Solicitation Amendment (SF1442) - W50S8F26RA0110004.pdf

PDF 6 MB Posted

Attached to
Construction of F16 Mission Training Center
Solicitation number
W50S8F-26-R-A011
Issued by

About this file

This is a Solicitation Amendment (SF1442) for Construction of an F-16 Mission Training Center at the 177th Fighter Wing in Egg Harbor Township, New Jersey. The solicitation is a Request for Proposals (RFP) to award a single firm fixed-price contract for non-personal services. The contractor must provide all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary to complete the construction project. The project is 100% set-aside for small businesses under NAICS code 236220 (Building Construction) with a small business size standard of $45,000,000. The magnitude of construction exceeds $10,000,000.

The amendment reflects multiple updates and extensions to the original solicitation timeline. The proposal due date has been extended to 28 July 2026 at 1:00 PM local time. Key amendments include the incorporation of Addendum #5 to the Architect & Engineer specifications and drawings, final answers to all Requests for Information (RFIs) with no further RFIs to be considered, an updated CLIN structure on the SF1442 form, and a revised Item 13d specifying 120 calendar days for Government acceptance. A Project Management Software fee schedule has been added. Contractors are required to submit a signed copy of the SF30 Amendment document with their proposals. The issuing agency is the Department of the Army National Guard.

View the file

Other files

File Type Posted
Solicitation Amendment W50S8F26RA0110004 SF 30.pdf PDF
Solicitation Amendment W50S8F26RA0110003 SF 30.pdf PDF
2025 Projectmates ANG.pdf PDF
Solicitation Amendment W50S8F26RA0110002 SF 30.pdf PDF
NJ ANG F-16 MTC Flight Sim - AQRC 189015 Addm No 5 - Narrative.pdf PDF
F16 MTC Pre-Proposal RFI Log as of 10 July 2026.pdf PDF
NJ ANG F-16 MTC Flight Sim - AQRC 189015 Addm No 5 - Drawing.pdf PDF
NJ ANG F-16 MTC Flight Sim - AQRC 189015 Addm No 5 - Spec Sect 01_45_00 - Attmts.pdf PDF
Solicitation Amendment W50S8F26RA0110001 SF 30-Proposal due date extension to 17 July 2026.pdf PDF
F16 MTC Pre-Proposal RFI Log as of 24 June 2026.pdf PDF
SAM RFI update - F16 MTC 23 June 26.pdf PDF
Pre-Proposal - Site Visit Sign_In.pdf PDF
MTC Pre-Proposal Conf Presentation.pdf PDF
Solicitation - W50S8F26RA011-Construction of F-16 MTC.pdf PDF
Addendum No. 4 - AQRC 189015 Addm No 4 - Narrative.pdf PDF
EXHIBIT B MTC.docx DOCX document
Exhibit D_Letter of Commitment MTC.docx DOCX document
012.1 - AQRD 189015 - NJ ANG F-16 MTC - Specifications Vol. 1 - Type B-3.pdf PDF
Addendum No. 1 - Boring log info for Storm water 013.3.pdf PDF
Addendum No. 2 - Security Items Clarification 013.4.pdf PDF
Addendum No. 4-Excess Haul Route - Drawings.pdf PDF
012.2 - AQRD 189015 - NJ ANG F-16 MTC - Specifications Vol. 2 - Type B-3.pdf PDF
013.1 - AQRD 189015 - NJ ANG F-16 MTC - Drawings - Type B-3.pdf PDF
Addendum No.3 - Updated Specs and Drawings 0136.pdf PDF
013.5 - Geotechnical Engineering Report.pdf PDF
EXHIBIT C Reference Questionnaire Package - MTC.docx DOCX document
Exhibit A MTC.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR

INFORMATION CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

CODE

6. PROJECT NUMBER

8. ADDRESS OFFER TO

4. CONTRACT NUMBER

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

SEALED BID (IFB)

INVITATION FOR BID

NEGOTIATED (RFP)

REQUEST FOR PROPOSAL

3. DATE ISSUED PAGE OF PAGES

AWARD (To be completed by Government)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 12/2022) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES

CODE AT

27. PAYMENT WILL BE MADE BY

10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE

Patrick.Ferguson Line

Patrick.Ferguson Line

Section 00 00 00 - Procurement and Contracting Requirements

Construction of F-16 Mission Training CenterInstrument Name:

REQUEST FOR PROPOSALS (RFP) TO AWARD A SINGLE FIRM FIXED-PRICE CONTRACT

FOR SERVICES, NON-PERSONAL, TO PROVIDE ALL PLANT, LABOR, TRANSPORTATION,

MATERIALS, TOOLS, EQUIPMENT, APPLIANCES AND SUPERVISION NECESSARY FOR THE

CONSTRUCTION OF CONSTRUCT A F-16 MTC FACILITY AT THE 177TH FIGHTER WING IN

EGG HARBOR TOWNSHIP, NJ. THIS PROJECT IS SET ASIDE 100% FOR SMALL

BUSINESSES. THE NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS)

CODE IS 236220, WITH A SMALL BUSINESS SIZE STANDARD OF $45,000,000. THE

MAGNITUDE OF CONSTRUCTION OVER $10,000,000.

W50S8F26RA0110004

Section 00 01 10 - Table of Contents

SOLICITATION, OFFER, AND AWARD SF 1442 and SF 1442 BACK

SECTION 00 01 10 - TABLE OF CONTENT AND NOTES

SECTION 00 21 00 - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

SECTION 00 21 16 - SUBMISSION REQUIREMENTS AND INSTRUCTIONS

SECTION 00 22 16 - PROPOSAL EVALUATIONS AND BASIS FOR AWARD

SECTION 00 45 00 - REPRESENTATIONS & CERTIFICATIONS

SECTION 00 70 00 - CONTRACT CLAUSES

SECTION 00 73 00 - WAGE DETERMINATION(S)

SECTION 01 00 00 - SPECIAL CONTRACT REQUIREMENTS

ATTACHMENT 1 - PLANS, SPECIFICATIONS (Project No. AQRC189015_Dated: May 15, 2025) AND ADDENDUMS No. 1 through 5

EXHIBIT A - Performance Relevancy Questionnaire

EXHIBIT B - Subcontractor Information and Consent Form

EXHIBIT C - Reference Questionnaire package

EXHIBIT D - Letter of Commitment

1. Instructions for the preparation of proposals are in Sections 00 21 00, 00 21 16 and 00 22 16.

2. Offeror's attention is invited to the insurance requirement contained in this solicitation Clause 52.228-5 Insurance - Work on a Government Revolutionary FAR Overhaul (RFO)

Installation). Certification of the required coverage for the prime contractor shall be furnished prior to beginning work on this contract, and the Contracting Officer may request evidence of the required insurance at any time during the life the contract.

3. Reference , Contract Prices - Bidding RFO DFARS CD 226-O0019 for provision 252.236-7008 Schedules. The term "Bidding Schedule" shall also be construed to mean "Offer Schedule" or "Schedule". The terms "bid" and "offer", and "bidder" and "offeror" shall be construed as having the same meaning in this solicitation and resulting contract.

4. Line items 0002 through 0009 are Option Line Items. See RFO FAR provision 52.217-5 Evaluation of Options, and RFO FAR clause 52.217-7 Option for Increased Quantity-Separately Priced Line Item.

*** END OF NARRATIVE ***

Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule

Additional Information/Notes

Item Supplies/Service Quanti ty

Unit Unit Price Amount

0001 Base Bid - F-16 MTC (Simulator Facility) (Excluding ESS Systems) and site work. Services Non- Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide a complete & useable F-16 Mission Training Facility. All work shall strictly be in accordance Drawings, Specifications, and addendums.

Pricing Arrangement: Firm Fixed Price

1 Job

0002 Services, Non-personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide all work in connection with the Advantor ESS (ACS/IDS /CCTV) System. All work shall strictly be in accordance Drawings, Specifications, and addendums.

Product Service Code: Y1JZ

Pricing Arrangement: Firm Fixed Price

1 Job

Option Line Item

Option Line Item (OLI) 1 - Site Demo, New Pavements & Striping (42 spaces). Services Non-

1 Job

0003 Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide site demolition, new bituminous and concrete pavements, and striping, west parking area (42 spaces). All work shall strictly be in accordance Drawings, Specifications, and addendums.

Pricing Arrangement: Firm Fixed Price

Option Line Item

Option Line Item (OLI) 2 - Resurface & Re-stripe Pavement, and Parking Island Planter Cleanup (66 Spaces). Services Non- Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide all work in connection with resurface and re-stripe bituminous parking pavement and parking lot islands cleanup, South parking area (66 Spaces). All work shall strictly be in accordance Drawings, Specifications, and addendums.

Pricing Arrangement: Firm Fixed Price

1 Job

Option Line Item

Option Line Item (OLI) 3 - Additional Masonry Veneer.

Services Non-Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, 1 Job management, & financial resources to provide all work in connection with additional Masonry Veneer. All work shall strictly be in accordance Drawings, Specifications, and addendums.

Pricing Arrangement: Firm Fixed Price

Option Line Item

Option Line Item (OLI) 4 - Vertical Building Entry Monolith. Services Non-Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide all work in connection with the Vertical Building Entry Monolith. All work shall strictly be in accordance Drawings, Specifications, and addendums.

Pricing Arrangement: Firm Fixed Price

1 Job

Option Line Item

Option Line Item (OLI) 5 - Mechanical Yard Walls. Services Non-Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide all work in connection with Mechanical Equipment Yard:

provide Masonry Wall. All work shall strictly be in accordance Drawings, Specifications, and addendums.

Pricing Arrangement: Firm Fixed Price

1 Job

Option Line Item

Option Line Item (OLI) 6 - Concrete Surface at Mechanical Yard.

Services Non-Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide all work in connection with Concrete Surface at Mechanical Yard. All work shall strictly be in accordance Drawings, Specifications, and addendums.

Pricing Arrangement: Firm Fixed Price

1 Job

Option Line Item

Option Line Item (OLI) 7 - Illuminated Unit Insignia Sign.

Services Non-Personal. Contractor shall provide all manpower, labor, equipment, material, supervision, management, & financial resources to provide all work in connection with Illuminated Unit Insignia Sign.

All work shall strictly be in accordance Drawings, Specifications, and addendums.

Pricing Arrangement: Firm Fixed Price

1 Job

Option Line Item

Option Line Item (OLI) 8 - Additional Concrete pavement for Simulator install. Services Non- Personal. Contractor shall provide, furnish and install additional concrete pavement to support simulator install. All work shall

1 Job strictly be in accordance Drawings, Specifications, and addendums.

Pricing Arrangement: Firm Fixed Price

Section 00 21 00 - Instructions

SECTION 00 21 00 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

1. SCOPE

1.1. You are invited to submit a proposal in response to our Request for Proposal W50S8F-26-R-A011 for Project

No. AQRC189015 at the 177th Fighter Wing (FW) in Egg Harbor Twp, NJ. As a result of this solicitation, the Government intends to award a single Firm Fixed Price (FFP) contract to the responsible offeror whose proposal represents the best value after evaluation in accordance with the factors and subfactors in the solicitation.

1.2. This solicitation is set-aside 100% for small businesses.

2. NOTICE OF PRE-PROPOSAL CONFERENCE

2.1. A pre-proposal conference will be conducted on 10 June 2026 for the purposes of briefing on at 1:30 PM the proposal requirements and answering questions regarding this solicitation. This conference will be held at the 177th

FW in Building 410 classroom. Interested Contractors are highly encouraged to attend the pre-proposal conference.

The site visit will be held following the conference.

2.2. Due to security conditions, all offerors must register to attend this conference and site visit. Email the following information for all attendees to 177fw.contracting.org@us.af.mil with the subject line - "Pre Proposal Conference registration for W50S8F-26-R-A011".

Visitor's Name

Last Four Digits of Social Security No.

Driver's License No., State Issued and Expiration Date

Date of Birth

Citizenship

2.3. This information must be provided in advance, not later than _7_ business days prior to the meeting, in order to ensure access to the military base and conference site and ensure adequate seating for the conference attendees. Even if you have access to the base you must register to ensure adequate seating. The furnishing of the above information is voluntary; however, your failure to furnish all or part of the requested information may result in the Government's denial of your access to the pre-proposal conference. This information will be provided to the Base Security Forces who will authorize your entrance to the site.

2.4. Visitors must pick up their passes at the Installation's Main Entry Gate prior to arrival. You will be required to present the following information upon arrival: (1) Vehicle Registration, (2) Valid Driver's License, (3) Proof of Insurance for Vehicle, and/or (4) Safety Inspection and Car Rental agreement if applicable. Any of the above information furnished by you is protected under the Privacy Act and shall not be released unless permitted by law and /or you have consented to such.

2.5. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.

2.6. A record of the conference will be made and furnished to all prospective offerors via posting to SAM.gov. The record will include information provided in the meeting.

3. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS

3.1. Submit all questions via email to the contracting office at the address shown below, NOT LATER THAN 1:00 PM EST, 26 June 2026 Do NOT contact the A-E or Engineering personnel directly. Doing so will only delay the .

response to your question.

Email: 177fw.contracting.org@us.af.mil

Subject Line: RFP Question for W50S8F-26-R-A011

INQUIRIES SHALL BE SUBMITTED VIA EMAIL AND INCLUDE THE FOLLOWING INFORMATION:

Date of Proposal Inquiry:

From: ______________________________

Company Name: ___________________________

Phone Number: ____________________________

Email address: _____________________________

Proposal Inquiry: Be specific as to part of solicitation you are questioning.

3.2. Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, or proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach offerors before the submission of their offer.

3.3. All questions and requests for information (RFI) must be received NOT LATER THAN the fifth working day prior to closing and will be posted not later than two working days prior to closing. OFFERORS ARE STRONGLY ENCOURAGED TO SUBMIT QUESTIONS EARLY IN THIS PROCESS. The Contracting Officer reserves the right to address questions received after the fifth day prior to solicitation closing with those offers deemed compliant and/or in the competitive range after closing.

3.4. Any interpretations made will be in the form of an amendment of the solicitation, drawings, specifications, etc., and will be furnished to all prospective offerors via posting to www.sam.gov.

W50S8F26RA0110004

file://ftdd-fs-001v.area52.afnoapps.usaf.mil/OfficialFilePlans-Legacy/177%20FW%20MSG/MSG%20MSC/03-Gen_Corr(Temp)/FY25%20Requirements/25-C-A011%20Main%20Gate/ZZZ_Folder_Structure_Construction/Pre-Award/Solicitation/Solicitation%20docs/SAM.gov mailto:177fw.contracting.org@us.af.mil

3.4.1. Receipt by the offeror must be acknowledged in the space provided on the SF 1442 or by returning a signed copy of the amendment by the time set for receipt of proposals. Explanations or instructions given in a form other than an amendment to the solicitation shall not be binding. Questions (on a non-attribution basis) and answers shall be furnished to all prospective offerors via the web site.

3.4.2. For security reasons, all technical and engineering data related to this solicitation will be distributed using the www.sam.gov. SAM.gov is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies.

3.4.2.2. Interested offerors must be registered in the System for Award Management (SAM). To register go to: www.

sam.gov. You will need your DUNS number to register. Instructions for registering are on the web page. (Please note the registration for access to the secure site takes approximately 15 business days, so plan accordingly.)

4. AMENDMENTS PRIOR TO DATE SET FOR RECEIPT OF PROPOSALS

4.1. The right is reserved, as the interest of the Government may require, to revise or amend, the specifications or drawings or both prior to and/or after the date set for receipt of proposals as necessary. Such amendments, if any, will be announced by an amendment or amendments to this Request for Proposal. All information relating to this RFP, including pertinent changes/amendments and information prior to the date set for receipt of proposals will be posted at www.sam.gov.

4.2. Offerors are strongly cautioned to check this site frequently and to "refresh" their web page to ensure they have the lasted information.

5. ELECTRONIC PROPOSAL

5.1. Offerors shall submit their proposals electronically, as described below. The offeror's proposal shall not contain classified data. The use of hyperlinks in proposals is prohibited.

5.2. Offerors shall submit proposals in response to this solicitation electronically via email to 177fw.contracting.

org@us.af.mil, Subject Line: Proposal for RFP W50S8F-26-R-A011. NO OTHER TRANSMISSION METHODS

(FACSIMILE, REGULAR MAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED.

5.3. FILE DESCRIPTION: Include a "File Description" for each file you upload. Files shall be uploaded in PDF format.

5.4. RECEIPT OF SUBMISSIONS: For purposes of establishing whether a proposal submission is considered late, the Government considers the date/time stamp on the e-mail notification sent to the Contracting Office.

5.5. The Government will not be responsible for proposal submissions delivered to any location or by any method other that stated above. Offerors are responsible for submitting proposals in sufficient time to be received by the Government in accordance with the instructions provided.

6. WAGE DETERMINATION

6.1. The Construction Wage Rate Requirements, formerly known as Davis Bacon Wage Rates, are applicable to this project. Current prevailing wage determination(s) at time of issuance of solicitation are included in section 00 73

00. In the event the current prevailing Wage Determination is changed by the Department of Labor prior to the closing date of the solicitation, the most current wage determination is in effect. Should the wage rate change after closing, but prior to award, the updated Wage Determination will be incorporated by amendment and issued to all offerors that have not been eliminated from the competition. If applicable, these offerors/contractors will be given a reasonable opportunity to provide revised proposals solely to amend proposals due to Wage Determination changes. If the new determination for the primary site of the work does not change any wage rates, solicitation will be amended to include the number and date of the new determination prior to award.

6.2. Applicable wage rates can be found at www.SAM.gov.

7. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

This RFP does not commit the Government to pay costs incurred in preparation and submission of initial and subsequent proposals or for other costs incurred prior to award of a formal contract.

8. REMOVAL OF SECTIONS AT TIME OF AWARD

Sections 00 01 00, 00 21 00, 00 21 16, 00 22 16 and all exhibits will be physically removed as a result of an award, but will be deemed to be incorporated by reference in that award.

9. DISPOSITION OF UNSUCCESSFUL PROPOSALS

In compliance with RFO FAR 4.309 (a), the Government will retain one copy of all unsuccessful proposals.

10. INFORMATION REGARDING AVAILABILITY OF UTILITY SERVICES

Utilities (water, natural gas, electric, communications) are NOT available in the vicinity of the project area. It has been determined that all temporary utilities shall be the responsibility of the contractor (i.e. generator & water tanks).

Propane tanks are NOT allowed. The contractor will pay all charges (hookup fees, metering, monthly usage, etc.)

resulting from temporary utilities. The offerors shall take this into consideration when computing their offers.

11. BID BONDS

A Bid bond is required with submission of the proposal. The bid bond is due on the date as stated on the SF1442 Block 13. The bid bond must be on a SF24 form. Rejection of a bid bond shall be in accordance with RFO FAR 28.101- 4, Noncompliance with bid guarantee requirements.

12. EXCEPTIONS

If the offeror takes exception to any of the requirements specified in this solicitation, the offeror shall clearly identify each such exception and include a complete explanation of why the exception was taken and what benefit accrues to the Government. All exceptions to the solicitation requirements (Sections 00 21 00 through 01 00 00) and supporting rationale shall be included in an addendum to the proposal and clearly labeled "Exceptions". An addendum is only required if the offeror takes exception to any requirement in the solicitation. (The Addendum does not have a page limitation but shall only include information relevant to exceptions taken to the solicitation requirements.) The Government will assume an offeror takes no exceptions to any solicitation requirement if the offeror does not submit an Addendum identifying exceptions. Offerors are advised that solicitation requirements are not necessarily negotiable and such exceptions may render an offeror's proposal unacceptable and ineligible for award.

13. CLAUSES

13.1. Clauses and provisions from the Revolutionary FAR Overhaul (RFO) and/or Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.

13.2. Clauses and provisions in this document may not appear in consecutive order.

14. BRAND NAME REQUIREMENTS

This solicitation includes a Brand Name requirement for Advantor equipment specifically identified for this project.

Please reference Brand Name requirement for Access Control System (ACS). The 177FW ACS is currently provided by Advantor.

15. NG Agency Protest Program

NG Agency Protest Program is intended to encourage interested parties to seek resolution of their concerns with the National Guard (NG) as an Alternative Dispute Resolution forum, rather than filing a protest with the Government Accountability Office (GAO) or other external forum. Contract award or performance is suspended during the protest to the same extent, and within the same time periods as if filed at the GAO. The NG protest decision goal is to resolve protests within 35 calendar days from filing. An agency protest may be filed with either the Contracting Officer or the NG Agency's Protest Decision Authority, but not both, in accordance with NG protest procedures.

To be timely, the protests must be filed with the periods specified in RFO FAR 33.104. To file a protest under the NG Agency Protest Program, the protest must request resolution under that program and be sent to the address below:

National Guard Bureau

Office of the Director of Acquisitions/ Head of Contracting Activity

ATTN: NGB-AQ-O 111 S. George Mason Dr. Arlington, VA 22204

Email: ng.ncr.ngb-arng.mbx.ngb-task-order-ombudsman@mail.mil

All other agency-level protests should be sent to the Contracting Officer for resolution at the address in the solicitation.

See RFO FAR clause 52.233-2.

NG Public-facing, general Protest information is found at: https://www.nationalguard.mil/Leadership/Joint-Staff/Special- Staff/Director-of-Acquisitions/

W50S8F26RA0110004

mailto:ng.ncr.ngb-arng.mbx.ngb-task-order-ombudsman@mail.mil https://www.nationalguard.mil/Leadership/Joint-Staff/Special-Staff/Director-of-https://www.nationalguard.mil/Leadership/Joint-Staff/Special-Staff/Director-of-

*** END OF NARRATIVE ***

FAR Provisions Incorporated by Reference

Number Title Effective Date

Alternate Deviation

Variation Effective Date

52.204-7 System for Award Management- Registration. (Deviation 2026- O0038)

2026-02

52.214-34 Submission of Offers in the English Language.

1991-04

52.214-35 Submission of Offers in U.S.

Currency.

1991-04

52.215-1 Instructions to Offerors- Competitive Acquisition.

(Deviation 2026-O0038)

2026-02

52.222-5 Construction Wage Rate Requirements-Secondary Site of the Work. (Deviation 2026- O0038)

2026-02

52.233-2 Service of Protest. (Deviation 2026-O0038)

2026-02

DFARS Provisions Incorporated by Reference

Number Title Effective Date

Alternate Deviation

Variation Effective Date

252.204-7024 Notice on the Use of the Supplier Performance Risk System.

2023-03

252.215-7013 Supplies and Services Provided by Nontraditional Defense Contractors.

2023-01

FAR Provisions Incorporated by Full Text

Date

Alternate Deviation

Variation Effective Date

52.216-1 Type of Contract. (Deviation 2026-O0038)

2026-02

Type of Contract (Feb 2026) (Deviation 2026-O0038)

The Government contemplates award of a ontract resulting from this Firm Fixed-Price c solicitation.

(End of provision)

52.228-1 Bid Guarantee. 1996-09

Bid Guarantee (Sept 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds-

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3 million, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of clause)

52.252-1 Solicitation Provisions Incorporated by Reference.

1998-02

Solicitation Provisions Incorporated by Reference (Feb 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

www.acquisition.gov and www.acquisition.gov/far-overhaul

(End of provision)

52.252-3 Alterations in Solicitation. 1984-04

Alterations in Solicitation (Apr 1984)

Portions of this solicitation are altered as follows:

None ____ ____

(End of clause)

52.252-5 Authorized Deviations in Provisions.

2020-11

Authorized Deviations in Provisions (Nov 2020)

The use in this solicitation of any Federal Acquisition Regulation and RFO FAR (48 CFR (a) Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.

The use in this solicitation of any (b) RFO Defense Federal Acquisition Regulation Supplement (48 CFR Chapter ) provision with an authorized deviation is indicated by the addition (DFARS) 2 of "(DEVIATION)" after the name of the regulation.

Section 00 21 16 - Instructions to Proposers

SECTION 00 21 16 SUBMISSION REQUIREMENTS AND INSTRUCTIONS

1. PROPOSAL PREPARATION INSTRUCTIONS

1.1. These instructions prescribe the format of proposals and the approach for the development and presentation of the proposal data. They are designed to ensure the submission of necessary information to provide for the understanding and comprehensive evaluation of proposals. Carefully review this section prior to commencing proposal preparation. All solicitation amendments must be acknowledged in accordance with Section 00 10 00, RFO FAR Provision 52.215-1, Instruction to Offerors - Competitive Acquisition.

1.2. Offerors are cautioned to strictly comply with all instructions within this solicitation to ensure submission of a complete proposal. Failure to furnish a complete proposal at the time of proposal submission may result in the proposal being unacceptable to the Government and eliminated from consideration for award.

2. PROPOSAL CONTENT

2.1. Prospective offerors shall submit the following volumes as separate files:

2.1.1. Submit Volume 1, Price proposal, pro forma documents, in accordance with instructions contained herein.

Volume 2, Part 1 - Technical Capability Proposal.

Subfactor 1 - Experience and Capability (limit resumes to 1 pages each)

Subfactor 2 - Construction Schedule (schedule no page limit; narrative - no more than 2 pages)

Volume 2, Part 2 - Past/Present Performance Information

Subfactor 1 - Project Execution

Subfactor 2 - Management Effectiveness

Subfactor 3 - Client Satisfaction

Exhibit A - Performance Relevancy Questionnaire

2.2. PROPOSAL FORMAT

2.2.1. Purpose: The proposal shall include all the information requested in the specific instructions. Failure to include all information requested may adversely affect the evaluation.

2.2.2. A proposal that merely reiterates or promises to accomplish the requirements of the RFP will be considered unacceptable. A proposal that is orderly and sufficiently documented will be easy for the Government to understand and will enable the Government to perform a thorough and fair evaluation.

2.2.3. Offerors are cautioned to submit enough information to enable the evaluation committee to fully ascertain each offeror's capability to perform all the requirements contemplated by this solicitation. All commitments made in the proposal may become a part of the resultant contract. The data submitted with each proposal should be complete and concise, but not overly elaborate. Excessive reliance on promotional brochures is discouraged.

2.2.4. Proposals shall be prepared on standard 8.5 x 11 inch pages (charts may be landscaped but must be on 8.5 x 11 inch pages) and shall be in a legible font size (10 min.). All pages of each proposal shall be appropriately numbered and identified with the RFP number. For ease of reference, consecutive page numbering is required. Type size for graphics, charts, diagrams and tables shall be of an appropriate font and size for the application, and must be clearly readable without magnification assistance to the normal eye. Text lines will be no less than single-space.

Where page limits exist, a page is defined as one single side of a page. To the maximum extent practicable, proposal submission shall be double sided. Unless otherwise stated, tabs, indexes and dividers do not count in the page limit.

2.2.5. The cover of each volume will clearly identify the offeror's name, Project number, RFP number, RFP title and copy number, (e.g. copy 2 of 3). Binders for this proposal will not be accepted, see electronic copy below.

2.2.6. Indexing: Each volume will contain a "Table of Contents" for that volume. The "Table of Contents" will identify major areas, paragraphs and subparagraphs by number and title, as well as by page number and volume locations.

Tab indexing will be used to identify Sections as appropriate.

2.2.7. Electronic submission: Offerors shall submit their proposals electronically, as described below. The offeror's proposal shall not contain classified data. The use of hyperlinks in proposals is prohibited.

2.2.8. The offeror shall be held responsible for the validity of all information supplied in his/her proposal, including that provided by potential subcontractors. Should subsequent investigation disclose that the facts and conditions were not as stated, the proposal may be rejected.

Each offeror's proposal shall be submitted as set forth below and all 2.3. PROPOSAL VOLUME CONTENTS.

information shall be confined to the appropriate part to facilitate independent evaluation. Proposals, which do not include the requested minimum information, may be eliminated from further consideration for award.

2.3.1. VOLUME 1, PRICE/COST INFORMATION AND PRO FORMA DOCUMENTS

2.3.1.1. Offerors shall provide all price/cost information necessary to provide a meaningful basis for Government's analysis and evaluation of price/cost for the project set forth in Section 00 22 16 of this solicitation. The Government is not, and does not intend on, requesting certified cost or pricing data. Offerors may be required during the evaluation process to provided sufficient price/cost information that will enable the Government to perform a meaningful evaluation.

2.3.1.2. Provide an introductory page to include CAGE Code, Unique Entity Identification (UEI), Tax Identification Number (TIN), points of contact, authorized negotiators, contact phone, facsimile numbers and email addresses. Also, include your business socioeconomic status, e.g. small business, woman-owned small business, HUBZone small business, etc.

2.3.1.3. Offer and Section 00 10 00 - Complete in its entirety the "Offeror" portion of the Standard Form (SF) 1442. An official having the authority to contractually bind your company must sign the SF 1442 in accordance with RFO FAR

4.207. One copy of the SF 1442 is required to have an original signature.

2.3.1.4. Section 00 10 00 - Insert the price/cost associated with the project in the line items. All line items (CLINs) must be priced to be considered.

2.3.1.5. Representations and Certifications (Section 00 45 00): Ensure all fillable provisions from Section 00 45 00 are filled out in their entirety. If the offeror's representations and certifications within System for Award Management (SAM) are current, these provisions do not need to be submitted separately with the proposal. However, any provision that is not included in the current SAM representations and certifications SHALL be completed in its entirety and submitted with the proposal.

2.3.1.6. All potential offerors are required to register in the System for Award Management. See RFO FAR Provision 52.204-7, System for Award Management.

2.3.1.7. Joint Venture Requirements - Parties wishing to propose as a joint venture must submit, with the Pro Forma documents, an executed copy of the joint venture agreement. The joint venture agreement shall be executed in accordance with RFO FAR 4.207(d). Each joint venture partner shall submit evidence satisfactory to the Contracting Officer that its Board of Directors has approved its participation in the joint venture or by an instrument of similarly binding character in the case of an unincorporated entity. Offerors are reminded that to obtain an award the awardee, to include a joint venture, must be registered in the System for Award Management (SAM) database. Applicable to set-aside solicitations: Joint Ventures must meet applicable size standards (See RFO FAR Subpart 19.1). Submit with the proposal any size determination for the Joint Venture entity received from the Small Business Administration. A Joint Venture where-in one party is not a small business may be referred to the Small Business Administration (IAW RFO FAR 19.201-1(b)) to determine eligibility. All questions regarding Joint Ventures must be directed to the Small Business Administration (SBA) and not the Contracting Officer.

2.3.2. VOLUME 2, PART 1, OFFEROR TECHNICAL CAPABILITY PROPOSAL

2.3.2.1. Volume 2 Part 1 is comprised of two (2) subfactors: Subfactor 1, Experience & Capability Subfactor 2, Construction Schedule.

2.3.2.1.1. The Government acknowledges that the technical proposal will involve discussion of some of the same projects/contracts discussed in the Past Performance volume. While Past Performance examines how an offeror performed in the past to determine the probability of success on future projects, this subfactor examines the offeror's experience with complex multidiscipline project management and execution and how the offeror demonstrates an understanding of the contract's requirements taking this experience into consideration. The Government intends to use

Exhibit A Part 1 information in the evaluation of experience for Subfactor 1. A reiteration of the information provided in Exhibit A is neither required nor desired. Offeror should reference this information by providing a short summation of their relevant experience to meet the submission requirements of this subfactor.

2.3.2.2. Subfactor 1: Experience and Capability. The Experience and Capability Proposal is limited to 10 single pages, excluding tabs, indexes and resumes as noted below. Pages in excess of the limit will not be evaluated.

2.3.2.2.1 Demonstrate offerors technical experience and capability to perform a project of this magnitude and complexity. Discuss and provide experience of key construction personnel including, but not limited to, Estimator, - Project Manager, Site Superintendent(s), Quality Control Manager (on site) and Safety Manager (Reference minimum qualifications for Key Personnel in Section 01 00 00 Division 01 - Special Contract Requirements Subsection 35).

Discuss any previous projects that are similar to this project in terms of scope, size and complexity. If no experience so state and indicate in detail how you plan to overcome this lack of experience. The onus is solely on the offeror to indicate in detail how the offeror plans to overcome this lack of experience. (Resumes or experience cut sheets are limited to 1 pages each and are not part of the page count.) In the event the intended person is not part of the offeror's organization at the time the proposal is submitted then a completed Exhibit B, "Subcontractor/Team/Key Personnel Information and Consent Form" is also required or the information will not be considered. The Exhibit D Consent form or Letter of Intent is required for the Subcontractor to be considered.

2.3.2.3. The construction schedule and commissioning approach/timeline is Subfactor 2: Construction Schedule.

obtained for the purposes of evaluating an offeror's understanding of the requirements of the schedule and commissioning. The Schedule itself is not subject to page limits; however, any narrative accompanying the schedule submission is limited to 2 pages, excluding tabs and indexes.

2.3.2.3.1. Provide a Construction Schedule in a Gantt chart that shows the complete project schedule from Notice to Proceed date of _1 October 2026_ (estimated) to include all construction activities as well as concurrent activities and outline the critical path activities that will show successful execution of the construction project within the period of performance requirements. Also include a narrative discussing the scheduling processes and resource allocation that ensure completion and control of schedule progress from beginning to the end of the project.

2.3.3. VOLUME 2, PART 2 OFFEROR PAST/PRESENT PERFORMANCE INFORMATION

2.3.3.1. Volume 2 Part 2 is obtained for the purpose of evaluating Past/Present Performance. Past/Present Performance includes current/on-going performance that is complete to 70% or greater. Volume 2 includes the offeror's Performance Relevancy Questionnaire, Exhibit A Parts 1 and 2; and any discussion and or additional information, awards, letters, etc. concerning past/present performance the offeror includes. Offerors are cautioned to complete all the questions on the Exhibit A Parts 1 and Part 2. Detailed instructions are included in Exhibit A.

2.3.3.2. Offerors shall use the Reference Package, Exhibit C, to obtain references from past and present clients.

2.3.3.3. Past/Present Performance, which includes current on-going (present) performance that is complete to 70% or greater will be evaluated using the evaluation criteria set forth in Section 00 22 16 of the solicitation. If the offeror represents the combining of two or more companies, joint venture or formal teaming agreement, for the purpose of this RFP, each company shall complete Exhibit As and obtain Exhibit C references. The Government may contact these references and may consider this information as well as information obtained from any other sources when evaluating the offeror's past/present performance.

2.3.3.4. Offerors shall discuss their performance using the Performance Relevancy Questionnaire format, Exhibit A, Part 1. Prepare not more than (3-5) of these documents. Contractors should select their projects carefully because the quality of the contractor's relevant performance is more important than the quantity of projects submitted.

2.3.3.5. Use the Exhibit A format to provide information that demonstrates a history of performance on contracts that are similar in scope, complexity, and cost magnitude to this project's plans and specifications. Explain what aspects of the contract you find relevant to the proposed effort and identify how each contract ranks, in terms of relevancy, with respect to the other contracts addressed in proposal.

2.3.3.6. Offerors should consider the currency and relevancy of the past/present performance information to be considered, the performance must have been completed during the past five (5) years. The period begins five (5) years prior to the solicitation release date and includes current performance. Performance that is more current may have greater impact than older performance.

2.3.3.7. In determining relevancy to the solicitation requirement, offerors should consider the similarity of construction methods employed, size, scope, cost magnitude, location, client type (e.g. federal government) and complexity of work performed to those required for the proposed effort. Location should also be considered.

2.3.3.8. Offerors are encouraged to include with their proposal information any problems encountered on the identified contracts and the offeror's corrective actions.

2.3.3.9. Offerors lacking relevant present/past performance experience may submit information regarding predecessor companies, key personnel who have relevant experience or subcontractors that will perform major or critical aspects of the requirement if such information is relevant to this acquisition. Such information shall, as a minimum, include:

Name(s) of Predecessor Company/Subcontractor and/or Key Personnel

Complete Address

Telephone and email address

Brief synopsis of the experience- A resume may be submitted for "Key Personnel"

Describe relevancy to this project

2.3.3.10 Provide three (3) references, for each Predecessor Company, Subcontractor or Key Personnel. Clearly identify the contractor/individual for whom the reference information concerns.

2.3.3.11. Past Performance References - REQUIRED - A "Final" Performance Evaluation (Construction) (also referred to as CPARS Evaluation) issued for a project may be included in lieu of sending out reference package for the project. OR Offerors shall prepare and submit to prior client(s) of all the projects listed on your Exhibit A submission a Reference Package (Exhibit C) (Detailed instructions are included in Exhibit C Package). This includes correspondence explaining the requirement to obtain an independent evaluation of prior contract performance, and the Past Performance Questionnaire for use in evaluating Past Performance. Inform references that completed Performance Questionnaire should be returned to the Contracting Officer via email at: 177fw.contracting.org@us.af.mil to arrive not later than the closing date for receipt of proposals. Include "W50S8F-26-R-A011- F16 Mission Training

W50S8F26RA0110004

mailto:177fw.contracting.org@us.af.mil in the subject line. Offeror must not review the Past Performance Questionnaire prior to submission. They are Center" to be submitted by the client/evaluator directly to the Contracting Officer. Offerors should follow-up and encourage references to get the questionnaires to the Contracting Officer in a timely manner.

2.3.3.12. In assessing past performance, the Government may also consider the past/present performance of the offeror's key personnel, Estimator, Project Manager, Manager and Site Superintendent, as it relates to previous projects. In the event the intended key personnel for this solicitation's project do not have demonstrated past performance in the project(s) submitted in Exhibit A, the Government reserves to obtain reference information additional information is required.

2.3.3.12.1. Each key person without prior past performance history demonstrated on the submitted Exhibit A shall provide a summary of experience or a resume. In the event the intended person is not part of the offeror's organization at the time the proposal is submitted then a completed Exhibit B, "Subcontractor/Team/Key Personnel Information and Consent Form (Exhibit D)" or Letter of Intent, is also required or the information will not be considered. The Government may seek additional references and reserves the right to use the information provided to obtain additional references.

2.3.3.13. Offerors are advised that the Government may use all data provided by the offeror in this volume and data obtained from any other sources, to include, but not limited to, data independently obtained from other Government or commercial sources; from any other sources available to the Government, to include, but not limited to, the Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases; interviews with Program/Project Managers, Contracting Officers or rely upon personal business experience with the offeror. The Government reserves the rights to obtain and evaluate past performance information from any source it deems appropriate. While the Government may elect to consider data obtained from other sources, the burden of providing current accurate and complete past/present performance information rests with the offeror.

*** END OF NARRATIVE ***

Section 00 22 00 - Supplementary Instructions

Number Title Effective Date

Alternate Deviation

Variation Effective Date

52.217-4 Evaluation of Options Exercised at Time of Contract Award.

(Deviation 2026-O0038)

2026-02

52.217-5 Evaluation of Options. (Deviation 2026-O0038)

Section 00 22 16 - Supplementary Instructions to Proposers

SECTION 00 22 16 PROPOSAL EVALUATION AND BASIS FOR AWARD

1. GENERAL INFORMATION

1.1. This solicitation is for a Firm Fixed Price Contract. The Government intends to award a single contract to a qualified Small Business Offeror deemed responsible in accordance with the Revolutionary FAR Overhaul (RFO), whose proposal conforms to all the RFP's requirements and is judged to represent the Best Value to the Government in accordance with the evaluation scheme set out in this solicitation. The award will be made based on the best overall (i.e. best value) proposal that is determined to be the most be the most beneficial to the Government, with appropriate consideration given to the three (3) evaluation factors: Technical, Price, and Past Performance. To arrive at a Best Value decision, the Source Selection Authority will integrate the evaluation of Past/Present Performance, Technical and Price as set out in the solicitation. In terms of the relative importance of the factors, the Technical factor is approximately equal to the Present/ Past Performance and when combined, the non-price factors are approximately equal to the Price Factor. The firm that represents the best value to the Government will be selected for award in accordance with RFO FAR 15.103-1, Tradeoff Approach.

1.2. To arrive at a Best Value decision this acquisition will utilize the RFO FAR Part 15.103-1 tradeoff process unless the lowest priced offeror (with a price deemed reasonable and realistic) is also deemed to be the highest rated in terms of non-price evaluation criteria. If the lowest priced offeror is also the highest rated in terms of non-price Factors, no tradeoff is necessary. Further, there is no tradeoff necessary between any offer that is lower priced and higher rated in terms of non-Price Factors with respect to any other offers that are higher priced and lower rated for the non- Price Factors.