Pre-Proposal Conference for F16 Mission Training Center Construction Contract
This document is a pre-proposal conference presentation for a firm fixed-price construction contract for the F16 Mission Training Center at the 177th Fighter Wing in Egg Harbor Township, New Jersey (Solicitation W50S8F-26-R-A011). The base contract requires all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary for construction of the F16 Mission Training Center. Eight optional line items (OLI) are available, including 33 new parking spaces, 77 additional south parking spaces, masonry veneer, entry monolith, mechanical yard masonry wall, concrete surface mechanical yard, signage, and concrete support simulator. The solicitation was posted to SAM.gov on May 29, 2026, and is set aside 100% for small businesses under NAICS code 236220, with a $45,000,000 size standard. The construction magnitude exceeds $10,000,000, requiring payment and performance bonds. The performance period is 425 calendar days after Notice to Proceed, including punch lists, cleanup, and closeout documents, with liquidated damages provisions in effect. Offers are due July 7, 2026, at 1:00 p.m. local time via email to 177fw.contracting.org@us.af.mil, with late offers not accepted.
Award will be made on a best value basis using source selection procedures, evaluated on technical capability, past/present performance, and price. Offerors must submit two volumes: Volume 1 containing the price proposal, and Volume 2 with technical capability proposal (Part 1) and past/present performance information (Part 2). Required exhibits include a Performance Relevancy Questionnaire (maximum three projects), Subcontractor Information and Consent Form, Reference Questionnaire packages, and Letters of Commitment for key personnel. The current wage determination is General Decision Number NJ20260025 (effective 05/18/2026). Contractors must provide their own site office trailers, storage, sanitary facilities, and utilities (generators and water tanks); propane tanks are prohibited. Key positions—Project Manager, Quality Control, Safety Officer, and Superintendent—cannot be subcontracted below the prime contractor, with the Site Superintendent required on-site at all times. Contractors must conduct daily Foreign Object Debris sweeps, attend bi-weekly progress meetings, and use designated Construction Program Management Software for all document submissions and communications. All solicitation documents are available on SAM.gov, and questions must be submitted no later than five days before closing, with answers posted to SAM.gov requiring receipt acknowledgement.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRE‐Proposal Conference
Project Title: F16 Mission Training Center
Solicitation: W50S8F‐26‐R‐A011
June 10, 2026 177 Fighter Wing, NJANG Egg Harbor Township, NJ
Introductions Contracting o Ms. Johanna Paz Base Contracting Officer o Jose Maldonado Contracting Officer o MSgt Tammy Hickerson, Contract Specialist o Major Chris Hower Chief of Contracting, USPFO
Civil Engineering o Lt Col Ricardo Basora
Base Civil Engineer o Major Natalia Rojas Deputy Base Civil Engineer
• Contracting Officer
Representative (COR) o Ms. Savina McGarrity Project Engineer
Other Base Representation o Security o Safety o Environmental
This meeting is strictly informational.
It is the responsibility of the contractor to review and respond to all the information in the solicitation prior to submitting a proposal
Project Description Firm fixed-price contract for the construction of the F16 Mission Training Center at the 177th Fighter Wing in Egg Harbor Township, N.J.
o Base Contract Line Item
• Services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary for the Construction of of F16 Mission Training Center o 8 Option Line Items (OLI):
• OLI 1 – 33 New Parking Spaces
• OLI 2 – South Parking 77 New Spaces
• OLI 3 – Masonry Veneer
• OLI 4 – Entry Monolith
• OLI 5 – Mechanical Yard Masonry Wall
• OLI 6 – Concrete Surface Mechanical Yard
• OLI 7 – Add Sign
• OLI 8 – Add Concrete Support Simulator
Ref: Section 00 10 00 of Solicitation
Solicitation Information Solicitation was posted to www.SAM.gov on 29 May
This project is set aside 100% for small businesses
The North American Industry Classification System (NAICS) code is 236220, with a small business size standard of $45,000,000
The magnitude of construction is over $10,000,000
Offer guarantee is required
Payment, & Performance Bonds will be required
Performance Period: 425 CALENDAR DAYS after Notice to Proceed (NTP) o (Includes Punch Lists, Cleanup, and Closeout Documents)
There are Liquidated Damages associated with this project
Wage Determination Currently, General Decision Number: NJ20260025 05/18/2026, Modification number 1
05/18/2026 is in effect o State: New Jersey o Construction Type: Building o County: Atlantic County in New Jersey
Updates to the DOL Wage Determination will be posted to www.SAM.gov as a formal Solicitation Amendment on a SF30 and must be acknowledged by the Offeror on their SF1442
No Solicitation Amendment has been issued to date
• All solicitation document are posted in www.SAM.gov
• Offerors shall interpret the solicitation (SF1442) and all attachments; including the drawings, specifications, SOW, and Solicitation Q&A Log; to give meaning to ALL its parts o In the event of a discrepancy, generally the more stringent shall apply o All deficiencies shall be brought to the attention of the Contracting Officer prior to submitting the proposal.
• Offerors are solely responsible for reviewing and adhering to ALL solicitation requirements & amendments posted to www.SAM.gov
• Offerors shall monitor www.SAM.gov for Solicitation Amendments and Government responses to Offer Questions/Clarifications
• The contract will be awarded using Source Selection tradeoff procedures to arrive at a Best Value decision
• The evaluation factors are o Technical o Past/Present Performance o Price
• Submission requirements and instructions are detailed in RFP section 00 21 16 o Two volumes are required
Volume 1 – Price proposal Volume 2
Part 1 - Technical Capability Proposal Part 2 - Past/Present Performance Information
• Proposal evaluations and basis for award are detailed in RFP section 00 22 16
• EXHIBIT A - Performance Relevancy Questionnaire o Prepare not more than three (3)
• EXHIBIT B -Subcontractor Information and Consent Form
• EXHIBIT C - Reference Questionnaire package o For projects listed in exhibit A
• EXHIBIT D - Letter of Commitment o For key subcontractor and/or key personnel
• The Government Intends To Award Without
Negotiations
• There May Not Be A Chance For Discussions, Corrections, Or Revised
Proposals
• Offerors are cautioned to strictly comply with all instructions and procedures for a successful submission
• Failure to furnish a complete proposal may result in the proposal being unacceptable
• Offerors MUST be registered in System for Award Management (SAM) at the time of Offer Closing Date o This is offerors responsibility (ref: FAR 52.204-7(b)(1))
Contactor Site Facilities
• Contractor Site Facilities o Site Office Trailer / Storage
• Government facilities are NOT available for administrative use, break areas or secure storage
• Contractor shall provide such facilities as deemed required for completion of the project o Contractor shall provide & maintain their own sanitary facilities (port-a-john toilets, wash stations) for the duration of the project o Utilities
• Water, natural gas, electric, communication, etc. are NOT available
• Contractor shall provide for his own utilities, i.e. generator & water tanks
• Propane tanks are NOT allowed
• Filling of non-potable water tanks on base hydrant near the project site may be available
Foreign Object Debris (FOD)
• Contractor will be required to conduct a daily FOD sweep of worksite at the end of every workday
• FOD: Any article or substance, alien to an aircraft or system, which could potentially cause damage o Rocks o Broken pavement o Garbage o Tools, bolts, metal shavings, wire, etc
Key Project Personnel
• Project Management & Site Superintendent o The contractor shall be required to provide a dedicated Site Superintendent through completion of the project o The Site Superintendent MUST be on site at all times during active construction activities.
• Key Positions SHALL NOT be subcontracted below the Prime Contractor
• The following are considered key positions o Project Manager o Quality Control o Safety Officer o Superintendent
RFP Questions
• Submit all questions via email to the contracting office at the following address
• Email: 177fw.contracting.org@us.af.mil
• Subject Line: RFP Question for W50S8F-26-R-A011
• Do NOT contact the A-E or Engineering personnel
• All questions and requests for information (RFI) must be received NOT LATER THAN 5 days prior to closing o Submit questions early in this process
• Answers will be posted to www.SAM.gov.
o Final Q&A posted will require receipt acknowledgement.
• Contractors will not receive personalized responses to questions
Offer Submission
• Due – 7 July 2026 @ 1:00pm local time o Changes to the Offer Due Date & Time will ONLY be made by a formal Solicitation Amendment on an SF30 and posted to www.SAM.gov o Official Offer Due Date & Time is located on the SF1442, Block 13
• Offerors shall submit their proposals electronically via email o Offer Submission Procedures are outlined in solicitation, section 00 21 00 paragraph 5 o Submit proposals via email to 177fw.contracting.org@us.af.mil, Subject Line: Proposal for RFP W50S8F- 26-R-A011 o NO OTHER TRANSMISSION METHODS (REGULARMAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED
• Offerors are responsible for ensuring that their Offers are received by the Due Date & Time
Late Offers will NOT be Accepted
Project Administration
• The Contractor shall be required to attend bi-weekly
Progress Meetings
• This project will be administered using a designated Construction Program Management Software
Program will be mandatory for submission of ALL documents & communication
The Contractor will be responsible for the project set-up and fees with Program
Reference solicitation section 01 00 00 paragraph 5.3
Site Visit to Follow
Presentation will be posted to www.SAM.gov