This document is a Route-Specific Technical Specification for the MBTA (Massachusetts Bay Transportation Authority) Water Transportation Services Appendix 6: Route F6 Winthrop/Quincy Ferry. The scope of work includes details on the passenger service route and schedule, the ferry vessels to be provided by the MBTA, maintenance requirements, docking facilities, and management and operations plan for the service provider. The operating season is approximately May 1 to November 30, with the MBTA currently owning one 75-passenger catamaran ferry vessel, M/V Valkyrie, that will be provided to the successful service provider. The service provider must abide by the MBTA's docking agreements at several locations, including Winthrop Landing, Marina Bay/Squantum Point Park, Logan Airport, Seaport/Fan Pier, and Central Wharf South/Aquarium. The service provider is responsible for all vessel maintenance, while the MBTA will provide spare parts, tools, and equipment.

The document outlines the minimum crew requirements, as well as the general maintenance requirements for the MBTA-supplied vessels, docks, and other assets. The service provider must also comply with accessibility requirements and manage ticketing, fares, and revenue collection. Compensation and expenses will be handled according to the terms specified in the contract.

View the file

Other files

File Type Posted
RFP 225-24 Commuter Ferry Service~1.docx DOCX document
Appendix 2-Route F2H - updated.docx DOCX document
Vessel Forms_F3_rev. 3.xlsx XLSX spreadsheet
Appendix 0 General Technical Specification~1.docx DOCX document
Form D - Price Proposal Forms updated 2024-12-09.xlsx XLSX spreadsheet
Attachment - Dock Agreement-LWC-LWN-CTown.pdf PDF
Attachment - Dock Agreement - Charlestown Marina.pdf PDF
Attachment - Dock Agreement-Lewis Wharf.pdf PDF
Attachment - Dock Agreement-Rowes Wharf w Amendment.pdf PDF
Safety Changes.docx DOCX document
Exhibit A - MBTA Minimum Insurance Requirements.docx DOCX document
Appendix 1-Route F1~1.docx DOCX document
RFP 225-24 Commuter Ferry Service - updated 2.docx DOCX document
Intermodal Center visit.docx DOCX document
Vessel Forms_F1_rev. 3.xlsx XLSX spreadsheet
Appendix 3-Route F3 - updated.docx DOCX document
Appendix 0 - Attachment H - Witness Statement Form.docx DOCX document
Appendix 0 General Technical Specification -updated.docx DOCX document
Attachment - Dock Agreement-Lynn.pdf PDF
Pre-Bid Conference1~3.pptx PPTX presentation
Attachment - Vessel and Dock Agreement-Valkyrie and Lewis Wharf.pdf PDF
Appendix 2-Route F2H~1.docx DOCX document
Appendix 0 - Attachment G - FTA Safety and Security Form.pdf PDF
Appendix 5-Route F5~1.docx DOCX document
Appendix 1-Route F1 - updated~1.docx DOCX document
Attachment - Vessel Agreement-Ava Pearl.pdf PDF
Appendix 3-Route F3~1.docx DOCX document
Appendix 4-Route F4~1.docx DOCX document
Appendix 5-Route F5 - updated.docx DOCX document
Ferry engine data rev 1.xlsx XLSX spreadsheet
Vessel Forms_F4_rev. 3.xlsx XLSX spreadsheet
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MBTA Water Transportation Services

Appendix 6:Route-Specific Technical Specification
Route F6: Winthrop / Quincy Ferry

Route F6: Winthrop / Quincy Ferry

MBTA Water Transportation Services Page 1 Appendix 6: F6 Route-Specific Technical Specification Table of Contents

1.Introduction1
1.1Document Overview1
1.2Definition and Terms1
2.Scope of Work2
2.1Passenger Service Route and Schedule2
2.1.1Route Description2
2.1.2Operating Season2
2.1.3Passenger Service Schedule3
2.1.4Days of Service4
2.1.5Holiday Service4
2.1.6Additional Considerations4
2.2Passenger Ferry Vessels – Supplied by the Service Provider4
2.2.1Minimum Vessel Requirements for Scheduled Service4
2.2.2Vessel Performance Characteristics5
2.2.3General Vessel Requirements5
2.2.4Automatic Identification System (AIS)5
2.2.5Vessel Accessibility Requirements5
2.2.6Vessel Dimensions5
2.3Passenger Ferry Vessels – Supplied by the MBTA5
2.3.1MBTA Vessels5
2.3.2MBTA Spare Parts5
2.3.3MBTA Tools and Equipment5
2.3.4Manufacturer’s Warranties5
2.3.5Vessel Monitoring and other New Onboard Equipment5
2.4Vessels Maintenance5
2.5Maintenance Management System – Helm Connect Maintenance5
2.6Docks and Facilities6
2.6.1Docking Facilities6
2.6.2Maintenance Facility6
2.6.3Other Facilities6
2.7Docks and Facilities Maintenance6
2.8General Maintenance Requirements – MBTA-Supplied Vessels, Docks and Other Assets6
2.9Accessibility7
2.10Ticketing, Fares and Revenue Collection7
2.11Expenses and Compensation7
2.12Management and Operations7
2.12.1Management and Operations Plan7
2.12.2Local Office7
2.12.3Personnel7

Table of Figures

Figure 1: Route Map2
Figure 2: 2024 Passenger Service Schedule - Weekdays3

Attachments

Attachment A: Authority-Supplied VesselsA-1
Attachment B: MBTA Vessel Maintenance RequirementsB-1
Attachment C: MBTA Ferry Vessel Major EquipmentC-1
Attachment D: Lease Agreement – Valkyrie and Winthrop LandingD-1
Attachment E: Dock Agreement – Marina BayE-1
Attachment F: Dock Agreement – Logan AirportF-1
Attachment G: Dock Agreement – Fan Pier (Seaport)G-1
Attachment H: Dock Agreement – Central Wharf South (Aquarium)H-1
Attachment I: Dock Agreement – Charlestown MarinaI-1

Route F6: Winthrop/Quincy Ferry

MBTA Water Transportation Services Page i Appendix 6: F6 Route-Specific Technical Specification Introduction Document Overview This Route-Specific Technical Specification contains the scope of work that is applicable to Service Provider(s) of the following route only:

Route F6: Winthrop/Quincy Ferry The Service Provider is required to comply with the requirements of this Route-Specific Technical Specification in addition to the requirements of Appendix 0: General Technical Specification.

Definition and Terms See General Technical Specification

Scope of Work Passenger Service Route and Schedule Route Description The passenger ferry routes are as follows, and as depicted in Figure 1.

F6 – Winthrop / Quincy Ferry:
Winthrop Landing and Marina Bay/Squantum Point Park Landing – Logan Airport, Seaport/Fan Pier and Aquarium

Figure 1: Route Map F1:

F6:

F6:

F2H:

F2H:

F4:

F3 F5:

Operating Season Service Provider shall operate this service approximately May 1 to November 30, with the specific start and end dates to be determined by the MBTA.

Passenger Service Schedule Current operating schedule is as shown in Figure 2 below:

Figure 2: 2024 Passenger Service Schedule - Weekdays

Days of Service Service Provider is required to operate this service on the following days as follows:

Day of Week
Service Operated
Monday
May 1

to November 30**

Tuesday

Wednesday

Thursday

Friday

Saturday
no service

Sunday

** inclusive of the entire week containing these dates.

Holiday Service Holiday service shall be operated as follows:

Holiday
Service Level
New Year's Day
no service
Memorial Day
no service
4th of July
no service
Labor Day
no service
Thanksgiving Day
no service
Christmas Day
no service

For all other holidays, the normal service levels for that route will be provided, based on whether the holiday falls on a weekday, Saturday or Sunday.

Additional Considerations The Authority is investigating options to provide more frequent and more direct service for its customers on this route. The Service Provider will cooperate with the Authority in implementing and operating any such future changes in routing or quantity of Authority-supplied vessels per the requirements of Section 2.15 (Service Changes and Amendments) in the General Technical Specification.

Passenger Ferry Vessels – Supplied by the Service Provider Not Applicable.

Passenger Ferry Vessels – Supplied by the MBTA MBTA Vessels The Authority currently owns one 75-passenger catamaran ferry vessel, M/V Valkyrie, that is equipped for bow loading (see Descriptions Attachment A and Attachment B). This vessel will be provided to the successful Service Provider for operation of Route F6.

MBTA Spare Parts See General Technical Specification MBTA Tools and Equipment See General Technical Specification Manufacturer’s Warranties See General Technical Specification Vessel Monitoring and other New Onboard Equipment See General Technical Specification Vessels Maintenance See General Technical Specification Maintenance Management System – Helm Connect Maintenance See General Technical Specification Docks and Facilities Docking Facilities The Authority shall provide all docking facilities for use by the Service Provider during operation of passenger service. The Service Provider shall abide by and fulfill the obligations of the Authority’s docking agreements at the following locations:

· Winthrop, Winthrop Landing (see Attachment D for lease agreement)

· Quincy, Marina Bay / Squantum Point Park (see Attachment E for lease agreement)

· East Boston, Logan Airport (see Attachment F for lease agreement)

· South Boston, Seaport / Fan Pier (see Attachment G for lease agreement)

· Boston, Central Wharf South/Aquarium (see Attachment H for lease agreement)

· Charlestown Marina (vessel layover and storage only, no passenger service, see Attachment I) Docking and Layover Assignments Service Provider may not layover vessels at Quincy/Marina Bay, Logan Airport, Seaport/Fan Pier or Aquarium.

Charlestown Marina: The Authority will provide layover space for the Authority-owned vessels at the Charlestown Marina. The Charlestown Marina is equipped with shore power and a water connection; there is no sewage connection.

Winthrop Landing: Daytime layover of vessels is available at Winthrop Landing. Winthrop Landing is not equipped with shore power, water connection or sewer connection.

Maintenance Facility See General Technical Specification Other Facilities Not Applicable Docks and Facilities Maintenance See General Technical Specification General Maintenance Requirements – MBTA-Supplied Vessels, Docks and Other Assets See General Technical Specification Accessibility See General Technical Specification Ticketing, Fares and Revenue Collection See General Technical Specification Expenses and Compensation See General Technical Specification Management and Operations Management and Operations Plan See General Technical Specification Local Office See General Technical Specification Personnel Minimum Crew Requirements Minimum crew requirements are as follows for each shift, for each vessel proposed for service:

· One (1) licensed captain, and

· One (1) crew member For all subsequent sections of the Technical Specification:

See General Technical Specification

Attachments

MBTA Water Transportation Services Appendix 6: F6 Route-Specific Technical Specification : Authority-Supplied Vessels

VESSEL INFORMATION SHEET

Vessel Identification

Vessel Name:
Valkyrie
Coast Guard Registration Number:
1330511
Current Owner:
Town of Winthrop
Make:
Evans Boat Repair
Passenger Capacity:
77
Model:
Low wake wash fiberglass catamaran
Crew Requirements:
1 Master
Year Vessel Built:
2015

1 Deckhands

Technical Information

Draft:
4 feet
USCG Certification:
Length:
53 feet
Engines:
2 Cummins QSL9 marine engines, EPA Tier III
Beam:
20 feet
Reverse/Reduction Gears:
ZF
Bow Radius:
Straight bow, no radius
:
Bow Freeboard:
4 feet loaded
Generators:
:

Potable Water:

Air Conditioning:
yes

Sewage:

Heating:
yes

Fuel:

Vessel Usage

Will this vessel be dedicated to this service?
YES - No other uses permitted.

Description of Accessibility Features

Bridgeplate:

Bathrooms:
1 ADA head. (also 1 non-ADA head)

Passenger Information:

Other features:
The vessel is designed for level boarding through the bow of the vessel. 36” aisle widths P&S.

Other Special Features

Bicycle racks provided on the bow.

MBTA Water Transportation Services Page i F6 Route-Specific Technical Specification Attachment: Lease Agreement – Valkyrie and Winthrop Landing

Please see the file named:

· Attachment - Vessel and Dock Agreement - Valkyrie and Lewis Wharf

Attachment: Dock Agreement – Marina Bay There is no dock agreement in place for the use of Marina Bay (Squantum Point Park) dock at this time.

Attachment: Dock Agreement – Logan Airport There is no dock agreement in place for the use of the Logan Airport dock at this time.

attachment: Dock Agreement – Fan Pier (Seaport) There is no dock agreement in place for the use of the Fan Pier (Seaport) dock at this time.

Attachment: Dock Agreement – Central Wharf South (Aquarium) There is no dock agreement in place for the use of the Central Wharf South (Aquarium) dock at this time.

Attachment: Dock Agreement – Charlestown Marina

Please see the file named:

· Attachment - Dock Agreement - Charlestown Marina image1.jpeg image2.jpeg image2.png

File details come from the government source that posted it. Updated .