RFI 36-44.pdf
PDF 126 KB Posted
- Attached to
- Repair and Add to Maintenance Complex - Hangar B Project Federal contract opportunity
- Solicitation number
- W50S8E22B0001
About this file
This document contains a request for information and related federal contract opportunity for repair and addition work on a maintenance hangar complex. The Army National Guard of New York intends to issue an invitation for bid to award a single firm fixed-price contract for renovation and addition work on an existing aircraft hangar at Westhampton Beach, with an optional bid for new communications wiring. The contract duration is 365 days after notice to proceed and is set aside 100% for small businesses with a NAICS code of 236220 and size standard of $39.5 million. The magnitude of construction is over $10 million. The tentative solicitation date is October 25, 2021 with a pre-bid conference on November 10, 2021 and bid opening on November 23, 2021. Interested offerors must register in the System for Award Management.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract of Offers Page 3.pdf | ||
| Abstract of Offers Page 2.pdf | ||
| Abstract of Offers Page 1.pdf | ||
| Attendance Sheet.pdf | ||
| 10 22 19.pdf | ||
| RFI 50.pdf | ||
| Attachment A Modified - Specifications Addendum.pdf | ||
| W50S8E22B0001 0003.pdf | ||
| RFI 48-49.pdf | ||
| WS0S8E22B0001 - Blank Vetting Form.xlsx | XLSX spreadsheet | |
| RFI 45-47.pdf | ||
| RFI 32-35.pdf | ||
| W50S8E22B0001 0002.pdf | ||
| 10 51 13 - Metal Lockers.pdf | ||
| RFI 17-31.pdf | ||
| W50S8E22B0001 0001.pdf | ||
| RFI 1-16.pdf | ||
| Attendance Sheet Page 1.pdf | ||
| Attendance Sheet Page 2.pdf | ||
| PREBID Conference Slides.pdf | ||
| PreBid Site Visit Photos_20220518.pdf | ||
| Attachment A - Specifications Addendum.pdf | ||
| Specifications - Vol 1.pdf | ||
| Drawings.pdf | ||
| Specifications - Vol 2.pdf | ||
| Solicitation W50S8E22B0001.pdf |
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
13 June 2022
Solicitation # W50S8E22B0001 Repair and Add to Maintenance Hangar B Complex
Request for Information (RFI) 36- 44
Q36- Who is the existing Fire Alarm Vendor?
A36– See “Answer 57” in the back of Specifications – Vol 2.
Q37- What is Electrical Scope of work on the Temporary Trailers Shown on Attachment “A” Addendum #1?
A37– Contractor should plan for typical office power requirements for 18 individuals to include computers, printers, scanners, coffee pot, etc. Trailer electrical should be configured for modular/hoteling office use similar to a construction field office.
Q38- We will need to know the Power Requirements for the Temporary Trailers Shown on Attachment “A” Addendum #1?
A38– Contractor should plan for typical office power requirements for 18 individuals to include computers, printers, scanners, coffee pot, etc. Trailer electrical should be configured for modular/hoteling office use similar to a construction field office.
Q39- We will also need to know the location of where we are picking the power from for the Temporary Trailers?
A39– Contractor will have to use generators or battery banks as the trailers will be completely separate from the base utility network-Contractor is responsible for power to the trailers.
Q40- Please provide the equipment list that will be required in trailer and provided the Contractor?
A40 – There is no requirement for the contractor to provide equipment in the trailers.
Q41- Please confirm Contractor trailer is also required on this Project?
A41-There is no requirement for a Contractor trailer on this project.
Q42- Advantor is the existing fire alarm vendor? Does the existing building have any other monitoring service vendor to coordinate with?
A42- See “Answer 57” in the back of Specifications – Vol 2.
Q43- In regard to roof penetrations, please confirm if existing roof have warranty?
A43- Three are no current warranties as the roof has not been replaced recently.
Q44- Are there additional Hazmat reports? If not, will this project be treated as a Hazmat free project (no soil contamination, no lead, no mold, no Hazmat work)?
A44- The location in the vicinity of the hangar is part of a closed No Further Action (NFA) environmental restoration cleanup (aka Site #2). The location is the site of a former (now removed) hazwaste storage area and two removed underground petroleum storage tanks. The installation is also currently assessed as a PFOS/PFOA release site where PFAS has tested in the soil and GW at levels exceeding DoD PFAS screening levels and is currently undergoing additional site investigations. The proposed work area could still contain metals, PAH, and PFAS in GW/soil. Ensure property PPE is utilized during subsurface disturbance and any GW/soil is tested and characterized prior to disposal. Additional information is available in the ANG Administrative Record at https://ar.afcec-cloud.af.mil/. As an older building, there is always risk of encountering toxic materials such as asbestos, lead pain, and PCBs. Asbestos-containing materials may be found inside walls or other not visible areas. It should be assumed the toxic materials may be present unless testing or sampling prove otherwise. In the mid- 1990s, the facility was renovated and the known toxic materials were abated but there is no guarantee that the facility is completely clear of toxic materials.