Vessel Forms_F4_rev. 3.xlsx
XLSX spreadsheet 109 KB Posted
- Attached to
- RFP 225-24 Ferry Service
- Solicitation number
- BD-24-1206-MBTA-MBTA-108240
- Issued by
- Massachusetts
About this file
This is a vessel information form template from the Massachusetts Bay Transportation Authority (MBTA) for the Charlestown Ferry Route F4 service. The form requires detailed information about vessels proposed for the ferry service, including vessel names, U.S. Coast Guard Registration Numbers, ownership status (own/lease/charter), make, model, year built, passenger capacity, seating details, top speed, and fuel consumption data. The template includes sections for up to six vessels and requires specific details about one-way trip times between Charlestown and Long Wharf.
The form is structured with multiple worksheets including a Vessel Summary, Vessel List, Fuel Consumption calculations, and individual Vessel Information Sheets. Bidders must complete information in highlighted yellow spaces, verify auto-filled data accuracy, and submit signed certifications for each vessel. The form requires specific operational details such as average fuel use during idling and operating conditions, and calculates one-way fuel usage based on trip times.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Vessel Summary 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
| Instructions: |
| 1. Complete the information below in the yellow spaces for each vessel that will be supplied for this route, all other rows can be left blank. |
| The information in this sheet will be auto-filled into the remaining documents where applicable. |
| 2. Verify the accuracy of the auto-filled data in the Vessel List and the Fuel Consumption Form. |
| 3. For each vessel being proposed, complete the information in the vessel's tab in yellow. |
| 4. Print all completed sheets to PDF. (This Vessel Summary sheet does not need to be printed or submitted to the MBTA) |
| 5. Sign the certification for each vessel. |
| 6. Submit with proposal as required. |
| Route F4: Charlestown Ferry | Average Fuel Use | |
| (gallons per hour) | One-Way |
Trip Time (minutes) One-Way Fuel Usage (gallons)
| Vessel Number | Vessel Name | U.S. Coast Guard Registration Number | Does Offeror Own, Lease, or Charter this Vessel? | Owner | Make | Model | Year Built | Passenger Capacity | Qty of Fixed Passenger Seats | Are Passenger Seats Upholstered? | Qty of Passenger Seats At Tables | Top Speed | ||
| (knots) | Fuel Type | Idling | Operating | Charlestown |
Long Wharf Charlestown Long Wharf
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
&A
Vessel List
| VESSEL LIST | ||||
| Route F4: Charlestown Ferry | ||||
| Provide the name and U.S. Coast Guard Registration Number for each vessel proposed for this contract. | ||||
| Vessel Number | Vessel Name | U.S. Coast Guard Registration Number | Does Offeror Own, Lease, or Charter this Vessel? | Owner |
| 1 | - | - | - | - |
| 2 | - | - | - | - |
| 3 | - | - | - | - |
| 4 | - | - | - | - |
| 5 | - | - | - | - |
| 6 | - | - | - | - |
| This sheet should auto-fill from the information provided in the Vessel Summary tab. Offeror should review and confirm the accuracy of this information. |
Fuel Consumption
| VESSEL FUEL CONSUMPTION | ||
| Route F4: Charlestown Ferry | ||
| Vessel Number | ||
| (per Vessel Information Sheet) | Vessel Name | Top Speed |
| (knots) | Fuel Type | Average Fuel Use |
| (gallons per hour) | One-Way |
Trip Time (minutes) One-Way Fuel Usage (gallons) Idling Operating Charlestown Long Wharf Charlestown Long Wharf
| 1 | - | - | - | - | - | - | - |
| 2 | - | - | - | - | - | - | - |
| 3 | - | - | - | - | - | - | - |
| 4 | - | - | - | - | - | - | - |
| 5 | - | - | - | - | - | - | - |
| 6 | - | - | - | - | - | - | - |
| This sheet auto-fills from the information provided in the Vessel Summary tab. |
| Offeror should review and confirm the accuracy of this information. |
Vessel 1
| VESSEL INFORMATION SHEET | ||||||||
| Route F4: Charlestown Ferry | ||||||||
| Complete one sheet for each vessel | ||||||||
| Vessel Identification | ||||||||
| Vessel Number: | ||||||||
| (from Vessel List) | 1 | Vessel Name: | 0 | |||||
| USCG Registration Number: | 0 | Current Owner: | 0 | |||||
| Make: | 0 | Passenger Capacity: | 0 | |||||
| Model: | 0 | Year Vessel Built: | 0 | |||||
| Fuel Type: | 0 | |||||||
| Vessel Usage | ||||||||
| Will this vessel be dedicated to this service? | <-- Select Yes or No | |||||||
| If it will be used for other purposes please briefly describe: | ||||||||
| <-- Enter N/A or description | ||||||||
| Vessel Measurements | ||||||||
| Length Overall (ft.): | Draft (ft): | <-- Enter dimensions | ||||||
| Beam (ft.): | Gross Tonnage (GT): | <-- Enter dimension/tonnage | ||||||
| Vessel Measurements - Passenger Loading Areas | ||||||||
| Distance from bow to forwardmost passenger loading gate (ft): | <-- Enter dimension, or N/A | |||||||
| Distance from forwardmost passenger loading gate to aft gate (ft.): | <-- Enter dimension, or N/A | |||||||
| Freeboard at bow loading gate, if present (ft-in): | <-- Enter dimension, or N/A | |||||||
| Freeboard at forward loading gate, if present (ft-in): | <-- Enter dimension, or N/A | |||||||
| Freeboard at aft loading gate, if present (ft-in): | <-- Enter dimension, or N/A | |||||||
| Description of Features | ||||||||
| Description of hydraulic, sewage, sanitary, electrical, firefighting, and safety features aboard vessel: | ||||||||
| <-- Enter description of this equipment and features | ||||||||
| Other special features: | ||||||||
| <-- Enter description of any other notable features | ||||||||
| VESSEL INFORMATION SHEET | ||||||||
| Route F4: Charlestown Ferry | ||||||||
| Complete one sheet for each vessel | ||||||||
| Vessel Identification | ||||||||
| Vessel Number: | ||||||||
| (from Vessel List) | 1 | Vessel Name: | 0 | |||||
| USCG Registration Number: | 0 | Current Owner: | 0 | |||||
| Description of Accessibility Features | ||||||||
| Bridgeplate: | <-- Describe accessible features | |||||||
| Bathrooms: | <-- Describe accessible features | |||||||
| Telephones: | <-- Describe accessible features | |||||||
| Wheelchair Tie-Down Equipment: | ||||||||
| Type of Securement: | ||||||||
| (i.e. belts, clamps, etc.) | <-- Describe type(s) of wheelchair tie down equipment | |||||||
| Manufacturer: | No. of wheelchair positions: | <-- Enter Manufacturer of wheelchair tie-down equipment and enter the number of wheelchair positions | ||||||
| Model: | Date Installed: | <--Enter model of wheelchair tie-down equipment and the date it was installed. | ||||||
| List other features which make vessel accessible to persons with disabilities: | ||||||||
| <-- Describe accessible features | ||||||||
| PROPOSED VESSEL UTILIZATION SHEET | Make font BOLD for the trips that would be operated by this vessel: | <--- follow these directions | ||||||
| Route F4: Charlestown Ferry | ||||||||
| Complete one sheet for each vessel | Weekday Schedule | |||||||
| The purpose of this sheet is to identify which of the proposed vessels will be used for each trip, in the full service schedule. Which vessels are designated for each trip will be a factor in determining whether the proposed vessels will meet the required passenger capacities in the evaluation of each proposal. The successful operator will be expected to operate service in accordance with this vessel listing. | Long Wharf | Charlestown | Charlestown | Long Wharf | ||||
| (depart) | (arrive) | (depart) | (arrive) | |||||
| 6:30 AM | 6:40 AM | 6:45 AM | 6:55 AM | |||||
| 6:45 AM | 6:55 AM | 7:00 AM | 7:10 AM | |||||
| 7:00 AM | 7:10 AM | 7:15 AM | 7:25 AM | |||||
| 7:15 AM | 7:25 AM | 7:30 AM | 7:40 AM | |||||
| 7:30 AM | 7:40 AM | 7:45 AM | 7:55 AM | |||||
| 7:45 AM | 7:55 AM | 8:00 AM | 8:10 AM | |||||
| 8:00 AM | 8:10 AM | 8:15 AM | 8:25 AM | |||||
| 8:15 AM | 8:25 AM | 8:30 AM | 8:40 AM | |||||
| Vessel Identification | 8:30 AM | 8:40 AM | 8:45 AM | 8:55 AM | ||||
| Vessel List Number: | 1 | 8:45 AM | 8:55 AM | 9:00 AM | 9:10 AM | |||
| Vessel Name: | 0 | 9:00 AM | 9:10 AM | 9:30 AM | 9:40 AM | |||
| Max. Vessel Speed: | 0 knots | 9:30 AM | 9:40 AM | 10:00 AM | 10:10 AM | |||
| 10:00 AM | 10:10 AM | 10:30 AM | 10:40 AM | |||||
| Passenger Capacity | 10:30 AM | 10:40 AM | 11:00 AM | 11:10 AM | ||||
| Passenger Capacity: | 0 | 11:00 AM | 11:10 AM | 11:30 AM | 11:40 AM | |||
| Fixed Passenger Seats (Qty): | 0 | 11:30 AM | 11:40 AM | 12:00 PM | 12:10 PM | |||
| Upholstered Seats (Yes or No): | 0 | 12:00 PM | 12:10 PM | 12:30 PM | 12:40 PM | |||
| Passenger Seats At Tables (Qty): | 0 | 12:30 PM | 12:40 PM | 1:00 PM | 1:10 PM | |||
| 1:00 PM | 1:10 PM | 1:30 PM | 1:40 PM | |||||
| Average Vessel Fuel Use: (Gallons Per Hour) | 1:30 PM | 1:40 PM | 2:00 PM | 2:10 PM | ||||
| Idling: | 0 | 2:00 PM | 2:10 PM | 2:30 PM | 2:40 PM | |||
| Operating: | 0 | 2:30 PM | 2:40 PM | 3:00 PM | 3:10 PM | |||
| 3:00 PM | 3:10 PM | 3:30 PM | 3:40 PM | |||||
| Vessel Trip Time | 3:30 PM | 3:40 PM | 3:45 PM | 3:55 PM | ||||
| Charlestown - Long Wharf: | 0 minutes | 3:45 PM | 3:55 PM | 4:00 PM | 4:10 PM | |||
| Fuel Consumption per Trip | 4:00 PM | 4:10 PM | 4:15 PM | 4:25 PM | ||||
| Charlestown - Long Wharf: | 0 gallons | 4:15 PM | 4:25 PM | 4:30 PM | 4:40 PM | |||
| Fuel Type: | 4:30 PM | 4:40 PM | 4:45 PM | 4:55 PM | ||||
| 0 | 4:45 PM | 4:55 PM | 5:00 PM | 5:10 PM | ||||
| 5:00 PM | 5:10 PM | 5:15 PM | 5:25 PM | |||||
| The above listed vessel is able to operate the specified ferry service with no modifications to the schedule listed in the RFP: (select Yes or No) | 5:15 PM | 5:25 PM | 5:30 PM | 5:40 PM | <-- Select Yes or No from the dropdown menu | |||
| 5:30 PM | 5:40 PM | 5:45 PM | 5:55 PM | |||||
| 5:45 PM | 5:55 PM | 6:00 PM | 6:10 PM | |||||
| 6:00 PM | 6:10 PM | 6:15 PM | 6:25 PM | |||||
| If NO, list all modifications that would be required to the schedule of operated with this vessel: | 6:15 PM | 6:25 PM | 6:30 PM | 6:40 PM | ||||
| 6:30 PM | 6:40 PM | 7:00 PM | 7:10 PM | <-- If applicable, enter any necessary schedule modifications --> | ||||
| 7:00 PM | 7:10 PM | 7:30 PM | 7:40 PM | |||||
| 7:30 PM | 7:40 PM | 8:00 PM | 8:10 PM | |||||
| 8:00 PM | 8:10 PM | 8:15 PM | 8:25 PM | |||||
| PROPOSED VESSEL UTILIZATION SHEET | Make font BOLD for the trips that would be operated by this vessel: | <--- follow these directions | ||||||
| Route F4: Charlestown Ferry | ||||||||
| Complete one sheet for each vessel | Weekend Schedule | |||||||
| The purpose of this sheet is to identify which of the proposed vessels will be used for each trip, in the full service schedule. Which vessels are designated for each trip will be a factor in determining whether the proposed vessels will meet the required passenger capacities in the evaluation of each proposal. The successful operator will be expected to operate service in accordance with this vessel listing. | Long Wharf | Charlestown | Charlestown | Long Wharf | ||||
| (depart) | (arrive) | (depart) | (arrive) | |||||
| 10:00 AM | 10:10 AM | 10:15 AM | 10:25 AM | |||||
| 10:30 AM | 10:40 AM | 10:45 AM | 10:55 AM | |||||
| 11:00 AM | 11:10 AM | 11:15 AM | 11:25 AM | |||||
| 11:30 AM | 11:40 AM | 11:45 AM | 11:55 AM | |||||
| 12:00 PM | 12:10 PM | 12:15 PM | 12:25 PM | |||||
| 12:30 PM | 12:40 PM | 12:45 PM | 12:55 PM | |||||
| 1:00 PM | 1:10 PM | 1:15 PM | 1:25 PM | |||||
| 1:30 PM | 1:40 PM | 1:45 PM | 1:55 PM | |||||
| Vessel Identification | 2:00 PM | 2:10 PM | 2:15 PM | 2:25 PM | ||||
| Vessel List Number: | 1 | 2:30 PM | 2:40 PM | 2:45 PM | 2:55 PM | |||
| Vessel Name: | 0 | 3:00 PM | 3:10 PM | 3:15 PM | 3:25 PM | |||
| Max. Vessel Speed: | 0 knots | 3:30 PM | 3:40 PM | 3:45 PM | 3:55 PM | |||
| 4:00 PM | 4:10 PM | 4:15 PM | 4:25 PM | |||||
| Passenger Capacity | 4:30 PM | 4:40 PM | 4:45 PM | 4:55 PM | ||||
| Passenger Capacity: | 0 | 5:00 PM | 5:10 PM | 5:15 PM | 5:25 PM | |||
| Fixed Passenger Seats (Qty): | 0 | 5:30 PM | 5:40 PM | 5:45 PM | 5:55 PM | |||
| Upholstered Seats (Yes or No): | 0 | 6:00 PM | 6:10 PM | 6:15 PM | 6:25 PM | |||
| Passenger Seats At Tables (Qty): | 0 |
| Average Vessel Fuel Use: (Gallons Per Hour) | |
| Idling: | 0 |
| Operating: | 0 |
| Vessel Trip Time | |
| Charlestown - Long Wharf: | 0 minutes |
| Fuel Consumption per Trip | |
| Charlestown - Long Wharf: | 0 gallons |
| Fuel Type: | |
| 0 |
| The above listed vessel is able to operate the specified ferry service with no modifications to the schedule listed in the RFP: (select Yes or No) | <-- Select Yes or No from the dropdown menu |
| If NO, list all modifications that would be required to the schedule of operated with this vessel: | |
| <-- If applicable, enter any necessary schedule modifications --> |
| VESSEL HISTORY DATA SHEET |
| Route F4: Charlestown Ferry |
| Complete one sheet for each vessel |
Complete the top portion only for existing vessels.
Complete the bottom portion only for vessels to be constructed prior to the Contract start.
| Vessel Identification | ||||
| Vessel Number: | ||||
| (from Vessel List) | 1 | Vessel Name: | 0 | |
| Is this vessel already constructed and ready for service (yes or no): | <-- Select Yes or No |
| For: Existing Vessels | <-- Complete this section unless you are proposing to use vessels that are currently under construction. | |
| Vessel History | (For vessels under construction, complete the "Vessels to be Constructed" section below) | |
| Year Vessel Built: | 0 | |
| Vessel Age (years): | 2024 years | |
| Estimated remaining vessel service life (years): | <-- Enter estimate years | |
| Type and quantity of power plant: | <-- Enter type and quantity | |
| Number of hours logged on each engine to date: | <-- Enter hours on each engine | |
| Date and nature of most recent routine maintenance or repair: | ||
| <-- Enter description | ||
| Date and nature of most recent major vessel maintenance or repair: | ||
| <-- Enter description | ||
| Date and nature of most recent external hull maintenance above the water line: | ||
| <-- Enter description | ||
| Date and nature of most recent internal or external hull maintenance below the waterline: | ||
| <-- Enter description | ||
| Date of most recent marine survey of this vessel: | <-- Enter date | |
| USCG Inspections | ||
| Offerer must attach the most recent Coast Guard Inspection, deficiencies found and date of repairs. | <-- Attach USCG inspection documentation with proposal |
| VESSEL HISTORY DATA SHEET |
| Route F4: Charlestown Ferry |
| Complete one sheet for each vessel |
Complete the top portion only for existing vessels.
Complete the bottom portion only for vessels to be constructed prior to the Contract start.
| Vessel Identification | |||
| Vessel Number: | |||
| (from Vessel List) | 1 | Vessel Name: | 0 |
| For: Vessels To Be Constructed | <-- Complete this section only if you are proposing to use vessels that are currently under construction. | ||||
| Vessel Identification | |||||
| Make: | 0 | Passenger Capacity: | 0 | ||
| Model: | 0 | Power Plant | |||
| Type and Qty: | <--Enter type and quantity of power plant |
| Vessel Construction | ||||
| Vessel construction schedule including confirmation of proposed delivery date by shipbuilder: | ||||
| (Offeror must include attachments verifying this information) | ||||
| <--indicate the construction and delivery schedule, AND attach documentation. | ||||
| PROPOSED VESSEL CERTIFICATION SHEET | ||||
| Route F4: Charlestown Ferry | ||||
| Complete one sheet for each vessel | ||||
| Vessel Identification | ||||
| Vessel List Number: | 1 | Vessel Top Speed: | 0 knots | |
| Vessel Name: | 0 | |||
| Name of Firm: | <-- Enter the Offeror's Corporate Name |
I, , hereby certify that: <-- Enter the Signer's Name
1. The dimensions and maneuvering capabilities of the above listed vessel will allow for safe and efficient docking at the designated terminal and intermediate stop locations for the designated route at all tide conditions.
2. I am familiar with the physical conditions and navigational constraints at the existing docking facilities for the above listed route.
3. The above listed vessel can operate safely and efficiently at these berthing facilities and meet all requirements of this specification for the above listed route.
| 4. | The draft of the above listed vessel, when fully loaded, shall be shallow enough to operate where required to operate their assigned ferry services during all tide conditions. | |
| Signature: | <-- Sign this form |
Name: <-- Enter the Signer's Name
Name of Firm: <-- Enter the Offeror's Corporate Name
NOTE: THIS INFORMATION TO BE INCLUDED IN THE CONTRACT
Vessel 2
| VESSEL INFORMATION SHEET | ||||||||
| Route F4: Charlestown Ferry | ||||||||
| Complete one sheet for each vessel | ||||||||
| Vessel Identification | ||||||||
| Vessel Number: | ||||||||
| (from Vessel List) | 2 | Vessel Name: | 0 | |||||
| USCG Registration Number: | 0 | Current Owner: | 0 | |||||
| Make: | 0 | Passenger Capacity: | 0 | |||||
| Model: | 0 | Year Vessel Built: | 0 | |||||
| Fuel Type: | 0 | |||||||
| Vessel Usage | ||||||||
| Will this vessel be dedicated to this service? | <-- Select Yes or No | |||||||
| If it will be used for other purposes please briefly describe: | ||||||||
| <-- Enter N/A or description | ||||||||
| Vessel Measurements | ||||||||
| Length Overall (ft.): | Draft (ft): | <-- Enter dimensions | ||||||
| Beam (ft.): | Gross Tonnage (GT): | <-- Enter dimension/tonnage | ||||||
| Vessel Measurements - Passenger Loading Areas | ||||||||
| Distance from bow to forwardmost passenger loading gate (ft): | <-- Enter dimension, or N/A | |||||||
| Distance from forwardmost passenger loading gate to aft gate (ft.): | <-- Enter dimension, or N/A | |||||||
| Freeboard at bow loading gate, if present (ft-in): | <-- Enter dimension, or N/A | |||||||
| Freeboard at forward loading gate, if present (ft-in): | <-- Enter dimension, or N/A | |||||||
| Freeboard at aft loading gate, if present (ft-in): | <-- Enter dimension, or N/A | |||||||
| Description of Features | ||||||||
| Description of hydraulic, sewage, sanitary, electrical, firefighting, and safety features aboard vessel: | ||||||||
| <-- Enter description of this equipment and features | ||||||||
| Other special features: | ||||||||
| <-- Enter description of any other notable features | ||||||||
| VESSEL INFORMATION SHEET | ||||||||
| Route F4: Charlestown Ferry | ||||||||
| Complete one sheet for each vessel | ||||||||
| Vessel Identification | ||||||||
| Vessel Number: | ||||||||
| (from Vessel List) | 2 | Vessel Name: | 0 | |||||
| USCG Registration Number: | 0 | Current Owner: | 0 | |||||
| Description of Accessibility Features | ||||||||
| Bridgeplate: | <-- Describe accessible features | |||||||
| Bathrooms: | <-- Describe accessible features | |||||||
| Telephones: | <-- Describe accessible features | |||||||
| Wheelchair Tie-Down Equipment: | ||||||||
| Type of Securement: | ||||||||
| (i.e. belts, clamps, etc.) | <-- Describe type(s) of wheelchair tie down equipment | |||||||
| Manufacturer: | No. of wheelchair positions: | <-- Enter Manufacturer of wheelchair tie-down equipment and enter the number of wheelchair positions | ||||||
| Model: | Date Installed: | <--Enter model of wheelchair tie-down equipment and the date it was installed. | ||||||
| List other features which make vessel accessible to persons with disabilities: | ||||||||
| <-- Describe accessible features | ||||||||
| PROPOSED VESSEL UTILIZATION SHEET | Make font BOLD for the trips that would be operated by this vessel: | <--- follow these directions | ||||||
| Route F4: Charlestown Ferry | ||||||||
| Complete one sheet for each vessel | Weekday Schedule | |||||||
| The purpose of this sheet is to identify which of the proposed vessels will be used for each trip, in the full service schedule. Which vessels are designated for each trip will be a factor in determining whether the proposed vessels will meet the required passenger capacities in the evaluation of each proposal. The successful operator will be expected to operate service in accordance with this vessel listing. | Long Wharf | Charlestown | Charlestown | Long Wharf | ||||
| (depart) | (arrive) | (depart) | (arrive) | |||||
| 6:30 AM | 6:40 AM | 6:45 AM | 6:55 AM | |||||
| 6:45 AM | 6:55 AM | 7:00 AM | 7:10 AM | |||||
| 7:00 AM | 7:10 AM | 7:15 AM | 7:25 AM | |||||
| 7:15 AM | 7:25 AM | 7:30 AM | 7:40 AM | |||||
| 7:30 AM | 7:40 AM | 7:45 AM | 7:55 AM | |||||
| 7:45 AM | 7:55 AM | 8:00 AM | 8:10 AM | |||||
| 8:00 AM | 8:10 AM | 8:15 AM | 8:25 AM | |||||
| 8:15 AM | 8:25 AM | 8:30 AM | 8:40 AM | |||||
| Vessel Identification | 8:30 AM | 8:40 AM | 8:45 AM | 8:55 AM | ||||
| Vessel List Number: | 2 | 8:45 AM | 8:55 AM | 9:00 AM | 9:10 AM | |||
| Vessel Name: | 0 | 9:00 AM | 9:10 AM | 9:30 AM | 9:40 AM | |||
| Max. Vessel Speed: | 0 knots | 9:30 AM | 9:40 AM | 10:00 AM | 10:10 AM | |||
| 10:00 AM | 10:10 AM | 10:30 AM | 10:40 AM | |||||
| Passenger Capacity | 10:30 AM | 10:40 AM | 11:00 AM | 11:10 AM | ||||
| Passenger Capacity: | 0 | 11:00 AM | 11:10 AM | 11:30 AM | 11:40 AM | |||
| Fixed Passenger Seats (Qty): | 0 | 11:30 AM | 11:40 AM | 12:00 PM | 12:10 PM | |||
| Upholstered Seats (Yes or No): | 0 | 12:00 PM | 12:10 PM | 12:30 PM | 12:40 PM | |||
| Passenger Seats At Tables (Qty): | 0 | 12:30 PM | 12:40 PM | 1:00 PM | 1:10 PM | |||
| 1:00 PM | 1:10 PM | 1:30 PM | 1:40 PM | |||||
| Average Vessel Fuel Use: (Gallons Per Hour) | 1:30 PM | 1:40 PM | 2:00 PM | 2:10 PM | ||||
| Idling: | 0 | 2:00 PM | 2:10 PM | 2:30 PM | 2:40 PM | |||
| Operating: | 0 | 2:30 PM | 2:40 PM | 3:00 PM | 3:10 PM | |||
| 3:00 PM | 3:10 PM | 3:30 PM | 3:40 PM | |||||
| Vessel Trip Time | 3:30 PM | 3:40 PM | 3:45 PM | 3:55 PM | ||||
| Charlestown - Long Wharf: | 0 minutes | 3:45 PM | 3:55 PM | 4:00 PM | 4:10 PM | |||
| Fuel Consumption per Trip | 4:00 PM | 4:10 PM | 4:15 PM | 4:25 PM | ||||
| Charlestown - Long Wharf: | 0 gallons | 4:15 PM | 4:25 PM | 4:30 PM | 4:40 PM | |||
| Fuel Type: | 4:30 PM | 4:40 PM | 4:45 PM | 4:55 PM | ||||
| 0 | 4:45 PM | 4:55 PM | 5:00 PM | 5:10 PM | ||||
| 5:00 PM | 5:10 PM | 5:15 PM | 5:25 PM | |||||
| The above listed vessel is able to operate the specified ferry service with no modifications to the schedule listed in the RFP: (select Yes or No) | 5:15 PM | 5:25 PM | 5:30 PM | 5:40 PM | <-- Select Yes or No from the dropdown menu | |||
| 5:30 PM | 5:40 PM | 5:45 PM | 5:55 PM | |||||
| 5:45 PM | 5:55 PM | 6:00 PM | 6:10 PM | |||||
| 6:00 PM | 6:10 PM | 6:15 PM | 6:25 PM | |||||
| If NO, list all modifications that would be required to the schedule of operated with this vessel: | 6:15 PM | 6:25 PM | 6:30 PM | 6:40 PM | ||||
| 6:30 PM | 6:40 PM | 7:00 PM | 7:10 PM | <-- If applicable, enter any necessary schedule modifications --> | ||||
| 7:00 PM | 7:10 PM | 7:30 PM | 7:40 PM | |||||
| 7:30 PM | 7:40 PM | 8:00 PM | 8:10 PM | |||||
| 8:00 PM | 8:10 PM | 8:15 PM | 8:25 PM | |||||
| PROPOSED VESSEL UTILIZATION SHEET | Make font BOLD for the trips that would be operated by this vessel: | <--- follow these directions | ||||||
| Route F4: Charlestown Ferry | ||||||||
| Complete one sheet for each vessel | Weekend Schedule | |||||||
| The purpose of this sheet is to identify which of the proposed vessels will be used for each trip, in the full service schedule. Which vessels are designated for each trip will be a factor in determining whether the proposed vessels will meet the required passenger capacities in the evaluation of each proposal. The successful operator will be expected to operate service in accordance with this vessel listing. | Long Wharf | Charlestown | Charlestown | Long Wharf | ||||
| (depart) | (arrive) | (depart) | (arrive) | |||||
| 10:00 AM | 10:10 AM | 10:15 AM | 10:25 AM | |||||
| 10:30 AM | 10:40 AM | 10:45 AM | 10:55 AM | |||||
| 11:00 AM | 11:10 AM | 11:15 AM | 11:25 AM | |||||
| 11:30 AM | 11:40 AM | 11:45 AM | 11:55 AM | |||||
| 12:00 PM | 12:10 PM | 12:15 PM | 12:25 PM | |||||
| 12:30 PM | 12:40 PM | 12:45 PM | 12:55 PM | |||||
| 1:00 PM | 1:10 PM | 1:15 PM | 1:25 PM | |||||
| 1:30 PM | 1:40 PM | 1:45 PM | 1:55 PM | |||||
| Vessel Identification | 2:00 PM | 2:10 PM | 2:15 PM | 2:25 PM | ||||
| Vessel List Number: | 2 | 2:30 PM | 2:40 PM | 2:45 PM | 2:55 PM | |||
| Vessel Name: | 0 | 3:00 PM | 3:10 PM | 3:15 PM | 3:25 PM | |||
| Max. Vessel Speed: | 0 knots | 3:30 PM | 3:40 PM | 3:45 PM | 3:55 PM | |||
| 4:00 PM | 4:10 PM | 4:15 PM | 4:25 PM | |||||
| Passenger Capacity | 4:30 PM | 4:40 PM | 4:45 PM | 4:55 PM | ||||
| Passenger Capacity: | 0 | 5:00 PM | 5:10 PM | 5:15 PM | 5:25 PM | |||
| Fixed Passenger Seats (Qty): | 0 | 5:30 PM | 5:40 PM | 5:45 PM | 5:55 PM | |||
| Upholstered Seats (Yes or No): | 0 | 6:00 PM | 6:10 PM | 6:15 PM | 6:25 PM | |||
| Passenger Seats At Tables (Qty): | 0 |
| Average Vessel Fuel Use: (Gallons Per Hour) | |
| Idling: | 0 |
| Operating: | 0 |
| Vessel Trip Time | |
| Charlestown - Long Wharf: | 0 minutes |
| Fuel Consumption per Trip | |
| Charlestown - Long Wharf: | 0 gallons |
| Fuel Type: | |
| 0 |
| The above listed vessel is able to operate the specified ferry service with no modifications to the schedule listed in the RFP: (select Yes or No) | <-- Select Yes or No from the dropdown menu |
| If NO, list all modifications that would be required to the schedule of operated with this vessel: | |
| <-- If applicable, enter any necessary schedule modifications --> |
| VESSEL HISTORY DATA SHEET |
| Route F4: Charlestown Ferry |
| Complete one sheet for each vessel |
Complete the top portion only for existing vessels.
Complete the bottom portion only for vessels to be constructed prior to the Contract start.
| Vessel Identification | ||||
| Vessel Number: | ||||
| (from Vessel List) | 2 | Vessel Name: | 0 | |
| Is this vessel already constructed and ready for service (yes or no): | <-- Select Yes or No |
| For: Existing Vessels | <-- Complete this section unless you are proposing to use vessels that are currently under construction. | |
| Vessel History | (For vessels under construction, complete the "Vessels to be Constructed" section below) | |
| Year Vessel Built: | 0 | |
| Vessel Age (years): | 2024 years | |
| Estimated remaining vessel service life (years): | <-- Enter estimate years | |
| Type and quantity of power plant: | <-- Enter type and quantity | |
| Number of hours logged on each engine to date: | <-- Enter hours on each engine | |
| Date and nature of most recent routine maintenance or repair: | ||
| <-- Enter description | ||
| Date and nature of most recent major vessel maintenance or repair: | ||
| <-- Enter description | ||
| Date and nature of most recent external hull maintenance above the water line: | ||
| <-- Enter description | ||
| Date and nature of most recent internal or external hull maintenance below the waterline: | ||
| <-- Enter description | ||
| Date of most recent marine survey of this vessel: | <-- Enter date | |
| USCG Inspections | ||
| Offerer must attach the most recent Coast Guard Inspection, deficiencies found and date of repairs. | <-- Attach USCG inspection documentation with proposal |
| VESSEL HISTORY DATA SHEET |
| Route F4: Charlestown Ferry |
| Complete one sheet for each vessel |
Complete the top portion only for existing vessels.
Complete the bottom portion only for vessels to be constructed prior to the Contract start.
| Vessel Identification | |||
| Vessel Number: | |||
| (from Vessel List) | 2 | Vessel Name: | 0 |
| For: Vessels To Be Constructed | <-- Complete this section only if you are proposing to use vessels that are currently under construction. | ||||
| Vessel Identification | |||||
| Make: | 0 | Passenger Capacity: | 0 | ||
| Model: | 0 | Power Plant | |||
| Type and Qty: | <--Enter type and quantity of power plant |
| Vessel Construction | ||||
| Vessel construction schedule including confirmation of proposed delivery date by shipbuilder: | ||||
| (Offeror must include attachments verifying this information) | ||||
| <--indicate the construction and delivery schedule, AND attach documentation. | ||||
| PROPOSED VESSEL CERTIFICATION SHEET | ||||
| Route F4: Charlestown Ferry | ||||
| Complete one sheet for each vessel | ||||
| Vessel Identification | ||||
| Vessel List Number: | 2 | Vessel Top Speed: | 0 knots | |
| Vessel Name: | 0 | |||
| Name of Firm: | <-- Enter the Offeror's Corporate Name |
I, , hereby certify that: <-- Enter the Signer's Name
1. The dimensions and maneuvering capabilities of the above listed vessel will allow for safe and efficient docking at the designated terminal and intermediate stop locations for the designated route at all tide conditions.
2. I am familiar with the physical conditions and navigational constraints at the existing docking facilities for the above listed route.
3. The above listed vessel can operate safely and efficiently at these berthing facilities and meet all requirements of this specification for the above listed route.
| 4. | The draft of the above listed vessel, when fully loaded, shall be shallow enough to operate where required to operate their assigned ferry services during all tide conditions. | |
| Signature: | <-- Sign this form |
Name: <-- Enter the Signer's Name
Name of Firm: <-- Enter the Offeror's Corporate Name
NOTE: THIS INFORMATION TO BE INCLUDED IN THE CONTRACT
Vessel 3
| VESSEL INFORMATION SHEET | ||||||||
| Route F4: Charlestown Ferry | ||||||||
| Complete one sheet for each vessel | ||||||||
| Vessel Identification | ||||||||
| Vessel Number: | ||||||||
| (from Vessel List) | 3 | Vessel Name: | 0 | |||||
| USCG Registration Number: | 0 | Current Owner: | 0 | |||||
| Make: | 0 | Passenger Capacity: | 0 | |||||
| Model: | 0 | Year Vessel Built: | 0 | |||||
| Fuel Type: | 0 | |||||||
| Vessel Usage | ||||||||
| Will this vessel be dedicated to this service? | <-- Select Yes or No | |||||||
| If it will be used for other purposes please briefly describe: | ||||||||
| <-- Enter N/A or description | ||||||||
| Vessel Measurements | ||||||||
| Length Overall (ft.): | Draft (ft): | <-- Enter dimensions | ||||||
| Beam (ft.): | Gross Tonnage (GT): | <-- Enter dimension/tonnage | ||||||
| Vessel Measurements - Passenger Loading Areas | ||||||||
| Distance from bow to forwardmost passenger loading gate (ft): | <-- Enter dimension, or N/A | |||||||
| Distance from forwardmost passenger loading gate to aft gate (ft.): | <-- Enter dimension, or N/A | |||||||
| Freeboard at bow loading gate, if present (ft-in): | <-- Enter dimension, or N/A | |||||||
| Freeboard at forward loading gate, if present (ft-in): | <-- Enter dimension, or N/A | |||||||
| Freeboard at aft loading gate, if present (ft-in): | <-- Enter dimension, or N/A | |||||||
| Description of Features | ||||||||
| Description of hydraulic, sewage, sanitary, electrical, firefighting, and safety features aboard vessel: | ||||||||
| <-- Enter description of this equipment and features | ||||||||
| Other special features: | ||||||||
| <-- Enter description of any other notable features | ||||||||
| VESSEL INFORMATION SHEET | ||||||||
| Route F4: Charlestown Ferry | ||||||||
| Complete one sheet for each vessel | ||||||||
| Vessel Identification | ||||||||
| Vessel Number: | ||||||||
| (from Vessel List) | 3 | Vessel Name: | 0 | |||||
| USCG Registration Number: | 0 | Current Owner: | 0 | |||||
| Description of Accessibility Features | ||||||||
| Bridgeplate: | <-- Describe accessible features | |||||||
| Bathrooms: | <-- Describe accessible features | |||||||
| Telephones: | <-- Describe accessible features | |||||||
| Wheelchair Tie-Down Equipment: | ||||||||
| Type of Securement: | ||||||||
| (i.e. belts, clamps, etc.) | <-- Describe type(s) of wheelchair tie down equipment | |||||||
| Manufacturer: | No. of wheelchair positions: | <-- Enter Manufacturer of wheelchair tie-down equipment and enter the number of wheelchair positions | ||||||
| Model: | Date Installed: | <--Enter model of wheelchair tie-down equipment and the date it was installed. | ||||||
| List other features which make vessel accessible to persons with disabilities: | ||||||||
| <-- Describe accessible features | ||||||||
| PROPOSED VESSEL UTILIZATION SHEET | Make font BOLD for the trips that would be operated by this vessel: | <--- follow these directions | ||||||
| Route F4: Charlestown Ferry | ||||||||
| Complete one sheet for each vessel | Weekday Schedule | |||||||
| The purpose of this sheet is to identify which of the proposed vessels will be used for each trip, in the full service schedule. Which vessels are designated for each trip will be a factor in determining whether the proposed vessels will meet the required passenger capacities in the evaluation of each proposal. The successful operator will be expected to operate service in accordance with this vessel listing. | Long Wharf | Charlestown | Charlestown | Long Wharf | ||||
| (depart) | (arrive) | (depart) | (arrive) | |||||
| 6:30 AM | 6:40 AM | 6:45 AM | 6:55 AM | |||||
| 6:45 AM | 6:55 AM | 7:00 AM | 7:10 AM | |||||
| 7:00 AM | 7:10 AM | 7:15 AM | 7:25 AM | |||||
| 7:15 AM | 7:25 AM | 7:30 AM | 7:40 AM | |||||
| 7:30 AM | 7:40 AM | 7:45 AM | 7:55 AM | |||||
| 7:45 AM | 7:55 AM | 8:00 AM | 8:10 AM | |||||
| 8:00 AM | 8:10 AM | 8:15 AM | 8:25 AM | |||||
| 8:15 AM | 8:25 AM | 8:30 AM | 8:40 AM | |||||
| Vessel Identification | 8:30 AM | 8:40 AM | 8:45 AM | 8:55 AM | ||||
| Vessel List Number: | 3 | 8:45 AM | 8:55 AM | 9:00 AM | 9:10 AM | |||
| Vessel Name: | 0 | 9:00 AM | 9:10 AM | 9:30 AM | 9:40 AM | |||
| Max. Vessel Speed: | 0 knots | 9:30 AM | 9:40 AM | 10:00 AM | 10:10 AM | |||
| 10:00 AM | 10:10 AM | 10:30 AM | 10:40 AM | |||||
| Passenger Capacity | 10:30 AM | 10:40 AM | 11:00 AM | 11:10 AM | ||||
| Passenger Capacity: | 0 | 11:00 AM | 11:10 AM | 11:30 AM | 11:40 AM | |||
| Fixed Passenger Seats (Qty): | 0 | 11:30 AM | 11:40 AM | 12:00 PM | 12:10 PM | |||
| Upholstered Seats (Yes or No): | 0 | 12:00 PM | 12:10 PM | 12:30 PM | 12:40 PM | |||
| Passenger Seats At Tables (Qty): | 0 | 12:30 PM | 12:40 PM | 1:00 PM | 1:10 PM | |||
| 1:00 PM | 1:10 PM | 1:30 PM | 1:40 PM | |||||
| Average Vessel Fuel Use: (Gallons Per Hour) | 1:30 PM | 1:40 PM | 2:00 PM | 2:10 PM | ||||
| Idling: | 0 | 2:00 PM | 2:10 PM | 2:30 PM | 2:40 PM | |||
| Operating: | 0 | 2:30 PM | 2:40 PM | 3:00 PM | 3:10 PM | |||
| 3:00 PM | 3:10 PM | 3:30 PM | 3:40 PM | |||||
| Vessel Trip Time | 3:30 PM | 3:40 PM | 3:45 PM | 3:55 PM | ||||
| Charlestown - Long Wharf: | 0 minutes | 3:45 PM | 3:55 PM | 4:00 PM | 4:10 PM | |||
| Fuel Consumption per Trip | 4:00 PM | 4:10 PM | 4:15 PM | 4:25 PM | ||||
| Charlestown - Long Wharf: | 0 gallons | 4:15 PM | 4:25 PM | 4:30 PM | 4:40 PM | |||
| Fuel Type: | 4:30 PM | 4:40 PM | 4:45 PM | 4:55 PM | ||||
| 0 | 4:45 PM | 4:55 PM | 5:00 PM | 5:10 PM | ||||
| 5:00 PM | 5:10 PM | 5:15 PM | 5:25 PM | |||||
| The above listed vessel is able to operate the specified ferry service with no modifications to the schedule listed in the RFP: (select Yes or No) | 5:15 PM | 5:25 PM | 5:30 PM | 5:40 PM | <-- Select Yes or No from the dropdown menu | |||
| 5:30 PM | 5:40 PM | 5:45 PM | 5:55 PM | |||||
| 5:45 PM | 5:55 PM | 6:00 PM | 6:10 PM | |||||
| 6:00 PM | 6:10 PM | 6:15 PM | 6:25 PM | |||||
| If NO, list all modifications that would be required to the schedule of operated with this vessel: | 6:15 PM | 6:25 PM | 6:30 PM | 6:40 PM | ||||
| 6:30 PM | 6:40 PM | 7:00 PM | 7:10 PM | <-- If applicable, enter any necessary schedule modifications --> | ||||
| 7:00 PM | 7:10 PM | 7:30 PM | 7:40 PM | |||||
| 7:30 PM | 7:40 PM | 8:00 PM | 8:10 PM | |||||
| 8:00 PM | 8:10 PM | 8:15 PM | 8:25 PM | |||||
| PROPOSED VESSEL UTILIZATION SHEET | Make font BOLD for the trips that would be operated by this vessel: | <--- follow these directions | ||||||
| Route F4: Charlestown Ferry | ||||||||
| Complete one sheet for each vessel | Weekend Schedule | |||||||
| The purpose of this sheet is to identify which of the proposed vessels will be used for each trip, in the full service schedule. Which vessels are designated for each trip will be a factor in determining whether the proposed vessels will meet the required passenger capacities in the evaluation of each proposal. The successful operator will be expected to operate service in accordance with this vessel listing. | Long Wharf | Charlestown | Charlestown | Long Wharf | ||||
| (depart) | (arrive) | (depart) | (arrive) | |||||
| 10:00 AM | 10:10 AM | 10:15 AM | 10:25 AM | |||||
| 10:30 AM | 10:40 AM | 10:45 AM | 10:55 AM | |||||
| 11:00 AM | 11:10 AM | 11:15 AM | 11:25 AM | |||||
| 11:30 AM | 11:40 AM | 11:45 AM | 11:55 AM | |||||
| 12:00 PM | 12:10 PM | 12:15 PM | 12:25 PM | |||||
| 12:30 PM | 12:40 PM | 12:45 PM | 12:55 PM | |||||
| 1:00 PM | 1:10 PM | 1:15 PM | 1:25 PM | |||||
| 1:30 PM | 1:40 PM | 1:45 PM | 1:55 PM | |||||
| Vessel Identification | 2:00 PM | 2:10 PM | 2:15 PM | 2:25 PM | ||||
| Vessel List Number: | 3 | 2:30 PM | 2:40 PM | 2:45 PM | 2:55 PM | |||
| Vessel Name: | 0 | 3:00 PM | 3:10 PM | 3:15 PM | 3:25 PM | |||
| Max. Vessel Speed: | 0 knots | 3:30 PM | 3:40 PM | 3:45 PM | 3:55 PM | |||
| 4:00 PM | 4:10 PM | 4:15 PM | 4:25 PM | |||||
| Passenger Capacity | 4:30 PM | 4:40 PM | 4:45 PM | 4:55 PM | ||||
| Passenger Capacity: | 0 | 5:00 PM | 5:10 PM | 5:15 PM | 5:25 PM | |||
| Fixed Passenger Seats (Qty): | 0 | 5:30 PM | 5:40 PM | 5:45 PM | 5:55 PM | |||
| Upholstered Seats (Yes or No): | 0 | 6:00 PM | 6:10 PM | 6:15 PM | 6:25 PM | |||
| Passenger Seats At Tables (Qty): | 0 |
| Average Vessel Fuel Use: (Gallons Per Hour) | |
| Idling: | 0 |
| Operating: | 0 |
| Vessel Trip Time | |
| Charlestown - Long Wharf: | 0 minutes |
| Fuel Consumption per Trip | |
| Charlestown - Long Wharf: | 0 gallons |
| Fuel Type: | |
| 0 |
| The above listed vessel is able to operate the specified ferry service with no modifications to the schedule listed in the RFP: (select Yes or No) | <-- Select Yes or No from the dropdown menu |
| If NO, list all modifications that would be required to the schedule of operated with this vessel: | |
| <-- If applicable, enter any necessary schedule modifications --> |
| VESSEL HISTORY DATA SHEET |
| Route F4: Charlestown Ferry |
| Complete one sheet for each vessel |
Complete the top portion only for existing vessels.
Complete the bottom portion only for vessels to be constructed prior to the Contract start.
| Vessel Identification | ||||
| Vessel Number: | ||||
| (from Vessel List) | 3 | Vessel Name: | 0 | |
| Is this vessel already constructed and ready for service (yes or no): | <-- Select Yes or No |
| For: Existing Vessels | <-- Complete this section unless you are proposing to use vessels that are currently under construction. | |
| Vessel History | (For vessels under construction, complete the "Vessels to be Constructed" section below) | |
| Year Vessel Built: | 0 | |
| Vessel Age (years): | 2024 years | |
| Estimated remaining vessel service life (years): | <-- Enter estimate years | |
| Type and quantity of power plant: | <-- Enter type and quantity | |
| Number of hours logged on each engine to date: | <-- Enter hours on each engine | |
| Date and nature of most recent routine maintenance or repair: | ||
| <-- Enter description | ||
| Date and nature of most recent major vessel maintenance or repair: | ||
| <-- Enter description | ||
| Date and nature of most recent external hull maintenance above the water line: | ||
| <-- Enter description | ||
| Date and nature of most recent internal or external hull maintenance below the waterline: | ||
| <-- Enter description | ||
| Date of most recent marine survey of this vessel: | <-- Enter date | |
| USCG Inspections | ||
| Offerer must attach the most recent Coast Guard Inspection, deficiencies found and date of repairs. | <-- Attach USCG inspection documentation with proposal |
| VESSEL HISTORY DATA SHEET |
| Route F4: Charlestown Ferry |
| Complete one sheet for each vessel |
Complete the top portion only for existing vessels.
Complete the bottom portion only for vessels to be constructed prior to the Contract start.
| Vessel Identification | |||
| Vessel Number: | |||
| (from Vessel List) | 3 | Vessel Name: | 0 |
| For: Vessels To Be Constructed | <-- Complete this section only if you are proposing to use vessels that are currently under construction. | ||||
| Vessel Identification | |||||
| Make: | 0 | Passenger Capacity: | 0 | ||
| Model: | 0 | Power Plant | |||
| Type and Qty: | <--Enter type and quantity of power plant |
| Vessel Construction | ||||
| Vessel construction schedule including confirmation of proposed delivery date by shipbuilder: | ||||
| (Offeror must include attachments verifying this information) | ||||
| <--indicate the construction and delivery schedule, AND attach documentation. | ||||
| PROPOSED VESSEL CERTIFICATION SHEET | ||||
| Route F4: Charlestown Ferry | ||||
| Complete one sheet for each vessel | ||||
| Vessel Identification | ||||
| Vessel List Number: | 3 | Vessel Top Speed: | 0 knots | |
| Vessel Name: | 0 | |||
| Name of Firm: | <-- Enter the Offeror's Corporate Name |
I, , hereby certify that: <-- Enter the Signer's Name
1. The dimensions and maneuvering capabilities of the above listed vessel will allow for safe and efficient docking at the designated terminal and intermediate stop locations for the designated route at all tide conditions.
2. I am familiar with the physical conditions and navigational constraints at the existing docking facilities for the above listed route.
3. The above listed vessel can operate safely and efficiently at these berthing facilities and meet all requirements of this specification for the above listed route.
| 4. | The draft of the above listed vessel, when fully loaded, shall be shallow enough to operate where required to operate their assigned ferry services during all tide conditions. | |
| Signature: | <-- Sign this form |
Name: <-- Enter the Signer's Name
Name of Firm: <-- Enter the Offeror's Corporate Name
NOTE: THIS INFORMATION TO BE INCLUDED IN THE CONTRACT
Vessel 4
| VESSEL INFORMATION SHEET | ||||||||
| Route F4: Charlestown Ferry | ||||||||
| Complete one sheet for each vessel | ||||||||
| Vessel Identification | ||||||||
| Vessel Number: | ||||||||
| (from Vessel List) | 4 | Vessel Name: | 0 | |||||
| USCG Registration Number: | 0 | Current Owner: | 0 | |||||
| Make: | 0 | Passenger Capacity: | 0 | |||||
| Model: | 0 | Year Vessel Built: | 0 | |||||
| Fuel Type: | 0 | |||||||
| Vessel Usage | ||||||||
| Will this vessel be dedicated to this service? | <-- Select Yes or No | |||||||
| If it will be used for other purposes please briefly describe: | ||||||||
| <-- Enter N/A or description | ||||||||
| Vessel Measurements | ||||||||
| Length Overall (ft.): | Draft (ft): | <-- Enter dimensions | ||||||
| Beam (ft.): | Gross Tonnage (GT): | <-- Enter dimension/tonnage | ||||||
| Vessel Measurements - Passenger Loading Areas | ||||||||
| Distance from bow to forwardmost passenger loading gate (ft): | <-- Enter dimension, or N/A | |||||||
| Distance from forwardmost passenger loading gate to aft gate (ft.): | <-- Enter dimension, or N/A | |||||||
| Freeboard at bow loading gate, if present (ft-in): | <-- Enter dimension, or N/A | |||||||
| Freeboard at forward loading gate, if present (ft-in): | <-- Enter dimension, or N/A | |||||||
| Freeboard at aft loading gate, if present (ft-in): | <-- Enter dimension, or N/A | |||||||
| Description of Features | ||||||||
| Description of hydraulic, sewage, sanitary, electrical, firefighting, and safety features aboard vessel: | ||||||||
| <-- Enter description of this equipment and features | ||||||||
| Other special features: | ||||||||
| <-- Enter description of any other notable features | ||||||||
| VESSEL INFORMATION SHEET | ||||||||
| Route F4: Charlestown Ferry | ||||||||
| Complete one sheet for each vessel | ||||||||
| Vessel Identification | ||||||||
| Vessel Number: | ||||||||
| (from Vessel List) | 4 | Vessel Name: | 0 | |||||
| USCG Registration Number: | 0 | Current Owner: | 0 | |||||
| Description of Accessibility Features | ||||||||
| Bridgeplate: | <-- Describe accessible features | |||||||
| Bathrooms: | <-- Describe accessible features | |||||||
| Telephones: | <-- Describe accessible features | |||||||
| Wheelchair Tie-Down Equipment: | ||||||||
| Type of Securement: | ||||||||
| (i.e. belts, clamps, etc.) | <-- Describe type(s) of wheelchair tie down equipment | |||||||
| Manufacturer: | No. of wheelchair positions: | <-- Enter Manufacturer of wheelchair tie-down equipment and enter the number of wheelchair positions | ||||||
| Model: | Date Installed: | <--Enter model of wheelchair tie-down equipment and the date it was installed. | ||||||
| List other features which make vessel accessible to persons with disabilities: | ||||||||
| <-- Describe accessible features | ||||||||
| PROPOSED VESSEL UTILIZATION SHEET | Make font BOLD for the trips that would be operated by this vessel: | <--- follow these directions | ||||||
| Route F4: Charlestown Ferry | ||||||||
| Complete one sheet for each vessel | Weekday Schedule | |||||||
| The purpose of this sheet is to identify which of the proposed vessels will be used for each trip, in the full service schedule. Which vessels are designated for each trip will be a factor in determining whether the proposed vessels will meet the required passenger capacities in the evaluation of each proposal. The successful operator will be expected to operate service in accordance with this vessel listing. | Long Wharf | Charlestown | Charlestown | Long Wharf | ||||
| (depart) | (arrive) | (depart) | (arrive) | |||||
| 6:30 AM | 6:40 AM | 6:45 AM | 6:55 AM | |||||
| 6:45 AM | 6:55 AM | 7:00 AM | 7:10 AM | |||||
| 7:00 AM | 7:10 AM | 7:15 AM | 7:25 AM | |||||
| 7:15 AM | 7:25 AM | 7:30 AM | 7:40 AM | |||||
| 7:30 AM | 7:40 AM | 7:45 AM | 7:55 AM | |||||
| 7:45 AM | 7:55 AM | 8:00 AM | 8:10 AM | |||||
| 8:00 AM | 8:10 AM | 8:15 AM | 8:25 AM | |||||
| 8:15 AM | 8:25 AM | 8:30 AM | 8:40 AM | |||||
| Vessel Identification | 8:30 AM | 8:40 AM | 8:45 AM | 8:55 AM | ||||
| Vessel List Number: | 4 | 8:45 AM | 8:55 AM | 9:00 AM | 9:10 AM | |||
| Vessel Name: | 0 | 9:00 AM | 9:10 AM | 9:30 AM | 9:40 AM | |||
| Max. Vessel Speed: | 0 knots | 9:30 AM | 9:40 AM | 10:00 AM | 10:10 AM | |||
| 10:00 AM | 10:10 AM | 10:30 AM | 10:40 AM | |||||
| Passenger Capacity | 10:30 AM | 10:40 AM | 11:00 AM | 11:10 AM | ||||
| Passenger Capacity: | 0 | 11:00 AM | 11:10 AM | 11:30 AM | 11:40 AM | |||
| Fixed Passenger Seats (Qty): | 0 | 11:30 AM | 11:40 AM | 12:00 PM | 12:10 PM | |||
| Upholstered Seats (Yes or No): | 0 | 12:00 PM | 12:10 PM | 12:30 PM | 12:40 PM | |||
| Passenger Seats At Tables (Qty): | 0 | 12:30 PM | 12:40 PM | 1:00 PM | 1:10 PM | |||
| 1:00 PM | 1:10 PM | 1:30 PM | 1:40 PM | |||||
| Average Vessel Fuel Use: (Gallons Per Hour) | 1:30 PM | 1:40 PM | 2:00 PM | 2:10 PM | ||||
| Idling: | 0 | 2:00 PM | 2:10 PM | 2:30 PM | 2:40 PM | |||
| Operating: | 0 | 2:30 PM | 2:40 PM | 3:00 PM | 3:10 PM | |||
| 3:00 PM | 3:10 PM | 3:30 PM | 3:40 PM | |||||
| Vessel Trip Time | 3:30 PM | 3:40 PM | 3:45 PM | 3:55 PM | ||||
| Charlestown - Long Wharf: | 0 minutes | 3:45 PM | 3:55 PM | 4:00 PM | 4:10 PM | |||
| Fuel Consumption per Trip | 4:00 PM | 4:10 PM | 4:15 PM | 4:25 PM | ||||
| Charlestown - Long Wharf: | 0 gallons | 4:15 PM | 4:25 PM | 4:30 PM | 4:40 PM | |||
| Fuel Type: | 4:30 PM | 4:40 PM | 4:45 PM | 4:55 PM | ||||
| 0 | 4:45 PM | 4:55 PM | 5:00 PM | 5:10 PM | ||||
| 5:00 PM | 5:10 PM | 5:15 PM | 5:25 PM | |||||
| The above listed vessel is able to operate the specified ferry service with no modifications to the schedule listed in the RFP: (select Yes or No) | 5:15 PM | 5:25 PM | 5:30 PM | 5:40 PM | <-- Select Yes or No from the dropdown menu | |||
| 5:30 PM | 5:40 PM | 5:45 PM | 5:55 PM | |||||
| 5:45 PM | 5:55 PM | 6:00 PM | 6:10 PM | |||||
| 6:00 PM | 6:10 PM | 6:15 PM | 6:25 PM | |||||
| If NO, list all modifications that would be required to the schedule of operated with this vessel: | 6:15 PM | 6:25 PM | 6:30 PM | 6:40 PM | ||||
| 6:30 PM | 6:40 PM | 7:00 PM | 7:10 PM | <-- If applicable, enter any necessary schedule modifications --> | ||||
| 7:00 PM | 7:10 PM | 7:30 PM | 7:40 PM | |||||
| 7:30 PM | 7:40 PM | 8:00 PM | 8:10 PM | |||||
| 8:00 PM | 8:10 PM | 8:15 PM | 8:25 PM | |||||
| PROPOSED VESSEL UTILIZATION SHEET | Make font BOLD for the trips that would be operated by this vessel: | <--- follow these directions | ||||||
| Route F4: Charlestown Ferry | ||||||||
| Complete one sheet for each vessel | Weekend Schedule | |||||||
| The purpose of this sheet is to identify which of the proposed vessels will be used for each trip, in the full service schedule. Which vessels are designated for each trip will be a factor in determining whether the proposed vessels will meet the required passenger capacities in the evaluation of each proposal. The successful operator will be expected to operate service in accordance with this vessel listing. | Long Wharf | Charlestown | Charlestown | Long Wharf | ||||
| (depart) | (arrive) | (depart) | (arrive) | |||||
| 10:00 AM | 10:10 AM | 10:15 AM | 10:25 AM | |||||
| 10:30 AM | 10:40 AM | 10:45 AM | 10:55 AM | |||||
| 11:00 AM | 11:10 AM | 11:15 AM | 11:25 AM | |||||
| 11:30 AM | 11:40 AM | 11:45 AM | 11:55 AM | |||||
| 12:00 PM | 12:10 PM | 12:15 PM | 12:25 PM | |||||
| 12:30 PM | 12:40 PM | 12:45 PM | 12:55 PM | |||||
| 1:00 PM | 1:10 PM | 1:15 PM | 1:25 PM | |||||
| 1:30 PM | 1:40 PM | 1:45 PM | 1:55 PM | |||||
| Vessel Identification | 2:00 PM | 2:10 PM | 2:15 PM | 2:25 PM | ||||
| Vessel List Number: | 4 | 2:30 PM | 2:40 PM | 2:45 PM | 2:55 PM | |||
| Vessel Name: | 0 | 3:00 PM | 3:10 PM | 3:15 PM | 3:25 PM | |||
| Max. Vessel Speed: | 0 knots | 3:30 PM | 3:40 PM | 3:45 PM | 3:55 PM | |||
| 4:00 PM | 4:10 PM | 4:15 PM | 4:25 PM | |||||
| Passenger Capacity | 4:30 PM | 4:40 PM | 4:45 PM | 4:55 PM | ||||
| Passenger Capacity: | 0 | 5:00 PM | 5:10 PM | 5:15 PM | 5:25 PM | |||
| Fixed Passenger Seats (Qty): | 0 | 5:30 PM | 5:40 PM | 5:45 PM | 5:55 PM | |||
| Upholstered Seats (Yes or No): | 0 | 6:00 PM | 6:10 PM | 6:15 PM | 6:25 PM | |||
| Passenger Seats At Tables (Qty): | 0 |
| Average Vessel Fuel Use: (Gallons Per Hour) | |
| Idling: | 0 |
| Operating: | 0 |
| Vessel Trip Time | |
| Charlestown - Long Wharf: | 0 minutes |
| Fuel Consumption per Trip | |
| Charlestown - Long Wharf: | 0 gallons |
| Fuel Type: | |
| 0 |
| The above listed vessel is able to operate the specified ferry service with no modifications to the schedule listed in the RFP: (select Yes or No) | <-- Select Yes or No from the dropdown menu |
| If NO, list all modifications that would be required to the schedule of operated with this vessel: | |
| <-- If applicable, enter any necessary schedule modifications --> |
| VESSEL HISTORY DATA SHEET |
| Route F4: Charlestown Ferry |
| Complete one sheet for each vessel |
Complete the top portion only for existing vessels.
Complete the bottom portion only for vessels to be constructed prior to the Contract start.
| Vessel Identification | ||||
| Vessel Number: | ||||
| (from Vessel List) | 4 | Vessel Name: | 0 | |
| Is this vessel already constructed and ready for service (yes or no): | <-- Select Yes or No |
| For: Existing Vessels | <-- Complete this section unless you are proposing to use vessels that are currently under construction. | |
| Vessel History | (For vessels under construction, complete the "Vessels to be Constructed" section below) | |
| Year Vessel Built: | 0 | |
| Vessel Age (years): | 2024 years | |
| Estimated remaining vessel service life (years): | <-- Enter estimate years | |
| Type and quantity of power plant: | <-- Enter type and quantity | |
| Number of hours logged on each engine to date: | <-- Enter hours on each engine | |
| Date and nature of most recent routine maintenance or repair: | ||
| <-- Enter description | ||
| Date and nature of most recent major vessel maintenance or repair: | ||
| <-- Enter description | ||
| Date and nature of most recent external hull maintenance above the water line: | ||
| <-- Enter description | ||
| Date and nature of most recent internal or external hull maintenance below the waterline: | ||
| <-- Enter description | ||
| Date of most recent marine survey of this vessel: | <-- Enter date | |
| USCG Inspections | ||
| Offerer must attach the most recent Coast Guard Inspection, deficiencies found and date of repairs. | <-- Attach USCG inspection documentation with proposal |
| VESSEL HISTORY DATA SHEET |
| Route F4: Charlestown Ferry |
| Complete one sheet for each vessel |
Complete the top portion only for existing vessels.
Complete the bottom portion only for vessels to be constructed prior to the Contract start.
| Vessel Identification | |||
| Vessel Number: | |||
| (from Vessel List) | 4 | Vessel Name: | 0 |
| For: Vessels To Be Constructed | <-- Complete this section only if you are proposing to use vessels that are currently under construction. | ||||
| Vessel Identification | |||||
| Make: | 0 | Passenger Capacity: | 0 | ||
| Model: | 0 | Power Plant | |||
| Type and Qty: | <--Enter type and quantity of power plant |
| Vessel Construction | ||||
| Vessel construction schedule including confirmation of proposed delivery date by shipbuilder: | ||||
| (Offeror must include attachments verifying this information) | ||||
| <--indicate the construction and delivery schedule, AND attach documentation. | ||||
| PROPOSED VESSEL CERTIFICATION SHEET | ||||
| Route F4: Charlestown Ferry | ||||
| Complete one sheet for each vessel | ||||
| Vessel Identification | ||||
| Vessel List Number: | 4 | Vessel Top Speed: | 0 knots | |
| Vessel Name: | 0 | |||
| Name of Firm: | <-- Enter the Offeror's Corporate Name |
I, , hereby certify that: <-- Enter the Signer's Name
1. The dimensions and maneuvering capabilities of the above listed vessel will allow for safe and efficient docking at the designated terminal and intermediate stop locations for the designated route at all tide conditions.
2. I am familiar with the physical conditions and navigational constraints at the existing docking facilities for the above listed route.
3. The above listed vessel can operate safely and efficiently at these berthing facilities and meet all requirements of this specification for the above listed route.
| 4. | The draft of the above listed vessel, when fully loaded, shall be shallow enough to operate where required to operate their assigned ferry services during all tide conditions. | |
| Signature: | <-- Sign this form |
Name: <-- Enter the Signer's Name
Name of Firm: <-- Enter the Offeror's Corporate Name
NOTE: THIS INFORMATION TO BE INCLUDED IN THE CONTRACT
Vessel 5
| VESSEL INFORMATION SHEET | ||||||||
| Route F4: Charlestown Ferry | ||||||||
| Complete one sheet for each vessel | ||||||||
| Vessel Identification | ||||||||
| Vessel Number: | ||||||||
| (from Vessel List) | 5 | Vessel Name: | 0 | |||||
| USCG Registration Number: | 0 | Current Owner: | 0 | |||||
| Make: | 0 | Passenger Capacity: | 0 | |||||
| Model: | 0 | Year Vessel Built: | 0 | |||||
| Fuel Type: | 0 | |||||||
| Vessel Usage | ||||||||
| Will this vessel be dedicated to this service? | <-- Select Yes or No | |||||||
| If it will be used for other purposes please briefly describe: | ||||||||
| <-- Enter N/A or description | ||||||||
| Vessel Measurements | ||||||||
| Length Overall (ft.): | Draft (ft): | <-- Enter dimensions | ||||||
| Beam (ft.): | Gross Tonnage (GT): | <-- Enter dimension/tonnage | ||||||
| Vessel Measurements - Passenger Loading Areas | ||||||||
| Distance from bow to forwardmost passenger loading gate (ft): | <-- Enter dimension, or N/A | |||||||
| Distance from forwardmost passenger loading gate to aft gate (ft.): | <-- Enter dimension, or N/A | |||||||
| Freeboard at bow loading gate, if present (ft-in): | <-- Enter dimension, or N/A | |||||||
| Freeboard at forward loading gate, if present (ft-in): | <-- Enter dimension, or N/A | |||||||
| Freeboard at aft loading gate, if present (ft-in): | <-- Enter dimension, or N/A | |||||||
| Description of Features | ||||||||
| Description of hydraulic, sewage, sanitary, electrical, firefighting, and safety features aboard vessel: | ||||||||
| <-- Enter description of this equipment and features | ||||||||
| Other special features: | ||||||||
| <-- Enter description of any other notable features | ||||||||
| VESSEL INFORMATION SHEET | ||||||||
| Route F4: Charlestown Ferry | ||||||||
| Complete one sheet for each vessel | ||||||||
| Vessel Identification | ||||||||
| Vessel Number: | ||||||||
| (from Vessel List) | 5 | Vessel Name: | 0 | |||||
| USCG Registration Number: | 0 | Current Owner: | 0 | |||||
| Description of Accessibility Features | ||||||||
| Bridgeplate: | <-- Describe accessible features | |||||||
| Bathrooms: | <-- Describe accessible features | |||||||
| Telephones: | <-- Describe accessible features | |||||||
| Wheelchair Tie-Down Equipment: | ||||||||
| Type of Securement: | ||||||||
| (i.e. belts, clamps, etc.) | <-- Describe type(s) of wheelchair tie down equipment | |||||||
| Manufacturer: | No. of wheelchair positions: | <-- Enter Manufacturer of wheelchair tie-down equipment and enter the number of wheelchair positions | ||||||
| Model: | Date Installed: | <--Enter model of wheelchair tie-down equipment and the date it was installed. | ||||||
| List other features which make vessel accessible to persons with disabilities: | ||||||||
| <-- Describe accessible features | ||||||||
| PROPOSED VESSEL UTILIZATION SHEET | Make font BOLD for the trips that would be operated by this vessel: | <--- follow these directions | ||||||
| Route F4: Charlestown Ferry | ||||||||
| Complete one sheet for each vessel | Weekday Schedule | |||||||
| The purpose of this sheet is to identify which of the proposed vessels will be used for each trip, in the full service schedule. Which vessels are designated for each trip will be a factor in determining whether the proposed vessels will meet the required passenger capacities in the evaluation of each proposal. The successful operator will be expected to operate service in accordance with this vessel listing. | Long Wharf | Charlestown | Charlestown | Long Wharf | ||||
| (depart) | (arrive) | (depart) | (arrive) | |||||
| 6:30 AM | 6:40 AM | 6:45 AM | 6:55 AM | |||||
| 6:45 AM | 6:55 AM | 7:00 AM | 7:10 AM | |||||
| 7:00 AM | 7:10 AM | 7:15 AM | 7:25 AM | |||||
| 7:15 AM | 7:25 AM | 7:30 AM | 7:40 AM | |||||
| 7:30 AM | 7:40 AM | 7:45 AM | 7:55 AM | |||||
| 7:45 AM | 7:55 AM | 8:00 AM | 8:10 AM | |||||
| 8:00 AM | 8:10 AM | 8:15 AM | 8:25 AM |