This is a Route-Specific Technical Specification document from the Massachusetts Bay Transportation Authority (MBTA) for Route F3 East Boston Ferry service, which operates between Lewis Mall Wharf and Boston Long Wharf. The service requires operation from April 1 to November 30, with specific weekday and weekend schedules, running daily including weekend service for major holidays except New Year's Day and Christmas Day. The service provider must supply two vessels - one primary and one backup - each with a minimum capacity of 49 passengers, capable of loading/unloading passengers within 5 minutes and completing dock-to-dock travel within 10 minutes during peak periods. Each vessel must be staffed with one licensed captain and one crew member per shift.
The service provider must secure their own docking facility in Boston between Central Wharf's northern face and Christopher Columbus Park's northern limit, while the MBTA provides the Lewis Mall Wharf facility. The provider is responsible for vessel maintenance, must implement the Helm Connect Maintenance management system, and comply with all accessibility requirements. The document specifies that the service provider is responsible for maintaining docking facilities and must follow MBTA's ticketing and revenue collection protocols, though specific pricing terms are not detailed in this technical specification.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MBTA Water Transportation Services
| Appendix 3: | Route-Specific Technical Specification |
| Route F3: East Boston Ferry |
Table of Contents
| 1. | Introduction | 1 |
| 1.1 | Document Overview | 1 |
| 1.2 | Definition and Terms | 1 |
| 2. | Scope of Work | 2 |
| 2.1 | Passenger Service Route and Schedule | 2 |
| 2.1.1 | Route Description | 2 |
| 2.1.2 | Operating Season | 2 |
| 2.1.3 | Passenger Service Schedule | 3 |
| 2.1.4 | Days of Service | 5 |
| 2.1.5 | Holiday Service | 5 |
| 2.2 | Passenger Ferry Vessels – Supplied by the Service Provider | 5 |
| 2.2.1 | Minimum Vessel Requirements for Scheduled Service | 5 |
| 2.2.2 | Vessel Performance Characteristics | 2 |
| 2.2.3 | General Vessel Requirements | 2 |
| 2.2.4 | Automatic Identification System (AIS) | 2 |
| 2.2.5 | Vessel Accessibility Requirements | 2 |
| 2.2.6 | Vessel Dimension Limitations | 2 |
| 2.3 | Passenger Ferry Vessels – Supplied by the MBTA | 2 |
| 2.4 | Vessel Maintenance | 2 |
| 2.5 | Maintenance Management System – Helm Connect Maintenance | 2 |
| 2.6 | Docks and Facilities | 2 |
| 2.6.1 | Docking Facilities | 2 |
| 2.6.2 | Maintenance Facility | 3 |
| 2.6.3 | Other Facilities | 3 |
| 2.7 | Docks and Facilities Maintenance | 3 |
| 2.8 | General Maintenance Requirements – MBTA-Supplied Vessels, Docks and Other Assets | 3 |
| 2.9 | Accessibility | 3 |
| 2.10 | Ticketing, Fares and Revenue Collection | 3 |
| 2.11 | Expenses and Compensation | 3 |
| 2.12 | Management and Operations | 3 |
| 2.12.1 | Management and Operations Plan | 3 |
| 2.12.2 | Local Office | 3 |
| 2.12.3 | Personnel | 3 |
Table of Figures
| Figure 1: Route Map | 2 |
| Figure 2: 2024 Passenger Service Schedule - Weekdays | 3 |
| Figure 3: 2024 Passenger Service Schedule - Weekends | 4 |
Attachments Attachment A : Dock Agreement – Lewis Mall, East Boston A-1
F3: East Boston Ferry
MBTA Water Transportation Services Page i Appendix 3: F3 Route-Specific Technical Specification Introduction Document Overview This Route-Specific Technical Specification contains the scope of work that is applicable to Service Provider(s) of the following route only:
Route F3: East Boston Ferry The Service Provider is required to comply with the requirements of this Route-Specific Technical Specification in addition to the requirements of Appendix 0: General Technical Specification.
Definition and Terms See General Technical Specification
Scope of Work Passenger Service Route and Schedule Route Description The passenger ferry routes are as follows, and as depicted in Figure 1.
| F3 – East Boston Ferry: |
| Lewis Mall Wharf – Boston Long Wharf |
Figure 1: Route Map F1:
F6:
F6:
F2H:
F2H:
F4:
F3 F5:
Operating Season Service Provider shall operate this service approximately April 1 to November 30, with the specific start and end dates to be determined by the MBTA.
Passenger Service Schedule Current operating schedule is as shown in Figure 2 and Figure 3 below:
Figure 2: 2024 Passenger Service Schedule - Weekdays
Figure 3: 2024 Passenger Service Schedule - Weekends
Days of Service Service Provider is required to operate this service on the following days as follows:
| Day of Week |
| Service Operated |
| Monday |
| April 1 to |
November 30**
Tuesday
Wednesday
Thursday
Friday
| Saturday |
| April 1 to |
November 30**
Sunday
** inclusive of the entire weekend containing these dates.
Holiday Service Holiday service shall be operated as follows:
| Holiday |
| Service Level |
| New Year's Day |
| no service |
| Memorial Day |
| weekend service |
| 4th of July |
| weekend service |
| Labor Day |
| weekend service |
| Thanksgiving Day |
| weekend service |
| Christmas Day |
| no service |
For all other holidays, the normal service levels for that route will be provided, based on whether the holiday falls on a weekday, Saturday or Sunday.
Passenger Ferry Vessels – Supplied by the Service Provider Service Provider shall provide passenger ferry vessels, as described in the following sections and the General Technical Specification.
At all times during the MBTA service hours, the operator shall provide a backup vessel meeting the vessel requirements in Section 2.2.1.
Minimum Vessel Requirements for Scheduled Service Enough vessels must be provided to meet the schedule described in Section 2.1.3, but at a minimum:
· One (1) vessel with minimum capacity of 49 passengers
· One (1) back-up vessel with minimum capacity of 49 passengers Vessel Performance Characteristics The vessels shall be configured such that they are capable of loading and unloading passengers in five (5) minutes during peak periods to maintain schedule.
Dock to dock travel times shall be no greater than 10 minutes, dock to dock in peak periods.
General Vessel Requirements See General Technical Specification Automatic Identification System (AIS) See General Technical Specification Vessel Accessibility Requirements See General Technical Specification Vessel Dimension Limitations See General Technical Specification Passenger Ferry Vessels – Supplied by the MBTA Not Applicable.
Vessel Maintenance See General Technical Specification Maintenance Management System – Helm Connect Maintenance See General Technical Specification Docks and Facilities Docking Facilities The Authority shall provide the following docking facilities for use by the Service Provider during operation of passenger service. The Service Provider shall abide by and fulfill the obligations of the Authority’s docking agreements at the following location:
· Lewis Mall Wharf (see Attachment A for dock agreement) Docking and Layover Assignments Service Provider must provide space for vessel layover or overnight storage; this may not be at the Lewis Wharf dock.
Service Provider-Supplied Dock The Service Provider must provide or obtain rights to use a docking facility in Boston for operation of the scheduled passenger service. The dock must be located between the northern face of Central Wharf and the northern limit of Christopher Columbus Park.
Maintenance Facility See General Technical Specification Other Facilities Not Applicable Docks and Facilities Maintenance See General Technical Specification General Maintenance Requirements – MBTA-Supplied Vessels, Docks and Other Assets See General Technical Specification Accessibility See General Technical Specification Ticketing, Fares and Revenue Collection See General Technical Specification Expenses and Compensation See General Technical Specification Management and Operations Management and Operations Plan See General Technical Specification Local Office See General Technical Specification Personnel Crew Requirements Minimum crew requirements are as follows for each shift, for each vessel proposed for service:
One (1) licensed captain, and One (1) crew member.
Staffing Levels See General Technical Specification
For all subsequent sections of the Technical Specification:
See General Technical Specification
Attachments
MBTA Water Transportation Services Appendix 3: F3 Route-Specific Technical Specification : Dock Agreement – Lewis Mall, East Boston Please see the file named:
· Attachment - Dock Agreement - Lewis Wharf
MBTA Water Transportation Services Page i Appendix 3: F3 Route-Specific Technical Specification image1.jpeg image2.jpeg image2.png image3.png