Exhibit D_Letter of Commitment MTC.docx

DOCX document 22 KB Posted

Attached to
Construction of F16 Mission Training Center
Solicitation number
W50S8F-26-R-A011
Issued by

About this file

This is a template for a Letter of Commitment from a key subcontractor and/or key personnel. The document is designed for submission by a subcontractor using their company letterhead to the Contracting Officer, confirming their commitment to support the prime contractor in the event of contract award. The subcontractor must provide an unequivocal commitment to fulfill specified duties on the project, with fields for the proposer's name, the subcontractor firm name, the role or duties to be performed, the authorized official's signature and title, and the date of commitment.

This template applies to the Construction of F-16 MTC facility solicitation (W50S8F-26-R-A011) issued by the Department of the Army National Guard for construction at the 177th Fighter Wing in Egg Harbor Township, New Jersey. The underlying contract opportunity is a single firm fixed-price contract for construction services valued over $10,000,000, with a NAICS code of 236220 (Heavy and Civil Engineering Construction). The solicitation is set aside 100% for small businesses with a size standard of $45,000,000. Proposers must submit commitment letters from any key subcontractors or personnel to demonstrate their availability and support for the proposed project.

View the file

Other files

File Type Posted
Solicitation Amendment W50S8F26RA0110004 SF 30.pdf PDF
Solicitation Amendment (SF1442) - W50S8F26RA0110004.pdf PDF
Solicitation Amendment W50S8F26RA0110003 SF 30.pdf PDF
2025 Projectmates ANG.pdf PDF
Solicitation Amendment W50S8F26RA0110002 SF 30.pdf PDF
F16 MTC Pre-Proposal RFI Log as of 10 July 2026.pdf PDF
NJ ANG F-16 MTC Flight Sim - AQRC 189015 Addm No 5 - Drawing.pdf PDF
NJ ANG F-16 MTC Flight Sim - AQRC 189015 Addm No 5 - Spec Sect 01_45_00 - Attmts.pdf PDF
NJ ANG F-16 MTC Flight Sim - AQRC 189015 Addm No 5 - Narrative.pdf PDF
Solicitation Amendment W50S8F26RA0110001 SF 30-Proposal due date extension to 17 July 2026.pdf PDF
F16 MTC Pre-Proposal RFI Log as of 24 June 2026.pdf PDF
SAM RFI update - F16 MTC 23 June 26.pdf PDF
Pre-Proposal - Site Visit Sign_In.pdf PDF
MTC Pre-Proposal Conf Presentation.pdf PDF
Solicitation - W50S8F26RA011-Construction of F-16 MTC.pdf PDF
Addendum No. 4 - AQRC 189015 Addm No 4 - Narrative.pdf PDF
EXHIBIT B MTC.docx DOCX document
012.2 - AQRD 189015 - NJ ANG F-16 MTC - Specifications Vol. 2 - Type B-3.pdf PDF
013.1 - AQRD 189015 - NJ ANG F-16 MTC - Drawings - Type B-3.pdf PDF
Addendum No.3 - Updated Specs and Drawings 0136.pdf PDF
013.5 - Geotechnical Engineering Report.pdf PDF
EXHIBIT C Reference Questionnaire Package - MTC.docx DOCX document
012.1 - AQRD 189015 - NJ ANG F-16 MTC - Specifications Vol. 1 - Type B-3.pdf PDF
Addendum No. 1 - Boring log info for Storm water 013.3.pdf PDF
Addendum No. 2 - Security Items Clarification 013.4.pdf PDF
Addendum No. 4-Excess Haul Route - Drawings.pdf PDF
Exhibit A MTC.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT D

LETTER OF COMMITMENT OF

KEY SUBCONTRACTOR AND/OR KEY PERSONNEL

(USE SUBCONTRACTOR’S COMPANY LETTERHEAD)

TO: Contracting Officer

SUBJECT: Letter of Commitment for Proposed Contract for ____________________

Dear Sir or Madam:

I hereby make the unequivocal commitment that, in the event of an award of a contract to (Fill in name of Proposer), that (insert name of firm) will fulfill the duties of (state role on a project)

Sincerely, Signature and Title of Authorized Subcontractor Official: ____________________

Date: __________

File details come from the government source that posted it. Updated .