This justification and approval document describes a sole source procurement for direct digital control systems from Johnson Controls for two construction projects at an Air National Guard base in Alabama. The projects include construction of a new 19,000 square foot F-35 Simulator Facility and a new 39,000 square foot Supply Facility, both of which require direct digital controls that are compatible with Johnson Controls' existing basewide system for standardization and interoperability purposes. The justification cites Federal Acquisition Regulation authority for a sole source procurement when only one responsible source can satisfy the agency's requirements.
The related federal contract opportunity is a solicitation for a firm fixed-price construction contract valued between $10-25 million to build the two new facilities. The pre-bid conference will be held on October 26, 2021 and bids are due by an unspecified date. The North American Industry Classification code is 236220 and the procurement is 100% set aside for small businesses with a size standard of $39.5 million. The soliciting agency is the Department of the Army Alabama Army National Guard.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Justification and Approval for Other Than Full and Open Competition
Sole Source Items within a Construction Project AFARS 5153.303-5
USPFO Alabama
Type of Action: Contract Type: Funding Type:
Name and describe the required supplies/services
New Contract Firm Fixed Price MILCON
FAKZ189019 – F-35 Simulator Facility & FAKZ999088 - Replace Base Supply Complex
The scope of work with relation to the limited sources includes the construction of a new 19,000 square foot F-35 Simulator Facility as well as construction of a 39,000 sf Supply facility. The Simulator Facility includes a large Secure Access Program Facility (SAPF) with multiple Compartmentalized Areas (SAPCA) and the Supply facility includes a smaller SAPF footprint. The SAPF areas in each facility are required to be constructed to the Intelligence Community Directive No. 705 (ICD-705) including STC rated construction, access control systems, and intrusion detection systems. This construction requires tests/inspections conducted by the Air Force that have to be passed before the facility is authorized to use.
The Simulator facility and the Supply Building have associated Mechanical Systems including chilled/hot water HVAC systems with redundant air handlers and chillers for facility resilience. They also have Reverse Osmosis water treatment systems and dedicated humidifiers for precise humidity control. The Simulator Facility also includes multiple dedicated computer room air conditioners to support F-35 simulator systems. This system will include the installation of a direct digital control system for each facility. The associated Electrical Systems include new pad mounted transformer, electrical distribution system, surge protection and lightning protection systems. Fiber optic service is provided from Building 1109. Secure and non-secure telecommunications are the backbone systems for compliance with applicable ICD-705 requirements.
United States Code 3304(a)(1) as implemented in Federal Acquisition Regulation 6.302-1(a)(2)(ii)(B), Only one responsible source and no other supplies or services will satisfy agency requirements.
The 187th exclusively utilizes Johnson Controls for HVAC system's Direct Digital Controls. This is the only manufacturer that is utilized basewide for reasons of standardization and guaranteed interoperability.
Risk: If the 187th built a facility that does not utilize this system, the ability to control and monitor base utilities would be compromised. Utilizing other manufacturers would necessitate the purchase of additional centralized monitoring systems for the the F-35 Simulator Facility and the new Base Supply Facility as well as Civil Engineering B1801. According to ANGETL 15-01-04, 20.1 "All ANG facility and site projects should provide or expand on the base Energy Management Control System (EMCS). All ANG facility HVAC systems should use complete DDC systems."
I certify that the supporting data under my cognizance, which are included in the justification are accurate and complete to the best of my knowledge and belief.
Date:
A pre-solicitation notice is placed in beta.sam.gov in order to give contractors an early notification of this project. However, due to the proprietary nature of the Johnson Controls system no effort to compete these brand name requirements will be made.
None.
Direct Digital Control (DDC) systems are not designed to be compatible with different DDC manufactures. Utilizing other manufacturers would necessitate the purchase of additional centralized monitoring systems for the the F-35 Simulator Facility, the new Base Supply Facility and Civil Engineering B1801.
N/A
01-Apr-2021 Maj Adam Sanders
187 FW Base Civil Engineer
SANDERS.ADAM.WA
YNE.1110351549
Digitally signed by
SANDERS.ADAM.WAYNE.1110351549
Date: 2021.04.01 12:18:02 -05'00'
I certify that the supporting data under my cognizance, which are included in the justification are accurate and complete to the best of my knowledge and belief.
Date:
I certify that this justification is accurate and complete to the best of my knowledge and belief.
Date:
01-Apr-2021 Maj Adam Sanders
187 FW Base Civil Engineer
SANDERS.ADAM.WA
YNE.1110351549
Digitally signed by
SANDERS.ADAM.WAYNE.1110351549
Date: 2021.04.01 12:18:19 -05'00'
06-Jul-2021 William 'Craig' Kast
Contracting Officer
KAST.WILLIAM.CRAI
G.1110182933
Digitally signed by
KAST.WILLIAM.CRAIG.1110182933
Date: 2021.07.06 18:51:21 -05'00'
Based on the foregoing justification, I hereby approve the procurement of on an other than full and open competition basis pursuant to the authority of subject to availability of funds, and provided that the services and property herein described have otherwise been authorized for acquisition.
Johnson Controls System.
United States Code 3304(a)(1) FAR 6.302-1(a)(2)(ii)(B), Only one responsible source and no other supplies or services will satisfy agency
07-Jul-2021 William 'Craig' Kast
Contracting Officer
KAST.WILLIAM.CRAI
G.1110182933
Digitally signed by
KAST.WILLIAM.CRAIG.1110182933
Date: 2021.07.07 16:49:25 -05'00'
File details come from the government source that posted it. Updated .