Solicitation Amendment W50S8F26RA0110004 SF 30.pdf
PDF 4 MB Posted
- Attached to
- Construction of F16 Mission Training Center
- Solicitation number
- W50S8F-26-R-A011
- Issued by
-
Department of the Army National Guard
About this file
This is Amendment 0004 to Solicitation W50S8F26RA011, issued by the United States Air Force on July 21, 2026, for an F-16 Mission Training Facility construction project at Egg Harbor Township, New Jersey. The amendment extends the proposal response due date from July 24, 2026, to July 28, 2026, at 1:00 PM Local Time. Contractors must acknowledge receipt of this amendment prior to the new deadline through completed items 8 and 15, acknowledgment on offer copies, or separate written communication referencing the solicitation and amendment numbers.
The amendment updates the CLIN structure and modifies multiple option line items while adding a new Option Line Item 0010 for Additional Concrete Pavement for Simulator Installation on a firm fixed price basis. Significant modifications include renaming existing CLINs to more accurately describe the work scope: CLIN 0001 becomes the Base Bid excluding ESS Systems, CLIN 0002 shifts from parking spaces to Advantor ESS system work, and subsequent CLINs are reorganized to reflect site demolition/pavement, resurfacing, masonry veneer, monolith, mechanical yard walls, signage, and mechanical yard concrete surface work. The new Option Line Item 0010 requires the contractor to provide, furnish, and install additional concrete pavement in accordance with project drawings and specifications with a performance period from October 1, 2026, to November 30, 2027. Inspection and acceptance responsibility is assigned to Major Natalia Rojas at the 177 FW CER CE RPS facility in Egg Harbor Township, New Jersey, with contact information provided for progress review and acceptance coordination.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section 00 00 00 - Procurement and Contracting Requirements
The following changes have been made:
INFORMATION FROM TO
Response Due Date
24 Jul 2026 28 Jul 2026
Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule
The following CLIN(s) / SLIN(s) / ELIN(s) were added:
Item Supplies / Services Quantity Unit Unit Price Amount
Option Line Item
Option Line Item (OLI) 8 - Additional Concrete pavement for Simulator install. Services Non-Personal. Contractor shall provide, furnish and install additional concrete pavement to support simulator install. All work shall strictly be in accordance Drawings, Specifications, andaddendums.
Pricing Arrangement: Firm Fixed Price
1 Job
W50S8F26RA0110004
The following CLIN(s) / SLIN(s) / ELIN(s) were modified:
INFORMATION FROM TO
Description Services Non-Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide a complete & useable F- 16 Mission Training Facility. All work shall strictly be in accordance Drawings and Specifications dated 15 May 2025, addendums 1, 2, and 3 and applicable codes; local, state, & federal regulations; industry standards; and commonly accepted best practices.
Base Bid - F-16 MTC (Simulator Facility) (Excluding ESS Systems) and site work. Services Non- Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide a complete & useable F-16 Mission Training Facility. All work shall strictly be in accordance Drawings, Specifications, and addendums.
INFORMATION FROM TO
Description Option Line Item (OLI) 1 - 33 New
Parking Spaces. Services Non- Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide a complete & useable F-16 Mission Training Facility. All work shall strictly be in accordance Drawings and Specifications dated 15 May 2025, addendums 1, 2, and 3 and applicable codes; local, state, & federal regulations; industry standards; and commonly accepted best practices.
Services, Non-personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide all work in connection with the Advantor ESS (ACS/IDS /CCTV) System. All work shall strictly be in accordance Drawings, Specifications, and addendums.
Option Yes No
Option Line Item 0003
INFORMATION FROM TO
Description Option Line Item (OLI) 2 - South
Parking 77 New Spaces. Services Non-Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide a complete & useable F- 16 Mission Training Facility. All work shall strictly be in accordance Drawings and Specifications dated 15 May 2025, addendums 1, 2, and 3 and applicable codes; local, state, & federal regulations; industry standards; and commonly accepted best practices.
Option Line Item (OLI) 1 - Site Demo, New Pavements & Striping (42 spaces). Services Non- Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide site demolition, new bituminous and concrete pavements, and striping, west parking area (42 spaces). All work shall strictly be in accordance Drawings, Specifications, and addendums.
Option Line Item 0004
INFORMATION FROM TO
Description Option Line Item (OLI) 3 - Masonry
Veneer. Services Non-Personal.
Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide a complete & useable F-16 Mission Training Facility. All work shall strictly be in accordance Drawings and Specifications dated 15 May 2025, addendums 1, 2, and 3 and applicable codes; local, state, & federal regulations; industry standards; and commonly accepted best practices.
Option Line Item (OLI) 2 - Resurface & Re-stripe Pavement, and Parking Island Planter Cleanup (66 Spaces).
Services Non-Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide all work in connection with resurface and re-stripe bituminous parking pavement and parking lot islands cleanup, South parking area (66 Spaces). All work shall strictly be in accordance Drawings, Specifications, and addendums.
Option Line Item 0005
INFORMATION FROM TO
Description Option Line Item (OLI) 4 - Entry
Monolith. Services Non-Personal.
Option Line Item (OLI) 3 - Additional Masonry Veneer. Services Non-
Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide a complete & useable F-16 Mission Training Facility. All work shall strictly be in accordance Drawings and Specifications dated 15 May 2025, addendums 1, 2, and 3 and applicable codes; local, state, & federal regulations; industry standards; and commonly accepted best practices.
Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide all work in connection with additional Masonry Veneer. All work shall strictly be in accordance Drawings, Specifications, and addendums.
Option Line Item 0006
INFORMATION FROM TO
Description Option Line Item (OLI) 5 -
Mechanical Yard Masonry Wall.
Services Non-Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide a complete & useable F- 16 Mission Training Facility. All work shall strictly be in accordance Drawings and Specifications dated 15 May 2025, addendums 1, 2, and 3 and applicable codes; local, state, & federal regulations; industry standards; and commonly accepted best practices.
Option Line Item (OLI) 4 - Vertical Building Entry Monolith. Services Non-Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide all work in connection with the Vertical Building Entry Monolith. All work shall strictly be in accordance Drawings, Specifications, and addendums.
Option Line Item 0007
INFORMATION FROM TO
Description Option Line Item (OLI) 6 - Concrete
Surface Mechanical Yard. Services Non-Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, Option Line Item (OLI) 5 - Mechanical Yard Walls. Services Non-Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide a complete & useable F- 16 Mission Training Facility. All work shall strictly be in accordance Drawings and Specifications dated 15 May 2025, addendums 1, 2, and 3 and applicable codes; local, state, & federal regulations; industry standards; and commonly accepted best practices.
management, & financial resources to provide all work in connection with Mechanical Equipment Yard:
provide Masonry Wall. All work shall strictly be in accordance Drawings, Specifications, and addendums.
Option Line Item 0008
INFORMATION FROM TO
Description Option Line Item (OLI) 7 - Add Sign.
Services Non-Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide a complete & useable F- 16 Mission Training Facility. All work shall strictly be in accordance Drawings and Specifications dated 15 May 2025, addendums 1, 2, and 3 and applicable codes; local, state, & federal regulations; industry standards; and commonly accepted best practices.
Option Line Item (OLI) 6 - Concrete Surface at Mechanical Yard.
Services Non-Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide all work in connection with Concrete Surface at Mechanical Yard. All work shall strictly be in accordance Drawings, Specifications, and addendums.
Option Line Item 0009
INFORMATION FROM TO
Description Option Line Item (OLI) 8 - Add
Concrete Support Simulator.
Services Non-Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide a complete & useable F- 16 Mission Training Facility. All work shall strictly be in accordance
Option Line Item (OLI) 7 - Illuminated Unit Insignia Sign.
Services Non-Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide all work in connection with Illuminated Unit Insignia Sign.
All work shall strictly be in
Drawings and Specifications dated 15 May 2025, addendums 1, 2, and 3 and applicable codes; local, state, & federal regulations; industry standards; and commonly accepted best practices.
accordance Drawings, Specifications, and addendums.
Section 00 73 00 - Supplementary Conditions
The inspection and acceptance locations for the following CLIN(s) / SLIN(s) / ELIN(s) were added:
Option Line Item 0010 Inspection and Acceptance Location - DoDAAC: F6B3RP
INFORMATION VALUE
Action Both Location Other Acceptance Location
F6B3RP
177 FW CER CE RPS
AF BPN NO MILSBILLS PROCESSES, 400 LANGLEY RD
EGG HARBOR TWP, NJ 08234-9500
UNITED STATES
Instructions Maj Rojas will be responsible for reviewing and accepting progress on this project.
POC Name Major Natalia Rojas POC Email natalia.rojas@us.af.mil POC Telephone 609-761-6746
The inspection and acceptance locations for the following CLIN(s) / SLIN(s) / ELIN(s) were deleted:
Option Line Item 0002 Inspection and Acceptance Location - DoDAAC: F6B3RP
The delivery information for the following CLIN(s) / SLIN(s) / ELIN(s) were added:
Option Line Item 0010
INFORMATION VALUE
Period of Performance 01 Oct 2026 to 30 Nov 2027
The delivery information for the following CLIN(s) / SLIN(s) / ELIN(s) were deleted:
Option Line Item 0002 Period of Performance
| IDCode: J |
| Page: 1 |
| Pages: 8 |
| AmendNo: 0004 |
| EffDate: 21 JUL 2026 |
| ReqNo: |
| ProjNo: AQRC189015 |
| IssCode: W50S8F |
| AdmCode: |
| IssuedBy: W7NP USPFO ACTIVITY NJANG 177 |
KO FOR NJANG DO NOT DELETE, 400 LANGLEY RD
EGG HARBOR TOWNSHIP, NJ 08234-9500
UNITED STATES
JOSE MALDONADO, EMAIL: JOSE.MALDONADO.28@US.AF.MIL TELEPHONE: 609 761-6096
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W50S8F26RA011 |
| SolDate: 29 MAY 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: A. This solicitation amendment is to update CLIN structure IAW Addendum #3. |
B. Contractors shall acknowledge this amendment and submit with proposal.
C. SF 1442 has been updated to provide pricing.
D. Proposal due date extended to 28 July 2026 at 1PM, Local Time E. No other changes.
| ContNameTitle: |
| CoNameTitle: JOHANNA PAZ |
| ContDate: |
| CODate: 21 JUL 2026 |