Attachment 9 - Protoype Testing Outline Updated 14APR2026.pdf

PDF 142 KB Posted

Attached to
Precision Grenadier System Prototype Project Opportunity (PPON)
Solicitation number
W15QKN-26-R-1BH5
Issued by

About this file

This document is a test requirements specification for weapons, ammunition, and fire control systems. It outlines detailed testing procedures and ammunition quantities across four ammunition variants: Training Round (TP), Counter Defilade Round (CD), Close Quarters Battle Round (CQB), and Counter-UAS Round (C-UAS).

Weapons Testing Requirements: The weapons testing phase requires 15 different weapon units and approximately 15,865 total rounds for Training Round, 830 for Counter Defilade, 470 for Close Quarters Battle, 15 for Primed Cases, and 600 for Counter-UAS variants. Tests include inspection, parts interchange, zero repeatability, zero retention, recoil, kinematics, reliability/durability, firing table ballistic matching, temperature extremes (ranging from -25°F to 160°F), ricochet, noise, toxic fumes, flash, unlubricated operation, thermal shock, altitude, solar radiation, dust, mud, humidity, rain, fresh water immersion, salt fog, and drop testing. All testing follows Test Operations Procedure 03-2-045A for Small Arms - Hand and Shoulder Weapons and Machine Guns.

Ammunition and Fire Control Testing: Ammunition testing requires approximately 680 rounds for Training, 1,165 for Counter Defilade, 710 for Close Quarters Battle, and 1,285 for Counter-UAS rounds. Tests include dispersion, sequential rough handling, electronic pressure/velocity/action time measurement, airburst accuracy, fuze arming, fuze graze sensitivity, fuze impact safety, point detonation, and long-term storage. Fire control systems testing encompasses 18 units and includes optical performance (magnification, resolution, transmittance, coatings), laser ranging and aiming capabilities (visible and infrared), ballistic calculations, environmental conditions (temperature, humidity, salt fog, immersion), reliability, electromagnetic effects, and material compatibility. All test quantities and methods are approximations subject to change.

View the file

Other files

File Type Posted
W15QKN-26-R-1BH5 PPON PGS QandAs - 2026MAY29.docx DOCX document
W15QKN-26-R-1BH5 PPON PGS QandAs - 2026MAY27.docx DOCX document
PGE PPON Updated 20MAY2026.docx DOCX document
W15QKN-26-R-1BH5 PPON PGS QandAs - 2026MAY19.docx DOCX document
W15QKN-26-R-1BH5 PPON PGS QandAs - 2026MAY18.docx DOCX document
Attachment 15 - PGS Model OTA DRAFT Updated 2026MAY07.docx DOCX document
W15QKN-26-R-1BH5 PPON PGS QandAs - 2026MAY11.docx DOCX document
W15QKN-26-R-1BH5 PPON PGS QandAs - 2026APR30.pdf PDF
PGS PPON Updated 28APR2026.docx DOCX document
Attachment 18 - Weapons Sample SLA.docx DOCX document
Attachment 17 - Ammunition Sample SLA.docx DOCX document
Attachment 16 - Fire Control Sample SLA.docx DOCX document
PGS PPON Updated14APR2026.docx DOCX document
Attachment 3 - Delivery Schedule Updated 14APR2026.pdf PDF
W15QKN-26-R-1BH5 PPON PGS QandAs - 2026APR17.docx DOCX document
Attachment 4 - Pricing Updated 14APR2026.xlsx XLSX spreadsheet
Attachment 15 - PGS Model OTA DRAFT Updated 14APR2026.docx DOCX document
W15QKN-26-R-1BH5 PPON PGS Questions and Answers - 2026APR13.pdf PDF
Attachment 21- Accounting System Questionnaire.pdf PDF
Non-Disclosure Non-Use Agreement.docx DOCX document
DD Form 2345 - Militarily Critical Technical Data Agreement.pdf PDF
AMSTA-AR 1350 - Data Request Questionnaire.pdf PDF
Attachment 19 - Business Status Certification.pdf PDF
Attachment 11 - Security Information Requirements.pdf PDF
Attachment 9 - Prototype Test Outline.pdf PDF
Attachment 3 -Delivery Schedule.pdf PDF
Attachment 7 - User Acceptance.pdf PDF
Attachment 14- Ammo Packaging Drawings.pdf PDF
Attachment 12 - Mount Drawings.pdf PDF
Attachment 5_ICD TDP Worksheet.pdf PDF
Attachment 6 -Operational Effectiveness.pdf PDF
Attachment 4 - Pricing .xlsx XLSX spreadsheet
Attachment 17 - Ammunition - Sample SLA.pdf PDF
Attachment 16 - Fire Control - Sample SLA.pdf PDF
Attachment 8_Weapons_Ammo_FC TDP Worksheet.pdf PDF
Attachment 18 - Weapons Sample SLA.pdf PDF
Attachment 15 - PGS Model OTA DRAFT 23JAN2026.docx DOCX document
Attachment 10 - Available Maintenance Tools.pdf PDF
PGS PPON Final 01APR2026.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Training Round

Counter Defilade Round

Close Quarters

Battle Round

Primed Cases

Counter-sUAS

Round*

Training Round

Counter Defilade Round

Close Quarters

Battle Round

Prined Cases

Counter-sUAS

Round*

Inspection 12 35 0 0 0 0 420 0 0 0 0 Parts Interchange 12 35 0 0 0 0 420 0 0 0 0 Zero Repeatability 3 0 0 0 0 0 0 0 0 0 0 Zero Retention 1 370 0 0 0 0 370 0 0 0 0 Recoil 1 5 5 5 0 5 5 5 5 0 5 Kinematics 1 15 15 15 0 15 15 15 15 0 15 Reliability/Durability 3 2700 100 100 0 100 8100 300 300 0 300 Firing Table - Ballistic Match 1 165 120 0 0 120 165 120 0 0 120 High Temperature Operational (125 F) 2 915 15 15 0 15 1830 30 30 0 30 Extreme (160 F) 1 20 15 15 0 20 20 15 15 0 20 Low Temperature Operational (0 F) 2 1395 15 15 0 15 2790 30 30 0 30 Extreme (-25 F) 1 20 15 15 0 20 20 15 15 0 20 Ricochet 1 250 0 0 0 0 250 0 0 0 0 Attitudes 1 40 40 40 0 40 40 40 40 0 40 Noise 1 10 0 0 0 0 10 0 0 0 0 Toxic Fumes 1 10 10 10 0 10 10 10 10 0 10 Flash 1 10 10 10 0 10 10 10 10 0 10 Unlubricated 2 320 0 0 0 0 640 0 0 0 0 Thermal Shock 2 30 10 0 0 0 60 20 0 0 0 Altitude 2 30 10 0 0 0 60 20 0 0 0 Solar Radiation 2 30 10 0 0 0 60 20 0 0 0 Dust 2 50 25 0 0 0 100 50 0 0 0 Wet Mud 2 15 0 0 0 0 30 0 0 0 0 Dry Mud 2 15 0 0 0 0 30 0 0 0 0 Humidity 2 40 20 0 0 0 80 40 0 0 0 Rain 1 120 0 0 0 0 120 0 0 0 0 Fresh Water Immersion 3 30 10 0 0 0 90 30 0 0 0 Salt Fog 3 40 20 0 0 0 120 60 0 0 0 1.5-m (5ft) Drop onto Concrete 3 0 0 0 5 0 0 0 0 15 0 Chemical Compatibility Coupons Only 0 0 0 0 0 0 0 0 0 0

TP CD CQB Primed Cases C-UAS

TOTALS: 15865 830 470 15 600

NOTE: All tests will be performed in general accordance with Test Operations Procedure 03-2-045A Small Arms - Hand and Shoulder Weapons and Machine Guns. All tests, test methods, and quantities are approximations and are subject to change.

Subtest Number of Weapons

Quantity of Ammunition per Weapon Total Rounds

Training Round

Counter Defilade Round

Close Quarters

Battle Round

Counter-sUAS Round

Training Round

Counter Defilade Round

Close Quarters

Battle Round

Counter-sUAS Round

Dispersion 5 0 60 0 60 0 300 0 300 0 Sequential Rough Handling 1 0 320 320 320 320 320 320 320 320 Electronic Pressure, Velocity, and Action Time (EPVAT)

0 2 50 50 50 50 50 50 50 50

Airburst Accuracy 5 0 0 100 0 100 0 500 0 500 Fuze Arming 1 0 5 90 0 90 5 90 0 90 Fuze Graze Sensitivity 1 0 0 100 0 100 0 100 0 100 Fuze Impact Safety 1 0 0 5 0 5 0 5 0 5 Point Detonation 1 0 0 60 0 60 0 60 0 60 Long-Term Storage 1 0 5 40 40 40 5 40 40 40 C-sUAS Targets (Sphere) 1 0 0 0 0 120 0 0 0 120

TP CD CQB C-UAS

TOTALS: 680 1165 710 1285

NOTE: All tests will be performed in general accordance with Test Operations Procedure 03-2-045A Ammunition Small Arms. All tests and quantities are approximations and are subject to change.

Subtest Number of Weapons

Quantity of Ammunition per Weapon Total Rounds

Number of

EPVAT

Barrels

Inspection 18 Ranging Capability with FWS-I 1 LRF Accuracy 3 Objective Interface 1 0.9-m (3 ft) Drop onto Dirt 3 Laser Filter Unit 1 Field of View 3 Anti-Reflection Device 1 Diopter Adjustment 3 Remote Mountable 1 Diopter Uniformity and Retention 3 Interconnection 1 Exit pupil 3 Communication Port / Wired Port 1 Clear Eye Distance 3 Maintenance Cable 1 Target Focus 3 Wireless Transmission Distance 3 Magnification 3 Network Configuration 3 Modulation Transfer Function 3 Network Association 3 Resolution Limit 3 Sensors Inclination Angle 3 Transmittance 3 Sensors Optical Coatings (Need Samples) 3 Cant Angle 3 Veiling Glare 3 Temperature 3 Passive Reticle Focal Plane 1 Barometric Pressure 3 Passive Reticle Surface Quality 3 Humidity 3 Elevation / Windage Adjustment Range 3 Power Source 1 Reticle Cant 3 Reverse Polarity Protection 1 Display Zones 1 Battery Orientation Marking 1 Dynamic Reticle 1 Battery Compartment Cover 1 Dynamic Reticle Focal Plane 1 Battery Replacement 1 Diopter Reticle Offset 3 Battery Level Monitor 1 Eye Box 3 Battery Run Time (all temps) Visibility 3 Ambient (70 F) 3 Luminance Degradation 3 Operational Hot (125 F) 3 Display Burn-in 3 Extreme Hot (160 F) 3 Response Time 3 Operational Cold (0 F) 3 LRF Ranging Capability 3 Extreme Cold (-25 F) 3 Beam Divergance 3 Software Standby Mode Inactivity 3 Wavelength 3 Start-Up/Wake-Up Time 3 Range Accuracy 3 System Updates 1 False Alarm 1 Ballistic Solver Computation Time 3 Adjustment Range 3 Target Reference Points 1 Coded Spot Tracking 3 System Accuracy - Reticle Boresight Error 3 Laser Safety 1 Reticle Calibration Error 3 Visible Laser Parallax Error 3 Visible Aiming Laser Capability 3 Magnification Switch Adjustment Error 3 Beam Divergence 3 Applied Forces 3 Wavelength 3 LRF Error Boresight 3 Output Power and Irradiance 3 Boresight Repeatability (Reattachment) 3 Laser Safety 3 Boresight Retention (Gunfire Pyroshock)* 3 Laser Activation 3 Low Pressure (High Altitude) 3 Infrared Aiming Laser Operational Temperature 5 Aiming Laser Capability 3 Storage Temperature 3 Beam Divergence 3 Temp Shock 3 Wavelength 3 Solar Radiation 3 Output Power and Irradiance 3 Transportation and Vibration 3 Laser Safety 1 Humidity 3 Laser Activation 3 Salt Fog 3 Lens Protection 1 Immersion 5 Operational Torque 3 Transport Drop 3 Glint Suppression 3 Optical Quality and Cleanliness 3 Size (length, height, width) 1 Gunfire During Rain* 3 Surface finish 3 Chemical Compatibility Coupons Only Color 3 Dust* 3 NIR Reflectance 3 Electromagnetic Effects 2 Transport Case (if available) 1 System Reliability* 3 Mount 1 Detectable Emissions 3 Operating Orientation 1 Material 1 Captive Mounting Hardware 1 Workmanship 3 Interference 1 Marking 1 Ballistic Laser Protective Spectacles 1 Cooperative Vulnerability Identification 1 Optical Center Line 1 3D Print 1

NOTE: All tests and quantities are approximations and are subject to change.

*Conducted during Weapon testing

Subtest Number of Fire Controls Subtest

Number of Fire Controls

PT Weapon
PT Ammo
PT Fire Control

File details come from the government source that posted it. Updated .