This file is a Performance Relevancy Questionnaire template (Exhibit A) for the F-16 Mission Training Center construction project solicitation W50S8F-26-R-A011, issued by the Department of the Army National Guard. Contractors responding to this 100% small business set-aside solicitation must submit up to three (3) completed questionnaires documenting relevant past performance on projects completed within the past five years and at least 70% complete at the time of submission. Each questionnaire requires detailed information including offeror name, project/contract title, contract number, original and final contract values, completion dates, contract modifications, specific work performed, subcontractor involvement, sustainability/LEED requirements, key personnel assignments, and relevance assessment to the proposed F-16 MTC facility construction at the 177th Fighter Wing in Egg Harbor Township, New Jersey.

Part 2 of the questionnaire requires one-time submission of company-wide information addressing small business utilization compliance under FAR 52.219-8, problems and corrective actions on relevant projects, liquidated damages assessments within the past five years, project terminations with explanations, and proof of Experience Modification Rate (EMR) for safety compliance. Contractors must also provide government reference contact information including phone, facsimile, and email for each project cited, with separate Exhibit C reference packages to be submitted directly to those references. The solicitation covers construction services valued over $10,000,000 under NAICS code 236220 with a small business size standard of $45,000,000.

View the file

Other files

File Type Posted
Solicitation Amendment W50S8F26RA0110004 SF 30.pdf PDF
Solicitation Amendment (SF1442) - W50S8F26RA0110004.pdf PDF
Solicitation Amendment W50S8F26RA0110003 SF 30.pdf PDF
2025 Projectmates ANG.pdf PDF
Solicitation Amendment W50S8F26RA0110002 SF 30.pdf PDF
F16 MTC Pre-Proposal RFI Log as of 10 July 2026.pdf PDF
NJ ANG F-16 MTC Flight Sim - AQRC 189015 Addm No 5 - Drawing.pdf PDF
NJ ANG F-16 MTC Flight Sim - AQRC 189015 Addm No 5 - Spec Sect 01_45_00 - Attmts.pdf PDF
NJ ANG F-16 MTC Flight Sim - AQRC 189015 Addm No 5 - Narrative.pdf PDF
Solicitation Amendment W50S8F26RA0110001 SF 30-Proposal due date extension to 17 July 2026.pdf PDF
F16 MTC Pre-Proposal RFI Log as of 24 June 2026.pdf PDF
SAM RFI update - F16 MTC 23 June 26.pdf PDF
Pre-Proposal - Site Visit Sign_In.pdf PDF
MTC Pre-Proposal Conf Presentation.pdf PDF
Solicitation - W50S8F26RA011-Construction of F-16 MTC.pdf PDF
Addendum No. 4 - AQRC 189015 Addm No 4 - Narrative.pdf PDF
EXHIBIT B MTC.docx DOCX document
Exhibit D_Letter of Commitment MTC.docx DOCX document
012.2 - AQRD 189015 - NJ ANG F-16 MTC - Specifications Vol. 2 - Type B-3.pdf PDF
013.1 - AQRD 189015 - NJ ANG F-16 MTC - Drawings - Type B-3.pdf PDF
Addendum No.3 - Updated Specs and Drawings 0136.pdf PDF
013.5 - Geotechnical Engineering Report.pdf PDF
EXHIBIT C Reference Questionnaire Package - MTC.docx DOCX document
012.1 - AQRD 189015 - NJ ANG F-16 MTC - Specifications Vol. 1 - Type B-3.pdf PDF
Addendum No. 1 - Boring log info for Storm water 013.3.pdf PDF
Addendum No. 2 - Security Items Clarification 013.4.pdf PDF
Addendum No. 4-Excess Haul Route - Drawings.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT A PERFORMANCE RELEVANCY QUESTIONNAIRE

PART 1: Prepare questionnaires in the format provided.

Provide the following information requested in this format for each of the projects/contracts being described. Prepare not more than three (3) of these documents. Contractors should select their projects carefully because the quality of the contractor's relevant performance is more important than the quantity of projects submitted. Projects may be on going, if complete to 70 %, and cannot have been completed any earlier than 5 years prior to the solicitation issue date. Provide frank, concise comments regarding your performance on the contracts you identify. Use as much space as required.

A. Offeror (Your) Name (Company/Division):

B. Project/Contract Title:

C. Contract Specifics:

1. Description of Effort as Prime or Subcontractor

2. Contract Number ____________________

3. Original Contract $ Value Current/Final Contract$ Value

4. If amounts in 3 above are different, provide a brief description of the reason:

5. Completion Date

a) Original Date:

b) Current Schedule:

c) Estimated/Final Completion Date:

d) Primary cause for Contract Modifications:

D. Provide detailed description of the work performed under the contract including but not limited to your past performance. Note that your description will be evaluated for similarity of the construction methods, particularly to this project scope; cost magnitude, and complexity of work performed to those required for the proposed effort. The Government may also consider similarity of the client type (i.e. federal government) and/or the project sustainability requirements. ANG projects will consider United States Green Building Council (USGBC) LEED®. The location at which work was performed to the location(s) at which work will be performed may also be considered.

1. Describe the specific elements of the work performed by your firm.

2. Indicate what elements of work were performed by your major subcontractors and if those same subcontractors will be used on this project. If you intend to use these subcontractors, please list name and principal areas of work they will perform. Indicate if you do not intend on utilizing any of these subcontractors.

3. Address any technical areas about this project you consider uniquely relevant to this project. Include in your discussion if project had sustainability requirements. Of particular interest are USGBC LEED® and the level of recognition received. Indicate if no such requirements.

4. If you intend to use any of the same key personnel on this solicitation 's project, indicate by name and position those personnel proposed to be utilized on the referenced contract. (Project Manager, Site Superintendent, Quality Control Manager). Indicate what position they will have on this solicitation 's contract. Indicate if you do not intend on utilizing any of these same personnel.

5. Describe why you believe the work is very relevant, relevant or semi-relevant to this solicited project. (see section 00120 for information.) (Use as much space as necessary) F16 Mission Training Center W50S8F-26-R-A011

E. List a point of Contact for Owner/Government agency Contracting Officer and/or inspector; include a current phone number and facsimile number. Email address is also desired. (This information is required here even though you will be sending Exhibit C letters and questionnaires to these references. (Do NOT include a copy of the Exhibit Cs you sent to your references.)

End of Part 1 -Questionnaire Requirements - Prepare and send Exhibit C Package to the reference(s) for each of projects discussed in the Exhibit As.

PART 2: Provide the following information one time.

Additional offeror information required but not project specific. This information need only be provided once in your submission package.

2 A. Applicable to all offerors - Describe your compliance with the requirements of FAR clause 52.219-8 Utilization of Small Business Concerns. Even if you are a Small or Small Disadvantaged Business, this clause in Federal Contracts applies. It is the policy of the United States that small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns shall have the maximum practicable opportunity to participate in performing contracts let by any Federal agency, including contracts and subcontracts for subsystems, assemblies, components, and related services for major systems. It is also policy to establish procedures to ensure the timely payment of amounts due pursuant to the terms of their subcontracts. Describe below the methods you have used to comply with this policy on prior federal contracts. Include any evidence, or a point of contact to verify this information, if available.

2B: Offerors are strongly encouraged to include with their proposals information on problems encountered on relevant projects and the specific corrective actions taken to remedy the problem(s).

2C: List any projects within the last five (5) years that have been assessed Liquidated damages. If none have been assessed, make a positive statement to that effect.

2D: List any projects within the last five (5) years that have been terminated, for any reason. Provide an explanation. If none, make a positive statement to that effect.

2E. Compliance with Safety Standards. Provide proof of your Experience Modification Rate (EMR).

End of Questionnaire Requirements