RFIs and Responses 8 September 2026 .pdf
PDF 87 KB Posted
- Attached to
- REPLACE EXTERIOR DOORS
- Solicitation number
- W50S74-26-Q-A021
- Issued by
-
Department of the Army National Guard
About this file
This document is an RFI (Request for Information) and Responses for federal contract opportunity W50S74-26-Q-A021, Amendment 3, dated 8 September 2026.
The RFI addresses 16 questions and answers regarding a storefront and access control installation project. Key requirements include: offset-glazed (not center-glazed) storefront frame systems; access control and 120V power infrastructure at five doors labeled as "E" on floor plans, with specifications referenced in Hardware Specs documentation; electronic submission of quotes with digital signatures (no physical paper copies); completed price schedules as the sole pricing requirement; UEI number provision for government retrieval of representations and certifications from SAM.gov; Volume 1 submission including price/cost information, introductory page, SF 1442, and acknowledgment of all amendments. Technical clarifications include: a dedicated circuit required only for door 71-4.1 (using existing circuits for other doors); 277V lighting with 120V sourced from exit signs; contractor responsibility for power, communication conduit, boxes, and pull cords for access control infrastructure (excluding security system devices and cable); electrified door specifications per Hardware Specs; door-by-door hardware schedule provided in Amendment; and clarification that storefront entrance replacements include both exterior and interior storefront openings as identified in the revised Statement of Work. The awarded contractor will receive existing plans to isolate circuits for the applicable door locations.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI and Responses
W50S74-26-Q-A021
Amendment 3
8 September 2026
1. Will a center-glazed rather than offset-glazed system for storefront frames be considered responsive to the RFQ as per Part 2.01 B Product section?
A. NO
2. 1.2 A8 states “Demo access control and provide 120v power, access control, and security infrastructure at doors indicated”. Could you please provide more information as to which doors are indicated to need access control?
A. See Floor Plans. Labeled as “E”
3. What specific hardware is requested for access control?
A. See Hardware Specs
4. What access control system is acceptable?
5. Section 00 10 00, Note 2(a) SECTION 00 10 00 NOTES 2(a) states one copy of the SF 1442 is required to have an original signature. Please confirm whether an original signature is required, as “submission of physical bids...is not authorized” and electronic submission is mandatory.
A. Physical paper copies are not authorized, emailed quote will signature will be submitted by email
6. Section 2.3.1.1, Price/Cost Information
2.3.1.1. "Quoters shall provide all price/cost information necessary to provide a meaningful basis for Government's analysis and evaluation of price/cost for the project set forth in Section 00 22 16 of this solicitation."
Please clarify what price/cost information is required. Is the completed price schedule, including all line items and options, sufficient, or is additional supporting information required?
A. 00 22 16 has been changed to 00 22 00. Completed price schedule is sufficient.
7. Section 2.3.1.5, Representations and Certifications
2.3.1.5. Representations and Certifications (Section 00 45 00) - If the offeror’s representations and certifications are current in SAM.gov, please confirm that no additional acknowledgment or placeholder page is required in Volume 1.
A. Representations and certifications will be pulled from sam.gov buy the government, insure you provide your UEI number so we can pull the correct information
8. Section 2.3.1. Volume 1 Submission Order
To confirm, 2.3.1. VOLUME 1, PRICE/COST INFORMATION AND PRO FORMA DOCUMENTS, the order will be:
Please confirm that the below order is the intention of the Volume 1 submission requirements:
Price/Cost Information Introductory Page
SF 1442
Representations and Certifications, if applicable A. Volume 1 includes, P Price/Cost Information, Introductory Page, SF 1442 and acknowledgment of all amendments.
9. Dedicated Circuit / Door 71-4.1 During the walk through, "Dedicated Circuit" was mentioned for the door labeled 71-4.1 and the Enlarged floor plan associated with the work at this location.
a. Our scope included removing one of the circuits (ERP1-2,4,6) and using it to power the door labeled 71-4.1. Are you expecting the receptacles to be reconfigured to one of the remaining circuits?
A. Yes
b. Is a dedicated circuit required at each of the other doors: 71-1, 71-6, 72-3, and 73-2?
A. No
10. Lighting Voltage At a quick glance, the lighting looked to be 277V. Can you verify this? It was brought up as a source for 120V power.
A. The Lights are 277V. Use Exit Sign 120V power.
11. 120/208V Panels
What is the closest 120/208V panel for each of the doors: 71-1, 71-4.1, 71-6, 72-3, and 73-2?
A. Awarded Contractor will be provided existing plans to isolate circuits.
12. Access Control and Security Wiring 1.2 SCOPE, DWGS pg.3 Entry Control Point
Please clarify the access-control/security portion of the scope. The SOW references access-control/security infrastructure, while the drawings state “Security System by Others.” Please clarify the contractor’s responsibility.
A. Infrastructure is all power, and com conduit, boxes, and pull cords.
B. The electrified door is similar to the others electrified doors.
C. The excluded Security System includes devices and cable not specified.
13. The drawing shows conduit and box infrastructure for the access control and security. Does this response mean we are responsible for running the wire to the access control panel and security system? If so, we will need the manufacturer and specs for the wire and the devices expected as part of the bid.
A. No see above
14. Electrified Doors Regarding the electrified doors. Could we identify the method of electrification (e.g., via the panic bar or strike) and obtain the specific part numbers?
15. Door Hardware – Section 08710
Section 08710 provides the door hardware requirements; however, we were unable to locate a Government-provided door-by-door hardware schedule identifying the specific hardware set required for each opening.
Question: Please confirm whether a Government-provided door-by-door hardware schedule is available, or whether the contractor is responsible for developing the required hardware sets based on Section 08710 and the drawings.
A. Door Schedule provided in Amendment
16. Interior and Exterior Storefront Openings – Attachment 0002, Drawings The drawings identify paired openings, including 71-3 and 71-3.1, as well as similar paired interior/exterior openings at other locations.
Question: Please confirm whether both the exterior and interior storefront/door assemblies at each paired location are required to be replaced, or only those storefront/door openings specifically included in the Statement of Work quantities.
A. New Storefront Entrances, Entrance is storefront opening including doors.
See revised SOW for clarity
File details come from the government source that posted it. Updated .