ADDENDUM 2 FAKZ999088 and 189019 SIGNED.pdf

PDF 21 MB Posted

Attached to
187 FW F35 Simulator & Base Supply New Construction
Solicitation number
W50S6N-22-B-0001
Issued by

About this file

This document provides details for a federal contract solicitation for construction services. The Alabama National Guard intends to award a firm fixed-price contract for the construction of a new 19,000 square foot Simulator Facility and a new 39,000 square foot Base Supply complex. The consolidated project requires a contractor to provide all plant, labor, materials, tools, equipment, permits, insurance and supervision necessary for construction. The magnitude of the contract is estimated between $10,000,000 and $25,000,000. The North American Industry Classification System code for this project is 236220. The solicitation is set aside 100% for small businesses with a size standard of $39,500,000. A pre-bid conference will be held on October 26, 2021 for briefing and questions, with site visits following. Interested vendors must submit an entry authorization list by October 21 to the identified points of contact.

View the file

Other files

File Type Posted
W50S6N-22-B-0001-0002.pdf PDF
W50S6N-22-B-0001-0001.pdf PDF
W50S6N-22-B-0001-0003.pdf PDF
ADDENDUM 003 - FAKZ999088 and FAKZ189019.pdf PDF
RFI RESPONSES 001 FAKZ999088 and 189019 REVISED SIGNED.pdf PDF
W50S6N-22-B-0002-0002.pdf PDF
FAKZ999088 - FAKZ189019 Addendum Number 1.pdf PDF
W50S6N-22-B-0002-0001.pdf PDF
Pre Bid Slides_SIMSUPPLY.pdf PDF
Pre Bid Attendance Roster.pdf PDF
J and A for Brand Name-Sole Source - Krieger_Redacted.pdf PDF
Attachment 6_FAKZ999088 SPECS VOL 1.pdf PDF
Attachment 4_FAKZ189019 Specs VOL 1.pdf PDF
Attachment 7_FAKZ999088 SPECS VOL 2.pdf PDF
Attachment 2_FAKZ999088 B3 Drawings.pdf PDF
J and A for Brand Name-Sole Source - Stanley Best Locks_Redacted.pdf PDF
J and A for Brand Name-Sole Source - Advantor_Redacted.pdf PDF
J and A for Brand Name-Sole Source - Johnson Controls_Redacted.pdf PDF
Attachment 3_Consolidated General Specs.pdf PDF
Attachment 5_FAKZ189019 Specs VOL 2.pdf PDF
Justification and Approval for Brand Name-Sole Source - Pavers_Redacted.pdf PDF
Attachment 1_FAKZ189019 B3 Drawings.pdf PDF
W50S6N-22-B-0001 Solicitation.pdf PDF
J and A for Brand Name-Sole Source - Monaco_Redacted.pdf PDF
Entry Auth List.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NEW BASE SUPPLY COMPLEX FAKZ999088

F35 SIMULATOR FACILITY FAKZ189019

ADDENDUM NO. 2 Page 1 of 6 Seay Seay & Litchfield, P.C. 17 November 2021

Date: 17 November 2021

To: TSgt. Ben Scott

Subject: ADDENDUM NO. 2

Project: CONSOLIDATED AWARD OF NEW BASE SUPPLY COMPLEX

AND F-35 SIMULATOR FACILITY

Job #: ANG# FAKZ999088 / FAKZ189019

SSL# 18042 / 18049

From: Jacob Johnson

The Specifications for the Consolidated General Requirements for the F35 Simulator Facility (FAKZ189019), dated 31 March 2021 are amended as follows. (Where there are conflicts between the plans and specifications and the addendum, this addendum shall govern).

Item No. 1: Refer to Specification Section 01 9113, “General Commissioning

Requirements.” Replace with included Specification Section 01 9113, “General Commissioning Requirements” with a revised date of 29 Oct. 21.

The plans and Specifications for the F35 Simulator Facility, dated 31 March 2021 are amended as follows. (Where there are conflicts between the plans and specifications and the addendum, this addendum shall govern).

Item No. 1: Refer to drawings. Delete drawing sheet M-601 and replace it with the attached drawing sheet M-601 with a revised date of 29 October 2021.

Item No. 2: Refer to specifications. Delete specification section 31 2210 “Earthwork” and replace it with the attached specification section 31 2210 with a revised date of 16 November 2021.

Item No. 3: Refer to specifications. Delete specification section 09 9600 “High

Performance Coatings” and replace it with the attached specification section 09 9600 with a revised date of 12 November 2021.

Item No. 4: Refer to drawings. Delete drawing sheet S0.2A “Alternate Foundation

Plan” and replace it with the attached revised drawing sheet S2.0A.

ADDENDUM NO. 2 Page 2 of 6 Seay Seay & Litchfield, P.C. 17 November 2021

Item No. 5: Refer to specifications. Delete specification section 05 5000

“Miscellaneous Metals” and replace it with the attached specification section 05 5000 with a revised date of 16 November 2021.

Item No. 6: Refer to specifications. Delete specification section 07 4113 “Metal Roof

Panels” and replace it with the attached specification section 07 4113 with a revised date of 16 November 2021.

Item No. 7: Refer to drawings. Delete drawing sheet A4.1 “Elevations” and replace it with the attached drawing sheet A4.1 with a revised date of 16 November 2021.

Item No. 8: Refer to drawings. Delete drawing sheet LS1.0 “Life Safety” and replace it with the attached drawing sheet LS1.0 with a revised date of 16 November 2021.

Item No. 9: Refer to specifications. Delete specification section 09 2116 “Gypsum

Board Assemblies” and replace it with the attached specification section 09 2116 with a revised date of 16 November 2021.

Item No. 10: Refer to specifications. Delete specification section 08 4413 “Glazed

Aluminum Curtain Walls” and replace it with the attached specification section 08 4413 with a revised date of 16 November 2021.

Item No. 11: Refer to specifications. Delete specification section 07 2500 “Weather

Barrier” and replace it with the attached specification section 07 2500 with

Item No. 12: Refer to drawings. Delete drawing sheet A7.1 “Interior Elevations” and replace it with the attached drawing sheet A7.1 with a revised date of 16

Item No. 13: Refer to specifications. Delete specification section 09 0561 “Common

Work Results for Flooring Preparation” and replace it with the attached specification section 09 0561with a revised date of 16 November 2021.

Item No. 14: Refer to specifications. Delete specification section 08 3481 “Security

Rated and Sound Control Door Assemblies” and replace it with the attached specification section 08 3481 with a revised date of 16 November

Item No. 15: Refer to drawings. Delete drawing sheet C6.1 “Simulator Site Details” and replace it with the attached drawing sheet C6.1 with a revised date of 11-16-21.

ADDENDUM NO. 2 Page 3 of 6 Seay Seay & Litchfield, P.C. 17 November 2021

Item No. 16: Refer to drawings. Delete drawing sheet C7.1 “Simulator – Site Details” and replace it with the attached drawing sheet C7.1 with a revised date of

Item No. 17: Refer to drawings. Delete drawing sheet C8.1 “Simulator – Site Details” and replace it with the attached drawing sheet C8.1 with a revised date of

Item No. 18: Refer to drawings. Delete drawing sheet A2.8 “Wall Type Plan” and replace it with the attached drawing sheet A2.8 with a revised date of 11- 16-21.

The plans and Specifications for the New Base Supply Complex, dated 31 March 2021 are amended as follows. (Where there are conflicts between the plans and specifications and the addendum, this addendum shall govern).

Item No. 1: Delete specification section 08 7100 “Door Hardware” and replace it with the attached specification section 08 7100 with a revised date of 16

Item No. 2: Refer to drawings. Delete drawing sheet C4.1 “Site Utilities Plan,” and replace it with attached drawing sheet C4.1 with a revised date of 10-29-

Item No. 3: Refer to drawings. Delete drawing sheet C8.1 “Site Details,” and replace with included drawing sheet C8.1 with a revised date of 10-29-2021.

Item No. 4: Refer to drawings. Delete drawing sheet A2.1 “First Floor Plan,” and replace with included drawing sheet A2.1 with a revised date of 10-29-

Item No. 5: Refer to drawings. Delete drawing sheet A2.1D “Dimensioned Floor

Plan,” and replace with included drawing sheet A2.1D with a revised date of 10-29-2021.

Item No. 6: Refer to drawings. Delete drawing sheet A5.4 “Sections,” and replace with included drawing sheet A5.4 with a revised date of 10-29-2021.

Item No 7: Refer to drawings. Delete drawing sheet A7.1 “Interior Elevations,” and replace with included drawing sheet A7.1 with a revised date of 10-29-

ADDENDUM NO. 2 Page 4 of 6 Seay Seay & Litchfield, P.C. 17 November 2021

Item No. 8: Refer to drawings. Delete drawing sheet S0.1 “General Notes-Schedules-

Typical Details,” and replace with included drawing sheet S0.1 with a revised date of 10-29-2021.

Item No. 9: Refer to drawings. Delete drawing sheet S1.1 “First Floor and Foundation

Plan,” and replace with included drawing sheet S1.1 with a revised date of 10-29-2021.

Item No. 10: Refer to drawings. Delete drawing sheet S1.2 “Ceiling Framing Plan,” and replace with included drawing sheet S1.2 with a revised date of 10-29-

Item No. 11: Refer to drawings. Delete drawing sheet M0.3 “Mechanical Details,” and replace with included drawing sheet M0.3 with a revised date of 10-29-

Item No. 12: Refer to drawings. Delete drawing sheet M1.1 “First Floor Plan –

Mechanical,” and replace with included drawing sheet M1.1 with a revised date of 10-29-2021.

Item No. 13: Refer to drawings. Delete drawing sheet M1.2 “Enlarged Mezzanine,” and replace with included drawing sheet M1.2 with a revised date of 10- 29-2021.

Item No. 14: Refer to drawings. Delete drawing sheet E0-03 “Power Riser Diagram &

Schedules,” and replace with included drawing sheet E0-03 with a revised date of 10-29-2021.

Item No. 15: Refer to drawings. Delete drawing sheet E0-04 “Panelboard Schedules,” and replace with included drawing sheet E0-04 with a revised date of 10-

Item No. 16: Refer to drawings. Delete drawing sheet E3-11 “Power Plan,” and replace with included drawing sheet E3-11 with a revised date of 10-29-2021.

Item No. 17: Refer to drawings. Delete drawing sheet E3-13 “Enlarged Power Plans,” and replace with included drawing sheet E3-13 with a revised date of 10-

Item No. 18: Refer to specifications. Delete specification section 10 1400, “Signage” and replace it with the attached specification section 10 1400 with a revised date of 10 November 2021.

ADDENDUM NO. 2 Page 5 of 6 Seay Seay & Litchfield, P.C. 17 November 2021

Item No. 19: Refer to specifications. Delete specification section 31 2210 “Earthwork” and replace it with the attached specification section 31 2210 with a revised date of 16 November 2021.

Item No. 20: Refer to specifications. Delete specification section 08 4413 “Glazed

Aluminum Curtain Walls” and replace it with the attached specification section 08 4413 with a revised date of 16 November 2021.

Item No. 21: Refer to specifications. Delete specification section 08 5200 “Blast

Resistant Aluminum Window Systems” and replace it with the attached specification section 08 5200 with a revised date of 16 November 2021.

Item No. 22: Refer to drawings. Delete drawing sheet A8.1 “Reflected Ceiling Plan” and replace it with the attached drawing sheet A8.1 with a revised date of 10-29-2021.

Item No. 23: Refer to specifications. Delete specification section 07 2500 “Weather

Barrier” and replace it with the attached specification section 07 2500 with

Item No. 24: Refer to specifications. Delete specification section 09 0561 “Common

Work Results for Flooring Preparation” and replace it with the attached specification section 09 0561with a revised date of 16 November 2021.

Item No. 25: Refer to specifications. Delete specification section 08 3481 “Security

Rated and Sound Control Door Assemblies” and replace it with the attached specification section 08 3481 with a revised date of 16 November

Item No. 26: Refer to specifications. Delete specification section 09 2116 “Gypsum

Board Assemblies” and replace it with the attached specification section 09 2116 with a revised date of 16 November 2021.

Item No. 27: Refer to specifications. Delete specification section 08 4313 “Aluminum-

Framed Storefronts” and replace it with the attached specification section 08 4313 with a revised date of 16 November 2021.

Item No. 28: Refer to drawings. Delete drawing sheet C4.1 “Site Utility Plan” and replace it with the attached drawing sheet C4.1 with a revised date of 11- 16-21.

Item No. 29: Refer to drawings. Delete drawing sheet C6.1 “Site Details” and replace it with the attached drawing sheet C6.1 with a revised date of 11-16-21.

ADDENDUM NO. 2 Page 6 of 6 Seay Seay & Litchfield, P.C. 17 November 2021

Item No. 30: Refer to drawings. Delete drawing sheet C7.1 “Site Details” and replace it with the attached drawing sheet C7.1 with a revised date of 11-16-21.

Item No. 31: Refer to drawings. Delete drawing sheet C8.1 “Site Details” and replace it with the attached drawing sheet C8.1 with a revised date of 11-16-21.

Item No. 32: Refer to drawings. Delete drawing sheet C9.1 “Site Details” and replace it with the attached drawing sheet C9.1 with a revised date of 11-16-21.

End of Addendum #2

ATTACHMENTS:

Consolidated Award:

1. Specification Section 01 9113

F35 Simulator Facility:

2. Drawing Sheet M-601

3. Specification Section 31 2210

4. Specification Section 09 9600

5. Drawing Sheet S2.0A

6. Specification Section 05 5000

7. Specification Section 07 4113

8. Drawing Sheet A4.1

9. Drawing Sheet LS1.0

10. Specification Section 09 2116

11. Specification Section 08 4413

12. Specification Section 07 2500

13. Drawing Sheet A7.1

14. Specification Section 09 0561

15. Specification Section 08 3481

16. Drawing Sheet C6.1

17. Drawing Sheet C7.1

18. Drawing Sheet C8.1

19. Drawing Sheet A2.8

New Base Supply Complex:

1. Specification Section 08 7100

2. Drawing Sheet C4.1

3. Drawing Sheet C8.1

4. Drawing Sheet A2.1

5. Drawing Sheet A2.1D

6. Drawing Sheet A5.4

New Base Supply Complex (Continued):

7. Drawing Sheet A7.1

8. Drawing Sheet S0.1

9. Drawing Sheet S1.1

10. Drawing Sheet S1.2

11. Drawing Sheet M0.3

12. Drawing Sheet M1.1

13. Drawing Sheet M1.2

14. Drawing Sheet E0-03

15. Drawing Sheet E0-04

16. Drawing Sheet E3-11

17. Drawing Sheet E3-13

18. Specification Section 10 1400

19. Specification Section 31 2210

20. Specification Section 08 4413

21. Specification Section 08 5200

22. Drawing Sheet A8.1

23. Specification Section 07 2500

24. Specification Section 09 0561

25. Specification Section 08 3481

26. Specification Section 09 2116

27. Specification Section 08 4313

28. Drawing Sheet C4.1

29. Drawing Sheet C6.1

30. Drawing Sheet C7.1

31. Drawing Sheet C8.1

32. Drawing Sheet C9.1

Consolidated Specifications for: Type B-3 (100%) Submittal F-35 Simulator Facility (FAKZ18019 / SSL#18049) and 31 March 2021 New Base Supply Complex (FAKZ999088 / SSL#18042) Revised 29 Oct. 21 187th Fighter Wing, Dannelly Field ANG, Montgomery, AL

GENERAL COMMISSIONING REQUIREMENTS 019113 - 1

SECTION 019113 - GENERAL COMMISSIONING REQUIREMENTS

PART 1 GENERAL

1.01 SUMMARY

A. Commissioning is intended to achieve the following specific objectives; this section specifies the Contractor's responsibilities for commissioning:

1. Verify that the work is installed in accordance with Contract Documents and the manufacturer’s recommendations and instructions, and that it receives adequate operational checkout prior to startup: Startup reports and Prefunctional Checklists executed by Contractor are utilized to achieve this.

2. Verify and document that functional performance is in accordance with Contract Documents: Functional Tests executed by Contractor and witnessed by the Commissioning Authority are utilized to achieve this.

3. Verify that operation and maintenance manuals submitted to the Government are complete: Detailed operation and maintenance (O&M) data submittals by Contractor are utilized to achieve this.

4. Verify that the Government operating personnel are adequately trained: Formal training conducted by Contractor is utilized to achieve this.

B. Commissioning, including Functional Tests, O&M documentation review, and training, is to occur after startup and initial checkout and be completed before Beneficial Occupancy and Functional Completion .

C. The Commissioning Authority directs and coordinates all commissioning activities;

this section describes some but not all of the Commissioning Authority's responsibilities.

D. The Commissioning Authority is employed by the Government

1. The contractor will be accountable for those responsibilities outlined in specification section 01 9113 - General Commissioning Requirements, and for compliance with the Commissioning Plan and correction of deficiencies, re-inspection, and re-testing, as applicable at no extra cost to the Government.

1.02 SCOPE OF COMMISSIONING

A. The following are to be commissioned:

B. Building envelope: (ADDED BY ADDENDUM)

1. Thermal and moisture integrity.

New Base Supply Complex (FAKZ999088 / SSL#18042) Revised 29 Oct. 21 187th Fighter Wing, Dannelly Field ANG, Montgomery, AL

GENERAL COMMISSIONING REQUIREMENTS 019113 - 2

C. Plumbing Systems:

1. Water heaters.

2. Booster pumps.

3. Water Meter.

D. HVAC System, including:

1. Major and minor equipment items.

2. Piping systems and equipment.

3. Ductwork and accessories.

4. Terminal units.

5. Control system.

6. Variable frequency drives.

E. Electrical Systems:

1. Power quality.

2. Emergency power systems.

3. Uninterruptible power systems.

4. Lighting controls other than manual switches.

5. Electricity Meter.

F. Electronic Safety and Security:

1. Security system, including doors and hardware.

2. Fire and smoke alarms.

G. Communications:

1. Voice and data systems.

2. Public address/paging.

H. Other equipment and systems explicitly identified elsewhere in Contract Documents as requiring commissioning.

I. Indoor Air Quality Procedures: The Commissioning Authority will coordinate;

Contractor will execute; see Section 015719 - Temporary Environmental Controls.

New Base Supply Complex (FAKZ999088 / SSL#18042) Revised 29 Oct. 21 187th Fighter Wing, Dannelly Field ANG, Montgomery, AL

GENERAL COMMISSIONING REQUIREMENTS 019113 - 3

1.03 RELATED REQUIREMENTS

A. Section 01 3325 - Project Sustainability Summary

B. Section 01 3329 - Sustainable Design Reporting

C. Section 015719 - Temporary Environmental Controls: Precautions and procedures;

smoking room testing; building flush-out.

D. Section 017000 - Execution and Closeout Requirements: General startup requirements.

E. Section 017800 - Closeout Submittals: Scope and procedures for operation and maintenance manuals and project record documents.

F. Section 017900 - Demonstration and Training: Scope and procedures for Government personnel training.

G. Section 230800 - Commissioning of HVAC: HVAC control system testing; other requirements.

1.04 REFERENCE STANDARDS

A. CSI/CSC MF - Masterformat 2016.

B. PECI (Samples) - Sample Forms for Prefunctional Checklists and Functional Performance Tests Current Edition.

1.05 SUBMITTALS

A. See Section 01 3001 - Submittals, for submittal procedure, except:

B. Product Data: If submittals to Architect do not include the following, submit copies as soon as possible:

1. Manufacturer's product data, cut sheets, and shop drawings.

2. Manufacturer's installation instructions.

3. Startup, operating, and troubleshooting procedures.

4. Fan and pump curves.

5. Factory test reports.

6. Warranty information, including details of Owner's responsibilities in regard to keeping warranties in force.

New Base Supply Complex (FAKZ999088 / SSL#18042) Revised 29 Oct. 21 187th Fighter Wing, Dannelly Field ANG, Montgomery, AL

GENERAL COMMISSIONING REQUIREMENTS 019113 - 4

C. Manufacturers' Instructions: Submit copies of all manufacturer-provided instructions that are shipped with the equipment as soon as the equipment is delivered.

D. Startup Plans and Reports.

E. Completed Prefunctional Checklists.

PART 2 PRODUCTS

2.01 TEST EQUIPMENT

A. Provide all standard testing equipment required to perform startup and initial checkout and required Functional Testing; unless otherwise noted such testing equipment will NOT become the property of the Government.

B. Calibration Tolerances: Provide testing equipment of sufficient quality and accuracy to test and/or measure system performance with the tolerances specified.

If not otherwise noted, the following minimum requirements apply:

1. Temperature Sensors and Digital Thermometers: Certified calibration within past year to accuracy of 0.5 degree F (0.3 degree C) and resolution of plus/minus 0.1 degree F (0.05 degree C).

2. Pressure Sensors: Accuracy of plus/minus 2.0 percent of the value range being measured (not full range of meter), calibrated within the last year.

3. Calibration: According to the manufacturer’s recommended intervals and when dropped or damaged; affix calibration tags or keep certificates readily available for inspection.

C. Equipment-Specific Tools: Where special testing equipment, tools and instruments are specific to a piece of equipment, are only available from the vendor, and are required in order to accomplish startup or Functional Testing, provide such equipment, tools, and instruments as part of the work at no extra cost to the Government; such equipment, tools, and instruments are to become the property of the Government.

D. Dataloggers: Independent equipment and software for monitoring flows, currents, status, pressures, etc. of equipment.

1. Dataloggers required to for Functional Tests will be provided by the Commissioning Authority and will not become the property of the Government

New Base Supply Complex (FAKZ999088 / SSL#18042) Revised 29 Oct. 21 187th Fighter Wing, Dannelly Field ANG, Montgomery, AL

GENERAL COMMISSIONING REQUIREMENTS 019113 - 5

PART 3 EXECUTION

3.01 COMMISSIONING PLAN

A. Commissioning Authority will prepare the Commissioning Plan.

1. Attend meetings called by the Commissioning Authority for purposes of completing the commissioning plan.

2. Require attendance and participation of relevant subcontractors, installers, suppliers, and manufacturer representatives.

B. Contractor is responsible for compliance with the Commissioning Plan.

C. Commissioning Plan: The commissioning schedule, procedures, and coordination requirements for all parties in the commissioning process.

1. Commissioning will be phased (by floors, for example) to minimize the total construction time.

D. Basis of Design Documentation (BOD): Detailed documentation of the functional requirements of the project; descriptions of the systems, components, and methods chosen to meet the design intent; assumptions underlying the design intent.

1. Basis of Design Documentation is to be prepared by the Government.

E. Commissioning Schedule:

1. Submit anticipated dates of startup of each item of equipment and system to Commissioning Authority within 60 days after start of work.

2. Re-submit anticipated startup dates monthly, but not less than 4 weeks prior to startup.

3. Prefunctional Checklists and Functional Tests are to be performed in sequence from components, to subsystems, to systems.

4. Provide sufficient notice to Commissioning Authority for delivery of relevant Checklists and Functional Test procedures, to avoid delay.

3.02 DOCUMENTATION IDENTIFICATION SYSTEM

A. Give each submitted form or report a unique identification; use the following scheme.

B. Type of Document: Use the following prefixes:

1. Startup Plan: SP-.

New Base Supply Complex (FAKZ999088 / SSL#18042) Revised 29 Oct. 21 187th Fighter Wing, Dannelly Field ANG, Montgomery, AL

GENERAL COMMISSIONING REQUIREMENTS 019113 - 6

2. Startup Report: SR-.

3. Prefunctional Checklist: PC-.

4. Functional Test Procedure: FTP-.

5. Functional Test Report: FTR-.

C. System Type: Use the first 4 digits from CSI/CSC MF (Master Format), that are applicable to the system; for example:

1. 2300: HVAC system as a whole.

2. 2320: HVAC Piping and Pumps.

3. 2330: HVAC Air Distribution.

D. Component Number: Assign numbers sequentially, using 1, 2, or 3 digits as required to accommodate the number of units in the system.

E. Test, Revision, or Submittal Number: Number each successive iteration sequentially, starting with 1.

F. Example: PC-2320-001.2 would be the Prefunctional Checklist for equipment item 1 in the HVAC piping system, probably a pump; this is the second, revised submittal of this checklist.

3.03 STARTUP PLANS AND REPORTS

A. Startup Plans: For each item of equipment and system for which the manufacturer provides a startup plan, submit the plan not less than 8 weeks prior to startup.

B. Startup Reports: For each item of equipment and system for which the manufacturer provides a startup checklist (or startup plan or field checkout sheet), document compliance by submitting the completed startup checklist prior to startup, signed and dated by responsible entity.

C. Submit directly to the Commissioning Authority.

3.04 PREFUNCTIONAL CHECKLISTS

A. A Prefunctional Checklist is required to be filled out for each item of equipment or other assembly specified to be commissioned.

1. No sampling of identical or near-identical items is allowed.

2. These checklists do not replace manufacturers' recommended startup checklists, regardless of apparent redundancy.

New Base Supply Complex (FAKZ999088 / SSL#18042) Revised 29 Oct. 21 187th Fighter Wing, Dannelly Field ANG, Montgomery, AL

GENERAL COMMISSIONING REQUIREMENTS 019113 - 7

3. Prefunctional Checklist forms will not be complete until after award of the contract; the following types of information will be gathered via the completed Checklist forms:

a. Certification by installing contractor that the unit is properly installed, started up, and operating and ready for Functional Testing.

b. Confirmation of receipt of each shop drawing and commissioning submittal specified, itemized by unit.

c. Manufacturer, model number, and relevant capacity information; list information "as specified," "as submitted," and "as installed."

d. Serial number of installed unit.

e. List of inspections to be conducted to document proper installation prior to startup and Functional Testing; these will be primarily static inspections and procedures; for equipment and systems may include normal manufacturer’s start-up checklist items and minor testing.

f. Sensor and actuator calibration information.

4. PECI (Samples) found at http://www.peci.org/library/mcpgs.htm indicate anticipated level of detail for Prefunctional Checklists.

B. Contractor is responsible for filling out Prefunctional Checklists, after completion of installation and before startup; witnessing by the Commissioning Authority is not required unless otherwise specified.

1. Each line item without deficiency is to be witnessed, initialed, and dated by the actual witness; checklists are not complete until all line items are initialed and dated complete without deficiencies.

2. Checklists with incomplete items may be submitted for approval provided the Contractor attests that incomplete items do not preclude the performance of safe and reliable Functional Testing; re-submission of the Checklist is required upon completion of remaining items.

3. Individual Checklists may contain line items that are the responsibility of more than one installer; Contractor shall assign responsibility to appropriate installers or subcontractors, with identification recorded on the form.

4. If any Checklist line item is not relevant, record reasons on the form.

5. Contractor may independently perform startup inspections and/or tests, at Contractor's option.

New Base Supply Complex (FAKZ999088 / SSL#18042) Revised 29 Oct. 21 187th Fighter Wing, Dannelly Field ANG, Montgomery, AL

GENERAL COMMISSIONING REQUIREMENTS 019113 - 8

6. Regardless of these reporting requirements, Contractor is responsible for correct startup and operation.

7. Submit completed Checklists to Commissioning Authority within two days of completion.

C. Commissioning Authority is responsible for furnishing the Prefunctional Checklists to Contractor.

1. Initial Drafts: Contractor is responsible for initial draft of Prefunctional Checklist where so indicated in Contract Documents.

2. Provide all additional information requested by Commissioning Authority to aid in preparation of checklists, such as shop drawing submittals, manufacturers' startup checklists, and O&M data.

3. Commissioning Authority may add any relevant items deemed necessary regardless of whether they are explicitly mentioned in Contract Documents or not.

4. When asked to review the proposed Checklists, do so in a timely manner.

D. Commissioning Authority Witnessing: Required for:

1. Each piece of primary equipment, unless sampling of multiple similar units is allowed by the commissioning plan.

2. A sampling of non-primary equipment, as allowed by the commissioning plan.

E. Deficiencies: Correct deficiencies and re-inspect or re-test, as applicable, at no extra cost to the Government.

1. If difficulty in correction would delay progress, report deficiency to the Commissioning Authority immediately.

3.05 FUNCTIONAL TESTS

A. A Functional Test is required for each item of equipment, system, or other assembly specified to be commissioned, unless sampling of multiple identical or near-identical units is allowed by the final test procedures.

B. Contractor is responsible for execution of required Functional Tests, after completion of Prefunctional Checklist and before closeout.

C. Commissioning Authority is responsible for witnessing and reporting results of Functional Tests, including preparation and completion of forms for that purpose.

New Base Supply Complex (FAKZ999088 / SSL#18042) Revised 29 Oct. 21 187th Fighter Wing, Dannelly Field ANG, Montgomery, AL

GENERAL COMMISSIONING REQUIREMENTS 019113 - 9

D. Contractor is responsible for correction of deficiencies and re-testing at no extra cost to the Government; if a deficiency is not corrected and re-tested immediately, the Commissioning Authority will document the deficiency and the Contractor 's stated intentions regarding correction.

1. Deficiencies are any condition in the installation or function of a component, piece of equipment or system that is not in compliance with Contract Documents or does not perform properly.

2. When the deficiency has been corrected, the Contractor completes the form certifying that the item is ready to be re-tested and returns the form to the Commissioning Authority; the Commissioning Authority will reschedule the test and the Contractor shall re-test.

3. Identical or Near-Identical Items: If 10 percent, or three, whichever is greater, of identical or near-identical items fail to perform due to material or manufacturing defect, all items will be considered defective; provide a proposal for correction within 2 weeks after notification of defect, including provision for testing sample installations prior to replacement of all items.

4. Contractor shall bear the cost of Government and Commissioning Authority personnel time witnessing re-testing.

5. Contractor shall bear the cost of Government and Commissioning Authority personnel time witnessing re-testing if the test failed due to failure to execute the relevant Prefunctional Checklist correctly; if the test failed for reasons that would not have been identified in the Prefunctional Checklist process, Contractor shall bear the cost of the second and subsequent re-tests.

E. Functional Test Procedures:

1. Some test procedures are included in Contract Documents; where Functional Test procedures are not included in Contract Documents, test procedures will be determined by the Commissioning Authority with input by and coordination with Contractor.

2. Examples of Functional Testing:

a. Test the dynamic function and operation of equipment and systems (rather than just components) using manual (direct observation) or monitoring methods under full operation (e.g., the chiller pump is tested interactively with the chiller functions to see if the pump ramps up and down to maintain the differential pressure setpoint).

b. Systems are tested under various modes, such as during low cooling or heating loads, high loads, component failures, unoccupied, varying outside

New Base Supply Complex (FAKZ999088 / SSL#18042) Revised 29 Oct. 21 187th Fighter Wing, Dannelly Field ANG, Montgomery, AL

GENERAL COMMISSIONING REQUIREMENTS 019113 - 10

air temperatures, fire alarm, power failure, etc.

c. Systems are run through all the HVAC control system’s sequences of operation and components are verified to be responding as the sequence's state.

d. Traditional air or water test and balancing (TAB) is not Functional Testing;

spot checking of TAB by demonstration to the Commissioning Authority is Functional Testing.

3. PECI (Samples) found at http://www.peci.org/library/mcpgs.htm indicated anticipated level of detail for Functional Tests.

F. Deferred Functional Tests: Some tests may need to be performed later, after Beneficial Occupancy, due to partial occupancy, equipment, seasonal requirements, design or other site conditions; performance of these tests remains the Contractor 's responsibility regardless of timing.

3.06 SENSOR AND ACTUATOR CALIBRATION

A. Calibrate all field-installed temperature, relative humidity, carbon monoxide, carbon dioxide, and pressure sensors and gauges, and all actuators (dampers and valves) on this piece of equipment shall be calibrated. Sensors installed in the unit at the factory with calibration certification provided need not be field calibrated.

B. Calibrate using the methods described below; alternate methods may be used, if approved by Commissioning Authority and the Government beforehand. See PART 2 for test instrument requirements. Record methods used on the relevant Prefunctional Checklist or other suitable forms, documenting initial, intermediate and final results.

C. All Sensors:

1. Verify that sensor location is appropriate and away from potential causes of erratic operation.

2. Verify that sensors with shielded cable are grounded only at one end.

3. For sensor pairs that are used to determine a temperature or pressure difference, for temperature make sure they are reading within 0.2 degree F (0.1 degree C) of each other, and for pressure, within tolerance equal to 2 percent of the reading, of each other.

4. Tolerances for critical applications may be tighter.

D. Sensors Without Transmitters - Standard Application:

New Base Supply Complex (FAKZ999088 / SSL#18042) Revised 29 Oct. 21 187th Fighter Wing, Dannelly Field ANG, Montgomery, AL

GENERAL COMMISSIONING REQUIREMENTS 019113 - 11

1. Make a reading with a calibrated test instrument within 6 inches (150 mm) of the site sensor.

2. Verify that the sensor reading, via the permanent thermostat, gauge or building automation system, is within the tolerances in the table below of the instrument-measured value.

3. If not, install offset, calibrate or replace sensor.

E. Sensors With Transmitters - Standard Application.

1. Disconnect sensor.

2. Connect a signal generator in place of sensor.

3. Connect ammeter in series between transmitter and building automation system control panel.

4. Using manufacturer’s resistance-temperature data, simulate minimum desired temperature.

5. Adjust transmitter potentiometer zero until 4 mA is read by the ammeter.

6. Repeat for the maximum temperature matching 20 mA to the potentiometer span or maximum and verify at the building automation system.

7. Record all values and recalibrate controller as necessary to comply with specified control ramps, reset schedules, proportional relationship, reset relationship and P/I reaction.

8. Reconnect sensor.

9. Make a reading with a calibrated test instrument within 6 inches (150 mm) of the site sensor.

10. Verify that the sensor reading, via the permanent thermostat, gauge or building automation system, is within the tolerances in the table below of the instrument-measured value.

11. If not, replace sensor and repeat.

12. For pressure sensors, perform a similar process with a suitable signal generator.

F. Sensor Tolerances for Standard Applications: Plus/minus the following maximums:

1. Watthour, Voltage, Amperage: 1 percent of design.

2. Pressure, Air, Water, Gas: 3 percent of design.

New Base Supply Complex (FAKZ999088 / SSL#18042) Revised 29 Oct. 21 187th Fighter Wing, Dannelly Field ANG, Montgomery, AL

GENERAL COMMISSIONING REQUIREMENTS 019113 - 12

3. Air Temperatures (Outside Air, Space Air, Duct Air): 0.4 degrees F (0.2 degree C).

4. Relative Humidity: 4 percent of design.

5. Barometric Pressure: 0.1 inch of Hg (340 Pa).

6. Flow Rate, Air: 10 percent of design.

7. Flow Rate, Water: 4 percent of design.

8. Flow Rate, Steam: 3 percent of design.

9. AHU Wet Bulb and Dew Point: 2.0 degrees F (1.1 degrees C).

10. Hot Water Coil and Boiler Water Temperature: 1.5 degrees F (0.8 degrees C).

11. Cooling Coil, Chilled and Condenser Water Temperatures: 0.4 degrees F (0.2 degree C).

12. Combustion Flue Temperature: 5.0 degrees F (2.8 degrees C).

13. Oxygen and CO2 Monitors: 0.1 percentage points.

14. CO Monitor: 0.01 percentage points.

15. Natural Gas and Oil Flow Rate: 1 percent of design.

G. Critical Applications: For some applications more rigorous calibration techniques may be required for selected sensors. Describe any such methods used on an attached sheet.

H. Valve/Damper Stroke Setup and Check:

1. For all valve/damper actuator positions checked, verify the actual position against the control system readout.

2. Set pump/fan to normal operating mode.

3. Command valve/damper closed; visually verify that valve/damper is closed and adjust output zero signal as required.

4. Command valve/damper to open; verify position is full open and adjust output signal as required.

5. Command valve/damper to a few intermediate positions.

6. If actual valve/damper position does not reasonably correspond, replace actuator or add pilot positioner (for pneumatics).

New Base Supply Complex (FAKZ999088 / SSL#18042) Revised 29 Oct. 21 187th Fighter Wing, Dannelly Field ANG, Montgomery, AL

GENERAL COMMISSIONING REQUIREMENTS 019113 - 13

I. Isolation Valve or System Valve Leak Check: For valves not associated with coils.

1. With full pressure in the system, command valve closed.

2. Use an ultra-sonic flow meter to detect flow or leakage.

3.07 TEST PROCEDURES - GENERAL

A. Provide skilled technicians to execute starting of equipment and to execute the Functional Tests. Ensure that they are available and present during the agreed upon schedules and for sufficient duration to complete the necessary tests, adjustments and problem-solving.

B. Provide all necessary materials and system modifications required to produce the flows, pressures, temperatures, and conditions necessary to execute the test according to the specified conditions. At completion of the test, return all affected equipment and systems to their pre-test condition.

C. Sampling: Where Functional Testing of fewer than the total number of multiple identical or near-identical items is explicitly permitted, perform sampling as follows:

1. Identical Units: Defined as units with same application and sequence of operation; only minor size or capacity difference.

2. Sampling is not allowed for:

a. Major equipment.

b. Life-safety-critical equipment.

c. Prefunctional Checklist execution.

3. XX = the percent of the group of identical equipment to be included in each sample; defined for specific type of equipment.

4. YY = the percent of the sample that if failed will require another sample to be tested; defined for specific type of equipment.

5. Randomly test at least XX percent of each group of identical equipment, but not less than three units. This constitutes the "first sample."

6. If YY percent of the units in the first sample fail, test another XX percent of the remaining identical units.

7. If YY percent of the units in the second sample fail, test all remaining identical units.

New Base Supply Complex (FAKZ999088 / SSL#18042) Revised 29 Oct. 21 187th Fighter Wing, Dannelly Field ANG, Montgomery, AL

GENERAL COMMISSIONING REQUIREMENTS 019113 - 14

8. If frequent failures occur, resulting in more troubleshooting than testing, the Commissioning Authority may stop the testing and require Contractor to perform and document a checkout of the remaining units prior to continuing testing.

D. Manual Testing: Use hand-held instruments, immediate control system readouts, or direct observation to verify performance (contrasted to analyzing monitored data taken over time to make the “observation”).

E. Simulating Conditions: Artificially create the necessary condition for the purpose of testing the response of a system; for example apply hot air to a space sensor using a hair dryer to see the response in a VAV box.

F. Simulating Signals: Disconnect the sensor and use a signal generator to send an amperage, resistance or pressure to the transducer and control system to simulate the sensor value.

G. Over-Writing Values: Change the sensor value known to the control system in the control system to see the response of the system; for example, change the outside air temperature value from 50 degrees F to 75 degrees F to verify economizer operation.

H. Indirect Indicators: Remote indicators of a response or condition, such as a reading from a control system screen reporting a damper to be 100 percent closed, are considered indirect indicators.

I. Monitoring: Record parameters (flow, current, status, pressure, etc.) of equipment operation using dataloggers or the trending capabilities of the relevant control systems; where monitoring of specific points is called for in Functional Test Procedures:

1. All points that are monitored by the relevant control system shall be trended by Contractor; at the Commissioning Authority’s request, Contractor shall trend up to 20 percent more points than specified at no extra charge.

2. Other points will be monitored by the Commissioning Authority using dataloggers.

3. At the option of the Commissioning Authority, some control system monitoring may be replaced with datalogger monitoring.

4. Provide hard copies of monitored data in columnar format with time down left column and at least 5 columns of point values on same page.

5. Graphical output is desirable and is required for all output if the system can produce it.

New Base Supply Complex (FAKZ999088 / SSL#18042) Revised 29 Oct. 21 187th Fighter Wing, Dannelly Field ANG, Montgomery, AL

GENERAL COMMISSIONING REQUIREMENTS 019113 - 15

6. Monitoring may be used to augment manual testing.

3.08 OPERATION AND MAINTENANCE MANUALS

A. See Section 017800 - Closeout Submittals for additional requirements.

B. Add design intent documentation furnished by the Architect to manuals prior to submission to the Government.

C. Submit manuals related to items that were commissioned to Commissioning Authority for review; make changes recommended by Commissioning Authority.

D. Commissioning Authority will add commissioning records to manuals after submission to the Government.

END OF SECTION

This page intentionally left blank

Sheet Number

Sheet Title

Project Title

M o n tg o m er y

D o th an

W W W .S S L A R C H .C O M

(M

4.

3.

D

. 7 1.

Job Number

Date

Drawn By

Checked By

A R

C H

IT

E

C T

U R

E

I N

T E

R

IO

R D

E

SI

G N

75 SOUTH "F" STREET

PENSACOLA, FLORIDA 32502

(850) 434-0513

(PROF. ENG. #: 3600)

PEI JOB #2018060

PETERSON ENGINEERING INC.

M-601

HVAC SCHEDULE-1

F -3

S im u la to r

F ac ili ty

7T

H F

W , D

A N

N E

L L

Y F

IE

L

D

M O

N T

G O

M E

R Y

, A L

18049

31 MARCH 2021

SCJ/BEJ

GDP

AHU-6 HDT 3200 725 2.5 5 460 3 60 500 126 90 78.4 64.9 52.5 51.4 20 44 10 2-WAY 10 500 MERV 8 MERV 16 SEE BELOW

CHWP-1

MARK SERVICE TYPE SIZE CAPACITY

GPM

HEAD FT.

(H O)

PERFORMANCE DATA

PUMP SCHEDULE

MAXIMUM

RPM

MINIMUM

EFFICIENCY

MOTOR - H.P.

(MAX)

ELECTRICAL DATA

VOLTS PHASE HERTZ

REMARKS

PRIMARY ESF 2.5 x 2 200 50 1760 70% 5 460 3 60

REMARKS:

1. THE CHILLED WATER PUMPS SHALL BE BASE-MOUNTED, END-SUCTION, CLOSE-COUPLED.

2. PROVIDE OIL FILLED SUCTION, DISCHARGE AND DIFFERENTIAL PRESSURE GAGES.

3. PROVIDE ISOLATION VALVES, BALANCING VALVES, CHECK VALVES, STRAINERS, AND SUCTION DIFFUSERS.

4. PUMP OPERATION SHALL BE CONTROLLED BY THE DDC SYSTEM WITH FAILURE ALARM.

5. PROVIDE MINIMUM 6" THICK CONCRETE EQUIPMENT PAD FOR EACH PUMP.

6. CHILLED WATER PUMPS SHALL BE PROVIDED WITH VARIABLE FREQUENCY DRIVES.

7. PUMPS SHALL BE NON OVER LOADING THROUGHOUT THE ENTIRE PUMP CURVE. MOTORS SHALL BE HIGH EFFICIENCY.

8. PROVIDE STAINLESS STEEL DRAIN PANS ON ALL BASE MOUNTED PUMPS.

9. PIPE DRAINS TO FLOOR DRAIN. PUMPS TO BE PROVIDED WITH MECHANICAL SEAL UNLESS NOTED OTHERWISE.

10. SUCTION AND DISCHARGE SIZES ARE THE MINIMUM ACCEPTABLE.

ESF - END SUCTION, FRAME MOUNTED CENTRIFUGAL PUMP

IL - IN-LINE

HORIZONTAL DRAW THROUGH

ABBREVIATIONS:

MULTI-ZONEMTZ -

HDT -

MARK

GPM

DATA

CHILLED WATER

°Fdb

CHILLED WATER COOLING DATA

AIR HANDLING UNIT SCHEDULE

°Fwb

ENTERING

AIR TEMP.

LEAVING

AIR TEMP.

HERTZ

REMARKS

FINAL

FILTER DATA

PRE

FAN DATA

EXT. STATIC

INCHES H O

PRESSURE

VOLTSCFM

TOTAL

AIR

PHASE

ELECTRICAL DATA

°F ENT.

MAX

WPD

FT

CONTROL VALVE

TYPE Cv

VARIABLE AIR VOLUMEVAV -

VDT - VERTICAL DRAW THROUGH

ACC-1 100 410A 10.1 200 56 44 15 460 3 600.0001 95 0 8 / 3.2 4 25% 100-75-50-25

CAPACITY REDUCTION

APPROX. STEPS

PERCENT

MINIMUM

COMPRESSOR DATA

COMP.

MIN.

TEMP.

LOW AMB.

TEMP.

AMB.

FOULING FACTOR

CONDENSER DATA

HR-FT -°F/BTU

°F db °F db QUANT. UNLOADING

VOLTS HERTZ

ELECTRICAL DATA

PHASEPRESS. DROP

MAX. WATER

WATER

ENTERING

EVAPORATOR DATA

WATER

LEAVING

FLOW

WATERREFRIG. MINIMUM

CAPACITY

RATED

MARK

TONS

TYPE EER

GPM TEMP. °FTEMP. °F FEET H O

PACKAGE AIR COOLED WATER CHILLER SCHEDULE

CONDENSER

FANS

QUANTITY/FLA

ACC-2

AHU-1

TYPE

HDT 10000

CFM

OUTSIDE

AIR

650 3

FAN

HP

15 460 3 60 500 238.8

MAX.

FACE VEL

FPM

TOTAL

COOLING

MBTU/HR

211.0

SENS.

COOLING

MBTU/HR

73.0 60.5

°Fdb °Fwb

52.5 51.4 40 44 10 2-WAY 20 500 MERV 8 MERV 16

MAX.

FACE

VEL. FPM

AHU-2 HDT

REMARKS:

1. PROVIDE SINGLE POINT CONNECTION WITH EXCEPTION OF UV-C LAMP CIRCUIT; UV-C LAMP CIRCUIT WILL REQUIRE SEPARATE 115V CIRCUIT.

2. MANUFACTURER SHALL ALLOW A MINIMUM OF .5 INCHES EXTRA STATIC FOR DIRTY FILTERS. EXTERNAL STATIC DOES NOT INCLUDE PRESSURE DROP THROUGH CASING COILS, FILTERS, AND FILTER HOUSINGS.

3. PROVIDE MERV 8 PRE-FILTERS AND MERV 16 FINAL FILTERS.

4. ADJUST LOCATION OF UNITS ON MECHANICAL MEZZANINE AS REQUIRED FOR SERVICE AS RECOMMENDED BY MANUFACTURER.

5. PIPE ALL CONDENSATE FROM UNITS TO FLOOR DRAIN WITH TRAP.

6. UNITS MAY REQUIRE SETTING BEFORE WALLS ARE INSTALLED OR UNITS MAY NEED DISASSEMBLY AND REASSEMBLY IN MECHANICAL ROOM.

CHWP-2

SEE BELOW

SEE BELOW

EXPANSION TANK SCHEDULE

MARK SERVICE TYPE

SIZE

DIAMETER/HEIGHT

(IN.)

VOLUME GAL.

INITIAL CHARGE

PRESSURE PSI NOTESTANK

VOLUME

(GAL.)

MINIMUM

ACCEPTANCE

VOLUME (GAL.)

ET-1 CH-1 BLADDER 20/32 23 15 18 SEE BELOW

NOTES:

1. VERTICAL FLOOR MOUNTED BLADDER TYPE.

AIR SEPARATOR SCHEDULE

MARK SERVICE

FLOW

MAX. WORKING

PRESS. PSIG

MIN. INLET

SIZE IN.

OUTLET

SIZE IN.CAPACITY

GPM

MAX WPD

FT

AS-1 CH-1 400 5 125 5 5

NOTES:

1. PROVIDE SUPPORT BRACKETS AND STRAINER.

NOTES

SEE BELOW

ELECTRICAL DATA

HEATER SHALL BE A PROPELLER FAN UNIT, COMPLETELY FACTORY ASSEMBLED, AND WIRED. UNIT SHALL BE PROVIDED WITH

DISCHARGE

UH-1

PHASEAMP RATING

MAX.

RPM

MOTOR DATA

HP

ELECTRIC UNIT HEATER SCHEDULE

VOLTS

CFMMARK HEATING CAPACITY

Hz

3.3 KW 350 HORIZ. 0.01 1600 15.9 208 1 60

TYPE OF

24 VOLT WALL MOUNTED THERMOSTAT. UNIT SHALL COME WITH TRANSFORMER, RELAYS, AND SAFETIES.

NOTE:

NOTES:

1. CHILLERS SHALL BE PROVIDED WITH SCROLL COMPRESSORS AND A MINIMUM OF TWO TOTALLY INDEPENDENT REFRIGERANT CIRCUITS

2. CHILLERS SHALL BE PROVIDED WITH COPPER TUBES AND ALUMINUM FIN CONDENSER COILS

3. CHILLERS SHALL BE PROVIDED WITH BACNET INTERFACE FOR COMMUNICATING WITH THE DDC/EMCS AND REMOTE DISPLAY WITH CHILLER CAPACITY

4. CHILLERS SHALL BE PROVIDED WITH LOUVERED PANELS TO PREVENT CONCEALMENT OF 6"x6"x6" EXPLOSIVE DEVICE WITHIN CHILLER ENCLOSURE AS REQUIRED BY UFC 4-010-01, LOW AMBIENT CONTROLS OPTION, CIRCUIT BREAKER, FUSED DISCONNECT SWITCH, AND EXTRA EVAPORATOR INSULATION FOR HIGH HUMIDITY ENVIRONMENTS.

* OA PROVIDED BY ERV

206 225

MCA MOCP

100 410A 10.1 200 56 44 15 460 3 600.0001 95 0 8 / 3.2 4 25% 100-75-50-25 206 225

AHU-3 HDT

AHU-4 HDT

AHU-5 HDT

CHWP-3

CHWP-4 SECONDARY

CHWP-5 SECONDARY

PRIMARY

PRIMARY

10000 650 3 15 460 3 60 500 238.8 211.0 73.0 60.5 52.5 51.4 40 44 10 2-WAY 20 500 MERV 8 MERV 16 SEE BELOW

10000 650 3 15 460 3 60 500 238.8 211.0 73.0 60.5 52.5 51.4 40 44 10 2-WAY 20 500 MERV 8 MERV 16 SEE BELOW

10000 650 3 15 460 3 60 500 238.8 211.0 73.0 60.5 52.5 51.4 40 44 10 2-WAY 20 500 MERV 8 MERV 16 SEE BELOW

2800 925 2.5 5 460 3 60 500 118.4 82.5 80.8 66.3 52.5 51.3 20 44 10 2-WAY 10 500 MERV 8 MERV 16 SEE BELOW

SERVES

FIRE RISER

MINI SPLIT AIR HANDLING UNIT SCHEDULE

MARK

FAN DATA COOLING CYCLE

MCA MOCP

BASIS OF DESIGN

NOTESAIRFLOW

CFM

FAN MOTOR TOTAL

CAPACITY

MBH

SENSABLE

CAPACITY

MBH

AIR SIDE

SEER MAKE MODEL

ELEC. V/ф/Hz

EAT °F

DB WB

MSAHU 1 850 208-230/1/60 22 17.03 80 67 21 23 35 LIEBERT SRC24 REFER TO ALL NOTES

NOTES:

1. COOLING CYCLE RATED AT ARI CONDITIONS OF 95°F AMB., 80°F D.B. AND 67°F W.B. COIL ENTERING.

2. HEATING CYCLE RATED AT ARI CONDITIONS OF 47°F AMB., 70°F D.B. AND 60°F W.B. COIL ENTERING.

3. SEER SCHEDULED IS MINIMUM AT ARI CONDITIONS.

4. HSPF SCHEDULED IS MINIMUM AT ARI CONDITIONS.

5. ADJUST LOCATION OF UNITS AS REQUIRED FOR SERVICE AS RECOMMENDED BY MANUFACTURER.

6. PIPE ALL CONDENSATE FROM UNITS TO DRAIN WITH TRAP.

7. PROVIDE CONDENSATE PUMP.

8. OUTDOOR UNIT POWERS INDOOR UNIT. CONTRACTOR SHALL COORDINATE WITH ELECTRICAL.

MINI SPLIT CONDENSING UNIT SCHEDULE

MARK

COOLING CYCLE REFRIGERANT COMPRESSOR DATA FAN DATA

MCA MOCP

BASIS OF DESIGN

NOTESTOTAL

CAPACITY

MBH

AMBIENT °F SEER TYPE TYPE QTY ELEC. V/ф/Hz MAKE MODEL

MSCU 1 22 95 21 R-410A TWIN ROTARY 1 208-230/1/60 23 35 LIEBERT SRC24 REFER TO ALL NOTES

NOTES:

1. UNITS SHALL BE MOUNTED ON 6" THICK 3,500PSI CONCRETE EQUIPMENT PADS USING STAINLESS STEEL FASTENERS.

2. SEER SCHEDULED IS MINIMUM AT ARI CONDITIONS.

3. HSPF SCHEDULED IS MINIMUM AT ARI CONDITIONS.

4. OUTDOOR UNIT POWERS INDOOR UNIT. CONTRACTOR SHALL COORDINATE WITH ELECTRICAL.

5. UNIT SHALL BE ENERGY STAR WHERE APPLICABLE.

ESF SEE BELOW

ESF SEE BELOW

ESF 3.5 x 2.5 400 65 1760 75% 10 460 3 60 SEE BELOW

ESF 3.5 x 2.5 400 65 1760 75% 10 460 3 60 SEE BELOW

2.5 x 2 200 50 1760 70% 5 460 3 60

2.5 x 2 200 50 1760 70% 5 460 3 60

BUFFER TANK SCHEDULE

MARK SERVICE

VOLUME GAL.

NOTES

TANK MIN.

INLET

SIZE

OUTLET

SIZE

BT-1 ACC-1 & 2 1000 6" 6" REFER TO ALL NOTES

NOTES:

1. ASME SECTION VIII CONSTRUCTION. PROVIDE

VERTICAL TANK WITH VERTICAL INTERNAL

BAFFLE. TANK SHALL BE FIELD INSULATED AND

JACKETED WITH UV RESISTANT COATING.

TANK SHALL FORM FACTORY WITH BASE RING

SUITABLE FOR MOUNTING ON LEVEL SURFACE.

PROVIDE 4" CONCRETE PAD FOR MOUNTING TANK.

UH-2 5 KW 350 HORIZ. 0.01 1600 15.9 208 1 60MECH

7. PROVIDE CONDENSATE OUTLET ON EITHER SIDE OF UNIT.

No. Revision Date

1 ADDENDU

M#1

10/29/21

8. INTERNAL VIBRATION ISOLATORS FROM MANUFACTURER.

F-35 Simulator Facility 18049/FAKZ 189019 31 March 2021 187th Fighter Wing, Dannelly Field ANG Revised Type B-3 (100%) Submittal Montgomery, AL Revised 16 November 2021

EARTHWORK 31 2210 - 1

SECTION 31 2210 - EARTHWORK

PART 1 GENERAL

1.01 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including requirements of the Government's Solicitation and Division 01 Specification Sections, apply to this Section.

1.02 SUMMARY

A. This Section includes the following:

1. Preparing subgrades for slabs-on-grade, walks, pavements, lawns, and plantings.

2. Excavating and backfilling for buildings and structures.

3. Drainage course for slabs-on-grade.

4. Fine grading, topsoiling and preparing lawn areas.

5. Excavating and backfilling trenches within building lines.

6. Excavating and backfilling trenches for buried mechanical and electrical utilities and pits for buried utility structures.

7. Geotechnical Reports applicable to this project.

8. Preparing crushed aggregate base for asphalt pavement areas. (Modified by Addendum No. 2)

B. Related Sections include the following:

1. Division 2 Section "Site Clearing" for site stripping, grubbing, removing topsoil, and protecting trees to remain.

2. Division 2 Section “Sodding” for placing of sod for lawn areas.

1.03 DEFINITIONS

A. Backfill: Soil materials used to fill an excavation.

1. Initial Backfill: Backfill placed beside and over pipe in a trench, including haunches to support sides of pipe.

2. Final Backfill: Backfill placed over initial backfill to fill a trench.

Montgomery, AL Revised 16 November 2021

EARTHWORK 31 2210 - 2

B. Bedding Course: Layer placed over the excavated subgrade in a trench before laying pipe.

C. Borrow: Satisfactory soil imported from off-site for use as fill or backfill.

D. Drainage Course: Layer supporting slab-on-grade used to minimize capillary flow of pore water.

E. Excavation: Removal of material encountered above subgrade elevations.

1. Additional Excavation: Excavation below subgrade elevations as directed by the Government. Additional excavation and replacement material will be paid for according to Contract provisions for changes in the Work.

2. Bulk Excavation: Excavations more than 10 feet in width and pits more than 30 feet in either length or width.

3. Unauthorized Excavation: Excavation below subgrade elevations or beyond indicated dimensions without direction by the Government. Unauthorized excavation, as well as remedial work directed by the Government, shall be without additional compensation.

F. Fill:…

This is the start of the file's text. The full file is on GovTribe.