"D1

18/10

18/14 10/12

16/14

"D

4/10 10/10

"D

"D

6/10 D

10/12 8"D

8"D

6"D

24/10

24/8

24/10

6/6

12/8

24/10

24/10

28/28

28/28

10/10

C

A

D

E

F

G

H

J

1 2 3 4 5

7 8 9 10 11 12 13 14 15 16 17

/1 MD101A/1 MD101A

FT(E) FT(E)

7.006

7.006

7.006

7.006

7.006

7.006

7.007

7.006

7.005

7.008

7.006

7.006

7.006

7.006

ROOF HATCH (E)

16x16 VA(E)

UTR TO

GRAVITY

RELIEF

HOOD (E)

TG(E)TG(E)

EG(E)EG(E)

EG(E)EG(E)

EG(E)EG(E)

EG(E)EG(E)

RG(E)RG(E)

RG(E)RG(E)

RG(E)RG(E)

RG(E)RG(E)

RG(E)RG(E)

RG(E)RG(E)

RG(E)RG(E)

RG(E)RG(E)

RG(E)RG(E)

RG(E)RG(E)

RG(E)RG(E)

RG(E)RG(E)

RG(E)RG(E)

RG(E)RG(E)

CD(E)CD(E)

CD(E)CD(E)

CD(E)CD(E)

CD(E)CD(E)

CD(E)CD(E)

CD(E)CD(E)

CD(E)CD(E)

CD(E)CD(E) CD(E)CD(E)

CD(E)CD(E)

CD(E)CD(E)

CD(E)CD(E)

CD(E)CD(E) CD(E)CD(E)

SG(E)SG(E)

SG(E)SG(E)

SG(E)SG(E)

CD(E)CD(E)

CD(E)CD(E)

RG(E)RG(E)

CD(E)CD(E)

CD(E)CD(E)

CD(E)CD(E)

CD(E)CD(E)

CD(E)CD(E) CD(E)CD(E)

CD(E)CD(E)

CD(E)CD(E)

CD(E)CD(E)

CD(E)CD(E)

CD(E)CD(E)

CD(E)CD(E)

CD(E)CD(E)

CD(E)CD(E)

CD(E)CD(E)CD(E)CD(E)

CD(E)CD(E)

CD(E)CD(E)

RCP(E)

RCP(E)

RCP(E)

CD(E)CD(E)

CD(E)CD(E)

CD(E)CD(E)

N

CHKD:

DRWN:

PROJ:

DESN:

A

B

C

D

E

F

2 3 4 5 6 7

Bar measures 1 inch, otherwise drawing is not to scale

C o p yr ig h t:

T e tr a T e c h

4' 8' 16'

SCALE: 1/8" = 1'-0"

/1

/2

:1 :1

P

M C

R e vi t L o c a l\4

-1

.0

-1

-M

-C e n tr a l-ch a rl e s.

s tr in g e r.

rv t

4269900-170410.01

BGD

CCS

KML

MD101B

O h io

A ir

N a ti o n a l G u a rd

S P

R

IN

G F

IE

L D

A N

G B

-A D

A L C

E B

L D

G S

F

IR

S T

F L

O O

R H

V A

C D

E M

O L

IT

IO

N P

L A

N

A R

E A

B

KEYED NOTES

7.005 DEMOLISH EXISTING ROOFTOP UNIT AND CURB AS SHOWN BOLD AND

DASHED. PROTECT OPENING THRU ROOF UNTIL NEW UNIT AND CURB CAN

BE PLACED. RECLAIM REFRIGERANT AND REPORT AMOUNT RECLAIMED TO

GOVERNMENT.

7.006 DEMOLISH EXISTING SUPPLY AND RETURN DUCT, FAN POWERED VAV

BOXES, GRILLES, DIFFUSERS, AND CONTROLS SERVING EXISTING RTU AS

SHOWN BOLD AND DASHED.

7.007 DEMOLISH EXISTING ROOF EXHAUST FAN AND ASSOCIATED EXHAUST DUCT

AND CONTROLS AS SHOWN BOLD AND DASHED. GC TO PATCH EXISTING

ROOF PENETRATIONS.

7.008 DEMOLISH EXISTING CABINET UNIT HEATER AND ASSOCIATED DUCT AND

CONTROLS AS SHOWN BOLD AND DASHED.

1/8" = 1'-0"1

FIRST FLOOR HVAC DEMOLITION PLAN - AREA B

M A

R K

D A

T E

D E

S C

R

IP

T

IO

N B

Y

/1

/1

T

Y P

E B

S

U B

M

IT

T

GENERAL HVAC DEMOLITION NOTES

1. COMPLETELY DEMOLISH ALL EXISTING DUCTWORK AS SHOWN WITH

BOLD DASHED LINES, INCLUDING ALL ABANDONED AND UNUSED

ACCESSORIES, INSULATION, HANGER SUPPORTS, ETC. FOR REMAINING

DUCT SYSTEM. PLUG OR CAP ALL OPENINGS CREATED BY DUCT

DEMOLITION. TEST DUCTWORK AS SPECIFIED, AND INSULATE OR PAINT

SAME AS NEW WORK. PATCH EXISTING WALLS, ROOFS, CEILINGS, AND

FLOORS DISTURBED BY DEMOLITION TO ORIGINAL CONDITION.

2. COMPLETELY DEMOLISH ALL EXISTING EQUIPMENT AS SHOWN WITH

BOLD DASHED LINES, INCLUDING ALL ABANDONED AND UNUSED

ACCESSORIES, INSULATION, HANGERS, SUPPORTS, BASES, CONTROLS,

ETC. PATCH EXISTING WALLS, ROOFS, CEILINGS, AND FLOORS

DISTURBED BY DEMOLITION TO ORIGINAL CONDITION.

3. DELIVER INDICATED EQUIPMENT TO OWNER'S DESIGNATED STORAGE

SPACE ON SITE, PLUG OR CAP ALL EQUIPMENT OPENINGS TO PREVENT

DIRT AND MOISTURE FROM ENTERING EQUIPMENT.

4. REINSTALL INDICATED EQUIPMENT, SAME AS NEW WORK, IN NEW

LOCATION WHERE INDICATED. COMPLETELY CLEAN AND RESTORE

EQUIPMENT TO GOOD OPERATING CONDITION.

5. INSTALL TEMPORARY COVERS OVER EXISTING EXTERIOR ENVELOPE

OPENINGS CREATED BY REMOVED EQUIPMENT/DUCT. COVER SHALL BE

WATERTIGHT, AND MEET OSHA AND OWNER REQUIREMENTS.

COMPLETELY REMOVE TEMPORARY COVER WHEN OPENINGS ARE

PATCHED TO FINAL CONDITION. REPAIR ANY DAMAGE TO EXISTING

BUILDING COMPONENTS CAUSED BY TEMPORARY COVER.

6. WHERE BRANCH DUCTWORK IS SHOWN TO BE DEMOLISHED BACK TO

THE MAIN DUCT AND THE EXISTING MAIN DUCT OPENING IS NOT TO BE

RE-USED, CAP AND SEAL THE MAIN DUCT BRANCH OPENING AIRTIGHT.

BAY

BAY

RESTROOM

MECH

JANITOR

STORAGE

OFFICE

FTC(E)

FTC(E)

FTC(E)

ACU(E)

ACU(E)

34ø(E)

UH(E)

SG(E)

x (E

MAU(E)

1"(E) 3"(E)

3"(E)

UH(E) UH(E)

/2

E

/2

E

FTC(E)

FTC(E)

EF(E)

EF(E)

1"(E) 3"(E)

3"(E)

EXISTING ROOF

HATCH AND

LADDER

L(E)

GAS METER (E)

UP TO GOOSENECK ON ROOF

(ROOF PENETRATION AND

GOOSENECK TO REMAIN)

7.007

8.003

7.009

7.009

7.009

8.003 8.003

8.003

7.011

7.011

8.003

8.003 8.003

7.007

7.007

6' - 6"

10ø(E)8ø(E)

8ø(E) ø

(E ø

(E

8ø(E)

8ø(E)

8ø(E) 8ø(E)

8ø(E)

8ø(E)

AHU(E)

ACCU(E)

CD-2(E)CD-2(E)

7.012

7.012

7.012

7.013

N

CHKD:

DRWN:

PROJ:

DESN:

A

B

C

D

E

F

2 3 4 5 6 7

Bar measures 1 inch, otherwise drawing is not to scale

C o p yr ig h t:

T e tr a T e c h

4' 8' 16'

SCALE: 1/8" = 1'-0"

/1

/2

:1 :1

P

M C

R e vi t L o c a l\4

-1

.0

-1

-M

-C e n tr a l-ch a rl e s.

s tr in g e r.

rv t

4269900-170410.01

BGD

CCS

BGD

MD102

O h io

A ir

N a ti o n a l G u a rd

S P

R

IN

G F

IE

L D

A N

G B

-A D

A L C

E B

L D

G S

F

IR

S T

F L

O O

R H

V A

C D

E M

O L

IT

IO

N P

L A

N S

KEYED NOTES

7.007 DEMOLISH EXISTING ROOF EXHAUST FAN AND ASSOCIATED EXHAUST DUCT

AND CONTROLS AS SHOWN BOLD AND DASHED. GC TO PATCH EXISTING

ROOF PENETRATIONS.

7.009 DEMOLISH EXISTING MAKE-UP AIR UNIT, ASSOCIATED SUPPLY DUCT, FILTER

SUPPLY GRILLE, AND CONTROLS AS SHOWN BOLD AND DASHED.

7.011 DEMOLISH EXISTING THRU-WALL AIR CONDITIONING UNIT AS SHOWN BOLD

AND DASHED. GC TO PATCH OPENING IN WALL. RECLAIM REFRIGERANT AND

REPORT AMOUNT RECLAIMED TO GOVERNMENT.

7.012 DEMOLISH FURNACE UNIT AND ASSOCIATED DUCTWORK, GRILLES, AND

CONTROLS AS SHOWN BOLD AND DASHED.

7.013 DEMOLISH EXISTING CONDENSING UNIT AND ASSOCIATED REFRIGERANT

PIPE, COIL, AND CONTROLS AS SHOWN BOLD AND DASHED. RECLAIM

REFRIGERANT AND REPORT AMOUNT RECLAIMED TO GOVERNMENT.

8.003 DEMOLISH EXISTING BOILER SYSTEM INCLUDING BOILERS, VENTING, HOT

WATER PIPE, CONVECTORS, UNIT HEATERS, PUMPS, CONTROLS, ETC AS

SHOWN BOLD AND DASHED. GC TO PATCH ANY OPENINGS IN WALL OR

ROOF.

3/16" = 1'-0"1

FIRST FLOOR HVAC DEMOLITION PLANS - BUILDING B

3/16" = 1'-0"2

FIRST FLOOR HVAC DEMOLITION PLANS - BUILDING A

M A

R K

D A

T E

D E

S C

R

IP

T

IO

N B

Y

/1

/1

T

Y P

E B

S

U B

M

IT

T

EF(E)

GRV(E)

EF(E)

BOILER VENTS (E)

7.005

7.007

ROOF HATCH (E)

GENERAL HVAC DEMOLITION NOTES

1. COMPLETELY DEMOLISH ALL EXISTING DUCTWORK AS SHOWN WITH

BOLD DASHED LINES, INCLUDING ALL ABANDONED AND UNUSED

ACCESSORIES, INSULATION, HANGER SUPPORTS, ETC. FOR REMAINING

DUCT SYSTEM. PLUG OR CAP ALL OPENINGS CREATED BY DUCT

DEMOLITION. TEST DUCTWORK AS SPECIFIED, AND INSULATE OR PAINT

SAME AS NEW WORK. PATCH EXISTING WALLS, ROOFS, CEILINGS, AND

FLOORS DISTURBED BY DEMOLITION TO ORIGINAL CONDITION.

2. COMPLETELY DEMOLISH ALL EXISTING EQUIPMENT AS SHOWN WITH

BOLD DASHED LINES, INCLUDING ALL ABANDONED AND UNUSED

ACCESSORIES, INSULATION, HANGERS, SUPPORTS, BASES, CONTROLS,

ETC. PATCH EXISTING WALLS, ROOFS, CEILINGS, AND FLOORS

DISTURBED BY DEMOLITION TO ORIGINAL CONDITION.

3. DELIVER INDICATED EQUIPMENT TO OWNER'S DESIGNATED STORAGE

SPACE ON SITE, PLUG OR CAP ALL EQUIPMENT OPENINGS TO PREVENT

DIRT AND MOISTURE FROM ENTERING EQUIPMENT.

4. REINSTALL INDICATED EQUIPMENT, SAME AS NEW WORK, IN NEW

LOCATION WHERE INDICATED. COMPLETELY CLEAN AND RESTORE

EQUIPMENT TO GOOD OPERATING CONDITION.

5. INSTALL TEMPORARY COVERS OVER EXISTING EXTERIOR ENVELOPE

OPENINGS CREATED BY REMOVED EQUIPMENT/DUCT. COVER SHALL BE

WATERTIGHT, AND MEET OSHA AND OWNER REQUIREMENTS.

COMPLETELY REMOVE TEMPORARY COVER WHEN OPENINGS ARE

PATCHED TO FINAL CONDITION. REPAIR ANY DAMAGE TO EXISTING

BUILDING COMPONENTS CAUSED BY TEMPORARY COVER.

6. WHERE BRANCH DUCTWORK IS SHOWN TO BE DEMOLISHED BACK TO

THE MAIN DUCT AND THE EXISTING MAIN DUCT OPENING IS NOT TO BE

RE-USED, CAP AND SEAL THE MAIN DUCT BRANCH OPENING AIRTIGHT.

N

CHKD:

DRWN:

PROJ:

DESN:

A

B

C

D

E

F

2 3 4 5 6 7

Bar measures 1 inch, otherwise drawing is not to scale

C o p yr ig h t:

T e tr a T e c h

4' 8' 16'

SCALE: 1/8" = 1'-0"

/1

/2

:1 :1

P

M C

R e vi t L o c a l\4

-1

.0

-1

-M

-C e n tr a l-ch a rl e s.

s tr in g e r.

rv t

4269900-170410.01

BGD

CCS

KML

MD103

O h io

A ir

N a ti o n a l G u a rd

S P

R

IN

G F

IE

L D

A N

G B

-A D

A L C

E B

L D

G S

M E

C H

A N

IC

A

L R

O O

F D

E M

O L

IT

IO

N P

L A

N

3/32" = 1'-0"1

MECHANICAL ROOF DEMOLITION PLAN

KEYED NOTES

7.005 DEMOLISH EXISTING ROOFTOP UNIT AND CURB AS SHOWN BOLD AND

DASHED. PROTECT OPENING THRU ROOF UNTIL NEW UNIT AND CURB CAN

BE PLACED. RECLAIM REFRIGERANT AND REPORT AMOUNT RECLAIMED TO

GOVERNMENT.

7.007 DEMOLISH EXISTING ROOF EXHAUST FAN AND ASSOCIATED EXHAUST DUCT

AND CONTROLS AS SHOWN BOLD AND DASHED. GC TO PATCH EXISTING

ROOF PENETRATIONS.

M A

R K

D A

T E

D E

S C

R

IP

T

IO

N B

Y

/1

/1

T

Y P

E B

S

U B

M

IT

T

H

H

H

H

AT(E)

EF(E)

MAU(E)

RH(E)

RH(E)

RH(E)

RH(E)

CUH(E)

CUH(E)

2"

3/4"1"

GENERAL PIPING DEMOLITION NOTES

1. COMPLETELY DEMOLISH ALL INDICATED EXISTING PIPING SHOWN WITH BOLD

DASHED LINES, INCLUDING ALL ABANDONED AND UNUSED PIPING, VALVES,

INSULATION, HANGERS, SUPPORTS, ETC. FOR REMAINING PIPING SYSTEMS.

PLUG OR CAP ALL OPENINGS CREATED BY PIPING DEMOLITION. TEST PIPING

SYSTEMS AS SPECIFIED, AND INSULATE OR PAINT SAME AS NEW WORK.

PATCH EXISTING WALLS, ROOFS, CEILINGS, AND FLOORS DISTURBED BY

DEMOLITION TO ORIGINAL CONDITION.

2. COMPLETELY DEMOLISH ALL EXISTING EQUIPMENT SHOWN WITH BOLD

DASHED LINES, INCLUDING ALL ABANDONED AND UNUSED PIPING, VALVES,

INSULATION, HANGERS, SUPPORTS, BASES, CONTROLS, ETC. PATCH

EXISTING WALLS, ROOFS, CEILINGS, AND FLOORS DISTURBED BY

DEMOLITION TO ORIGINAL CONDITION.

3. DELIVER INDICATED EQUIPMENT TO OWNER'S DESIGNATED STORAGE

SPACE ON SITE, PLUG OR CAP ALL EQUIPMENT OPENINGS TO PREVENT DIRT

AND MOISTURE FROM ENTERING EQUIPMENT.

4. WHERE PIPES ARE REMOVED AND NOT RE-CONNECTED, REMOVE PIPE BACK

TO NEXT BRANCH THAT IS TO REMAIN. INSTALL CAPS OR PLUGS ON

OPENINGS. PRIME, PAINT, AND INSULATE DISTURBED PIPE SAME AS

SPECIFIED FOR NEW WORK.

5. REINSTALL INDICATED EQUIPMENT, SAME AS NEW WORK, IN NEW LOCATION

WHERE INDICATED. COMPLETELY CLEAN AND RESTORE EQUIPMENT TO

GOOD OPERATING CONDITION.

6. ABANDON IN PLACE UNDERGROUND PIPES SHOWN ON DRAWINGS AS

PHANTOM.

7. WHERE PIPES ARE ROUTED INSIDE CMU WALLS, PIPE MAY BE ABANDONED

PIPE IN PLACE. REMOVE PIPE TO 1" INSIDE WALL AT BOTH ENDS.

8. WHERE PIPES PASS THROUGH FLOOR SLABS, SAW-CUT SLAB AND REMOVE

CONCRETE TO MINIMUM EXTENT NECESSARY TO GAIN ACCESS BELOW

SLAB. REMOVE PIPE DOWN TO HORIZONTAL PIPING BELOW FLOOR. SEAL

AND CAP ABANDONED PIPE ENDS.

9. COORDINATE WITH ARCHITURAL AND STRUCTURAL TRADES. PATCH

EXISTING ROOFS, WALLS, AND FLOORS DISTURBED BY DEMOLITION.

RESTORE TO MATCH CONDITION OF ORIGINAL SURROUNDING SURFACES.

K

L

3 4 5

7 8 9 10 11 12 13 14 15 16 17

/1 MD131B/1 MD131B

8.002

8.002

8.002

8.001 8.001

8.001

8.001

8.001

AIR

COMPRESSOR(E)

AIR

DRYER(E)

DUST

COLLECTOR(E)

N

CHKD:

DRWN:

PROJ:

DESN:

A

B

C

D

E

F

2 3 4 5 6 7

Bar measures 1 inch, otherwise drawing is not to scale

C o p yr ig h t:

T e tr a T e c h

4' 8' 16'

SCALE: 1/8" = 1'-0"

/1

/2

:1 :1

P

M C

R e vi t L o c a l\4

-1

.0

-1

-M

-C e n tr a l-ch a rl e s.

s tr in g e r.

rv t

4269900-170410.01

BGD

CCS

KML

MD131A

O h io

A ir

N a ti o n a l G u a rd

S P

R

IN

G F

IE

L D

A N

G B

-A D

A L C

E B

L D

G S

F

IR

S T

F L

O O

R P

IP

IN

G D

E M

O L

IT

IO

N P

L A

N

A R

E A

A

KEYED NOTES

8.001 DEMOLISH EXISTING GAS PIPING AS SHOWN BOLD AND DASHED. SERVING

DEMOLISHED INFRA-RED HEATING SYSTEM. PERMANENTLY CAP GAS PIPING

IN MECHANICAL EQUIPMENT ROOM. PATCH ANY WALL PENETRATIONS.

8.002 DEMOLISH HOT WATER PIPING SHOWN AS BOLD AND DASHED.

1/8" = 1'-0"1

FIRST FLOOR PIPING DEMOLITION PLAN - AREA A

M A

R K

D A

T E

D E

S C

R

IP

T

IO

N B

Y

/1

/1

T

Y P

E B

S

U B

M

IT

T

AT(E)

AT(E)

AT(E)

AT(E)

AT(E)

CUH(E)

AT(E)

AT(E)

AT(E)

AT(E)

AT(E)

AT(E)

EF(E) ON

ROOF

AT(E)

CUH(E)

2"

1"

GENERAL PIPING DEMOLITION NOTES

1. COMPLETELY DEMOLISH ALL INDICATED EXISTING PIPING SHOWN WITH BOLD

DASHED LINES, INCLUDING ALL ABANDONED AND UNUSED PIPING, VALVES,

INSULATION, HANGERS, SUPPORTS, ETC. FOR REMAINING PIPING SYSTEMS.

PLUG OR CAP ALL OPENINGS CREATED BY PIPING DEMOLITION. TEST PIPING

SYSTEMS AS SPECIFIED, AND INSULATE OR PAINT SAME AS NEW WORK.

PATCH EXISTING WALLS, ROOFS, CEILINGS, AND FLOORS DISTURBED BY

DEMOLITION TO ORIGINAL CONDITION.

2. COMPLETELY DEMOLISH ALL EXISTING EQUIPMENT SHOWN WITH BOLD

DASHED LINES, INCLUDING ALL ABANDONED AND UNUSED PIPING, VALVES,

INSULATION, HANGERS, SUPPORTS, BASES, CONTROLS, ETC. PATCH

EXISTING WALLS, ROOFS, CEILINGS, AND FLOORS DISTURBED BY

DEMOLITION TO ORIGINAL CONDITION.

3. DELIVER INDICATED EQUIPMENT TO OWNER'S DESIGNATED STORAGE

SPACE ON SITE, PLUG OR CAP ALL EQUIPMENT OPENINGS TO PREVENT DIRT

AND MOISTURE FROM ENTERING EQUIPMENT.

4. WHERE PIPES ARE REMOVED AND NOT RE-CONNECTED, REMOVE PIPE BACK

TO NEXT BRANCH THAT IS TO REMAIN. INSTALL CAPS OR PLUGS ON

OPENINGS. PRIME, PAINT, AND INSULATE DISTURBED PIPE SAME AS

SPECIFIED FOR NEW WORK.

5. REINSTALL INDICATED EQUIPMENT, SAME AS NEW WORK, IN NEW LOCATION

WHERE INDICATED. COMPLETELY CLEAN AND RESTORE EQUIPMENT TO

GOOD OPERATING CONDITION.

6. ABANDON IN PLACE UNDERGROUND PIPES SHOWN ON DRAWINGS AS

PHANTOM.

7. WHERE PIPES ARE ROUTED INSIDE CMU WALLS, PIPE MAY BE ABANDONED

PIPE IN PLACE. REMOVE PIPE TO 1" INSIDE WALL AT BOTH ENDS.

8. WHERE PIPES PASS THROUGH FLOOR SLABS, SAW-CUT SLAB AND REMOVE

CONCRETE TO MINIMUM EXTENT NECESSARY TO GAIN ACCESS BELOW

SLAB. REMOVE PIPE DOWN TO HORIZONTAL PIPING BELOW FLOOR. SEAL

AND CAP ABANDONED PIPE ENDS.

9. COORDINATE WITH ARCHITURAL AND STRUCTURAL TRADES. PATCH

EXISTING ROOFS, WALLS, AND FLOORS DISTURBED BY DEMOLITION.

RESTORE TO MATCH CONDITION OF ORIGINAL SURROUNDING SURFACES.

C

A

D

E

F

G

H

J

1 2 3 4 5

7 8 9 10 11 12 13 14 15 16 17

/1 MD131A/1 MD131A

1 1/2" HWS(E)

3" HWR(E)

1" 3/4"

3" HWR(E)

3" HWS(E)

2 1/2" HWR(E)

2" HWS(E)

1 1/4" HWS(E)

3/4" HWS(E)

3/4" HWR(E)

1/2" HWR(E)

1/2" HWS(E)

RCP(E)

RCP(E)

RCP(E)

RCP(E)

GAS

METER(E)

8.002

8.002

8.002

8.002

8.002

8.002

8.002

8.002

8.002

8.002

N

CHKD:

DRWN:

PROJ:

DESN:

A

B

C

D

E

F

2 3 4 5 6 7

Bar measures 1 inch, otherwise drawing is not to scale

C o p yr ig h t:

T e tr a T e c h

4' 8' 16'

SCALE: 1/8" = 1'-0"

/1

/2

:1 :1

P

M C

R e vi t L o c a l\4

-1

.0

-1

-M

-C e n tr a l-ch a rl e s.

s tr in g e r.

rv t

4269900-170410.01

BGD

CCS

KML

MD131B

O h io

A ir

N a ti o n a l G u a rd

S P

R

IN

G F

IE

L D

A N

G B

-A D

A L C

E B

L D

G S

F

IR

S T

F L

O O

R P

IP

IN

G D

E M

O L

IT

IO

N P

L A

N

A R

E A

B

KEYED NOTES

8.002 DEMOLISH HOT WATER PIPING SHOWN AS BOLD AND DASHED.

1/8" = 1'-0"1

FIRST FLOOR PIPING DEMOLITION PLAN - AREA B

M A

R K

D A

T E

D E

S C

R

IP

T

IO

N B

Y

/1

/1

T

Y P

E B

S

U B

M

IT

T

GENERAL HVAC NOTES

1. INLET DUCT SIZE TO AIR TERMINAL DEVICES SHALL BE SAME AS INLET SIZE

UNLESS OTHERWISE NOTED. IF RUNOUT TO AIR TERMINAL BOX IS GREATER

THAN 6 FEET IN LENGTH, SIZE RUNOUT ONE EVEN INCREMENT SIZE LARGER

(MINIMUM 2" LARGER) UNLESS OTHERWISE NOTED TO WITHIN 3 FEET OF BOX

BEFORE REDUCING TO BOX INLET SIZE.

2. DUCTWORK DOWNSTREAM OF AIR TERMINAL BOXES TO BE INTERNALLY

LINED FOR A MINIMUM OF 6'-0" FOR SOUND ATTENUATION. OUTLET DUCT

SIZES TO MATCH AIR TERMINAL BOX OUTLET UNLESS NOTED OTHERWISE.

3. PROVIDE MANUAL BALANCE DAMPER AT EACH DIFFUSER, GRILLE, AND

BRANCH TAKE-OFF IN ALL SUPPLY, RETURN, AND EXHAUST DUCTWORK

EXCEPT KITCHEN GREASE EXHAUST DUCT. LOCATE BALANCE DAMPER AS

CLOSE TO BRANCH TAKE-OFF AS POSSIBLE.

4. DUCT SIZE TO DIFFUSERS, REGISTERS, AND GRILLES SHALL BE SAME AS

NECK SIZE UNLESS NOTED OR DETAILED OTHERWISE.

5. COORDINATE DIFFUSER, REGISTER, AND GRILLE LOCATIONS WITH

REFLECTED CEILING PLAN.

6. PROVIDE FLEXIBLE DUCTWORK FOR FINAL CONNECTIONS TO SUPPLY AIR

DIFFUSERS UNLESS NOTED OTHERWISE ON DRAWINGS OR IN

SPECIFICATIONS. FLEXIBLE DUCT SIZE SHALL BE SAME AS NECK SIZE OF

DIFFUSER AND SHALL NOT EXCEED 5 FEET IN LENGTH.

K

L

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

CARPENTRY

PAVEMENT

GROUND

SHOP

STORAGE

WELDING

SHOP

MECH. /

UTILITY

SHOP

POWER

PRODUCTION

SHOP

SUPERVISORS

TOOL

ROOM

SECURE

CRYPTO

ITE

STORAGE

/ STAGING

SERVER

ROOM

ELECT

MECH

63 TELCOM

MATERIAL

CONTROL

/ WORK

CONTROL

SUPPLIES

/1 M-101B/1 M-101B

CORRIDOR

CORRIDOR

20x1620x16

24x14(E) 24x18(E)

MAU-1

UH-7

UH-5

UH-4

UH-1

x S

A (E

UH-2

UH-3

UH-6

UH-11(E)

DUST

COLLECTOR(E)

ø

(E

4ø(E) 6ø(E) 4ø(E)

4ø (E

)9 ø

(E

7ø(E) 6ø(E) ø

(E

5ø(E)

4ø(E)

4ø(E)

4ø(E)

4ø(E)

14ø(E)

EF(E)

EF(E)

10ø(E)

10ø(E) 10ø(E)

10ø(E)

10ø(E)

10ø(E)

L(E)

FD (E)FD (E)

FD (E) FD (E)

18x18(E)

18x18(E)

18x18(E)

18x18(E)

12x12 EA

UTR TO

EF(E)

8x8(E)

12x12(E)

20x1620x16 ø

S A x R

A ø

S A

24x24 OA(E)

CRAC-1

CRAC-2

UH-9

SF(E)

DF-1

DF-3

DF-4

DF-2 DF-5 DF-6

DF-9

DF-7

DF-8

M-402 x x

CD-3CD-3CD-3

8x108x10

8x108x10

CD-3CD-3CD-3

RG-1RG-1RG-1

RG-1RG-1RG-1

MOD (E)

MOD-2

L(E)

L(E)

24x16(E) 20x14(E) x (E

AIR

COMPRESSOR(E)

AIR

DRYER(E)

10x10(E)

12x10(E) x x

CD-2CD-2CD-2

ø ø

6x66x6

RG-1RG-1RG-1

UH-8

RISE

7.102

7.101

7.103

7.108 7.108 7.108

7.108

7.108

7.108

EF-2

MOD (E)

x R

A

26x1426x14

RG(E)

RG(E)

RG(E)

RG(E)

RG(E)

RG(E)

RG(E)

RG(E)

EGEGEG

EGEGEG

L(E)

SG(E)

SG(E)

SG(E)

SG(E)

SG(E)

SG(E)

SG(E)

SG(E)

SG(E)

SG(E) SG(E)

SG(E) SG(E)

SG(E)

SG(E)

SG(E)

SG(E)

SG(E)

SUPPLY DUCT 16' 6" AFF

FROM CENTER OF DUCT

VFD-2

VFD-3 VFD-4

VFD-5

TCP

TCP

7.107

UH-10(E)

EF-6

MOD-3

7.109

A F

M S

-1

30x20(E)

24x19(E)

A F

-1 A

18x18(E)

16x1416x14

12x1012x10

N

CHKD:

DRWN:

PROJ:

DESN:

A

B

C

D

E

F

2 3 4 5 6 7

Bar measures 1 inch, otherwise drawing is not to scale

C o p yr ig h t:

T e tr a T e c h

4' 8' 16'

SCALE: 1/8" = 1'-0"

/1

/2

:1 :5

P

M C

R e vi t L o c a l\4

-1

.0

-1

-M

-C e n tr a l-ch a rl e s.

s tr in g e r.

rv t

4269900-170410.01

BGD

CCS

KML

M-101A

O h io

A ir

N a ti o n a l G u a rd

S P

R

IN

G F

IE

L D

A N

G B

-A D

A L C

E B

L D

G S

F

IR

S T

F L

O O

R H

V A

C R

E V

IS

E

D P

L A

N

A R

E A

A

KEYED NOTES

7.101 ROUTE RETURN DUCT AS HIGH AS POSSIBLE. MOUNT MAU-1 DIRECTLY

BELOW RETURN DUCT, KEEPING UNIT AS HIGH AS PRACTICAL.

7.102 1/2" X 1/2" BIRD SCREEN ON END OF DUCT.

7.103 REINSTALL AND REROUTE EXISTING DUST COLLECTION DUCTING AS

NECESSARY.

7.107 RELOCATE EXISTING UNIT HEATER. COORDINATE NEW LOCATION WITH

OTHER EQUIPMENT AND RANGE OF OVERHEAD DOOR.

7.108 COORDINATE FINAL LOCATION OF HUNG HVAC EQUIPMENT WITH EXISTING

EQUIPMENT AND RANGE OF OVERHEAD DOOR.

7.109 CAP END OF EXISTING DUCT.

1/8" = 1'-0"1

FIRST FLOOR HVAC REVISED PLAN - AREA A

M A

R K

D A

T E

D E

S C

R

IP

T

IO

N B

Y

/1

/1

T

Y P

E B

S

U B

M

IT

T

UNLESS OTHERWISE NOTED. IF RUNOUT TO AIR TERMINAL BOX IS GREATER

THAN 6 FEET IN LENGTH, SIZE RUNOUT ONE EVEN INCREMENT SIZE LARGER

(MINIMUM 2" LARGER) UNLESS OTHERWISE NOTED TO WITHIN 3 FEET OF BOX

BEFORE REDUCING TO BOX INLET SIZE.

2. DUCTWORK DOWNSTREAM OF AIR TERMINAL BOXES TO BE INTERNALLY

LINED FOR A MINIMUM OF 6'-0" FOR SOUND ATTENUATION. OUTLET DUCT

SIZES TO MATCH AIR TERMINAL BOX OUTLET UNLESS NOTED OTHERWISE.

3. PROVIDE MANUAL BALANCE DAMPER AT EACH DIFFUSER, GRILLE, AND

BRANCH TAKE-OFF IN ALL SUPPLY, RETURN, AND EXHAUST DUCTWORK

EXCEPT KITCHEN GREASE EXHAUST DUCT. LOCATE BALANCE DAMPER AS

CLOSE TO BRANCH TAKE-OFF AS POSSIBLE.

4. DUCT SIZE TO DIFFUSERS, REGISTERS, AND GRILLES SHALL BE SAME AS

NECK SIZE UNLESS NOTED OR DETAILED OTHERWISE.

5. COORDINATE DIFFUSER, REGISTER, AND GRILLE LOCATIONS WITH

REFLECTED CEILING PLAN.

6. PROVIDE FLEXIBLE DUCTWORK FOR FINAL CONNECTIONS TO SUPPLY AIR

DIFFUSERS UNLESS NOTED OTHERWISE ON DRAWINGS OR IN

SPECIFICATIONS. FLEXIBLE DUCT SIZE SHALL BE SAME AS NECK SIZE OF

DIFFUSER AND SHALL NOT EXCEED 5 FEET IN LENGTH.

C

A

D

E

F

G

H

J

1 2 3 4 5

7 8 9 10 11 12 13 14 15 16 17

/1 M-101A/1 M-101A

MULTIMEDIA

STUDIO

PA ADMIN

PERSONNEL

BREAK

WOMEN

RESTROOM

VESTIBULE

MEN

REPRODUCTION

OPEN

OFFICE

ENVIRONMENTAL

TRAINING

MANAGER

BCE

DEP BCE

CE CHIEF

POWER

PRO 2

POWER

PRO 1

NCOIC

EM TECH

DRAFTING

47 ENGINEERING

SHARED

ADMIN.

KNOW

OPS

KNOW

OPS

OPEN

OFFICE

INFRAST.

INFRAST.

INFRAST.

INFRAST.

REAL

PROP / RA

COMM CC

QA

OPEN

OFFICE

RADIO 2

RADIO 1

PLANS

SHOP -

ADMIN

CYBER

SECURITY

RESTROOM

VESTIBULE

SIPR CAFE

NET OPS

RADIO 4

RADIO 3

STAN /

EVAL

CLIENT

SER. 2

CLIENT

SER.1

COMPUTER

CAFE

OPS

CHIEF

P & R

CHIEF

COMM

CHIEF

VEST

LOBBY

CONFERENCE

COMM

STORAGE

PUBLISHING

/ MAIL

CENTER

WING

TRAINING

TRAINING

/ TESTING

COMPUTER

CLASSROOM

OPEN

OFFICE

AT-2

AT-7

AT-37 AT-36

AT-35

AT-44

AT-30

AT-17C

AT-17D

AT-17B

AT-17A

AT-56

AT-55

AT-54

AT-22

AT-21

AT-19AT-13

AT-11AT-10

AT-3

AT-38

AT-29

AT-39 AT-40

x x

24x2024x20 30x2430x24

30x26 SA

20x1820x18 30x2630x26

10x12 SA 14x14 SA x S

A x S

A x S

A x S

A

26x20 SA

10x1010x10

10x1210x12

10x810x8

18x1018x10

60x20 RA

AT-59

10x610x6

10x10

10x10

16x14

16x14 x x

44x20 RA x x x x x x

44x18 RA

12x1012x10 x x x x x x x x

36x18 RA

24x18 RA

FT(E) FT(E)

RISE

RISE RISE RISE

RISE

RISE

RISE

x S

A

10x810x8

RCP(E)

RCP(E)

RCP(E)

CUH(E)

RISE

TELCOM

ELECT

MECH

SUPPLIES

AC-1

PA NCOIC

PA

OFFICER

VESTIBULE

CORRIDOR

8x68x6

8x88x8

OPEN

OFFICE

CLOSET

AT-69

AT-70

CD-2CD-2CD-2

CD-2CD-2CD-2

RG-1RG-1RG-1

CD-3CD-3CD-3

CD-3CD-3CD-3

CD-3CD-3CD-3

CD-3CD-3CD-3

CD-3CD-3CD-3

CD-3CD-3CD-3

CD-3CD-3CD-3

CD-3CD-3CD-3

CD-3CD-3CD-3

RG-2RG-2RG-2

RG-2RG-2RG-2

RG-2RG-2RG-2

RG-2RG-2RG-2

CD-3CD-3CD-3

CD-3CD-3CD-3

RG-2RG-2RG-2

CD-2CD-2CD-2

CD-2CD-2CD-2

CD-2CD-2CD-2

CD-2CD-2CD-2

RG-1RG-1RG-1

CD-2CD-2CD-2

CD-2CD-2CD-2

CD-2CD-2CD-2

CD-3CD-3CD-3

CD-3CD-3CD-3

RG-1RG-1RG-1

RG-1RG-1RG-1

CD-2CD-2CD-2

RG-1RG-1RG-1

CD-2CD-2CD-2

RG-1RG-1RG-1

CD-2CD-2CD-2

RG-1RG-1RG-1

CD-2CD-2CD-2

x x x x x x

8ø8ø 8ø8ø

8ø8ø

8ø8ø 8ø8ø

20x1820x18 ø ø ø ø ø ø

8ø8ø

12x1012x10

8ø8ø

8ø8ø

8ø8ø

8ø8ø

CD-2CD-2CD-2

CD-2CD-2CD-2

CD-2CD-2CD-2

CD-2CD-2CD-2

RG-1RG-1RG-1

RG-1RG-1RG-1

RG-1RG-1RG-1

CD-1CD-1CD-1

CD-2CD-2CD-2

RG-1RG-1RG-1

CD-2CD-2CD-2

RG-1RG-1RG-1

AT-5

AT-4

20x1620x16 ø ø ø ø ø ø ø ø ø ø ø ø ø ø ø ø

10ø10ø

AT-6

CD-1CD-1CD-1

CD-3CD-3CD-3 6ø6ø

RG-1RG-1RG-1

CD-2CD-2CD-2

CD-2CD-2CD-2

CD-2CD-2CD-2 185

CD-2CD-2CD-2

CD-3CD-3CD-3

CD-2CD-2CD-2

CD-2CD-2CD-2

CD-2CD-2CD-2

CD-2CD-2CD-2

16x1016x10

8ø8ø

8ø8ø

8ø8ø 12x1012x10 ø ø

10ø10ø

CD-3CD-3CD-3

CD-3CD-3CD-3

8x68x6 x x

CD-1CD-1CD-1

CD-2CD-2CD-2

CD-1CD-1CD-1

CD-2CD-2CD-2

14x1414x14

10ø10ø

10ø10ø

8ø8ø 8ø8ø x x x x

16x16 VA(E)

UTR TO

GRAVITY

RELIEF

HOOD (E)

12x812x8

AT-66

12x1012x10 ø ø

6ø6ø 8ø8ø

14x1214x12

RG-1RG-1RG-1

12x1012x10

RG-2RG-2RG-2

RG-2RG-2RG-2

RG-2RG-2RG-2

14x24 EA

UTR TO

RTU-1

CD-1CD-1CD-1

12x812x8

10x610x6

10ø10ø 10ø10ø

18x1018x10

SG(E)

SG(E)

SG(E)

SG(E)

SG(E)

SG(E)

CD-1CD-1CD-1

60x2060x20

38x38 38x38

UTR TO

EF-1

7.104

7.104

72x2472x24

MOD-1

FD (E)

CUH-1

EG(E)

EG(E)

EG(E)

EG(E)

EG(E)

EG(E)

EG(E)

EG(E)

EG-1EG-1EG-1

14x8 EA(E) 12x8(E) 10x6(E) x x

14x8(E)

18x10 EA(E) x2

R

A

26x50 SA

UTR TO

RTU-1

TG-1TG-1TG-1

TG-1TG-1TG-1

16x10 TA

TG-2TG-2TG-2

TG-2TG-2TG-2

20x12 TA

RG(E)

RG(E)

RG-1RG-1RG-1

RG-1RG-1RG-1

RG-1RG-1RG-1

RG-1RG-1RG-1

RG-1RG-1RG-1

RG-1RG-1RG-1

RG-1RG-1RG-1

8ø8ø

8ø8ø

8ø8ø

8ø8ø 8ø8ø

12x812x8 x x

8ø8ø

8ø8ø

8ø8ø

6ø6ø

8ø8ø 8ø8ø

10ø10ø CORRIDOR

12x812x8

10ø10ø

24x1624x16

24x1624x16 x x

72x24 RA

UTR TO

RTU-17.113

7.114

20x1620x16

8x6 8x6

12x6 12x6

12x1012x10 ø ø

N

CHKD:

DRWN:

PROJ:

DESN:

A

B

C

D

E

F

2 3 4 5 6 7

Bar measures 1 inch, otherwise drawing is not to scale

C o p yr ig h t:

T e tr a T e c h

4' 8' 16'

SCALE: 1/8" = 1'-0"

/1

/2

:1 :5

P

M C

R e vi t L o c a l\4

-1

.0

-1

-M

-C e n tr a l-ch a rl e s.

s tr in g e r.

rv t

4269900-170410.01

BGD

CCS

KML

M-101B

O h io

A ir

N a ti o n a l G u a rd

S P

R

IN

G F

IE

L D

A N

G B

-A D

A L C

E B

L D

G S

F

IR

S T

F L

O O

R H

V A

C R

E V

IS

E

D P

L A

N

A R

E A

B

KEYED NOTES

7.104 EXHAUST DUCT TO BE ALUMINUM SERVING LOCKER/SHOWER AREA.

7.113 ENTIRE LENGTH OF SUPPLY AIR DUCT TO BE INTERNALLY LINED

DOWNSTREAM OF AT-38

7.114 ENTIRE LENGTH OF RETURN DUCT TO BE LINED FROM BRANCH TAKE-OFF

OUTSIDE OF ROOM TO GRILLE.

1/8" = 1'-0"1

FIRST FLOOR HVAC REVISED PLAN - AREA B

M A

R K

D A

T E

D E

S C

R

IP

T

IO

N B

Y

/1

/1

T

Y P

E B

S

U B

M

IT

T

T

TT

T

GENERAL HVAC NOTES

1. INLET DUCT SIZE TO AIR TERMINAL DEVICES SHALL BE SAME AS INLET SIZE

UNLESS OTHERWISE NOTED. IF RUNOUT TO AIR TERMINAL BOX IS GREATER

THAN 6 FEET IN LENGTH, SIZE RUNOUT ONE EVEN INCREMENT SIZE LARGER

(MINIMUM 2" LARGER) UNLESS OTHERWISE NOTED TO WITHIN 3 FEET OF BOX

BEFORE REDUCING TO BOX INLET SIZE.

2. DUCTWORK DOWNSTREAM OF AIR TERMINAL BOXES TO BE INTERNALLY

LINED FOR A MINIMUM OF 6'-0" FOR SOUND ATTENUATION. OUTLET DUCT

SIZES TO MATCH AIR TERMINAL BOX OUTLET UNLESS NOTED OTHERWISE.

3. PROVIDE MANUAL BALANCE DAMPER AT EACH DIFFUSER, GRILLE, AND

BRANCH TAKE-OFF IN ALL SUPPLY, RETURN, AND EXHAUST DUCTWORK

EXCEPT KITCHEN GREASE EXHAUST DUCT. LOCATE BALANCE DAMPER AS

CLOSE TO BRANCH TAKE-OFF AS POSSIBLE.

4. DUCT SIZE TO DIFFUSERS, REGISTERS, AND GRILLES SHALL BE SAME AS

NECK SIZE UNLESS NOTED OR DETAILED OTHERWISE.

5. COORDINATE DIFFUSER, REGISTER, AND GRILLE LOCATIONS WITH

REFLECTED CEILING PLAN.

6. PROVIDE FLEXIBLE DUCTWORK FOR FINAL CONNECTIONS TO SUPPLY AIR

DIFFUSERS UNLESS NOTED OTHERWISE ON DRAWINGS OR IN

SPECIFICATIONS. FLEXIBLE DUCT SIZE SHALL BE SAME AS NECK SIZE OF

DIFFUSER AND SHALL NOT EXCEED 5 FEET IN LENGTH.

BAY

BAY

RESTROOM

MECH

STORAGE

OFFICE

JANITOR

ACCU-2

FAF-1

x E

A

10x1410x14

14x14 SA x S

A

6ø6ø x S

A x R

A

10x810x8

8x68x6

14x14 EA UP

TO EF-5

EG-3EG-3EG-3

GUH-2GUH-1

SG-1SG-1SG-1

SG-1SG-1SG-1

RG-1RG-1RG-1

CD-2CD-2CD-2

RG-1RG-1RG-1

CD-2CD-2CD-2

CD-2CD-2CD-2

EUH-1

EG-2EG-2EG-2

EWH-1

CD-1CD-1CD-1

EG-1EG-1EG-1

6x66x6

MAU

DF-10 DF-11

6ø OA x x

EF-3 EF-4

WALL CAP

WITH BDD

7.108 7.108

7.105

L(E)L(E) x x x x

6ø6ø

MOD-4

RL

RS

TCP

MOD-5

7.106

8.103

3/4" CD

/4

G

1 1/4" G

3/4" 3/4"

3/4" G

1 1/4" G

TO WATER

HEATER

MOD-6

EXISTING GAS

METER. ESTIMATED

LOAD OF 340 CFH @

0.5 PSI.

3/4" G

GUH-3

7.112

7.1127.112

EG-3EG-3EG-3

10x1410x14

GUH-1 GUH-2

GUH-3

16x34 OA

UTR

OPEN

BAYS

STORAGE

N

CHKD:

DRWN:

PROJ:

DESN:

A

B

C

D

E

F

2 3 4 5 6 7

Bar measures 1 inch, otherwise drawing is not to scale

C o p yr ig h t:

T e tr a T e c h

4' 8' 16'

SCALE: 1/8" = 1'-0"

/1

/2

:1 :1

P

M C

R e vi t L o c a l\4

-1

.0

-1

-M

-C e n tr a l-ch a rl e s.

s tr in g e r.

rv t

4269900-170410.01

BGD

CCS

BGD

M-102

O h io

A ir

N a ti o n a l G u a rd

S P

R

IN

G F

IE

L D

A N

G B

-A D

A L C

E B

L D

G S

F

IR

S T

F L

O O

R H

V A

C R

E V

IS

E

D P

L A

N S

KEYED NOTES

7.105 MECHANICAL VENTILATION EMERGENCY KILL SWITCH WITH PROTECTIVE

COVER.

7.106 REUSE EXISTING INTAKE LOUVER. BLANK OFF UNUSED PORTION.

7.108 COORDINATE FINAL LOCATION OF HUNG HVAC EQUIPMENT WITH EXISTING

EQUIPMENT AND RANGE OF OVERHEAD DOOR.

7.112 VENT THROUGH ROOF PER MANUFACTURE'S INSTRUCTIONS.

8.103 SIZE REFRIGERANT PIPING PER MANUFACTURER'S INSTRUCTIONS.

3/16" = 1'-0"1

FIRST FLOOR HVAC REVISED PLANS - BUILDING B

3/16" = 1'-0"2

FIRST FLOOR HVAC REVISED PLANS - BUILDING A

VIEW SHOWN FOR REFERENCE

ONLY. NO HVAC WORK IN THIS

BUILDING.

M A

R K

D A

T E

D E

S C

R

IP

T

IO

N B

Y

/1

/1

T

Y P

E B

S

U B

M

IT

T

EF(E)

GRV(E)

RTU-1

ACCU-1

FC-2 FC-1

BOILER VENTS (E)

EF-1

ROOF HATCH (E)

2" GWS

2" GWR

2" GWR

2" GWS

1 1/2" G

7.111

7.110

GENERAL HVAC NOTES

1. INLET DUCT SIZE TO AIR TERMINAL DEVICES SHALL BE SAME AS INLET SIZE

UNLESS OTHERWISE NOTED. IF RUNOUT TO AIR TERMINAL BOX IS GREATER

THAN 6 FEET IN LENGTH, SIZE RUNOUT ONE EVEN INCREMENT SIZE LARGER

(MINIMUM 2" LARGER) UNLESS OTHERWISE NOTED TO WITHIN 3 FEET OF BOX

BEFORE REDUCING TO BOX INLET SIZE.

2. DUCTWORK DOWNSTREAM OF AIR TERMINAL BOXES TO BE INTERNALLY

LINED FOR A MINIMUM OF 6'-0" FOR SOUND ATTENUATION. OUTLET DUCT

SIZES TO MATCH AIR TERMINAL BOX OUTLET UNLESS NOTED OTHERWISE.

3. PROVIDE MANUAL BALANCE DAMPER AT EACH DIFFUSER, GRILLE, AND

BRANCH TAKE-OFF IN ALL SUPPLY, RETURN, AND EXHAUST DUCTWORK

EXCEPT KITCHEN GREASE EXHAUST DUCT. LOCATE BALANCE DAMPER AS

CLOSE TO BRANCH TAKE-OFF AS POSSIBLE.

4. DUCT SIZE TO DIFFUSERS, REGISTERS, AND GRILLES SHALL BE SAME AS

NECK SIZE UNLESS NOTED OR DETAILED OTHERWISE.

5. COORDINATE DIFFUSER, REGISTER, AND GRILLE LOCATIONS WITH

REFLECTED CEILING PLAN.

6. PROVIDE FLEXIBLE DUCTWORK FOR FINAL CONNECTIONS TO SUPPLY AIR

DIFFUSERS UNLESS NOTED OTHERWISE ON DRAWINGS OR IN

SPECIFICATIONS. FLEXIBLE DUCT SIZE SHALL BE SAME AS NECK SIZE OF

DIFFUSER AND SHALL NOT EXCEED 5 FEET IN LENGTH.

N

CHKD:

DRWN:

PROJ:

DESN:

A

B

C

D

E

F

2 3 4 5 6 7

Bar measures 1 inch, otherwise drawing is not to scale

C o p yr ig h t:

T e tr a T e c h

5'-4" 10'-8" 21'-4"

SCALE: 3/32" = 1'-0"

/1

/2

:1 :5

P

M C

R e vi t L o c a l\4

-1

.0

-1

-M

-C e n tr a l-ch a rl e s.

s tr in g e r.

rv t

4269900-170410.01

BGD

CCS

KML

M-103

O h io

A ir

N a ti o n a l G u a rd

S P

R

IN

G F

IE

L D

A N

G B

-A D

A L C

E B

L D

G S

M E

C H

A N

IC

A

L R

O O

F P

L A

N

3/32" = 1'-0"1

MECHANICAL ROOF PLAN

KEYED NOTES

7.110 NEW BOILER VENT TERMINATION PER MANUFACTURER'S INSTRUCTIONS.

7.111 NEW RTU TO BE LOCATED IN APPROXIMATELY SAME LOCATION AS DEMO'D

UNIT. PROVIDE NEW CURB. COORDINATE ROOFING WITH GENERAL

CONTRACTOR.

M A

R K

D A

T E

D E

S C

R

IP

T

IO

N B

Y

/1

/1

T

Y P

E B

S

U B

M

IT

T

T

T

T

T

T

T

T

T

T

T

T

GENERAL PIPING NOTES

1. PIPING RUNOUTS TO ALL EQUIPMENT TO BE 3/4"" UNLESS NOTED OTHERWISE.

2. WELD-O-LETS AND THREAD-O-LETS MAY BE USED FOR BRANCH TAKE-OFFS UP

TO ONE-HALF THE DIAMETER OF THE MAIN.

3. INSTALL DIELECTRIC FITTINGS WHERE PIPING OF DIFFERENT MATERIALS IS

JOINED.

4. INSTALL PIPING FREE OF SAGS AND BENDS.

5. LOCATE ALL VALVES FOR EASY ACCESS. INSTALL VALVES WITH STEM UP OR

HORIZONTAL.

6. INSTALL DRAIN VALVES AT ALL LOW POINTS IN PIPING SYSTEM AND

ELSEWHERE AS REQUIRED FOR SYSTEM DRAINAGE. INSTALL MANUAL AIR

VENTS AT ALL HIGH POINTS IN PIPING, AT HEAT-TRANSFER COILS, AND

ELSEWHERE AS REQUIRED FOR SYSTEM AIR VENTING.

7. DO NOT INSTALL TEES IN A 'BULLEAD" POSITION.

K

L

2 3 4 5

7 8 9 10 11 12 13 14 15 16 17

/1 M-131B/1 M-131B

M-401

UH-7

UH-6 UH-5

UH-3 UH-4

UH-1

UH-2

CARPENTRY

PAVEMENT

GROUND

SHOP

STORAGE

WELDING

SHOP

MECH. /

UTILITY

SHOP

POWER

PRODUCTION

SHOP

SUPERVISORS

TOOL

ROOM

SECURE

CRYPTO

CORRIDOR

ITE

STORAGE

/ STAGING

SERVER

ROOM

MATERIAL

CONTROL

/ WORK

CONTROL

TELCOM

ELECT

MECH

SUPPLIES

CORRIDOR

UH-11(E)

2" HWR

2 1/2" HWS

3" HWR

2 1/2" HWS

H W

R

2" HWS

1" G

DF-1 DF-2

DF-3 DF-4

DF-5 DF-6 DF-7

DF-8

DF-9

M-402

UH-9

UH-8

/4

H

W S

/4

H

W R

8.101

MAU-1

AIR

COMPRESSOR(E)

AIR

DRYER(E)

$ 7.105

HWP-3

VFD-2 VFD-3 VFD-4 VFD-5

TCP

TCP

UH-10(E)

DUST

COLLECTOR(E)

1 1/2" 1 1/2"

CRAC-2

CRAC-1

2" GWR

2" GWS

1 1/2" HWR

1 1/2" HWS

2" GWR

2" GWS

1 1/4" HWS

1 1/4" HWR

1 1/4" HWS

1 1/4" HWR

1 1/4" HWS

1 1/4" HWR

1 1/4" HWS

1 1/4" HWR

1 1/4" HWS

1 1/4" HWR

1 1/4" HWS

1 1/4" HWR

2 1/2" HWS

2 1/2" HWR

1 1/4" HWR

1 1/4" HWS

1 1/4" HWR

1 1/4" HWS

2" HWS

DP

ISOLATION VALVE

8.104

3/4" CD

3/4" CD

3/4" CD DN

TO FLOOR

DRAIN

3/4" CD DN

TO FLOOR

DRAIN

1 1/4" 1 1/4"

/4

/4

1 1/4" 1 1/4"

3" HWS

N

CHKD:

DRWN:

PROJ:

DESN:

A

B

C

D

E

F

2 3 4 5 6 7

Bar measures 1 inch, otherwise drawing is not to scale

C o p yr ig h t:

T e tr a T e c h

4' 8' 16'

SCALE: 1/8" = 1'-0"

/1

/2

:1 :5

P

M C

R e vi t L o c a l\4

-1

.0

-1

-M

-C e n tr a l-ch a rl e s.

s tr in g e r.

rv t

4269900-170410.01

BGD

CCS

KML

M-131A

O h io

A ir

N a ti o n a l G u a rd

S P

R

IN

G F

IE

L D

A N

G B

-A D

A L C

E B

L D

G S

F

IR

S T

F L

O O

R P

IP

IN

G R

E V

IS

E

D P

L A

N

A R

E A

A

KEYED NOTES

7.105 MECHANICAL VENTILATION EMERGENCY KILL SWITCH WITH PROTECTIVE

COVER.

8.101 CAP EXISTING GAS PIPE WITHIN MECHANICAL EQUIPMENT ROOM.

8.104 SWITCHES FOR DESTRATIFICATION FANS 1 THROUGH 4 LOCATED

TOGETHER.

1/8" = 1'-0"1

FIRST FLOOR PIPING REVISED PLAN - AREA A

M A

R K

D A

T E

D E

S C

R

IP

T

IO

N B

Y

/1

/1

T

Y P

E B

S

U B

M

IT

T

T

T

T

T T

T

TT

T

T

T

T

T

T T

T

T

T

T

T

T

T

T

T

T

T

T

T T

T

T

T

DP

GENERAL PIPING NOTES

1. PIPING RUNOUTS TO ALL EQUIPMENT TO BE 3/4"" UNLESS NOTED OTHERWISE.

2. WELD-O-LETS AND THREAD-O-LETS MAY BE USED FOR BRANCH TAKE-OFFS UP

TO ONE-HALF THE DIAMETER OF THE MAIN.

3. INSTALL DIELECTRIC FITTINGS WHERE PIPING OF DIFFERENT MATERIALS IS

JOINED.

4. INSTALL PIPING FREE OF SAGS AND BENDS.

5. LOCATE ALL VALVES FOR EASY ACCESS. INSTALL VALVES WITH STEM UP OR

HORIZONTAL.

6. INSTALL DRAIN VALVES AT ALL LOW POINTS IN PIPING SYSTEM AND

ELSEWHERE AS REQUIRED FOR SYSTEM DRAINAGE. INSTALL MANUAL AIR

VENTS AT ALL HIGH POINTS IN PIPING, AT HEAT-TRANSFER COILS, AND

ELSEWHERE AS REQUIRED FOR SYSTEM AIR VENTING.

7. DO NOT INSTALL TEES IN A 'BULLEAD" POSITION.

C

A

D

E

F

G

H

J

1 2 3 4 5

7 8 9 10 11 12 13 14 15 16 17

/1 M-131A/1 M-131A

CORRIDOR

VEST

PUBLISHING

/ MAIL

CENTER

WING

TRAINING

TRAINING

/ TESTING

COMPUTER

CLASSROOM

LOBBY

CONFERENCE

COMM

STORAGE

MULTIMEDIA

STUDIO

PA ADMIN

PERSONNEL

PA NCOIC

PA

OFFICER

BREAK

VESTIBULE

WOMEN

RESTROOM

VESTIBULE

RESTROOM

VESTIBULE

SIPR CAFE

NET OPS

CYBER

SECURITY

COMPUTER

CAFE

OPS

CHIEF

P & R

CHIEF

COMM

CHIEF

COMM CC

REAL

PROP / RA

PLANS

SHOP -

ADMIN

REPRODUCTION

DRAFTING

OPEN

OFFICE

BCE

DEP BCE

CE CHIEF

MEN

H W

S (E

2 1/2" HWR(E)

2" HWS(E)

1 1/2" HWS(E)

3" HWR(E)

1 1/4" HWS(E)

3" HWR(E)

CAP

CAP

CAP

CAP

CAP

CAPCAP

CAP

CAP

CAPCAP

AT-39

AT-40

AT-44

AT-59

AT-17C

AT-56

AT-55

AT-54

AT-17D

AT-22

AT-17A

AT-21

AT-17B

AT-19

AT-13

AT-11AT-10

AT-29

AT-7

AT-2

AT-30

AT-35

AT-36AT-37AT-38

AT-3

2" HWS(E)

2 1/2" HWR(E)

3/4" HWS(E)

3/4" HWR(E)

1/2" HWR(E)

1/2" HWS(E)RCP(E)

RCP(E)

RCP(E)

RCP(E)

3" HWS(E)

AT-69 AT-70

CUH(E)

1 1/2" G

UTR TO RTU-1

M-401

AT-6

AT-5

AT-4

/4

H

W S

/4

H

W R

1" HWS

1" HWR

/4

H

W R

/4

H

W S

/4

H

W S

/4

H

W R

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

1" HWS

1" HWR

3/4" HWR

3/4" HWR

3/4" HWS

1" HWR

1" HWS

1" HWR

1" HWS

3/4" HWS

3/4" HWR

/4

H

W S

/4

H

W R

ENVIRONMENTAL

TRAINING

MANAGER

NCOIC

53 EM TECH

POWER

PRO 2

POWER

PRO 1

INFRAST.

INFRAST.

QA

RADIO 4

RADIO 3

RADIO 1

RADIO 2

STAN /

EVAL

CLIENT

SER. 2

CLIENT

SER.1

KNOW

OPS

KNOW

OPS

OPEN

OFFICE

CORRIDOR

CORRIDOR

MECH

ELECT

TELCOM

CUH-1

7.105

AC-1

8.103

R L

R S

REFRIGERANT

PIPING UTR

TO ACCU-1

1 1/2" G

H W

S

1 1/4" HWS 1" HWS

3/4" HWS(E)

3" HWR(E)

EXISTING GAS METER.

ESTIMATED LOAD OF

1880 CFH @ 0.5 PSI.

ISOLATION VALVE

2" GWS

2" GWR

2" GWS

2" GWR

2" GWS

UTR TO FC-2

2" GWR

UTR TO FC-2

2" GWS

UTR TO FC-1

2" GWR

UTR TO FC-1

SHARED

ADMIN.

ENGINEERING

3/4" CD

N

CHKD:

DRWN:

PROJ:

DESN:

A

B

C

D

E

F

2 3 4 5 6 7

Bar measures 1 inch, otherwise drawing is not to scale

C o p yr ig h t:

T e tr a T e c h

4' 8' 16'

SCALE: 1/8" = 1'-0"

/1

/2

:1 :5

P

M C

R e vi t L o c a l\4

-1

.0

-1

-M

-C e n tr a l-ch a rl e s.

s tr in g e r.

rv t

4269900-170410.01

BGD

CCS

KML

M-131B

O h io

A ir

N a ti o n a l G u a rd

S P

R

IN

G F

IE

L D

A N

G B

-A D

A L C

E B

L D

G S

F

IR

S T

F L

O O

R P

IP

IN

G R

E V

IS

E

D P

L A

N

A R

E A

B

KEYED NOTES

7.105 MECHANICAL VENTILATION EMERGENCY KILL SWITCH WITH PROTECTIVE

COVER.

8.103 SIZE REFRIGERANT PIPING PER MANUFACTURER'S INSTRUCTIONS.

1/8" = 1'-0"1

FIRST FLOOR PIPING REVISED PLAN - AREA B

M A

R K

D A

T E

D E

S C

R

IP

T

IO

N B

Y

/1

/1

T

Y P

E B

S

U B

M

IT

T

UNLESS OTHERWISE NOTED. IF RUNOUT TO AIR TERMINAL BOX IS GREATER

THAN 6 FEET IN LENGTH, SIZE RUNOUT ONE EVEN INCREMENT SIZE LARGER

(MINIMUM 2" LARGER) UNLESS OTHERWISE NOTED TO WITHIN 3 FEET OF BOX

BEFORE REDUCING TO BOX INLET SIZE.

2. DUCTWORK DOWNSTREAM OF AIR TERMINAL BOXES TO BE INTERNALLY

LINED FOR A MINIMUM OF 6'-0" FOR SOUND ATTENUATION. OUTLET DUCT

SIZES TO MATCH AIR TERMINAL BOX OUTLET UNLESS NOTED OTHERWISE.

3. PROVIDE MANUAL BALANCE DAMPER AT EACH DIFFUSER, GRILLE, AND

BRANCH TAKE-OFF IN ALL SUPPLY, RETURN, AND EXHAUST DUCTWORK

EXCEPT KITCHEN GREASE EXHAUST DUCT. LOCATE BALANCE DAMPER AS

CLOSE TO BRANCH TAKE-OFF AS POSSIBLE.

4. DUCT SIZE TO DIFFUSERS, REGISTERS, AND GRILLES SHALL BE SAME AS

NECK SIZE UNLESS NOTED OR DETAILED OTHERWISE.

5. COORDINATE DIFFUSER, REGISTER, AND GRILLE LOCATIONS WITH

REFLECTED CEILING PLAN.

6. PROVIDE FLEXIBLE DUCTWORK FOR FINAL CONNECTIONS TO SUPPLY AIR

DIFFUSERS UNLESS NOTED OTHERWISE ON DRAWINGS OR IN

SPECIFICATIONS. FLEXIBLE DUCT SIZE SHALL BE SAME AS NECK SIZE OF

DIFFUSER AND SHALL NOT EXCEED 5 FEET IN LENGTH.

GENERAL PIPING NOTES

1. PIPING RUNOUTS TO ALL EQUIPMENT TO BE 3/4"" UNLESS NOTED OTHERWISE.

2. WELD-O-LETS AND THREAD-O-LETS MAY BE USED FOR BRANCH TAKE-OFFS UP

TO ONE-HALF THE DIAMETER OF THE MAIN.

3. INSTALL DIELECTRIC FITTINGS WHERE PIPING OF DIFFERENT MATERIALS IS

JOINED.

4. INSTALL PIPING FREE OF SAGS AND BENDS.

5. LOCATE ALL VALVES FOR EASY ACCESS. INSTALL VALVES WITH STEM UP OR

HORIZONTAL.

6. INSTALL DRAIN VALVES AT ALL LOW POINTS IN PIPING SYSTEM AND

ELSEWHERE AS REQUIRED FOR SYSTEM DRAINAGE. INSTALL MANUAL AIR

VENTS AT ALL HIGH POINTS IN PIPING, AT HEAT-TRANSFER COILS, AND

ELSEWHERE AS REQUIRED FOR SYSTEM AIR VENTING.

7. DO NOT INSTALL TEES IN A 'BULLEAD" POSITION.

J

K

10 11

MECH

K

J

10 11

UH-11(E)

HWB(E) HWB(E) HWB(E)

ET(E)

HWP-2HWP-1

G (E

H W

R (E

H W

S (E

H W

R

/4

H

W S

HWB-4

SF(E)

16x16 VA(E)

UTR TO

GRAVITY

RELIEF

HOOD (E)

$ 8.102

8.101

VFD-2 VFD-3 VFD-4 VFD-5

AIR

COMPRESSOR(E)

AIR

DRYER(E)

TCP

ISOLATION VALVE

ISOLATION VALVE

H W

S

2 1/2" G

1 1/4" G

/2

G

1" G(E)

4" VA

UTR

4" VA

UTR

4" VA

UTR

4" VA

UTR

/2

H W

S

H W

S (E

3" HWS(E)

1 1/4" HWS

1 1/4" HWR 1 1/4" HWR(E)

1 1/4" HWS(E)

1 1/4" HWR(E)

1 1/4" HWS(E)

1 1/4" HWR(E)

1 1/4" HWS(E)

AS-1

CPF(E)

DOMESTIC WATER HEATER

L(E)

G W

S

G W

R

G W

S

G W

R

3/4" CD

/4

C

D

3/4" CD

TO FLOOR

DRAIN

3/4" CD

TO FLOOR

DRAIN

3/4" DOMESTIC

WATER LINE

N

CHKD:

DRWN:

PROJ:

DESN:

A

B

C

D

E

F

2 3 4 5 6 7

Bar measures 1 inch, otherwise drawing is not to scale

C o p yr ig h t:

T e tr a T e c h

2' 4' 8'

SCALE: 1/4" = 1'-0"

/1

/2

:1 :0

P

M C

R e vi t L o c a l\4

-1

.0

-1

-M

-C e n tr a l-ch a rl e s.

s tr in g e r.

rv t

4269900-170410.01

BGD

CCS

KML

M-401

O h io

A ir

N a ti o n a l G u a rd

S P

R

IN

G F

IE

L D

A N

G B

-A D

A L C

E B

L D

G S

E N

L A

R G

E D

P L

A N

S A

N D

S E

C T

IO

N

S

KEYED NOTES

8.101 CAP EXISTING GAS PIPE WITHIN MECHANICAL EQUIPMENT ROOM.

8.102 BOILER SHUTDOWN BUTTON PER ASME CSD-1. LOCATE MANUALLY

OPERATED REMOTE SHUTDOWN SWITCH JUST INSIDE THE BOILER ROOM

EXTERIOR DOOR AND MARKED FOR EASY IDENTIFICATION. THE SWITCH

MUST SHUT DOWN ALL POWER TO THE BOILER CONTROLS.1/2" = 1'-0"1

ENLARGED MECH 63 MECHANICAL PLAN

M A

R K

D A

T E

D E

S C

R

IP

T

IO

N B

Y

/1

/1

T

Y P

E B

S

U B

M

IT

T

UNLESS OTHERWISE NOTED. IF RUNOUT TO AIR TERMINAL BOX IS GREATER

THAN 6 FEET IN LENGTH, SIZE RUNOUT ONE EVEN INCREMENT SIZE LARGER

(MINIMUM 2" LARGER) UNLESS OTHERWISE NOTED TO WITHIN 3 FEET OF BOX

BEFORE REDUCING TO BOX INLET SIZE.

2. DUCTWORK DOWNSTREAM OF AIR TERMINAL BOXES TO BE INTERNALLY

LINED FOR A MINIMUM OF 6'-0" FOR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .