Solicitation Amendment W50S8F26RA0110002 SF 30.pdf

PDF 4 MB Posted

Attached to
Construction of F16 Mission Training Center
Solicitation number
W50S8F-26-R-A011
Issued by

About this file

This is Amendment 0002 to a solicitation for an F-16 Mission Training Center construction project (Project No. AQRC189015) issued by the Department of the Air Force at Kadena Air Base, Japan. The amendment is effective July 10, 2026, and was issued by the Wright-Patterson Air Force Base contracting office, with administration by the same entity.

The amendment incorporates five addenda to the Architect & Engineer specifications and drawings, provides final answers to all previously submitted Requests for Information with a notation that no additional RFIs will be considered, and extends the Government acceptance period from 90 to 120 calendar days per Item 13d of SF1442. The amendment also includes a fee schedule for Project Management Software. Contractors must submit a signed copy of this amendment with their proposal package. The document modifies DFARS clause 252.236-7001 regarding contract drawings and specifications, establishing an index of all drawings and addenda dated between May 2025 and July 2026. Line items 0002 through 0009 are identified as option line items subject to FAR provisions 52.217-5 and 52.217-7. Acknowledgment of receipt of this amendment is required prior to proposal submission, and the hour and date for offer receipt is not extended by this amendment. Insurance requirements under RFO FAR clause 52.228-5 apply, with certification of required coverage to be furnished prior to work commencement.

View the file

Other files

File Type Posted
Solicitation Amendment (SF1442) - W50S8F26RA0110004.pdf PDF
Solicitation Amendment W50S8F26RA0110004 SF 30.pdf PDF
Solicitation Amendment W50S8F26RA0110003 SF 30.pdf PDF
NJ ANG F-16 MTC Flight Sim - AQRC 189015 Addm No 5 - Narrative.pdf PDF
F16 MTC Pre-Proposal RFI Log as of 10 July 2026.pdf PDF
NJ ANG F-16 MTC Flight Sim - AQRC 189015 Addm No 5 - Drawing.pdf PDF
NJ ANG F-16 MTC Flight Sim - AQRC 189015 Addm No 5 - Spec Sect 01_45_00 - Attmts.pdf PDF
2025 Projectmates ANG.pdf PDF
Solicitation Amendment W50S8F26RA0110001 SF 30-Proposal due date extension to 17 July 2026.pdf PDF
F16 MTC Pre-Proposal RFI Log as of 24 June 2026.pdf PDF
Pre-Proposal - Site Visit Sign_In.pdf PDF
MTC Pre-Proposal Conf Presentation.pdf PDF
SAM RFI update - F16 MTC 23 June 26.pdf PDF
Exhibit A MTC.docx DOCX document
012.1 - AQRD 189015 - NJ ANG F-16 MTC - Specifications Vol. 1 - Type B-3.pdf PDF
Addendum No. 1 - Boring log info for Storm water 013.3.pdf PDF
Addendum No. 2 - Security Items Clarification 013.4.pdf PDF
Addendum No. 4-Excess Haul Route - Drawings.pdf PDF
012.2 - AQRD 189015 - NJ ANG F-16 MTC - Specifications Vol. 2 - Type B-3.pdf PDF
013.1 - AQRD 189015 - NJ ANG F-16 MTC - Drawings - Type B-3.pdf PDF
Addendum No.3 - Updated Specs and Drawings 0136.pdf PDF
013.5 - Geotechnical Engineering Report.pdf PDF
EXHIBIT C Reference Questionnaire Package - MTC.docx DOCX document
Solicitation - W50S8F26RA011-Construction of F-16 MTC.pdf PDF
Addendum No. 4 - AQRC 189015 Addm No 4 - Narrative.pdf PDF
EXHIBIT B MTC.docx DOCX document
Exhibit D_Letter of Commitment MTC.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

A. This amendment is issued to Block 14 (Description of Amendment/Modification):

incorporate the following into the Solicitation.

1) Addendum #5 to the Architect & Engineer (AE) Specifications and Drawings.

2) Final Answers to all Request for Information (RFI)s received. No other RFIs will be considered.

3) Item 13d of SF1442 is changed to 120 calendar days for Government acceptance.

4) Fee schedule for the Project Management Software.

B. Contractors shall submit a signed copy of this amendment with the proposal package.

c. No other updates at this time.

Section 00 00 00 - Procurement and Contracting Requirements

The following changes have been made:

INFORMATION FROM TO

Accept Within Days

90 120

Section 00 01 10 - Table of Contents

Miscellaneous text in this section has been modified to:

SOLICITATION, OFFER, AND AWARD SF 1442 and SF 1442 BACK

SECTION 00 01 10 - TABLE OF CONTENT AND NOTES

SECTION 00 21 00 - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

SECTION 00 21 16 - SUBMISSION REQUIREMENTS AND INSTRUCTIONS

SECTION 00 22 16 - PROPOSAL EVALUATIONS AND BASIS FOR AWARD

SECTION 00 45 00 - REPRESENTATIONS & CERTIFICATIONS

W50S8F26RA0110002

SECTION 00 70 00 - CONTRACT CLAUSES

SECTION 00 73 00 - WAGE DETERMINATION(S)

SECTION 01 00 00 - SPECIAL CONTRACT REQUIREMENTS

ATTACHMENT 1 - PLANS, SPECIFICATIONS (Project No. AQRC189015_Dated: May 15, 2025) AND ADDENDUMS No. 1 through 5

EXHIBIT A - Performance Relevancy Questionnaire

EXHIBIT B - Subcontractor Information and Consent Form

EXHIBIT C - Reference Questionnaire package

EXHIBIT D - Letter of Commitment

1. Instructions for the preparation of proposals are in Sections 00 21 00, 00 21 16 and 00 22 16.

2. Offeror's attention is invited to the insurance requirement contained in this solicitation Clause 52.228-5 Insurance - Work on a Government Revolutionary FAR Overhaul (RFO)

Installation). Certification of the required coverage for the prime contractor shall be furnished prior to beginning work on this contract, and the Contracting Officer may request evidence of the required insurance at any time during the life the contract.

3. Reference , Contract Prices - Bidding RFO DFARS CD 226-O0019 for provision 252.236-7008 Schedules. The term "Bidding Schedule" shall also be construed to mean "Offer Schedule" or "Schedule". The terms "bid" and "offer", and "bidder" and "offeror" shall be construed as having the same meaning in this solicitation and resulting contract.

4. Line items 0002 through 0009 are Option Line Items. See RFO FAR provision 52.217-5 Evaluation of Options, and RFO FAR clause 52.217-7 Option for Increased Quantity-Separately Priced Line Item.

Section 00 72 00 - General Conditions

The following clauses were modified:

252.236-7001 Contract Drawings and Specifications. Aug 2000 hereby reads as follows:

CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall-

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Title File Drawing No.

F-16 Mission Training Center Drawings Dated 15 May

AQRC 189015 2022-130-00

F-16 Mission Training Center Specifications Vol I & 2 Dated 15 May 2025

AQRC 189015 ____

Addendum No. 1-Boring log info for Storm water

Dated May 22, B-100 and B-104 Dated May 22, 2025

Addendum No. 2- Security Items Clarification

Spec 01 14 00, 05 50 13 & 22 00 00- Dated July 22, G-002, CU101, CU102, CU202, AE101, AE104, AE207, AE208, AE504, F001, FA101, FA601, FA701, P701, EY101, ET101

Addendum No. 3 - Updated Specs and Drawings

00 22 13.0020 and 32 92 19 dated November 5, 2025

G-001, CS101, CS102, CU101,

CU102, C504, SB502, AE101,

AE102, AE501, IF101, FX401,

EL101, EP101, EP102, EP600,

EP700, EP703, EY101 Dated November 5, 2025

Addendum No. 4 - Excess Soil Haul Route

May 27, 2026 GC 100, C-001

Addendum No. 5- Project Location & Vicinity Map, Schedule of Fire Protection System, and QC Specialist Experience Matrix

July 10, 2026 GC 100

(End of clause)

IDCode: J
Page: 1
Pages: 6
AmendNo: 0002
EffDate: 10 JUL 2026
ReqNo:
ProjNo: AQRC189015
IssCode: W50S8F
AdmCode:
IssuedBy: W7NP USPFO ACTIVITY NJANG 177

KO FOR NJANG DO NOT DELETE, 400 LANGLEY RD

EGG HARBOR TOWNSHIP, NJ 08234-9500

UNITED STATES

JOSE MALDONADO, EMAIL: JOSE.MALDONADO.28@US.AF.MIL TELEPHONE: 609 761-6096

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W50S8F26RA011
SolDate: 29 MAY 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: See Schedule
ContNameTitle:
CoNameTitle: JOHANNA PAZ
ContDate:
CODate: 10 JUL 2026

File details come from the government source that posted it. Updated .