VA244-17-R-1057-004.xls

XLS spreadsheet 73 KB Posted

Attached to
WILMINGTON and COATESVILLE VAMC MATOC
Solicitation number
VA24417R1057
Issued by

About this file

This document contains a price proposal template and details regarding a Multiple Award Task Order Contract (MATOC) opportunity with the Department of Veterans Affairs. The MATOC will be awarded to approximately six contractors to provide construction services at the Wilmington VA Medical Center in Delaware and the Coatesville VA Medical Center in Pennsylvania over a period of five years, with a total ceiling of $100 million across all task orders. Services will include interior and exterior renovations, electrical, plumbing, HVAC, communications, site work, and other construction tasks. Individual task orders will range from $2,000 to $5.5 million. The solicitation is set aside for Service-Disabled Veteran Owned Small Businesses. It will be released on or around January 3rd, 2018.

VA244-17-R-1057 S02 - Solicitation ATTACHMENT 7 Price Schedule-Seed Project.xls

View the file

Other files

File Type Posted
VA244-17-R-1057-008.docx DOCX document
VA244-17-R-1057-00009000.docx DOCX document
VA244-17-R-1057-00008000.docx DOCX document
VA244-17-R-1057-00008001.xls XLS spreadsheet
VA244-17-R-1057-00007000.docx DOCX document
VA244-17-R-1057-00006000.docx DOCX document
VA244-17-R-1057-00005002.pdf PDF
VA244-17-R-1057-00005000.docx DOCX document
VA244-17-R-1057-00005001.pdf PDF
VA244-17-R-1057-00004000.docx DOCX document
VA244-17-R-1057-00003000.docx DOCX document
VA244-17-R-1057-00002000.docx DOCX document
VA244-17-R-1057-00001000.docx DOCX document
VA244-17-R-1057-00001003.pdf PDF
VA244-17-R-1057-00001001.docx DOCX document
VA244-17-R-1057-00001002.pdf PDF
VA244-17-R-1057-007.pdf PDF
VA244-17-R-1057-003.docx DOCX document
VA244-17-R-1057-005.pdf PDF
VA244-17-R-1057-006.pdf PDF
VA244-17-R-1057-002.docx DOCX document
VA244-17-R-1057-001.docx DOCX document
VA244-17-R-1057-000.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

PRICE PROPSALDATE PREPARED
ACTIVITY AND LOCATION:Company Name:
Estimated By:
PROJECT TITLE:
VA244-17-R-1057; MATOC SEED Project 542-18-107; Flooring Replacement Phase IProject Number:
ITEMDESCRIPTIONMATERIALS COSTDIRECT LABOR COSTTOTAL
NO.QTYUNUNIT COSTTOTALQTYUNUNIT COSTTOTAL
1Building 1 Ground Floor
2Remove Carpet- 0- 0- 0
3Remove Cove Base- 0- 0- 0
4Materials for New Cove Base (6")- 0- 0- 0
5Install New Cove Base (6")- 0- 0- 0
6Floor Prep- 0- 0- 0
7Materials for New Floor- 0- 0- 0
8Install New Floor- 0- 0- 0
9ICRA Walls- 0- 0- 0
10Total Cost for Area- 0- 0- 0
11
12Building 3 Ground Floor
13Remove Carpet- 0- 0- 0
14Remove Cove Base- 0- 0- 0
15Materials for New Cove Base (6")- 0- 0- 0
16Install New Cove Base (6")- 0- 0- 0
17Floor Prep- 0- 0- 0
18Materials for New Floor- 0- 0- 0
19Install New Floor- 0- 0- 0
20ICRA Walls- 0- 0- 0
21Total Cost for Area- 0- 0- 0
22
23Building 5 Ground Floor
24Remove Carpet- 0- 0- 0
25Remove Cove Base- 0- 0- 0
26Materials for New Cove Base (6")- 0- 0- 0
27Install New Cove Base (6")- 0- 0- 0
28Materials for New Floor- 0- 0- 0
29Install New Floor- 0- 0- 0
30ICRA Walls- 0- 0- 0
31Total Cost for Area- 0- 0- 0
32
33Building 6 Logistics B12
34Remove Carpet- 0- 0- 0
35Remove Cove Base- 0- 0- 0
36Materials for New Cove Base (6")- 0- 0- 0
37Install New Cove Base (6")- 0- 0- 0
38Materials for New Floor- 0- 0- 0
39Install New Floor- 0- 0- 0
40ICRA Walls- 0- 0- 0
41Total Cost for Area- 0- 0- 0
42
43Building 38 2nd Floor Corridor
44Remove Carpet- 0- 0- 0
45Materials for New Cove Base (6")- 0- 0- 0
46Materials for Transition Strips- 0- 0- 0
47Install Transition Strips- 0- 0- 0
48Install New Cove Base (6")- 0- 0- 0
49Paint Cove Base- 0- 0- 0
50Materials for New Floor- 0- 0- 0
51Install New Floor- 0- 0- 0
52ICRA Walls- 0- 0- 0
53Total Cost for Area- 0- 0- 0
54
55Building 39 Mental Health Suite
56Remove Carpet- 0- 0- 0
57Remove Cove Base- 0- 0- 0
58Materials for New Cove Base (6")- 0- 0- 0
59Install New Cove Base (6")- 0- 0- 0
60Materials for New Floor- 0- 0- 0
61Install New Floor- 0- 0- 0
62ICRA Walls- 0- 0- 0
63Total Cost for Area- 0- 0- 0
64
65
66Breakdown of Total Material / Labor Costs- 0- 0
67Subtotal- 0- 0- 0
68Profit- 0- 0- 0
69Subtotal- 0- 0- 0
70Overhead- 0- 0- 0
71Subtotal- 0- 0- 0
72Bond- 0- 0- 0
73Total Project Cost- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0

&RSHEET

&POF&N

Sheet2

Sheet3