RFI 6.pdf
PDF 128 KB Posted
- Attached to
- Renovation of Automated Fuels Service Station
- Solicitation number
- W50S8D21B0001
- Issued by
-
Department of the Army National Guard
About this file
This document contains questions and answers regarding a request for information (RFI) for the renovation of an automated fuels service station. The RFI requests design and construction services for upgrades including new concrete and asphalt work, canopy installation, fuel storage tanks to be provided by the government, and replacement of automatic tank gauging and monitoring systems. Specifics of the required work include designing and building a new concrete pad and canopy footings to accommodate new tanks, as well as restoring asphalt pavement. Dimensions and other details for items like the canopy, concrete pad, and monitoring systems are to be designed by the contractor as part of the project. Responses to the RFI were due by December 28, 2020 to coordinate with suppliers and subcontractors for the work. The related federal contract opportunity is solicitation number W50S8D21B0001 issued by the Department of the Army National Guard for renovation of the automated fuels service station.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1) If these RFI can’t be answered by Monday 12/28 is there a possibility this solicitation can be extended? We need to coordinate with supplier and subcontractors if needed and with the holiday that may be difficult with such short time.
Extended per contracting
2) Please confirm if this is a design/build project. If design/build please provide design requirements.
This is a design/build project. Contractor to provide design of the concrete pad, canopy footings, canopy, bollards and utilities to serve the new tanks.
3) Please provide details of new tanks and equipment to be provided by the government?
Please see attached tanks specifications (112663R1.pdf and 112664R1.pdf)
4) Please confirm if contractor is required to supply a crane to offload and set the new storage tanks?
Yes
5) Please provide dimensions of new canopy and canopy column layout in relation to tank orientation.
The design of the canopy is part of the design/build.
6) Please provide dimensions of new concrete tank and fueling pad.
Design/build
7) Please provide design details for asphalt pavement restoration.
Detail attached (10 Asph‐Conc‐PVMT Detail.pdf)
8) Please provide construction details of new concrete tank and fueling pad including sub‐base reinforcement, footing and thickness.
Design/build
9) Please clarify item 1.3.7, is contractor to provide new Veeder Root monitoring system?
No. Only replace current RONAN automatic tank gauging with 2 each, one‐inch conduit with pull strings, prepped and capped to building 208. A separate DLA Contractor will be handling the rest to furnish and install the Veeder‐Root Tank monitoring system.
10) Please provide additional clarification for item 1.4.2.4.
This section has been revised to state “canopy cannot be installed without the tanks first being installed”.
The revised Performance Work Statement has been included in solicitation amendment 0003.
File details come from the government source that posted it. Updated .