This document provides an amendment to a solicitation for construction services. The solicitation is for a project to remodel and add to two civil engineering buildings at Springfield Air National Guard Base in Ohio. The project scope includes mechanical, electrical, plumbing, communications, security, and new construction work. The amendment extends the response deadline to September 24, 2020 at 12:00 PM, the offer acceptance period to 100 days, and the anticipated funds availability date to December 31, 2020. It also includes additional drawings, specifications, and answers to questions from prospective offerors.

View the file

Other files

File Type Posted
BID ABSTRACT 20-B-0004.pdf PDF
Sign-In Bid Opening 20-B-0004.pdf PDF
W50S8Q-20-B-0004-0003 ADAL CE SPANGB.pdf PDF
ADAL Amendment 0002.pdf PDF
ATTACHMENT 7A - Questions_ Answers 2.docx DOCX document
ATTACHMENT 7C - Typical Existing Restroom Elevations.pdf PDF
ATTACHMENT 7B - A-601 - Arch Door_Window Schedules.pdf PDF
ATTACHMENT 7D - B119 Mezz Location.pdf PDF
ATTACHMENT 6B - A0-5 Layout.pdf PDF
Site Visit SignIn Sheet 01 Sept 2020 (1).pdf PDF
20-B-0004 ATTACHMENT 6D - Arch Specs pg 12 08 71 00.pdf PDF
ATTACHMENT 6A - Questions Answers.docx DOCX document
20-B-0004 Site Visit SignIn Sheet 01 Sept 2020 (4).pdf PDF
20-B-0004 ATTACHMENT 6C - A-104 Architectural Roof Plan.pdf PDF
20-B-0004 Site Visit MFR.docx DOCX document
W50S8Q-20-B-0004 ADAL CE SPANGB 25AUG.pdf PDF
ATTACHMENT 3B - DRAWINGS (CIVIL SET).pdf PDF
ATTACHMENT 3J - CORRECTIONS (A102 A104 A601 AD102 F501).pdf PDF
ATTACHMENT 4 - Base Entry Request.pdf PDF
JA for Brand Names -Advantor Monaco Lochinvar-redo 18 Aug 20.pdf PDF
ATTACHMENT 3H - DRAWINGS (STRUCT SET).pdf PDF
ATTACHMENT 3C - DRAWINGS (ELECTRICAL SET).pdf PDF
ATTACHMENT 2A - SPEC BOOK VOL I.pdf PDF
ATTACHMENT 3A - DRAWINGS (ARCH SET).pdf PDF
ATTACHMENT 3I - DRAWINGS (TECHNOLOGY SET).pdf PDF
ATTACHMENT 1 - SUMMARY OF WORK.docx DOCX document
ATTACHMENT 3D - DRAWINGS (FIRE PROTECTION SET).pdf PDF
ATTACHMENT 5 - RFI.doc DOC document
ATTACHMENT 2B - SPEC BOOK VOL II.pdf PDF
ATTACHMENT 3G - DRAWINGS (PLUMBING SET).pdf PDF
ATTACHMENT 3F - DRAWINGS (MECHANICAL SET).pdf PDF
ATTACHMENT 3E - DRAWINGS (GEN SET).pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to incorporate questions and answ ers, extend the Government acceptance period of bids, and to extend the expected date of funds availablitlity.

1. See Attachments 6A - 6D for questions and answ ers, and referenced draw ings.

2. Government acceptance period of bids is extended from 60 days to 100 days.

3. Expected date of funds availability is extended from 01 September 2020 to 31 December 2020.

4. See summary of changes.

5. All other solicitation terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Sep-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W50S8Q20B0004

X 9B. DATED (SEE ITEM 11)

25-Aug-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Sep-2020

CODE

USPFO OH 178 MISSION SUPPORT CONTRACTING

5319 REGULA AVE BLDG 118

SPRINGFIELD OH 45502-8782

W50S8Q 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W50S8Q20B0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 01 10 - TABLE OF CONTENTS

The Table of Contents has changed from:

TABLE OF CONTENTS

CONSTRUCTION SOLICITATION SF 1442

DIVISION 00 01 10 - TABLE OF CONTENTS

CLINS

DELIVERY

DIVISION 00 10 00 - PROVISIONS & INSTRUCTIONS

DIVISION 00 60 00 - REPS AND CERTS

DIVISION 00 70 00 - CLAUSES

DIVISION 01 00 00 - SUPPLEMENTAL INSTRUCTIONS & WAGE DETERMINATION

ATTACHMENT 1 - SUMMARY OF WORK

ATTACHMENT 2A - SPECIFICATIONS (VOLUME I)

ATTACHMENT 2B - SPECIFICATIONS (VOLUME II)

ATTACHMENT 3A - DRAWINGS (ARCH SET)

ATTACHMENT 3B - DRAWINGS (CIVIL SET)

ATTACHMENT 3C - DRAWINGS (ELECTRICAL SET)

ATTACHMENT 3D - DRAWINGS (FIRE PROTECTION SET)

ATTACHMENT 3E - DRAWINGS (GEN SET)

ATTACHMENT 3F - DRAWINGS (MECHANICAL SET)

ATTACHMENT 3G - DRAWINGS (PLUMBING SET)

ATTACHMENT 3H - DRAWINGS (STRUCT SET)

ATTACHMENT 3I - DRAWINGS (TECHNOLOGY SET)

ATTACHMENT 3J - DRAWINGS (CORRECTIONS)

ATTACHMENT 4 - SANGB FORM 3, AUTHORIZED UNESCORTED BASE ENTRY REQUEST

ATTACHMENT 5 - RFI (FORMAL REQUEST FOR INFORMATION FORM)

to:

TABLE OF CONTENTS

CONSTRUCTION SOLICITATION SF 1442

DIVISION 00 01 10 - TABLE OF CONTENTS

CLINS

DELIVERY

DIVISION 00 10 00 - PROVISIONS & INSTRUCTIONS

DIVISION 00 60 00 - REPS AND CERTS

DIVISION 00 70 00 - CLAUSES

DIVISION 01 00 00 - SUPPLEMENTAL INSTRUCTIONS & WAGE DETERMINATION

ATTACHMENT 1 - SUMMARY OF WORK

ATTACHMENT 2A - SPECIFICATIONS (VOLUME I)

ATTACHMENT 2B - SPECIFICATIONS (VOLUME II)

ATTACHMENT 3A - DRAWINGS (ARCH SET)

ATTACHMENT 3B - DRAWINGS (CIVIL SET)

ATTACHMENT 3C - DRAWINGS (ELECTRICAL SET)

ATTACHMENT 3D - DRAWINGS (FIRE PROTECTION SET)

ATTACHMENT 3E - DRAWINGS (GEN SET)

ATTACHMENT 3F - DRAWINGS (MECHANICAL SET)

ATTACHMENT 3G - DRAWINGS (PLUMBING SET)

ATTACHMENT 3H - DRAWINGS (STRUCT SET)

ATTACHMENT 3I - DRAWINGS (TECHNOLOGY SET)

ATTACHMENT 3J - DRAWINGS (CORRECTIONS)

ATTACHMENT 4 - SANGB FORM 3, AUTHORIZED UNESCORTED BASE ENTRY REQUEST

ATTACHMENT 5 - RFI (FORMAL REQUEST FOR INFORMATION FORM)

ATTACHMENT 6A - QUESTIONS & ANSWERS

ATTACHMENT 6B - A0-5 CAD DRAWING

ATTACHMENT 6C - A-104 ARCHITECTURAL ROOF PLAN

ATTACHMENT 6D - ARCH SPECS

The following have been modified:

TABLE OF CONTENTS

TABLE OF CONTENTS

CONSTRUCTION SOLICITATION SF 1442

DIVISION 00 01 10 - TABLE OF CONTENTS

CLINS

DELIVERY

DIVISION 00 10 00 - PROVISIONS & INSTRUCTIONS

DIVISION 00 60 00 - REPS AND CERTS

DIVISION 00 70 00 - CLAUSES

DIVISION 01 00 00 - SUPPLEMENTAL INSTRUCTIONS & WAGE DETERMINATION

ATTACHMENT 1 - SUMMARY OF WORK

ATTACHMENT 2A - SPECIFICATIONS (VOLUME I)

ATTACHMENT 2B - SPECIFICATIONS (VOLUME II)

ATTACHMENT 3A - DRAWINGS (ARCH SET)

ATTACHMENT 3B - DRAWINGS (CIVIL SET)

ATTACHMENT 3C - DRAWINGS (ELECTRICAL SET)

ATTACHMENT 3D - DRAWINGS (FIRE PROTECTION SET)

ATTACHMENT 3E - DRAWINGS (GEN SET)

ATTACHMENT 3F - DRAWINGS (MECHANICAL SET)

ATTACHMENT 3G - DRAWINGS (PLUMBING SET)

ATTACHMENT 3H - DRAWINGS (STRUCT SET)

ATTACHMENT 3I - DRAWINGS (TECHNOLOGY SET)

ATTACHMENT 3J - DRAWINGS (CORRECTIONS)

ATTACHMENT 4 - SANGB FORM 3, AUTHORIZED UNESCORTED BASE ENTRY REQUEST

ATTACHMENT 5 - RFI (FORMAL REQUEST FOR INFORMATION FORM)

ATTACHMENT 6A - QUESTIONS & ANSWERS

ATTACHMENT 6B - A0-5 CAD DRAWING

ATTACHMENT 6C - A-104 ARCHITECTURAL ROOF PLAN

ATTACHMENT 6D - ARCH SPECS

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 24-Sep-2020 12:00 AM to 24-Sep-

2020 12:00 PM.

The offeror acceptance period has increased by 40 from 60 to 100.

The required performance has changed from ADAL Civil Engineering, Buildings 151 & 119 at the 178th Wing in Springfield, OH. Work proposed consist of the remodel and additions to civil engineering Building 151, including mechanical, electrical, plumbing, communications, security, finishes, and new construction. Also included is the remodel of both Buildings 119a and 119b, including finishes, mechanical, plumbing, electrical, and incidental related work. Funds are not presently available for this contract. Currently, the Government anticipates funds will become available prior to but no later than midnight 01 September 2020.

This action has been identified on the National Guard priority list for award if funds become available and the prices received are within an awardable range. Award will be made to the responsible bidder whose bid conforms to the invitation for bids and is most advantageous to the Government considering only price and price related factors. NAICS: 236220Small Business Size Standard: $39,500,000 Magnitude between $5,000,000 and $10,000,000 Competitive 8(a) Set-Aside to ADAL Civil Engineering, Buildings 151 & 119 at the 178th Wing in Springfield, OH. Work proposed consist of the remodel and additions to civil engineering Building 151, including mechanical, electrical, plumbing, communications, security, finishes, and new construction. Also included is the remodel of both Buildings 119a and 119b, including finishes, mechanical, plumbing, electrical, and incidental related work. Funds are not presently available for this contract. Currently, the Government anticipates funds will become available prior to 31 December 2020. This action has been identified on the National Guard priority list for award if funds become available and the prices received are within an awardable range. Award will be made to the responsible bidder whose bid conforms to the invitation for bids and is most advantageous to the Government considering only price and price related factors. NAICS:

236220Small Business Size Standard: $39,500,000 Magnitude between $5,000,000 and $10,000,000 Competitive 8(a) Set-Aside.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .