RFI 8.pdf

PDF 79 KB Posted

Attached to
Renovation of Automated Fuels Service Station
Solicitation number
W50S8D21B0001
Issued by

About this file

This document contains responses to questions from potential offerors regarding a solicitation to renovate an automated fuels service station for the Department of the Army National Guard. The solicitation seeks hard copy bids by a specified date to replace underground storage tanks and install new dispensers, a vapor recovery system, compressed air lines, and heat tracing for product piping at specified locations according to provided plans. Offerors must provide information on firm name, visitor names and social security numbers, and driver's licenses in advance to attend the bid opening.

View the file

Other files

File Type Posted
Abstract of Offers - Construction.pdf PDF
Bid Opening Attendance Sheet.pdf PDF
RFI 10.pdf PDF
RFI 9.pdf PDF
Solicitation Amendment W50S8D21B0001_0004.pdf PDF
FM-010_FMU_Installation_Manual(052413).pdf PDF
RFI 5.pdf PDF
RFI 6.pdf PDF
208-pe2.PNG PNG image
112664R1.pdf PDF
Bollard Detail.PNG PNG image
10 Asph- Conc-PVMT Detail.pdf PDF
208-p3.PNG PNG image
112663R1.pdf PDF
208-pe1.PNG PNG image
RFI 7.pdf PDF
208-p4.PNG PNG image
PVMT Detail.pdf PDF
Solicitation Amendment W50S8D21B0001_0003.pdf PDF
Solicitation Amendment W50S8D21B0001_0002.pdf PDF
RFI 4.pdf PDF
RFI 3.pdf PDF
208-p4.jpg JPG image
Pre-Bid Conference Attendance List.pdf PDF
Pre-Bid Conference Slides.pdf PDF
Pre-Bid Conference Minutes.pdf PDF
Solicitation Amendment W50S8D21B0001_0001.pdf PDF
RFI 2.pdf PDF
Concrete Slab Detail.PNG PNG image
Previous Contract Soils Results.pdf PDF
Q 61392_DIESEL - Updated 2 Dec 2019.pdf PDF
RFI 1.pdf PDF
Q 61392_UNLEADED FUEL - Updated 2 Dec 2019 (002).pdf PDF
Plan 2 of 2.pdf PDF
Plan 1 of 2.pdf PDF
W50S8D21B0001.pdf PDF
Performance Work Statement.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Are the dispensers on the new tanks set up electronically to communicate with the existing VIL Key Reader and Fuel Management system. The print does not show a data connection conduit.

The dispensers will have to be connected to the Fuel Management System under a separate contract.

2. By the MFG. cut sheet for the tanks, they show existing level gauges w/ alarms and leak detectors. Will the new VR system replace these items or will they be an addition. This could affect how many available tank top openings are available.

Veeder Root to be installed under separate contract. Under this contract the contractor will be responsible for providing the underground utility conduit and stub at the appropriate location based on the tank specifications.

3. The “air line” to the new island, please indicate where in Building 208 is the compressor is located. What type of piping or tubing is to be installed underground, please clarify..

Please see plans P‐1 through P‐4 for tank location and underground location of piping.

4. What type of air dispensing equipment is to be installed, please clarify.

Contractor to provide specifications for a stand‐alone above ground pump near the location of the existing underground tanks, along the sidewalk. Contractor to tie into existing underground compressed air conduit. See response #3 above for plan sheets.

5. The product piping is calling for heat tracing. Will this be installed at the factory if not what are the specifications for the equipment a where will the controls be located.

Contractor to provide specifications for heat tracing of underground utilities from tie in point to new tanks.

6. What type of piping insulation will be required for the heat tracing.

Contractor to provide specifications based on manufacturers recommendations for heat tracing products.

7. Sealed bid means hardcopy correct? Email is not acceptable?

Yes, hard copies will only be accepted. No emails. You can drop off your package or FedEx it any time so that it is received on our end prior to the bid opening time. If you plan to drop off your package early, please contact Joseph Kugler at joseph.kugler.1@us.af.mil to schedule a drop off appointment.

8. What procedures do we need to follow in order to attend the bid opening?

The same procedures that you followed to attend the site visit shall also be followed in order to attend the bid opening. Email the following information for all attendees to Joseph Kugler at the following email address: joseph.kugler.1@us.af.mil.

Firm Name and Telephone Number Visitor's Name and Social Security No.

Drivers License & State of Issuance Citizenship

This information must be provided in advance, 3 business days prior to the bid opening.

File details come from the government source that posted it. Updated .