Addendum 02 Q-A_W50S6Y24B0001.pdf
PDF 153 KB Posted
- Attached to
- Repair Medical Training Facility
- Solicitation number
- W50S6Y24B0001
About this file
This document contains an addendum to a solicitation for construction services and related questions and answers. The solicitation is for repair and renovation work at a medical training facility located in Florida for the Army National Guard. The work includes demolition, remodeling of interior spaces, installation of new windows and doors, mechanical and electrical system upgrades, abatement of existing mold, and other construction services. The period of performance is 300 calendar days with a pre-bid conference scheduled for January 10, 2024 and bids due shortly thereafter. The contract is set aside exclusively for small businesses with a NAICS code of 236220 and value between $5-10 million.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION W50S6Y-24-B-0001 Repair Medical
Addendum 02 Q&A
Date of Bid Inquiry: 1/11/24
Jacobs Response by Mark A. Johnson, AIA, (shown red).
Ques�ons 1:
We are reques�ng the hazardous materials report for the building per drawings AD100.
Atached is a copy of the referenced report dated 7/26/2018.
Ques�on 2:
Are there any exis�ng security that is required to be bypassed and/or reinstated.
No. There isn’t a security/alarm system associated within the work area; however, there should be a phased construc�on to provide separa�on between proposed construc�on within 1002A and exis�ng Headquarters Offices.
Ques�ons 3:
To verify our Demoli�on scope does not interfere with ongoing opera�ons are there as build drawings to verify u�lity lines. Addi�onally verify exis�ng condi�ons of the building. Verify if building will be occupied during construc�on.
The exis�ng facility was constructed in five phases, including 3 separate buildings and two in-fill structures, then a roof over all buildings tying them together. Each building por�on was constructed with its own separate u�li�es. The Government has provided Jacobs with several incomplete As-Built drawings for different phases of construc�on which may be shared.
The Headquarters Building 1002A and Dining Hall 1002C are occupied and will remain opera�onal during renova�on of 1002B.
Ques�ons 4:
We request the FFE package for the furnishings of the space. Will this be a part of the construc�on contract?
The FFE is included in the contract. Some of the furnishings and equipment were removed from the previously occupied facility by Govt. and will be (Provided by Govt. and Installed by Contr.) other select equipment will be (provided by Govt. and Installed by Govt.). Other Furnishings and equipment will be (provided by Contr. And installed by Contr.).
Ques�on 5:
Clarify any roofing in the scope of work.
The standing seam metal roofing is exis�ng. There will be limited re-work of the standing seam metal roofing as required to patch removed and or relocated mechanical and plumbing penetra�ons.
The metal canopy out front and drive thru canopy out back are exis�ng to remain. There is no scope for renova�ng any of the canopies; however, there is scope to repair select areas of damaged and/or deteriorated EIFS fascia associated with the canopy out front.
Ques�ons 6:
For the Exis�ng transformer and transformer can we leave the exis�ng conduit in place.
We recommend you provide new conduit. The loca�on of the new Electrical room is different than the exis�ng electrical room loca�on. We don’t know the condi�on of the exis�ng conduit either.
Added: 1/11/24
Ques�ons 7
Ref. A-101: There is a new window along column line 1 just south of column line CC that is unlabeled.
Should this be type “A4” window?
Yes. There are a total of 4 new windows which should be type A4.
Change window shown as type A5 to type A4.
Ques�ons 8
Ref. A-101: There is a new window along column line A at Office 148 that is unlabeled. Should this be a type “A4” window?
Provide NEW Type A4 SIM, Same as A4 but only 2’-2” wide (field verify).
Ques�ons 9
Ref. A-101: There are two (2) new windows at Senior Commander Office 132 that are unlabeled. Should these be type “A4” windows?
Provide NEW Type A4 SIM, Same as A4 but only 2’-2” wide (field verify).
Ques�ons 10
Ref. A-101: There is a new window along column line 1 just south of unlabeled window that is labeled “A5”. Should this be labeled type “A4” window?
Change un-labeled window to in-fill door as type A4.
Ques�ons 11
Ref. A-602: Please clarify types “G1” and “G2” glass.
Glass Type G1 is ‘gray’ �nted 1” insulated low-e.
1. Glass Type G2 is ‘clear’ non-insulated interior glass.
2. Provide tempered glass where required.
Ques�ons 12
Ref. A-603, Details C3, D3, A5, B5, C5, D5 & A-601, Door Schedule: Please clarify where these details apply. All the new exterior doors and windows are in exis�ng CMU walls, not precast walls correct?
3. Building 1002 was constructed in mul�ple phases over the years.
4. The North por�on of 1002B bounded by column line A-D and 1-6 exterior perimeter walls were constructed using 6 inch precast concrete.
5. The South por�on of 1002B was built as an in-fill between 1002A and the original 1002B
(North por�on) with the East and West exterior walls being constructed of reinforced CMU and custom cement plaster to look similar to the precast in the original buildings to the North and South.
Ques�ons 13
RFI 1. The “Finish schedule on drawing sheet I-602” indicates “VCT-1 floor at Office #104 and Wai�ng #107”. However, the “Finish plan on drawing sheet I-101” indicates CPT-1 floor? Which page should be used when submi�ng our bid proposals.
Provide carpet CPT-1 per the Finish Plan.
Ques�ons 14
A-102 General notes on all wall types, call for 3” mineral wool. However, wall type details on A-502 indicate we are to provide 3 ½” mineral wool. Please confirm if this is to be 3” or 3 ½”.
Provide 2 1/2-inch (R-5.7 minimum) mineral wool cavity insula�on at 2 ½ inch studs around perimeter.
Provide 3 1/2-inch sound atenua�on blankets at interior par��ons.
Ques�ons 15
Ref. A-601 & A-602: A-602 indicates Type C door as hollow metal and Type D door as solid core wood.
The Door Schedule indicates that all Type C doors are solid core wood under Door Material except for Door 161 and also, all Type D doors are labeled solid core wood. Please clarify which doors should be labeled Type C (hollow metal) and Type D (solid core wood) on Door Schedule.
Sheet A-601: Exterior doors and frames are all thermally broken aluminum storefront, with one excep�on; door 161 is a hollow metal door and frame.
Sheet A-601: All interior doors are solid core wood doors.
Sheet A-601: Revise the door schedule to show all interior doors as Type D in lieu of C as shown.
Sheet A-602: Omit Door Frame Type H5.
Ques�ons 16
Ref. A-103, Keynotes: Please clarify which items under Keynotes are Govt Furnished-Govt Installed, Govt Furnished–Contractor Installed and Contractor Furnished–Contractor Installed.
1. Reference: General Notes 4 & 5.
2. Furniture and Furnishings shall be provided and installed by Government.
They are for illustra�on and coordina�on with other disciplines.
a. See Keynotes: Items A1 - A46, except listed ‘c’ below.
b. Equipment shall be provided by Government and installed by Contractor.
i. See Keynotes: A12, A25, A26, A27, A31, A32, A33.
c. Equipment furnished by Contractor and installed by Contractor.
i. See Keynotes: Items C1 – C9.
Ques�ons 17
Ref. Specifica�on Sec�on 02 41 19, 1.6.D: This specifica�on states that no hazardous materials are expected to be encountered but at the Pre-Bid Mee�ng it was stated that there is a significant amount of mold to be abated.
3. Building area 1002B has mold that is required to be mi�gated.
Is there a mold survey report available?
a. There is a mold report which indicates the presence of mold in select areas, but the contractor should be cau�oned to make a site visit and evaluate the current extent since the report was writen.
Please clarify how the contractors are to quan�fy and bid on the mold removal if the amount is unknown un�l it is encountered.
b. The GC shall make a site visit to evaluate the current condi�ons.
Is a third party subcontractor required for oversight and monitoring in addi�on to the abatement subcontractor?
c. Yes. The GC shall provide a qualified abatement subcontractor shall provide oversight and monitoring during demoli�on.
The same ques�ons would apply to any other hazardous materials such as asbestos or lead.
d. There isn’t any asbestos nor lead within the building area 1002B.
Ques�ons 18
Ref. A-101: Please verify that the extent of exterior pain�ng of building and canopy at the west eleva�on begins at the entrance of Headquarters Building 1002A that is just south of column line “AA” and extends north and terminates at column line “D”. Please verify that the extent of exterior pain�ng of building at east eleva�on begins at Mech Room 133 just south of column line “AA” and extends north and terminates at column line “D”.
The limits of the cleaning and pain�ng listed above are correct.
Ques�ons 19
Ref. I-101 & I-602: Finish Schedule on I-602 indicates that Office 104 has VCT-1 flooring and I-101 indicates CPT-1. Which is correct?
Finish Schedule on I-602 indicates that Open Office 106 has CPT-1 flooring and I-101 indicates VCT-1.
Which is correct? Finish Schedule on I-602 indicates Wai�ng 107 has VCT-1/VCT-2 and I-101 indicates CPT-1. Which is correct?
Provide CPT-1 at Office 104 and Open Office 106.
File details come from the government source that posted it. Updated .