This addendum to specifications and site plan outlines requirements for temporary trailers to house staff during renovations to an aircraft hangar for the New York Air National Guard. The contractor must provide two trailers measuring 12 feet by 60 feet and 24 feet by 64 feet from Cassone or equal, delivering and installing all utilities, connections, skirting, and removal. The trailers will house staff until construction is complete. A site plan details the proposed trailer locations on base.
The pre-solicitation notice seeks bids for repair and addition to the maintenance hangar complex at Westhampton Beach, New York. Work includes renovation of an existing hangar and addition of enclosed vehicle storage. The 100% small business set-aside contract will have a value over $10 million and 365-day performance period. The solicitation is expected to issue on October 25th, with a pre-bid meeting on November 10th and bids due on November 23rd. The NAICS code is 236220. The contractor must subcontract no more than 15% of the contract value, excluding materials, to non-similarly situated entities.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attendance Sheet.pdf | ||
| Abstract of Offers Page 3.pdf | ||
| Abstract of Offers Page 2.pdf | ||
| Abstract of Offers Page 1.pdf | ||
| Attachment A Modified - Specifications Addendum.pdf | ||
| W50S8E22B0001 0003.pdf | ||
| 10 22 19.pdf | ||
| RFI 50.pdf | ||
| RFI 48-49.pdf | ||
| WS0S8E22B0001 - Blank Vetting Form.xlsx | XLSX spreadsheet | |
| RFI 45-47.pdf | ||
| RFI 36-44.pdf | ||
| RFI 32-35.pdf | ||
| W50S8E22B0001 0002.pdf | ||
| 10 51 13 - Metal Lockers.pdf | ||
| RFI 17-31.pdf | ||
| W50S8E22B0001 0001.pdf | ||
| RFI 1-16.pdf | ||
| PreBid Site Visit Photos_20220518.pdf | ||
| Attendance Sheet Page 1.pdf | ||
| Attendance Sheet Page 2.pdf | ||
| PREBID Conference Slides.pdf | ||
| Specifications - Vol 1.pdf | ||
| Drawings.pdf | ||
| Specifications - Vol 2.pdf | ||
| Solicitation W50S8E22B0001.pdf |
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
New York Air National Guard Date Issued: 29 May 2020
Repair and Add to Maintenance Hangar, Building 358 Addendum #1
TEMPORARY TRAILERS
1. Contractor to provide temporary trailers as manufactured by Cassone or approved equal. Coordinate required floor plan and amenities with BCE and manufacturer.
Amenities list:
- Bathroom
- Air Conditioning and heating
- Access steps
2. Contractor shall include all cost associated with supply of temporary trailers including the following delivery and installation costs:
- Fuel surcharge
- Tie downs
- Block and leveling
- Vinyl siding
- Utility connections
- Return freight
As well as the following return costs:
- Fuel surcharge
- Tie down removal
- Skirt removal
- Tear down
- Utility disconnections
- Return freight
3. Temporary trailers shall be in place until building construction is fully complete.
4. For site detail, please see the attached Temporary Trailers Plan.
C H
A
IN
LIN
K
FE
N
C E
ASPHALT
C O
N C
ASPHALT
GAZEBO
GRASS
LIGHT
BASE
CONC.
CONC.
PAD
UTILITY
POLE
W V
CONC.
PAD
W V
CONC.
COVER
YELLOW LINE
RED LINE
ASPHALT
WHITE LINE
506507
511 512
521 522
529 530 531
535 536
539 540
POINT TABLE
POINT #
NORTHING
EASTING
POINT TABLE
POINT #
NORTHING
EASTING
S ca le F or M ic ro fil m in g
In ch es M ill im et er s
no. date descriptionby
1 1615141312111098765432 17
M
L
K
J
I
H
G
F
E
D
C
B
A ckd
NEW YORK AIR NATIONAL GUARD
106TH RESCUE WING
FRANCIS S. GABRESKI AIRPORT
WESTHAMPTON BEACH, NEW YORK
REPAIR & ADD TO HANGAR 358
C O
P Y
R
IG
H T
B U
R N
S
M cD
O N
N E
LL
E
N G
IN
E
E R
IN
G
C O
M P
A N
Y , I
N C
TEMPORARY TRAILERS PLAN
SCALE IN FEET
20'10' 40'
EXISTING FIRE STATION
BLDG 300
MOEN STREET
3780 SF
BUILDING
ADDITION
ENCLOSED STRUCTURE
FOR VEHICLE STORAGE
12' AT / FP
BUILDING
ASPHALT PAVEMENT
CHAIN LINK FENCE
BLDG. 358
BLDG. 235
PEDESTRIAN GATE
LEGEND:
I:\USAIRNG\69623\CAD\CIVIL\69623-C101.DWG 5/14/2014 1:11 PM FPASCERI
9.00'
(TYP.)
.0
0'
(T Y
P
LAWN
LAWN
LAWN
5.
5' SIDEWALK
5' SIDEWALK
CONC. CURB
R=5'
R=15'
R=15'
4" WHITE
STRIPING (TYP)
R=5'
R=5'
2.1'
5.0'
2.
8.
C-500
CONNECT
TO EXIST.
PAVEMENTC-500
CONCRETE CURB
C-500
C-501
C-501
7.57' 14.47' 12.64'
7.
CONNECT GATE
TO EXISTING
FENCE
PEDESTRIAN
GATE
STRUCTURAL STOOP
GENERAL SITE NOTES:
1. BUILDING COORDINATES ARE POINTED TO OR MEASURED AT THE OUTSIDE FACE OF FOUNDATION.
CONTRACTOR SHALL COORDINATE BEARINGS OF BUILDING GRID LINES WITH ARCHITECTURAL AND
STRUCTURAL DRAWINGS.
2. ALL SITE COORDINATES AND DIMENSIONS ARE TO THE FACE OF CURB OR EDGE OF PAVEMENT AND ARE
IN FEET, UNLESS NOTED OTHERWISE.
3. CONTRACTOR SHALL COORDINATE BUILDING ENTRANCES, EGRESSES, WALKWAYS, AND DOORWAY
LOCATIONS WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS.
4. LOCATION OF STRUCTURAL STOOPS SHALL BE COORDINATED WITH ARCHITECTURAL AND STRUCTURAL
DRAWINGS.
5. SEE STRUCTURAL/MECHANICAL/ELECTRICAL DRAWINGS FOR MISCELLANEOUS SITE EQUIPMENT AND
PADS.
6. ALL PARKING SPACES ARE 9 FEET WIDE AND 18 FEET DEEP EXCEPT FOR ACCESSIBLE PARKING SPACES.
ALL ACCESSIBLE PARKING SPACES ARE 8 FEET WIDE WITH A MINIMUM 5 FEET WIDE ACCESS LANE ADJACENT TO THEM, OR A MINIMUM 8 FEET WIDE ACCESS LANE FOR VAN ACCESSIBLE PARKING SPACES.
AN ACCESSIBLE PARKING SIGN SHALL BE PLACED AT EACH ACCESSIBLE PARKING SPACE.
7. STANDARD PARKING STALLS SHALL BE STRIPED WITH 4 INCH WIDE WHITE STRIPES. ACCESSIBLE STALLS
AND ACCESS AISLES SHALL BE STRIPED WITH 4 INCH WIDE BLUE STRIPES.
8. ACCESSIBLE RAMP MUST COMPLY WITH FEDERAL, DOD AND LOCAL ADA REQUIREMENTS. MAXIMUM
SLOPE SHALL BE 1:12.
9. ALL PAVEMENT MARKINGS SHALL CONFORM TO THE STANDARDS OF THE CURRENT “MANUAL ON
UNIFORM TRAFFIC CONTROL DEVICES”.
10.COORDINATE BICYCLE RACK PAD DIMENSIONS WITH THE BICYCLE RACK MANUFACTURER'S
RECOMMENDATIONS OR REQUIREMENTS. FOR BICYCLE RACK INFORMATION SEE SPECIFICATION 055000.
CONCRETE ANCHORAGE FOR BICYCLE RACK SHALL BE PER MANUFACTURER'S INSTALLATION
PROCEDURE.
STRUCTURAL
STOOP (TYP.)
C-501
8' SIDEWALK
BOLLARD
C-501
6.
BOLLARD
(TYP. OF 2)
CONNECT TO EXIST.
PAVEMENT
CONNECT
TO EXIST.
PAVEMENT
10.5'x6' CONCRETE
EQUIPMENT PAD
(SEE NOTE 5}
2' CURB
OPENING
1'
2' LAWN
LAWN
9'
18'
(TYP.)
(T Y
P
C-500
C-500
BICYCLE RACK
AND CONC. PAD
FOR 2 BICYCLES,
SEE NOTE 10
C-503
MECHANICAL EQUIPMENT
CONCRETE PADS.
(SEE GENERAL NOTE 5 )
4'x18.5' PAD 3'x5' PAD
R=5'
TAPERED
CURB END C-500
2'
LAWN
LAWN
LAWN
LAWN
LAWN
LAWN
BOLLARD
(TYP. OF 2)
10'x8' CONCRETE
EQUIPMENT PAD
(SEE NOTE 5}
CONC. CURB
CONC. CURB
EXIST. CURB
CHAIN LINK
FENCE
CONCRETE SIDEWALK
C-500
LAWN
LAWN
12'X60' & 24'x64'
TEMPORARY TRAILERS
(SEE NOTES)
.0
0'
.0
0'
TEMPORARY TRAILERS NOTES :
1. CONTRACTOR TO PROVIDE TEMPORARY TRAILERS AS MANUFACTURED
BY CASSONE OR APPROVED EQUAL. COORDINATE REQUIRED FLOOR PLAN AND
AMENITIES WITH BCE AND MANUFACTURER.
AMENITIES LIST:
BATHROOM
AIRCONDITIONING AND HEATING
ACCESS STEPS
2. CONTRACTOR SHALL INCLUDE ALL COST ASSOCIATED WITH SUPPLY OF
TEMPORARY TRAILERS INCLUDING THE FOLLOWING DELIVERY AND
INSTALLATION COSTS:
FUEL SURCHARGE
TIE DOWNS
BLOCK AND LEVELING
VINYL SIDING
UTILITY CONNECTIONS
RETURN FREIGHT
AS WELL AS THE FOLLOWING RETURN COSTS :
FUEL SURCHARGE
TIE DOWN REMOVAL
SKIRT REMOVAL
TEAR DOWN
UTILITY DISCONNECTIONS
RETURN FREIGHT
3. TEMPORARY TRAILERS SHALL BE IN PLACE UNTIL BUILDING CONSTRUCTION IS
FULLY COMPLETE.
ISSUE FOR PROPOSALLRM DLL0 05/01/14
TAPERED
CURB END C-500
5'x8' SIDEWALK
ADDENDUM #1FP LRM1 05/14/14