This is Amendment 0004 to Solicitation W50S8F26RA011, issued by the United States Air Force on July 21, 2026, for an F-16 Mission Training Facility construction project at Egg Harbor Township, New Jersey. The amendment extends the proposal response due date from July 24, 2026, to July 28, 2026, at 1:00 PM Local Time. Contractors must acknowledge receipt of this amendment prior to the new deadline through completed items 8 and 15, acknowledgment on offer copies, or separate written communication referencing the solicitation and amendment numbers.

The amendment updates the CLIN structure and modifies multiple option line items while adding a new Option Line Item 0010 for Additional Concrete Pavement for Simulator Installation on a firm fixed price basis. Significant modifications include renaming existing CLINs to more accurately describe the work scope: CLIN 0001 becomes the Base Bid excluding ESS Systems, CLIN 0002 shifts from parking spaces to Advantor ESS system work, and subsequent CLINs are reorganized to reflect site demolition/pavement, resurfacing, masonry veneer, monolith, mechanical yard walls, signage, and mechanical yard concrete surface work. The new Option Line Item 0010 requires the contractor to provide, furnish, and install additional concrete pavement in accordance with project drawings and specifications with a performance period from October 1, 2026, to November 30, 2027. Inspection and acceptance responsibility is assigned to Major Natalia Rojas at the 177 FW CER CE RPS facility in Egg Harbor Township, New Jersey, with contact information provided for progress review and acceptance coordination.

View the file

Other files

File Type Posted
Solicitation Amendment (SF1442) - W50S8F26RA0110004.pdf PDF
Solicitation Amendment W50S8F26RA0110003 SF 30.pdf PDF
2025 Projectmates ANG.pdf PDF
Solicitation Amendment W50S8F26RA0110002 SF 30.pdf PDF
F16 MTC Pre-Proposal RFI Log as of 10 July 2026.pdf PDF
NJ ANG F-16 MTC Flight Sim - AQRC 189015 Addm No 5 - Drawing.pdf PDF
NJ ANG F-16 MTC Flight Sim - AQRC 189015 Addm No 5 - Spec Sect 01_45_00 - Attmts.pdf PDF
NJ ANG F-16 MTC Flight Sim - AQRC 189015 Addm No 5 - Narrative.pdf PDF
Solicitation Amendment W50S8F26RA0110001 SF 30-Proposal due date extension to 17 July 2026.pdf PDF
F16 MTC Pre-Proposal RFI Log as of 24 June 2026.pdf PDF
SAM RFI update - F16 MTC 23 June 26.pdf PDF
Pre-Proposal - Site Visit Sign_In.pdf PDF
MTC Pre-Proposal Conf Presentation.pdf PDF
Solicitation - W50S8F26RA011-Construction of F-16 MTC.pdf PDF
Addendum No. 4 - AQRC 189015 Addm No 4 - Narrative.pdf PDF
EXHIBIT B MTC.docx DOCX document
Exhibit D_Letter of Commitment MTC.docx DOCX document
Exhibit A MTC.docx DOCX document
012.2 - AQRD 189015 - NJ ANG F-16 MTC - Specifications Vol. 2 - Type B-3.pdf PDF
013.1 - AQRD 189015 - NJ ANG F-16 MTC - Drawings - Type B-3.pdf PDF
Addendum No.3 - Updated Specs and Drawings 0136.pdf PDF
013.5 - Geotechnical Engineering Report.pdf PDF
EXHIBIT C Reference Questionnaire Package - MTC.docx DOCX document
012.1 - AQRD 189015 - NJ ANG F-16 MTC - Specifications Vol. 1 - Type B-3.pdf PDF
Addendum No. 1 - Boring log info for Storm water 013.3.pdf PDF
Addendum No. 2 - Security Items Clarification 013.4.pdf PDF
Addendum No. 4-Excess Haul Route - Drawings.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section 00 00 00 - Procurement and Contracting Requirements

The following changes have been made:

INFORMATION FROM TO

Response Due Date

24 Jul 2026 28 Jul 2026

Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule

The following CLIN(s) / SLIN(s) / ELIN(s) were added:

Item Supplies / Services Quantity Unit Unit Price Amount

Option Line Item

Option Line Item (OLI) 8 - Additional Concrete pavement for Simulator install. Services Non-Personal. Contractor shall provide, furnish and install additional concrete pavement to support simulator install. All work shall strictly be in accordance Drawings, Specifications, andaddendums.

Pricing Arrangement: Firm Fixed Price

1 Job

W50S8F26RA0110004

The following CLIN(s) / SLIN(s) / ELIN(s) were modified:

INFORMATION FROM TO

Description Services Non-Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide a complete & useable F- 16 Mission Training Facility. All work shall strictly be in accordance Drawings and Specifications dated 15 May 2025, addendums 1, 2, and 3 and applicable codes; local, state, & federal regulations; industry standards; and commonly accepted best practices.

Base Bid - F-16 MTC (Simulator Facility) (Excluding ESS Systems) and site work. Services Non- Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide a complete & useable F-16 Mission Training Facility. All work shall strictly be in accordance Drawings, Specifications, and addendums.

INFORMATION FROM TO

Description Option Line Item (OLI) 1 - 33 New

Parking Spaces. Services Non- Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide a complete & useable F-16 Mission Training Facility. All work shall strictly be in accordance Drawings and Specifications dated 15 May 2025, addendums 1, 2, and 3 and applicable codes; local, state, & federal regulations; industry standards; and commonly accepted best practices.

Services, Non-personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide all work in connection with the Advantor ESS (ACS/IDS /CCTV) System. All work shall strictly be in accordance Drawings, Specifications, and addendums.

Option Yes No

Option Line Item 0003

INFORMATION FROM TO

Description Option Line Item (OLI) 2 - South

Parking 77 New Spaces. Services Non-Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide a complete & useable F- 16 Mission Training Facility. All work shall strictly be in accordance Drawings and Specifications dated 15 May 2025, addendums 1, 2, and 3 and applicable codes; local, state, & federal regulations; industry standards; and commonly accepted best practices.

Option Line Item (OLI) 1 - Site Demo, New Pavements & Striping (42 spaces). Services Non- Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide site demolition, new bituminous and concrete pavements, and striping, west parking area (42 spaces). All work shall strictly be in accordance Drawings, Specifications, and addendums.

Option Line Item 0004

INFORMATION FROM TO

Description Option Line Item (OLI) 3 - Masonry

Veneer. Services Non-Personal.

Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide a complete & useable F-16 Mission Training Facility. All work shall strictly be in accordance Drawings and Specifications dated 15 May 2025, addendums 1, 2, and 3 and applicable codes; local, state, & federal regulations; industry standards; and commonly accepted best practices.

Option Line Item (OLI) 2 - Resurface & Re-stripe Pavement, and Parking Island Planter Cleanup (66 Spaces).

Services Non-Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide all work in connection with resurface and re-stripe bituminous parking pavement and parking lot islands cleanup, South parking area (66 Spaces). All work shall strictly be in accordance Drawings, Specifications, and addendums.

Option Line Item 0005

INFORMATION FROM TO

Description Option Line Item (OLI) 4 - Entry

Monolith. Services Non-Personal.

Option Line Item (OLI) 3 - Additional Masonry Veneer. Services Non-

Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide a complete & useable F-16 Mission Training Facility. All work shall strictly be in accordance Drawings and Specifications dated 15 May 2025, addendums 1, 2, and 3 and applicable codes; local, state, & federal regulations; industry standards; and commonly accepted best practices.

Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide all work in connection with additional Masonry Veneer. All work shall strictly be in accordance Drawings, Specifications, and addendums.

Option Line Item 0006

INFORMATION FROM TO

Description Option Line Item (OLI) 5 -

Mechanical Yard Masonry Wall.

Services Non-Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide a complete & useable F- 16 Mission Training Facility. All work shall strictly be in accordance Drawings and Specifications dated 15 May 2025, addendums 1, 2, and 3 and applicable codes; local, state, & federal regulations; industry standards; and commonly accepted best practices.

Option Line Item (OLI) 4 - Vertical Building Entry Monolith. Services Non-Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide all work in connection with the Vertical Building Entry Monolith. All work shall strictly be in accordance Drawings, Specifications, and addendums.

Option Line Item 0007

INFORMATION FROM TO

Description Option Line Item (OLI) 6 - Concrete

Surface Mechanical Yard. Services Non-Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, Option Line Item (OLI) 5 - Mechanical Yard Walls. Services Non-Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide a complete & useable F- 16 Mission Training Facility. All work shall strictly be in accordance Drawings and Specifications dated 15 May 2025, addendums 1, 2, and 3 and applicable codes; local, state, & federal regulations; industry standards; and commonly accepted best practices.

management, & financial resources to provide all work in connection with Mechanical Equipment Yard:

provide Masonry Wall. All work shall strictly be in accordance Drawings, Specifications, and addendums.

Option Line Item 0008

INFORMATION FROM TO

Description Option Line Item (OLI) 7 - Add Sign.

Services Non-Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide a complete & useable F- 16 Mission Training Facility. All work shall strictly be in accordance Drawings and Specifications dated 15 May 2025, addendums 1, 2, and 3 and applicable codes; local, state, & federal regulations; industry standards; and commonly accepted best practices.

Option Line Item (OLI) 6 - Concrete Surface at Mechanical Yard.

Services Non-Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide all work in connection with Concrete Surface at Mechanical Yard. All work shall strictly be in accordance Drawings, Specifications, and addendums.

Option Line Item 0009

INFORMATION FROM TO

Description Option Line Item (OLI) 8 - Add

Concrete Support Simulator.

Services Non-Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide a complete & useable F- 16 Mission Training Facility. All work shall strictly be in accordance

Option Line Item (OLI) 7 - Illuminated Unit Insignia Sign.

Services Non-Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide all work in connection with Illuminated Unit Insignia Sign.

All work shall strictly be in

Drawings and Specifications dated 15 May 2025, addendums 1, 2, and 3 and applicable codes; local, state, & federal regulations; industry standards; and commonly accepted best practices.

accordance Drawings, Specifications, and addendums.

Section 00 73 00 - Supplementary Conditions

The inspection and acceptance locations for the following CLIN(s) / SLIN(s) / ELIN(s) were added:

Option Line Item 0010 Inspection and Acceptance Location - DoDAAC: F6B3RP

INFORMATION VALUE

Action Both Location Other Acceptance Location

F6B3RP

177 FW CER CE RPS

AF BPN NO MILSBILLS PROCESSES, 400 LANGLEY RD

EGG HARBOR TWP, NJ 08234-9500

UNITED STATES

Instructions Maj Rojas will be responsible for reviewing and accepting progress on this project.

POC Name Major Natalia Rojas POC Email natalia.rojas@us.af.mil POC Telephone 609-761-6746

The inspection and acceptance locations for the following CLIN(s) / SLIN(s) / ELIN(s) were deleted:

Option Line Item 0002 Inspection and Acceptance Location - DoDAAC: F6B3RP

The delivery information for the following CLIN(s) / SLIN(s) / ELIN(s) were added:

Option Line Item 0010

INFORMATION VALUE

Period of Performance 01 Oct 2026 to 30 Nov 2027

The delivery information for the following CLIN(s) / SLIN(s) / ELIN(s) were deleted:

Option Line Item 0002 Period of Performance

IDCode: J
Page: 1
Pages: 8
AmendNo: 0004
EffDate: 21 JUL 2026
ReqNo:
ProjNo: AQRC189015
IssCode: W50S8F
AdmCode:
IssuedBy: W7NP USPFO ACTIVITY NJANG 177

KO FOR NJANG DO NOT DELETE, 400 LANGLEY RD

EGG HARBOR TOWNSHIP, NJ 08234-9500

UNITED STATES

JOSE MALDONADO, EMAIL: JOSE.MALDONADO.28@US.AF.MIL TELEPHONE: 609 761-6096

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W50S8F26RA011
SolDate: 29 MAY 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: 1
OffrNoEx: Off
NoCopies: 1
ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: A. This solicitation amendment is to update CLIN structure IAW Addendum #3.

B. Contractors shall acknowledge this amendment and submit with proposal.

C. SF 1442 has been updated to provide pricing.

D. Proposal due date extended to 28 July 2026 at 1PM, Local Time E. No other changes.

ContNameTitle:
CoNameTitle: JOHANNA PAZ
ContDate:
CODate: 21 JUL 2026