Addendum No. 4-Excess Haul Route - Drawings.pdf
PDF 4 MB Posted
- Attached to
- Construction of F16 Mission Training Center
- Solicitation number
- W50S8F-26-R-A011
- Issued by
-
Department of the Army National Guard
About this file
This document is a civil engineering plan sheet for the New Jersey Air National Guard F-16 Mission Training Center (MTC) at Atlantic City ANG Base, 177th Fighter Wing. The sheet serves as a legend, general notes, and abbreviations reference for the overall project numbered 2022-130-00, with an issue date of May 15, 2025, and Addendum No. 4 dated May 27, 2026.
The document provides comprehensive technical specifications and symbols used throughout the civil construction drawings. It includes detailed abbreviations for common contracting and construction terms (such as ABA, ADA, ASTM, AASHTO, concrete specifications, electrical systems, and utility lines), graphical symbols for infrastructure elements (sanitary/storm/water/gas lines, electrical systems, fire protection, communications ductbanks, and drainage systems), and construction phases delineated as Phase 1 (Base Bid), Phase 2 (Optional Line Item 1), and Phase 3 (Optional Line Item 2). The general notes outline contractor responsibilities including utility location verification, existing facility documentation, soil preparation and environmental compliance, and proper material handling and staging. The project location maps indicate the site is situated near Atlantic City, New Jersey, with soil stockpile locations identified at a separate FAA facility. The drawings were prepared by FSB A+E (5801 Broadway Extension, Suite 500, Oklahoma City, OK 73118-7436) and include review signatures from J. Birk, A. Beschnett, J. Purpura, and D. Adams.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. THE CONTRACTOR MUST IMMEDIATELY NOTIFY THE CONTRACTING OFFICER OF ANY
DISCREPANCY OR CONFLICT FOUND IN THE FIELD PRIOR TO OR DURING THE COURSE
OF CONSTRUCTION AND MUST NOT PROCEED WITH CONSTRUCTION UNTIL THE
CONTRACTING OFFICER RESOLVES THE SAID DISCREPANCY OR CONFLICT.
2. UNLESS OTHERWISE NOTED, ALL EXISTING PAVEMENT, UTILITY LINES, AND OTHER
IMPROVEMENTS DAMAGED OR UNDERMINED AS A RESULT OF THE CONTRACTOR'S
OPERATIONS, MUST BE RECONSTRUCTED OR REPLACED BY THE CONTRACTOR AT THE
CONTRACTORS EXPENSE TO MATCH EXISTING CONDITIONS.
3. THE UNDERGROUND PIPES, CABLES, OR DUCT LINES KNOWN TO EXIST BY THE
ENGINEER FROM THE ENGINEERS SEARCH OF RECORDS AND SURVEY, ARE INDICATED
ON THE PLANS. THE CONTRACTOR MUST VERIFY THE LOCATIONS AND DEPTHS OF THE
FACILITIES AND EXERCISE PROPER CARE IN EXCAVATING IN THE AREA. WHEREVER
CONNECTIONS OF NEW UTILITIES TO EXISTING UTILITIES ARE SHOWN ON THE PLANS
THE CONTRACTOR MUST EXPOSE THE EXISTING LINES AT THE PROPOSED
CONNECTIONS TO VERIFY THEIR LOCATIONS AND DEPTHS PRIOR TO EXCAVATION FOR
NEW LINES.
4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY ALL EXISTING UTILITIES.
DAMAGE TO THE EXISTING UTILITIES MUST BE REPAIRED BY THE CONTRACTOR AT THE
CONTRACTOR'S EXPENSE WITH NO COST TO THE GOVERNMENT.
5. THE CONTRACTOR MUST VERIFY AND CHECK ALL DIMENSIONS AND DETAILS SHOWN
ON THE DRAWING PRIOR TO THE START OF CONSTRUCTION. ANY DISCREPANCIES
MUST BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER
FOR CLARIFICATION.
6. THE CONTRACTOR MUST SEED AND STABILIZE ALL DISTURBED AREAS NOT COVERED
BY PAVEMENT.
7. DEMOLITION, REMOVAL, AND DISPOSAL OF OTHER ITEMS AS IDENTIFIED DURING
DEMOLITION ACTIVITIES AND BY THE GOVERNMENT CLIENT MAY BE REQUIRED AND
MUST BE ACCOMPLISHED WHEN REQUESTED BY THE GOVERNMENT.
8. SPOILS MUST BE DISPOSED OF OFFSITE AT THE CONTRACTOR'S EXPENSE.
STOCKPILES AND STAGING AREAS WILL BE PROVIDED BY THE CONTRACTOR.
9. THE CONTRACTOR MUST NOT DISTURB OR BLOCK ACCESS TO OTHER FACILITIES AND
WORK AREAS THAT MAY BE ADJACENT TO THE PROJECT SITE. DETOURS, WHEN
REQUIRED, MUST BE COORDINATED WITH THE CONTRACTING OFFICER.
10. HAUL ROUTES ARE NOT FOR THE CONTRACTOR'S SOLE USE AND MUST REQUIRE
COORDINATION WITH THE CONTRACTING OFFICER AND OTHER USERS.
11. HAUL ROUTES MUST BE USED AS DIRECTED BY THE NJ ANG. THE USE OF EXISTING
ROADS SHOWN ON THESE DRAWINGS FOR ACCESS TO THE PROJECT SITE MUST BE
VERIFIED WITH THE NJ ANG PRIOR TO BEGINNING WORK.
12. EXISTING FACILITIES SHOWN ON THE DRAWINGS ARE BASED ON THE BEST AVAILABLE
INFORMATION, BUT MAY NOT REFLECT THE ACTUAL CONDITIONS AT THE SITE. THE
CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING CONDITIONS
PRIOR TO BEGINNING WORK.
13. CONTRACTOR MUST NOTIFY CONTRACTING OFFICER WHEN AN UNKNOWN UTILITY IS
ENCOUNTERED. ALL DEBRIS AND SCRAP WILL BE REMOVED FROM THE WORK AREA
AND DISPOSED OF AT A COMMERCIAL LANDFILL OR OTHER APPROVED OFF-SITE
LOCATION.
14. THE CONTRACTOR MUST FIELD VERIFY THIS INFORMATION PRIOR TO USE TO
DETERMINE WHETHER ANY DISCREPANCIES OR DIFFERING SITE CONDITIONS EXIST.
15. UNLESS OTHERWISE NOTED, ALL DIMENSIONS AND ELEVATIONS SHOWN ON THE
DRAWINGS ARE EXPRESSED IN FEET.
16. ALL DIMENSIONS SHOWN ARE MEASURED FROM THE OUTSIDE FACE OF BUILDING
FOUNDATIONS AND BACKS OF CURBS, UNLESS NOTED OTHERWISE.
17. THE CONTRACTOR MUST MAINTAIN POSITIVE DRAINAGE AWAY FROM NEW AND
EXISTING CONSTRUCTION AT ALL TIMES.
18. PROVIDE SOIL PREPARATION (INCLUDING SOIL CONDITIONERS AS REQUIRED),
FERTILIZING, SEEDING, AND SURFACE TOP-DRESSING OF ALL NEWLY GRADED
FINISHED EARTH SURFACES, UNLESS INDICATED OTHERWISE, AND AT ALL AREAS
INSIDE OR OUTSIDE THE LIMITS OF CONSTRUCTION THAT ARE DISTURBED BY THE
CONTRACTOR'S OPERATIONS.
19. TO THE MAXIMUM EXTENT POSSIBLE, EXCAVATED SOILS MUST BE RE-PURPOSED TO
REMAIN WITHIN THE PROJECT LIMITS AS FILL MATERIAL. FAA RESERVES THE RIGHT OF
FIRST REFUSAL TO RETAIN ALL EXCESS MATERIAL GENERATED FROM CONSTRUCTION
PROJECTS PERFORMED ON TECHNICAL CENTER PROPERTY (INCLUDING LEASED
AREAS). ANY SOIL THAT IS PROPOSED TO BE RELOCATED OUTSIDE OF A PROJECT
AREA MUST BE SAMPLED AND ANALYZED FOLLOWING NJ DEP FILL MATERIAL (I.E., ONE
TCLP SAMPLE PER EVERY 1,000 YARDS) AND RECEIVE APPROVAL FROM FAA PRIOR TO
TRANSPORT. IN THE EVENT FAA ELECTS TO REFUSE ACCEPTANCE OR IF THE
EXCAVATED SOIL IS FOUND TO BE CONTAMINATED AND NOT BEING USED AS ON-SITE
BACKFILL MATERIAL, THE CONTRACTOR WILL BE REQUIRED TO PREPARE AN OFF-SITE
DISPOSAL PLAN AND COORDINATE WITH FAA AND CONTRACTING OFFICER ON THE
MATERIAL'S TRANSPORT AND DISPOSAL TO AN APPROVED, OFF-SITE FACILITY. ANY
CLEAN SOIL REMAINING ON TECHNICAL CENTER PROPERTY MUST BE TRANSPORTED
TO A GOVERNMENT STOCKPILE AREA WITHIN 3 AERIAL MILES OF THE PROJECT SITE
AND THE CONTRACTOR MUST PROVIDE A BULLDOZER TO BREAK DOWN THE
STOCKPILES AFTER DELIVERY.
20. CONTRACTOR MUST NOTIFY CONTRACTING OFFICER AND NJ ANG WHEN ALL BURIED
UTILITIES ARE BEING INSTALLED PRIOR TO BACKFILLING AND FOR EXISTING UTILITIES
THAT ARE UNCOVERED. NJ ANG WILL COORDINATE WITH FAATC SO THAT THE FAATC
CAN GPS ALL UTILITIES.
21. ACCESS TO THE STOCKPILE IS RESTRICTED AND REQUIRES A BADGING AND PRESCREENING
PROCESS. THIS PROCESS INVOLVES A FEE AND MAY TAKE UP TO FOUR WEEKS.
REQUIREMENTS INCLUDE A SUCCESSFUL BACKGROUND CHECK, A REAL ID, AND ONLINE
TRAINING.
GENERAL NOTES
CONCRETE
SANITARY SEWER LINE
LEGEND
ABA
ADA
ASTM
Ø
AASHTO
C
C-C
CDB
CF
CONC
CU
DIA/D
DR
E
EDB
E.G.
EL/ ELEV
EXP
F
FAA
FFE
FO
' or FT
G
H
HDPE
H/C
" or IN
INV
L
LOC
LOD
AND
DEGREES
ARCHITECTURAL BARRIERS ACT
AMERICANS WITH DISABILITIES ACT
AMERICAN SOCIETY FOR TESTING
AT
OUTSIDE DIAMETER
AMERICAN ASSOCIATION OF STATE
HIGHWAY AND TRANSPORTATION OFFICIALS
CENTERLINE
CENTER TO CENTER
COMMUNICATIONS DUCT BANK
CUBIC FEET
CONCRETE
CUBIC
DIAMETER
DRIVE
EASTING
ELECTRICAL DUCT BANK
FOR EXAMPLE
ELEVATION
EXPANSION
FIRE PROTECTION
FEDERAL AVIATION ADMINISTRATION
FINISHED FLOOR ELEVATION
FUEL OIL
FEET
GAS
HORIZONTAL
HIGH DENSITY POLYETHYLENE
HANDICAP
INCHES
INVERT
LENGTH
CONSTRUCTION LIMITS
LIMITS OF DISTURBANCE
ABBREVIATIONS
L
MAX
MH
MIN
ML
MM
MSL
MTC
MV
N
NTS
OC
OD
OLI
O&M
OSHA
PB
PE
PC
PIV
PSF
PSI
PV
PVC
R
RC
RCP
RD
REINF
ROW
S
SDB
SF
SQ
STA
SWM
SY
T T&B
TEMP
TYP
VAR
W
MAXIMUM
MANHOLE
MINIMUM
MILLILITER
MILLIMETER
MEAN SEA LEVEL
MISSION TRAINING CENTER
MEDIUM VOLTAGE
NORTHING
NOT TO SCALE
ON CENTER
OUTSIDE DIAMETER
OPTIONAL LINE ITEMS
OPERATION AND MAINTENANCE
OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION
PAVEMENT BORING
POLYETHYLENE
POINT OF CURVATURE
POST INDICATOR VALVE
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
PHOTOVOLTAIC
POLYVINYL CHLORIDE
RADIUS
REINFORCED CONCRETE
REINFORCED CONCRETE PIPE
ROAD
REINFORCED
RIGHT OF WAYS
SLOPE
SHIELDED DUCT BANK
SQUARE FEET/SILT FENCE
SQUARE
STATION
STORM WATER MANAGEMENT
SQUARE YARD
TANGENT
TOP AND BOTTOM
TEMPORARY
TYPICAL
VARIABLE
DOMESTIC WATER
AGGREGATE SURFACE
POTABLE WATER LINE
GAS LINE
STORM DRAIN LINE
G
SD
NEW EXISTING
CHAIN-LINK FENCE WITH
VISION SLATS
ASPHALT
SD
G
ELECTRICAL MANHOLE
CONTOUR 59.0 59.0
SPOT ELEVATION 880.000
SAN
ELECTRICAL DUCTBANK LINE
TREE
X X
SANITARY MANHOLE
BUILDING FOOTPRINT
E
COMMUNICATIONS DUCTBANK LINE
COMM
X X
COMM
DSTORM MANHOLE
STORM INLET D
POLE MOUNTED LIGHTS
S
FLOW ARROW
W W
SAN
GAS VALVE
SIGNAGE
WATER MANHOLE
CLEANOUT
WATER VALVE
POST INDICATOR VALVE
BOLLARD
LODLIMITS OF DISTURBANCE
SEEDING / NATIVE GRASS
MECHANICAL YARD
(OPTIONAL LINE ITEMS - OLIS)
GRAVEL DRIVE FOR
FIRE TRUCK ACCESS
OPTIONAL LINE ITEMS (OLIS)
OUTLINE
CONSTRUCTION STAGING AREA
X X
MECHANICAL YARD
(BASE BID)
CHAIN-LINK FENCE WITH VISION
SLATS
PHASE 1-BASE BID
PHASE 2-OLI 1
PHASE 3-OLI 2
FIRE HYDRANT
FIRE PROTECTION LINE F F
BASE BID DEMOLISH AND
REMOVE PAVEMENT SURFACE
AND EXISTING FEATURES
BASE BID CLEAR AND GRUB
VEGETATION AND STONE
SURFACING
DEMOLISH PAVEMENT SURFACES,
VEGETATION, FENCING, AND RSS
PADS. DEMOLISH ALL BUILDING
RELATED UTILITIES AND TERMINATE
AT CONNECTION TO MAIN.
OPTIONAL LINE ITEM 1
DEMOLISH AND
REMOVE PAVEMENT
OPTIONAL LINE ITEM 1
DEMOLISH VEGETATION
OPTIONAL LINE ITEM 2
DEMOLISH ROCK AND
VEGETATION
LEGEND NEW EXISTING
BORING LOCATION
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
C
B
A
D
C
B
A
54321
2022-130-00
MAY 15, 2025
5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436
405.840.2931 | fsb-ae.com
Eg g
Ne w
J er se y
To w ns hi p, Ha rb or
At la nt ic
C ity
A
NG
B as e F-
M is si on T ra in in g
Ce nt er (M
TC
N
EW
J
ER
SE
Y
A N
G -1 th
F W
C-001
J. BIRK
A. BESCHNETT
J. PURPURA
D. ADAMS
CIVIL - LEGEND, GENERAL
NOTES, AND ABBREVIATIONS
1 ADDENDUM NO. 4 5-27-2026
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
D
D
D
D
D
D
D
D
D
B1 SCALE:
N
PROJECT LOCATION MAP
NTS
C1 SCALE:
PROJECT SITE LOCATION MAP
NTS C3 SCALE:
PROJECT VICINITY MAP
NTS
NN
SEE PROJECT VICINITY MAP
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
C
B
A
D
C
B
A
54321
2022-130-00
MAY 15, 2025
5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436
405.840.2931 | fsb-ae.com
Eg g
Ne w
J er se y
To w ns hi p, Ha rb or
At la nt ic
C ity
A
NG
B as e F-
M is si on T ra in in g
Ce nt er (M
TC
N
EW
J
ER
SE
Y
A N
G -1 th
F W
GC100
J. BIRK
A. BESCHNETT
J. PURPURA
D. ADAMS
CIVIL - PROJECT LOCATION
AND VICINITY MAP
SEE PROJECT LOCATION MAP
PROJECT LOCATION
A3 SCALE:
FAA SOIL STOCKPILE LOCATION MAP
NTS
N
1 ADDENDUM NO. 4 5-27-2026
| Sheets and Views |
| Layout1 |
| 02 - GC100-CIVIL-.pdf |
| Sheets and Views |
| Layout1 |
File details come from the government source that posted it. Updated .