Attachment 5_ICD TDP Worksheet.pdf

PDF 255 KB Posted

Attached to
Precision Grenadier System Prototype Project Opportunity (PPON)
Solicitation number
W15QKN-26-R-1BH5
Issued by

About this file

This document is a Technical Data Package (TDP) Option Selection Worksheet from MIL-STD-31000B, a military standard for technical data deliverables in federal contracts.

The worksheet is a template used to specify and tailor TDP requirements for individual contracts. It captures critical selections across twelve sections: (1) TDP level (Conceptual, Developmental, or Product); (2) type and format of deliverables, including 2D drawings and 3D models in various formats such as native CAD (CREO 12, SolidWorks 2024 or older preferred), ISO 32000 PDF, STEP files, or neutral formats; (3) cage code and document numbering conventions; (4) drawing format preferences (contractor or government format); (5) specific TDP elements required, such as engineering design data, specifications, software documentation, quality assurance provisions, and special tooling or packaging instructions; (6) applicable ASME standards for engineering drawings and practices; (7) associated lists including parts lists, data lists, wiring lists, and application lists with options for integral, separate, or contractor-selected formats; (8) TDP data management products such as technical data package lists, source control approval requests, and engineering drawing trees; (9) metadata requirements; (10) supplementary data requirements; and (11) other tailoring provisions. The worksheet notes that 2D or 3D format is acceptable if preferred native CAD is provided, and that STEP files are not required when native CAD is supplied. Interface control data must be provided in universally viewable format (ISO 32000 PDF) but may be supplemented with CAD. The document requires completion by the procuring activity with title, signature, and date.

View the file

Other files

File Type Posted
W15QKN-26-R-1BH5 PPON PGS QandAs - 2026MAY29.docx DOCX document
W15QKN-26-R-1BH5 PPON PGS QandAs - 2026MAY27.docx DOCX document
PGE PPON Updated 20MAY2026.docx DOCX document
W15QKN-26-R-1BH5 PPON PGS QandAs - 2026MAY19.docx DOCX document
W15QKN-26-R-1BH5 PPON PGS QandAs - 2026MAY18.docx DOCX document
Attachment 15 - PGS Model OTA DRAFT Updated 2026MAY07.docx DOCX document
W15QKN-26-R-1BH5 PPON PGS QandAs - 2026MAY11.docx DOCX document
W15QKN-26-R-1BH5 PPON PGS QandAs - 2026APR30.pdf PDF
PGS PPON Updated 28APR2026.docx DOCX document
Attachment 17 - Ammunition Sample SLA.docx DOCX document
Attachment 18 - Weapons Sample SLA.docx DOCX document
Attachment 16 - Fire Control Sample SLA.docx DOCX document
PGS PPON Updated14APR2026.docx DOCX document
Attachment 3 - Delivery Schedule Updated 14APR2026.pdf PDF
Attachment 9 - Protoype Testing Outline Updated 14APR2026.pdf PDF
W15QKN-26-R-1BH5 PPON PGS QandAs - 2026APR17.docx DOCX document
Attachment 4 - Pricing Updated 14APR2026.xlsx XLSX spreadsheet
Attachment 15 - PGS Model OTA DRAFT Updated 14APR2026.docx DOCX document
W15QKN-26-R-1BH5 PPON PGS Questions and Answers - 2026APR13.pdf PDF
Attachment 21- Accounting System Questionnaire.pdf PDF
DD Form 2345 - Militarily Critical Technical Data Agreement.pdf PDF
Non-Disclosure Non-Use Agreement.docx DOCX document
AMSTA-AR 1350 - Data Request Questionnaire.pdf PDF
Attachment 19 - Business Status Certification.pdf PDF
Attachment 11 - Security Information Requirements.pdf PDF
Attachment 9 - Prototype Test Outline.pdf PDF
Attachment 3 -Delivery Schedule.pdf PDF
Attachment 7 - User Acceptance.pdf PDF
Attachment 17 - Ammunition - Sample SLA.pdf PDF
Attachment 16 - Fire Control - Sample SLA.pdf PDF
Attachment 8_Weapons_Ammo_FC TDP Worksheet.pdf PDF
Attachment 14- Ammo Packaging Drawings.pdf PDF
Attachment 12 - Mount Drawings.pdf PDF
Attachment 6 -Operational Effectiveness.pdf PDF
Attachment 4 - Pricing .xlsx XLSX spreadsheet
Attachment 18 - Weapons Sample SLA.pdf PDF
Attachment 15 - PGS Model OTA DRAFT 23JAN2026.docx DOCX document
Attachment 10 - Available Maintenance Tools.pdf PDF
PGS PPON Final 01APR2026.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MIL-STD-31000B

TDP OPTION SELECTION WORKSHEET

SYSTEM: DATE PREPARED:

A. CONTRACT NO. B. EXHIBIT/ATTACHMENT

NO.

C. CLIN D. CDRL DATA ITEM NO.

1. TDP LEVEL (CHOOSE ONLY ONE PER WORKSHEET). Note: The level selected must coincide with the requirements of the elements selected in block 5.

A. CONCEPTUAL LEVEL

DEVELOPMENTAL LEVEL

PRODUCT LEVEL

B. REMARKS:

2. TYPE AND FORMAT (X all that apply and complete as applicable.)

A. TYPE 2D: 2D DRAWINGS(describe in detail in remarks below or in block 11):

NATIVE 2D CAD (SPECIFY TYPE): ____________________________________________________________

ISO 32000 PDF

HARD COPY

OTHER FORMAT (SPECIFY TYPE): ____________________________________________________________

REMARKS :

B. TYPE 3D: 3D MODEL BASED (describe in detail in remarks below or in block 11):

NATIVE 3D CAD (SPECIFY TYPE): _____________________________________________________________ 3Di VIEWABLE* FORMAT DERIVED FROM 3D NATIVE MODELS (Specify type, i.e. ISO 32000 PDF etc.).

NEUTRAL FORMAT DERIVED FROM 3D NATIVE MODELS (Specify type, i.e. STEP AP203, AP 214 etc.).

2D DRAWINGS DERIVED FROM 3D NATIVE MODELS (Specify type, i.e. ISO 32000 PDF etc.).

OTHER FORMAT (SPECIFY TYPE): _____________________________________________________________

*NOTE: 3Di viewable will be in ISO 32000 pdf format unless otherwise specified.

REMARKS :

3. CAGE CODE AND

DOCUMENT NUMBERS

A. CONTRACTOR CAGE & DOCUMENT NUMBERS

GOVERNMENT CAGE & DOCUMENT NO. (COMPLETE 3B, 3C, AND 3D)

B. USE CAGE CODE: C. USE DOCUMENT NUMBERS: D. TO BE ASSIGNED BY:

4. DRAWING FORMATS AND/OR 3Di PDF FORMAT (X one and complete as applicable)

CONTRACTOR FORMAT GOVERNMENT FORMAT

REMARKS:

5. TDP ELEMENTS REQUIRED (X all that apply )

ELEMENTS REQUIRED TO BE DETERMINED BY CONTRACTOR

OR THE FOLLOWING ARE REQUIRED:

CONCEPTUAL ENGINEERING DESIGN DATA

DEVELOPMENTAL ENGINEERING DESIGN DATA AND ASSOCIATED LISTS

PRODUCT ENGINEERING DESIGN DATA AND ASSOCIATED LISTS

COMMERCIAL ENGINEERING DESIGN DATA AND ASSOCIATED LISTS

SPECIAL INSPECTION EQUIPMENT (SIE) ENGINEERING DESIGN DATA AND ASSOCIATED LISTS

SPECIAL TOOLING ENGINEERING DESIGN DATA AND ASSOCIATED LISTS

SPECIFICATIONS

SOFTWARE DOCUMENTATION

SPECIAL PACKAGING INSTRUCTIONS (SPI) ENGINEERING DESIGN DATA AND ASSOCIATED LISTS QUALITY ASSURANCE PROVISIONS (QAPs)

6. APPLICABILITY OF STANDARDS. The following Standards apply: (X as applicable)

ASME Y14.100

ENGINEERING DRAWING

PRACTICES

WITH APPENDICES:

B C D E

Company stds permitted? Y/N

ASME Y14.24 TYPES AND APPLICATIONS OF

ENGINEERING DRAWINGS

ASME Y14.34 ASSOCIATED LISTS

ASME Y14.35 REVISION OF ENGINEERING

DRAWINGS AND ASSOCIATED DOCUMENTS

ASME Y14.41 DIGITAL PRODUCT DEFINITION

DATA PRACTICES

ASME Y14.5 DIMENSIONING AND TOLERANCING

OTHER STANDARDS APPLY AS

DESCRIBED:

Source: https://assist.dla.mil -- Downloaded: 2020-10-14T19:30Z Check the source to verify that this is the current version before use.

sara.m.larson Text Box X sara.m.larson Text Box X sara.m.larson Text Box X sara.m.larson Text Box X sara.m.larson Text Box Drawing title block shall include, at a minimum, CAGE Code, drawing number sara.m.larson Text Box X sara.m.larson Text Box X sara.m.larson Text Box X sara.m.larson Rectangle sara.m.larson Text Box X sara.m.larson Text Box X sara.m.larson Text Box 2D or 3D Format is acceptable. See Section 11 sara.m.larson Text Box X sara.m.larson Text Box X sara.m.larson Text Box CREO 12 or older / SolidWorks 2024 or older preferred sara.m.larson Text Box 2D or 3D Format is acceptable. If preferred Native CAD is provided, STEP files are not required. Only one of either 3Di or 2D is required, as determined by contractor. See Section 11 sara.m.larson Text Box X sara.m.larson Text Box X

MIL-STD-31000B

TDP OPTION SELECTION WORKSHEET

A. CONTRACT NO. B. EXHIBIT/ATTACHMENT

NO.

C. CLIN D. CDRL DATA ITEM NO.

7. ASSOCIATED LISTS (X all that apply and complete as applicable.)

A. PARTS LISTS (X ONE)* (1) INTEGRAL (2) SEPARATE (3) CONTRACTOR SELECT

B. DATA LISTS REQUIRED (Specify Levels of ASSY) __________________________________

C. INDEX LISTS REQUIRED (Specify Levels of ASSY) __________________________________

D. WIRING LISTS (1) INTEGRAL (2) SEPARATE (3) CONTRACTOR SELECT

E. APPLICATION LISTS (1) INTEGRAL (2) SEPARATE

(3) PLM

MAINTAINED

(4) CONTRACTOR SELECT

F. OTHER REQUIRED(Specify Levels of ASSY) __________________________________

*NOTE: USE OF SEPARATE PARTS OR WIRING LISTS ARE NOT RECOMMENDED ESPECIALLY WITH TYPE 3D TDPS.

8. TDP DATA MANAGEMENT PRODUCTS

A. TECHNICAL DATA PACKAGE LIST (TDPL)

SOURCE CONTROL APPROVAL REQUEST

DOCUMENT NUMBER ASSIGNMENT REPORT

PROPOSED CRITICAL MANUFACTURING PROCESS DESCRIPTION

ENGINEERING DRAWING TREE

TO LOWEST REPAIRABLE UNIT (LRU) LEVEL

TO LOWEST COMPONENT LEVEL

OTHER (DESCRIBE):_______________________________________

B. REMARKS:

9. TDP METADATA

TDP METADATA REQUIRED (describe requirements):

10. TDP SUPPLEMENTARY DATA

TDP SUPPLEMENTARY DATA REQUIRED (describe requirements):

11. OTHER TAILORING (Attach additional sheets as necessary

12. PROCURING ACTIVITY TITLE, SIGNATURE AND DATE

TITLE: SIGNATURE: DATE:

FIGURE 5 (reference Para A.3)

Source: https://assist.dla.mil -- Downloaded: 2020-10-14T19:30Z Check the source to verify that this is the current version before use.

sara.m.larson Text Box X sara.m.larson Text Box Section 2: Section 2: The interface control data should be provided in a universally viewable format (ISO 32000 PDF) but may be supplemented with CAD, as required.

sara.m.larson Text Box X sara.m.larson Text Box X sara.m.larson Text Box X sara.m.larson Text Box Pin outs as applicable

File details come from the government source that posted it. Updated .