This document contains a request for information regarding a federal contract opportunity to renovate an automated fuels service station for the Department of the Army National Guard. The request for information includes questions about extending the bid period by 12 weeks, providing tank measurements and specifications from the supplier, responsibilities for offloading and installing fuel tanks and a canopy, and specifications for the fuel management and VeederRoot tank monitoring systems. Contractor will replace the existing automatic tank gauging system with new conduit and caps in preparation for a separate contractor to furnish and install the VeederRoot Tank monitoring system.

View the file

Other files

File Type Posted
Abstract of Offers - Construction.pdf PDF
Bid Opening Attendance Sheet.pdf PDF
RFI 10.pdf PDF
RFI 9.pdf PDF
Solicitation Amendment W50S8D21B0001_0004.pdf PDF
RFI 8.pdf PDF
FM-010_FMU_Installation_Manual(052413).pdf PDF
RFI 6.pdf PDF
208-pe2.PNG PNG image
112664R1.pdf PDF
Bollard Detail.PNG PNG image
10 Asph- Conc-PVMT Detail.pdf PDF
208-p3.PNG PNG image
112663R1.pdf PDF
208-pe1.PNG PNG image
RFI 7.pdf PDF
208-p4.PNG PNG image
PVMT Detail.pdf PDF
Solicitation Amendment W50S8D21B0001_0003.pdf PDF
Solicitation Amendment W50S8D21B0001_0002.pdf PDF
RFI 4.pdf PDF
RFI 3.pdf PDF
208-p4.jpg JPG image
Pre-Bid Conference Attendance List.pdf PDF
Pre-Bid Conference Slides.pdf PDF
Pre-Bid Conference Minutes.pdf PDF
Solicitation Amendment W50S8D21B0001_0001.pdf PDF
RFI 2.pdf PDF
Concrete Slab Detail.PNG PNG image
Previous Contract Soils Results.pdf PDF
Q 61392_DIESEL - Updated 2 Dec 2019.pdf PDF
RFI 1.pdf PDF
Q 61392_UNLEADED FUEL - Updated 2 Dec 2019 (002).pdf PDF
Plan 2 of 2.pdf PDF
Plan 1 of 2.pdf PDF
W50S8D21B0001.pdf PDF
Performance Work Statement.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please consider the following additional RFIs regarding your proposed project:

1) Can you consider extending the bid another 1‐2 weeks?

Extended per contracting

2) Can we have all the tank measurements from your supplier?

Please see attached tank specs

3) Will you need us (the Contractor) to off‐load the tanks?

Yes

4) How are you approaching the canopy and associated footings? The PWS mentions that the canopy cannot be approved without the tanks first being installed. If that means the canopy submittal and subsequent orders cannot be approved until the tanks are installed, this has a significant impact on overall schedule, and it also impacts the installation and size of the concrete tank mat.

The PWS has been revised to state “canopy cannot be installed without the tanks first being installed”.

5) Please provide the spec for the fuel management system.

Specifications attached (FM‐010_FMU_Installation_Manual(052413).pdf)

6) Please provide the spec for the Veeder‐Root tank monitoring system.

Contractor to replace current RONAN automatic tank gauging with 2 each, one‐inch conduit with pull strings, prepped and capped to building 208. A separate DLA Contractor will be handling the rest to furnish and install the Veeder‐Root Tank monitoring system.

7) Who will furnish and install the Veeder‐Root tank monitoring system?

Please refer to response #6 above