Justification and Approval for Brand Name-Sole Source - Pavers_Redacted.pdf

PDF 112 KB Posted

Attached to
187 FW F35 Simulator & Base Supply New Construction Federal contract opportunity
Solicitation number
W50S6N-22-B-0001
Issued by
Department of the Army Alabama Army National Guard

About this file

This justification document approves a sole source procurement of Moduline Series paver systems from Belgard for use in five construction projects at an Air National Guard base in Alabama. The projects include building a new F-35 simulator facility and supply complex, with a pedestrian concourse connecting the facilities. To ensure uniform appearance across projects, the justification cites using the same paver product throughout to match existing architecture and maintain consistent color and finish. The contracting officer approved the sole source based on the proprietary nature of the Belgard pavers and need for color consistency in the concourse.

The related federal contract opportunity is a solicitation for firm fixed-price construction of the F-35 simulator facility and supply complex projects. The combined magnitude is between $10-25 million. The NAICS code is 236220. The award is 100% set aside for small businesses. A pre-bid conference will be held on October 26, 2021 for interested vendors to brief on bid requirements and site visit the project location.

View the file

Other files for this federal contract opportunity

Other files attached to 187 FW F35 Simulator & Base Supply New Construction, newest first.
File Type Posted
W50S6N-22-B-0001-0002.pdf PDF
W50S6N-22-B-0001-0001.pdf PDF
W50S6N-22-B-0001-0003.pdf PDF
ADDENDUM 003 - FAKZ999088 and FAKZ189019.pdf PDF
W50S6N-22-B-0002-0002.pdf PDF
ADDENDUM 2 FAKZ999088 and 189019 SIGNED.pdf PDF
RFI RESPONSES 001 FAKZ999088 and 189019 REVISED SIGNED.pdf PDF
W50S6N-22-B-0002-0001.pdf PDF
FAKZ999088 - FAKZ189019 Addendum Number 1.pdf PDF
Pre Bid Attendance Roster.pdf PDF
Pre Bid Slides_SIMSUPPLY.pdf PDF
Attachment 4_FAKZ189019 Specs VOL 1.pdf PDF
Attachment 6_FAKZ999088 SPECS VOL 1.pdf PDF
J and A for Brand Name-Sole Source - Advantor_Redacted.pdf PDF
Attachment 7_FAKZ999088 SPECS VOL 2.pdf PDF
J and A for Brand Name-Sole Source - Johnson Controls_Redacted.pdf PDF
J and A for Brand Name-Sole Source - Krieger_Redacted.pdf PDF
Entry Auth List.pdf PDF
W50S6N-22-B-0001 Solicitation.pdf PDF
Attachment 1_FAKZ189019 B3 Drawings.pdf PDF
Attachment 5_FAKZ189019 Specs VOL 2.pdf PDF
J and A for Brand Name-Sole Source - Monaco_Redacted.pdf PDF
Attachment 2_FAKZ999088 B3 Drawings.pdf PDF
Attachment 3_Consolidated General Specs.pdf PDF
J and A for Brand Name-Sole Source - Stanley Best Locks_Redacted.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Justification and Approval for Other Than Full and Open Competition

Sole Source Items within a Construction Project AFARS 5153.303-5

USPFO Alabama

Type of Action: Contract Type: Funding Type:

Name and describe the required supplies/services

New Contract Firm Fixed Price MILCON

FAKZ189019 – F-35 Simulator Facility & FAKZ999088 - Replace Base Supply Complex

The scope of work with relation to the limited sources includes the construction of a new 19,000 square foot F-35 Simulator Facility as well as construction of a 39,000 sf Supply facility. This project includes a portion of a Pedestrian Concourse that projects to combine multiple facilities together. This Pedestrian Concourse will be constructed with pavers. The final product of the Pedestrian Concourse will not be seen until 5 projects are completed. A percentage of this walkway will be constructed in each of the five different projects.

United States Code 3304(a)(1) as implemented in Federal Acquisition Regulation 6.302-1(a)(2)(ii)(B), Only one responsible source and no other supplies or services will satisfy agency requirements.

In order to ensure a uniform appearance through the entire Pedestrian Concourse, the product used to construct the Pedestrian Concourse for each project must be the same product used in each of the five projects. The justification for limited source is to ensure color consistency and an overall uniform appearance of the Pedestrian Concourse.

Risk: The Pedestrian Concourse, although broken across multiple project scopes, is continuous and the potential use of multiple paver manufacturers would result in inconsistency of size, color, and finish of pavers that would have a detrimental impact to overall aesthetic of the concourse. The concourse will cover a span of ground including the Base Supply, the F-35 Simulator, the Squadron Operations Building, the Aircraft Maintenance Unit, and the Weapons Load Training projects.

I certify that the supporting data under my cognizance, which are included in the justification are accurate and complete to the best of my knowledge and belief.

Date:

A pre-solicitation notice is placed in beta.sam.gov in order to give contractors an early notification of this project. However, due to the proprietary nature of the Moduline Series Paver System | Moduline Plank Pavers (belgard.com), no effort to compete these brand name requirements will be made.

None.

Research was done to find a paver that matched the existing base architecture and color scheme in order to create consistency throughout the base. Moduline Series Paver System | Moduline Plank Pavers (belgard.com) is the only manufacturer that can ensure that deliver pavers that meet the requirement for consistent color and uniform appearance.

N/A

01-Apr-2021 Maj Adam Sanders

187 FW B187 FW Base Civil E

SANDERS.ADAM.WA

YNE.1110351549

Digitally signed by

SANDERS.ADAM.WAYNE.1110351549

Date: 2021.04.01 12:51:44 -05'00'

I certify that the supporting data under my cognizance, which are included in the justification are accurate and complete to the best of my knowledge and belief.

Date:

I certify that this justification is accurate and complete to the best of my knowledge and belief.

Date:

01-Apr-2021 Maj Adam Sanders

187 FW B187 FW Base Civil E

SANDERS.ADAM.WA

YNE.1110351549

Digitally signed by

SANDERS.ADAM.WAYNE.1110351549

Date: 2021.04.01 12:51:56 -05'00'

06-Jul-2021 William 'Craig' Kast

Contracting Officer

KAST.WILLIAM.CRAI

G.1110182933

Digitally signed by

KAST.WILLIAM.CRAIG.1110182933

Date: 2021.07.06 18:38:03 -05'00'

Based on the foregoing justification, I hereby approve the procurement of on an other than full and open competition basis pursuant to the authority of subject to availability of funds, and provided that the services and property herein described have otherwise been authorized for acquisition.

Moduline Series Paver System | Moduline Plank Pavers (belgard.com).

United States Code 3304(a)(1) FAR 6.302-1(a)(2)(ii)(B), Only one responsible source and no other supplies or services will satisfy agency

07-Jul-2021 William 'Craig' Kast

Contracting Officer

KAST.WILLIAM.CRAI

G.1110182933

Digitally signed by

KAST.WILLIAM.CRAIG.1110182933

Date: 2021.07.07 16:54:51 -05'00'

File details come from the government source that posted it. Updated .