This document contains a justification and approval for other than full and open competition on a federal construction contract. The Alabama National Guard intends to award a firm fixed-price contract to construct a new 19,000 square foot F-35 Simulator Facility and a new 39,000 square foot Base Supply complex at a cost between $10-25 million. The projects require facilities be constructed to Intelligence Community Directive standards and include proprietary Monaco brand fire alarm systems that integrate with existing systems. A pre-bid conference will be held on October 26, 2021 for interested vendors to review requirements, with site visits following and response lists due by October 21. The North American Industry Classification for this small business set-aside is 236220, with a $39.5 million size standard.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Justification and Approval for Other Than Full and Open Competition
Sole Source Items within a Construction Project AFARS 5153.303-5
USPFO Alabama
Type of Action: Contract Type: Funding Type:
Name and describe the required supplies/services
New Contract Firm Fixed Price MILCON
FAKZ189019 – F-35 Simulator Facility & FAKZ999088 - Replace Base Supply Complex
The scope of work with relation to the limited sources includes the construction of a new 19,000 square foot F-35 Simulator Facility as well as construction of a 39,000 sf Supply facility. The Simulator Facility includes a large Secure Access Program Facility (SAPF) with multiple Compartmentalized Areas (SAPCA) and the Supply facility includes a smaller SAPF footprint. The SAPF areas in each facility are required to be constructed to the Intelligence Community Directive No. 705 (ICD-705) including STC rated construction, access control systems, and intrusion detection systems. This construction requires tests/inspections conducted by the Air Force that have to be passed before the facility is authorized to use.
The Simulator facility and the Supply Building have associated Fire Alarm systems that are required to be included in the project in order to be able to communicate with the existing fire alarms system equipment located in the on base Fire Department.
United States Code 3304(a)(1) as implemented in Federal Acquisition Regulation 6.302-1(a)(2)(ii)(B), Only one responsible source and no other supplies or services will satisfy agency requirements.
The 187th currently uses the Monaco fire alarm system base wide. We currently have a Monaco system installed at the Fire Department and in order for the alarm system at the F-35 Simulator Facility and the new Base Supply Facility to be compatible and be able to communicate with the existing system at the Fire Department, the system installed must be Monaco. No other fire alarm transceiver will integrate with the Monaco system. Total replacement cost of these systems do not present an effective use of government resources at this time.
I certify that the supporting data under my cognizance, which are included in the justification are accurate and complete to the best of my knowledge and belief.
Date:
A pre-solicitation notice is placed in beta.sam.gov in order to give contractors an early notification of this project. However, due to the proprietary nature of the Monaco system no effort to compete these brand name requirements will be made.
None.
In general fire alarm systems are not designed to be compatible with different fire alarm manufactures.
Utilizing other manufacturers would necessitate the purchase of additional centralized monitoring systems for the the F-35 Simulator Facility, the new Base Supply Facility and Fire Department.
N/A
01-Apr-2021 Maj Adam Sanders
187 FW Base Civil Engineer
SANDERS.ADAM.WA
YNE.1110351549
Digitally signed by
SANDERS.ADAM.WAYNE.1110351549
Date: 2021.04.01 12:25:00 -05'00'
I certify that the supporting data under my cognizance, which are included in the justification are accurate and complete to the best of my knowledge and belief.
Date:
I certify that this justification is accurate and complete to the best of my knowledge and belief.
Date:
01-Apr-2021 Maj Adam Sanders
187 FW Base Civil Engineer
SANDERS.ADAM.WA
YNE.1110351549
Digitally signed by
SANDERS.ADAM.WAYNE.1110351549
Date: 2021.04.01 12:25:09 -05'00'
06-Jul-2021 William 'Craig' Kast
Contracting Officer
KAST.WILLIAM.CRAI
G.1110182933
Digitally signed by
KAST.WILLIAM.CRAIG.1110182933
Date: 2021.07.06 18:46:33 -05'00'
Based on the foregoing justification, I hereby approve the procurement of on an other than full and open competition basis pursuant to the authority of subject to availability of funds, and provided that the services and property herein described have otherwise been authorized for acquisition.
Monaco System.
United States Code 3304(a)(1) FAR 6.302-1(a)(2)(ii)(B), Only one responsible source and no other supplies or services will satisfy agency
07-Jul-2021 William 'Craig' Kast
Contracting Officer
KAST.WILLIAM.CRAI
G.1110182933
Digitally signed by
KAST.WILLIAM.CRAIG.1110182933
Date: 2021.07.07 16:53:42 -05'00'
File details come from the government source that posted it. Updated .