This document is a route-specific technical specification from the Massachusetts Bay Transportation Authority (MBTA) for the Charlestown Ferry (Route F4) passenger service. The scope of work includes a route description, operating season, passenger service schedules for weekdays and weekends, days of service, and holiday service levels. The Service Provider is required to supply a minimum of two passenger ferry vessels with a capacity of at least 100 passengers each, plus one backup vessel, that are capable of loading and unloading passengers within 5 minutes during peak periods. The MBTA will provide the docking facilities at Charlestown Navy Yard and Long Wharf South, and the Service Provider must abide by the Authority's docking agreements. The Service Provider is responsible for all vessel maintenance and must use the MBTA's Helm Connect Maintenance system. The Service Provider must also staff each vessel with a licensed captain and one crew member per shift.
The document outlines the general technical specification requirements which the Service Provider must also comply with, covering areas such as accessibility, ticketing, fares, revenue collection, expenses, compensation, management, and operations. Pricing terms, set asides, incumbents, funding sources, and amounts are not specified in this route-specific technical specification.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MBTA Water Transportation Services
| Appendix 4: | Route-Specific Technical Specification |
| Route F4: Charlestown Ferry |
F4: Charlestown Ferry
MBTA Water Transportation Services Appendix 4: F4 Route-Specific Technical Specification Table of Contents
| 1. | Introduction | 1 |
| 1.1 | Document Overview | 1 |
| 1.2 | Definition and Terms | 1 |
| 2. | Scope of Work | 2 |
| 2.1 | Passenger Service Route and Schedule | 2 |
| 2.1.1 | Route Description | 2 |
| 2.1.2 | Operating Season | 2 |
| 2.1.3 | Passenger Service Schedule | 3 |
| 2.1.4 | Days of Service | 5 |
| 2.1.5 | Holiday Service | 5 |
| 2.2 | Passenger Ferry Vessels – Supplied by the Service Provider | 5 |
| 2.2.1 | Minimum Vessel Requirements for Scheduled Service | 5 |
| 2.2.2 | Vessel Performance Characteristics | 6 |
| 2.2.3 | General Vessel Requirements | 6 |
| 2.2.4 | Automatic Identification System (AIS) | 6 |
| 2.2.5 | Vessel Accessibility Requirements | 6 |
| 2.2.6 | Vessel Dimensions | 6 |
| 2.3 | Passenger Ferry Vessels – Supplied by the MBTA | 6 |
| 2.4 | Vessel Maintenance | 6 |
| 2.5 | Maintenance Management System – Helm Connect Maintenance | 6 |
| 2.6 | Docks and Facilities | 6 |
| 2.6.1 | Docking Facilities | 6 |
| 2.6.2 | Maintenance Facility | 7 |
| 2.6.3 | Other Facilities | 7 |
| 2.7 | Docks and Facilities Maintenance | 7 |
| 2.8 | General Maintenance Requirements – MBTA-Supplied Vessels, Docks and Other Assets | 7 |
| 2.9 | Accessibility | 7 |
| 2.10 | Ticketing, Fares and Revenue Collection | 7 |
| 2.11 | Expenses and Compensation | 7 |
| 2.12 | Management and Operations | 7 |
| 2.12.1 | Management and Operations Plan | 7 |
| 2.12.2 | Local Office | 7 |
| 2.12.3 | Personnel | 7 |
Table of Figures
| Figure 1: Route Map | 2 |
| Figure 2: 2024 Passenger Service Schedule - Weekdays | 3 |
| Figure 3: 2024 Passenger Service Schedule - Weekends | 4 |
Attachments
| Attachment A | : Dock Agreement – Charlestown Navy Yard | A-1 |
| Attachment B | : Dock Agreement – Long Wharf South | B-1 |
MBTA Water Transportation Services Page i Appendix 4: F4 Route-Specific Technical Specification Introduction Document Overview This Route-Specific Technical Specification contains the scope of work that is applicable to Service Provider(s) of the following route only:
Route F3: East Boston Ferry The Service Provider is required to comply with the requirements of this Route-Specific Technical Specification in addition to the requirements of Appendix 0: General Technical Specification.
Definition and Terms See General Technical Specification
Scope of Work Passenger Service Route and Schedule Route Description The passenger ferry routes are as follows, and as depicted in Figure 1.
| F4 - Charlestown Ferry: |
| Charlestown Navy Yard – Boston Long Wharf |
Figure 1: Route Map F1:
F6:
F6:
F2H:
F2H:
F4:
F3 F5:
Operating Season Service Provider shall operate this service year-round.
Passenger Service Schedule Current operating schedule is as shown in Figure 2 and Figure 3 below:
Figure 2: 2024 Passenger Service Schedule - Weekdays
Figure 3: 2024 Passenger Service Schedule - Weekends
Days of Service Service Provider is required to operate this service on the following days as follows:
| Day of Week |
| Service Operated |
| Monday |
| year-round |
service
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Holiday Service Holiday service shall be operated as follows:
| Holiday |
| Service Level |
| New Year's Day |
| no service |
| Memorial Day |
| weekend service |
| 4th of July |
| weekend service |
| Labor Day |
| weekend service |
| Thanksgiving Day |
| weekend service |
| Christmas Day |
| no service |
For all other holidays, the normal service levels for that route will be provided, based on whether the holiday falls on a weekday, Saturday or Sunday.
Passenger Ferry Vessels – Supplied by the Service Provider Service Provider shall provide passenger ferry vessels, as described in the following sections and the General Technical Specification.
At all times during the MBTA service hours, the Service Provider shall provide a backup vessel meeting the vessel requirements in Section 2.2.1.
Minimum Vessel Requirements for Scheduled Service Enough vessels must be provided to meet the schedule described in Section 2.1.3, but at a minimum:
· Two (2) vessels with minimum capacity of 100 passengers
· One (1) back-up vessel with minimum capacity of 100 passengers Vessel Performance Characteristics The vessels shall be configured such that they are capable of loading and unloading passengers in five (5) minutes during peak periods to maintain schedule.
Dock to dock travel times shall be no greater than:
· 10 minutes, dock to dock in peak periods.
General Vessel Requirements See General Technical Specification Automatic Identification System (AIS) See General Technical Specification Vessel Accessibility Requirements See General Technical Specification Vessel Dimensions Due to dockage constraints at Long Wharf, the maximum vessel length required for this route is 65 feet. Service Providers shall demonstrate that the proposed vessels are of appropriate dimensions to meet the needs of the service and are of the appropriate dimensions and maneuverability to operate in confined spaces such as at the existing MBTA Long Wharf docking facility.
Passenger Ferry Vessels – Supplied by the MBTA Not Applicable.
Vessel Maintenance See General Technical Specification Maintenance Management System – Helm Connect Maintenance See General Technical Specification Docks and Facilities
Docking Facilities The Authority shall provide all docking facilities for use by the Service Provider during operation of passenger service. The Service Provider shall abide by and fulfill the obligations of the Authority’s docking agreements at the following locations:
· Charlestown Navy Yard (see Attachment A for dock agreement)
· Long Wharf South (see Attachment B for dock agreement) Docking and Layover Assignments The Authority will provide docking space during operating hours only at Pier 4 in Charlestown and Long Wharf.
Maintenance Facility See General Technical Specification Other Facilities Not Applicable Docks and Facilities Maintenance See General Technical Specification General Maintenance Requirements – MBTA-Supplied Vessels, Docks and Other Assets See General Technical Specification Accessibility See General Technical Specification Ticketing, Fares and Revenue Collection See General Technical Specification Expenses and Compensation See General Technical Specification Management and Operations Management and Operations Plan See General Technical Specification Local Office See General Technical Specification Personnel Crew Requirements Minimum crew requirements are as follows for each shift, for each vessel proposed for service:
· One (1) licensed captain, and
· One (1) crew member.
Staffing Levels See General Technical Specification
For all subsequent sections of the Technical Specification:
See General Technical Specification
Attachments
MBTA Water Transportation Services Appendix 4: F4 Route-Specific Technical Specification B: Dock Agreement – Charlestown Navy Yard Please see the file named:
· Attachment - Dock Agreement - LWC-LWN-CTown
MBTA Water Transportation Services Page i Appendix 4: F4 Route-Specific Technical Specification Attachment c: Dock Agreement – Long Wharf South Please see the file named:
· Attachment - Dock Agreement - LWC-LWN-CTown
Note:
The MBTA ferry service uses the name Long Wharf South on its schedules and maps. However; per the terms of the dock agreement, that same location is called Long Wharf Central.