This document is a synopsis for a Request for Proposal for multiple award task order contracts to provide construction services at the Wilmington VA Medical Center in Delaware and the Coatesville VA Medical Center in Pennsylvania. Approximately six indefinite-delivery, indefinite-quantity contracts will be awarded on a competitive basis to service-disabled veteran owned small businesses registered in the VetBiz database. The contracts have a maximum total value of $100 million over five years. Task orders will range from $2,000 to $5.5 million and include construction, repair, and maintenance projects across various trades. Eligible work includes interior and exterior renovations, mechanical, electrical, and more. The NAICS codes are 236 for construction and 238 for specialty trades. The solicitation is expected to release on January 3, 2018 and be posted on FBO.gov.

VA244-17-R-1057 VA244-17-R-1057.docx

View the file

Other files

File Type Posted
VA244-17-R-1057-008.docx DOCX document
VA244-17-R-1057-00009000.docx DOCX document
VA244-17-R-1057-00008000.docx DOCX document
VA244-17-R-1057-00008001.xls XLS spreadsheet
VA244-17-R-1057-00007000.docx DOCX document
VA244-17-R-1057-00006000.docx DOCX document
VA244-17-R-1057-00005002.pdf PDF
VA244-17-R-1057-00005000.docx DOCX document
VA244-17-R-1057-00005001.pdf PDF
VA244-17-R-1057-00004000.docx DOCX document
VA244-17-R-1057-00003000.docx DOCX document
VA244-17-R-1057-00002000.docx DOCX document
VA244-17-R-1057-00001000.docx DOCX document
VA244-17-R-1057-00001003.pdf PDF
VA244-17-R-1057-00001001.docx DOCX document
VA244-17-R-1057-00001002.pdf PDF
VA244-17-R-1057-007.pdf PDF
VA244-17-R-1057-005.pdf PDF
VA244-17-R-1057-006.pdf PDF
VA244-17-R-1057-004.xls XLS spreadsheet
VA244-17-R-1057-002.docx DOCX document
VA244-17-R-1057-001.docx DOCX document
VA244-17-R-1057-000.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER

2. TYPE OF SOLICITATION

3. DATE ISSUED

PAGE OF PAGES

4. CONTRACT NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

6. PROJECT NUMBER

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)

STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION

SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES

NO

a.

Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b.

An offer guarantee is, is not required.

c.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d.

Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

VA244-17-R-1057

X 02-14-2018

TO BE DETERMINED.

none 00244 Department of Veterans Affairs Network Contracting Office 4

See attached delivery schedule

Mike White 302-994-2511 x7528 THIS SOLICITATION IS 100% SET-A-SIDE FOR SERVICE-DISABLED VETERAN OWNED SMALL BUSINESSES (SDVOSB). Registration in the VIP database is required at MATOC proposal submission and at award.

CONSTRUCTION INDEFINITE DELIVERY-INDEFINITE QUANTITY (IDIQ)MULTIPLE AWARD TASK ORDER CONTRACTOR (MATOC) for Maintenance, Repair, and Construction services in support of the Department of Veterans Affairs Wilmington VA Medical Center located in Wilmington, DE, and the Coatesville, VA Medical Center located in Coatesville PA. The Government intends to award this contract to approximately 6 qualified offers providing sufficient qualified contractors present offers. Typical task orders under this contract will range from $2,000 - $5,5000,000. The NAICS codes associated with this contract are 236 – Construction of Buildings, and 238 – Specialty Trade Contractors. While it is anticipated that the majority of the task order projects will be under NAICS 236220 Commercial and Industrial Building Construction, the MATOC will have the flexibility to also be used for specialty construction projects. The small business size standard for NAICS 236 is $36.5 million. The small business size standard for NAICS 238 is $15 million. The period of performance for awarded contracts will be August 1, 2018 through July 31, 2023.

The minimum guaranteed task order amount for the entire contract period is $5,000.00 per IDIQ contract awarded. In the event the minimum order is not met, the contractor will be paid a minimum guaranteed amount of $5,000.00.

SEED Project will be awarded.

Magnitude of Construction - Seed Project: Between $250,000 and $500,000 Seed Project: Flooring Replacement Phase 1, Project #542-18-107 NAICS: 236220 - Commercial and Industrial Building Construction Small Business Size Standard: $36.5 million

Contractors shall be responsible for the correct title classification of workers and compliance with all applicable wage and hour laws. Performance and Payment Bonds are NOT required for MATOC award but ARE required for all Task Order awards priced at $150,000.00 or greater. See seed project #542-18-107 and SCR17.

Firms interested in offering a proposal under this solicitation should attend the Pre-Proposal Conference. See 52.236-27 Site Visit (CONSTRUCTION) provision for location, date and time of the conference. All information pertaining to this solicitation i.e., solicitation, amendments, notices, etc., will be posted electronically at http://www.fbo.gov

General Decision Number: PA180107 01/12/2018 PA107 shall be used when submitting proposals for the seed project.

The decision is located beginning on page 134 of 148.

Solicitation may be canceled and all offers rejected before award but after solicitation closing date when it is clearly in the best interest of the Government.

N/A X x 52.211-10 X N/A one compact disc 4:00pm 04-04-2018 X

14. NAME AND ADDRESS OF OFFEROR

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE

FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (

26. ADMINISTERED BY

27. PAYMENT WILL BE MADE BY

PHONE:

FAX:

28. NEGOTIATED AGREEMENT

29. AWARD

Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code) (Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror) (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

00244

Network Contracting Office 4

Austin Payment Center

PO Box 149971 Austin

TX

78714-9971

(877) 353-9791

(512) 460-5429

MICHAEL F. WHITE

Contracting Officer

Table of Contents

PART I - THE SCHEDULE1
SECTION A - SOLICITATION/CONTRACT FORM1
SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)1
SCR 1PURPOSE AND SCOPE13
SCR 2PERIOD OF SERVICE13
SCR 3ORDERING PROCEDURES FOR COMPETITIVE TASK ORDERS14
SCR 4TASK ORDER COMPETITION14
SCR 5SITE VISITS15
SCR 6PROPOSAL CONTENTS15
SCR 7TASK ORDER EVALUATION METHOD AND PROCEDURES16
SCR 8TASK ORDER AWARD DECISION16
SCR 9TASK ORDER ISSUANCE17
SCR 10SOLE SOURCE ORDERS17
SCR 11PROPOSED KEY PERSONNEL AND PROPOSED MINIMUM QUALIFICATIONS OF KEY PERSONNEL AND PROPOSED SUBCONTRACTORS.18
SCR 12GENERAL WAGE DECISIONS.18
SCR 13EVALUATION OF CONTRACTOR PERFORMANCE18
SCR 14VALUE ENGINEERING CHANGE PROPOSALS19
SCR 15WORK BY THE GOVERNMENT19
SCR 16BID BONDS19
SCR 17PERFORMANCE AND PAYMENT BONDS AND ALTERNATIVE PAYMENT PROTECTIONS FOR CONSTRUCTION CONTRACTS19
SCR 18ENVIRONMENTAL PROTECTION AGENCY (EPA) ENERGY STAR®20
SCR 19TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER20
SCR 20SECURITY REQUIREMENTS21
SCR 21ADMINISTRATIVE MATTERS21
SCR 22AMBIGUITY/CONTRACT INTERPRETATION22
SCR 23TELEPHONE COMMUNICATIONS SECURITY MONITORING22
SCR 24REGULATIONS22
SCR 25INVOICES, INVOICING AND PAYMENT23
SCR 26MISCELLANEOUS CONTRACTOR REQUIREMENTS24
SCR 27RESTORATION25
SCR 28AS-BUILT DRAWINGS25
SCR 29USE OF ROADWAYS26
SCR 30TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT26
SCR 31TEMPORARY USE OF EXISTING ELEVATORS27
SCR 32TEMPORARY TOILETS27
SCR 33AVAILABILITY AND USE OF UTILITY SERVICES27
SCR 34TESTS28
SCR 35INSTRUCTIONS29
SCR 36SCHEDULING OF PRE-FINAL AND FINAL INSPECTIONS29
SCR 37DEFAULT TECHNICAL SPECIFICATIONS30
SCR 38CORRESPONDENCE30
SCR 39ALTERATIONS30
SCR 40COMPLIANCE WITH STATE AND FEDERAL LAWS AND REQUIREMENTS31
SCR 41OPERATIONS AND STORAGE AREAS32
SCR 42DISPOSAL AND RETENTION35
SCR 43CLEANUP AND DISPOSAL OF DEBRIS AND FILL MATERIALS35
SCR 44SHOP DRAWINGS AND SUBMITTALS35
SCR 45SAFETY/ACCIDENT REPORTING35
SCR 46SAFETY ASSURANCE36
SCR 47CORRESPONDENCE37
SCR 48SAFETY AND HEALTH DURING CONSTRUCTION37
SCR 49FIRE SAFETY37
SCR 50SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR40
SCR 51CORRELATION OF DRAWINGS, SPECIFICATIONS AND CONTRACTS40
SCR 52REPORT OF ERROR AND DISCREPANCIES40
SCR 53DIVISION OF WORK40
SCR 54METHOD OF CARRYING ON THE WORK41
SCR 55STANDARDS OF MANUFACTURE41
SCR 56MEANING OF APPROVED, DIRECTED, ETC.41
SCR 57WORK SCHEDULING41
SCR 58ENTRY/ACCESS TO SITE42
SCR 59INSPECTION OF SITE43
SCR 60MISPLACED MATERIALS43
SCR 61MATERIAL TESTING BY NATIONAL LABORATORIES43
SCR 62KEYS44
SCR 63CONSTRUCTION SCHEDULING, WORK PROGRESS AND PREPARATION OF PROGRESS SCHEDULES AND REPORTS44
SCR 64INSPECTIONS AND TESTS45
SCR 65QUALITY CONTROL/TESTS45
SCR 66WARRANTY46
SCR 67CUTTING AND REPAIRING47
SCR 68SITE CLEAN UP47
SCR 69LAYOUT AND GRADES47
SCR 70REFUSE AND SALVAGE MATERIALS48
SCR 71TEMPORARY TOILET FACILITIES AND TEMPORARY FIELD OFFICES48
SCR 72EXCAVATING PERMIT48
SCR 73COMPRESSED AIR49
SCR 74WEATHER PROTECTION AND TEMPORARY HEATING49
SCR 75BLOCKING OFF STREETS49
SCR 76ARCHEOLOGICAL, PALEONTOLOGICAL AND ENDANGERED SPECIES FINDS49
SCR 77SPECIAL CONDITIONS49
SCR 78COMMERCIALLY OWNED/OPERATED RADIOACTIVE SOURCES USED ON VA PROPERTY49
SCR 79HAZARDOUS MATERIAL USAGE50
SCR 80ENERGY AND WATER EFFICIENCY AND RENEWABLE ENERGY51
SCR 81POLLUTION ABATEMENT52
SCR 82WORK BY THE GOVERNMENT52
SCR 83ENVIRONMENTAL IMPACT52
SCR 84IDENTIFICATION OF VEHICLES AND PERSONNEL53
SCR 85UTILITY INTERRUPTIONS53
SCR 86INTERIM LIFE SAFETY MEASURES53
SCR 87INFECTION CONTROL AND SAFETY/HEALTH GUIDELINES FOR CONSTRUCTION AND RENOVATION54
SCR 88GENERAL INTENTIONS59
SCR 89INDEMNIFICATION61
SCR ATTACHMENTS62
Attachment No. 1 – Construction and Demolition Debris Diversion from Landfill63
Attachment No. 2 – Construction and Demolition Debris Disposal64
Attachment No. 3 – Interim Life Safety Measures (ILSM) Evaluation Sheet65
Attachment No. 4 – Interim Life Safety Measures Matrix68
Attachment No. 5 – Description of Interim Life Safety Measures (ILSM) Used70
Attachment No. 6 –Trenching and Excavation Permit with Checklist71
Attachment No. 7 – Contractor Hazardous Material Identification Form74
Attachment No. 8 – Infection Control Risk Assessment76
Attachment No. 9 – Infection Control Construction Permit81
A.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)95
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS96
2.1 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013)96
2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014)97
2.3 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)97
2.4 52.233-2 SERVICE OF PROTEST (SEP 2006)98
2.5 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)99
2.6 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008)100
REPRESENTATIONS AND CERTIFICATIONS101
3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2017)101
GENERAL CONDITIONS105
4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)105
4.2 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (JUN 2016)105
4.3 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)106
4.4 52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION (SEPT 2000)107
4.5 52.211-18 VARIATION IN ESTIMATED QUANTITY (APR 1984)107
4.6 52.216-1 TYPE OF CONTRACT (APR 1984)107
4.7 52.216-18 ORDERING (OCT 1995)107
4.8 52.216-19 ORDER LIMITATIONS (OCT 1995)108
4.9 52.216-22 INDEFINITE QUANTITY (OCT 1995)108
4.10 52.219-13 NOTICE OF SET-ASIDE OF ORDERS (NOV 2011)109
4.11 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013)109
4.12 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2015)110
4.13 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION CONTRACTS (SEP 2013)111
4.14 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-DESIGNATED ITEMS (MAY 2008)111
4.15 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)112
4.16 SUPPLEMENTAL INSURANCE REQUIREMENTS115
4.17 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)115
4.18 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (JAN 2008)118
4.19 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (JAN 1998)119
4.20 VAAR 852.203-70 COMMERCIAL ADVERTISING (JAN 2008)119
4.21 VAAR 852.203-71 DISPLAY OF DEPARTMENT OF VETERAN AFFAIRS HOTLINE POSTER (DEC 1992)119
4.22 VAAR 852.211-73 BRAND NAME OR EQUAL (JAN 2008)120
4.23 VAAR 852.211-74 LIQUIDATED DAMAGES (JAN 2008)121
4.24 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2016)(DEVIATION)121
4.25 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)122
4.26 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)122
4.27 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2012)122
4.28 VAAR 852.236-72 PERFORMANCE OF WORK BY THE CONTRACTOR (JUL 2002) ALTERNATE I124
4.29 VAAR 852.236-74 INSPECTION OF CONSTRUCTION (JUL 2002)124
4.30 VAAR 852.236-76 CORRESPONDENCE (APR 1984)124
4.31 VAAR 852.236-77 REFERENCE TO "STANDARDS" (JUL 2002)125
4.32 VAAR 852.236-78 GOVERNMENT SUPERVISION (APR 1984)125
4.33 VAAR 852.236-79 DAILY REPORT OF WORKERS AND MATERIAL (APR 1984)125
4.34 VAAR 852.236-83 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (INCLUDING NAS) (JUL 2002)125
4.35 VAAR 852.236-84 SCHEDULE OF WORK PROGRESS (NOV 1984)128
4.36 VAAR 852.236-86 WORKER'S COMPENSATION (JAN 2008)129
4.37 VAAR 852.236-87 ACCIDENT PREVENTION (SEP 1993)129
4.38 VAAR 852.236-88 CONTRACT CHANGES--SUPPLEMENT (JUL 2002)129
4.39 VAAR 852.236-89 BUY AMERICAN ACT (JAN 2008)131
4.40 VAAR 852.236-91 SPECIAL NOTES (JUL 2002)131
4.41 VAAR 852.246-74 SPECIAL WARRANTIES (JAN 2008)132
4.42 LIMITATIONS ON SUBCONTRACTING-- MONITORING AND COMPLIANCE (JUN 2011)132

Statement of Work

Construction Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) Wilmington Veteran Affairs Medical Center (WVAMC), DE And Coatesville Veterans Affairs Medical Center (CVAMC), PA

Contractor shall perform maintenance, repair, and construction services in support of the Department of Veterans Affairs (VA) Medical Centers located in Wilmington, DE and Coatesville, PA. This MATOC may not be used to purchase non-construction supplies or services. After MATOC contracts are awarded, individual task orders will then be awarded based on the competition requirements for each task order solicited. Typical task orders awarded under this contract will range from $2,000 - $5.5 million. [Task Orders exceeding $5.5 million may be awarded IAW FAR 16.505(b)(iv)]. Work associated with these task orders may require work from all construction trades and disciplines. Work shall be performed in accordance with the VA CMF technical information library (TIL), and specifications will be tailored for each project. The task order request for quote/proposal and resulting task order will define the scope of work, provide all significant quantities, describe the methods of construction, state the period of performance, and state the quality levels required, and the appropriate Construction Wage Rates Requirements (previously Davis-Bacon) rates. The NAICS code associated with this contract are 236 Construction of Buildings and 238 Specialty Trade Contractors. While in is anticipated that the majority of the task order projects will be under the 236220 Commercial and Institutional Building Construction NAICS, the MATOC will have the flexibility to also be used for specialty construction projects.

Task Order Statement of Work (SOW) Coatesville Veterans Affairs Medical Center (CVAMC) Flooring Replacement Phase 1 June 22, 2017

SEED PROJECT #542-18-107: Flooring Replacement Phase 1 PURPOSE: This project will entail replacing the sub-flooring and floor with floor self-leveler and an INTERLOCKING Luxury Vinyl Plank floor respectively. The design will be based on the Office of Construction and Facilities Management guidelines for a hospital environment. Any underlying problems or necessary deviations from the contract must be told to the Contracting Officer’s Representative (COR) PRIOR to proceeding with the contract or risk withheld payment.

DEPARTMENT: Facilities Engineering Service (FES) CVAMC, Coatesville, PA BACKGROUND: Throughout multiple locations of the CVAMC, carpet remains within multiple locations. This carpeting has become a health hazard by exceeding its lifespan with excessive traffic causing a vast decomposition and creating airborne dust fibers which can be inhaled. Most of the locations of this carpet are within basement spaces. Over the years ad hoc offices were created and carpet was installed. This facility has multiple hydronic heat, steam, chiller, and water pipes which have broken over the years causing water to rest in the carpeted spaces. Add to this scenario hydraulic water pressure from under the concrete, leaking walls below grade, etc., and this creates an extensive mold habitat. The amount of maintenance to combat visible mold is extensive, but the invisible mold throughout carpeted area is a more concerning threat. This will cause sickness in healthy employees and serious complications in prone employees as well as patients.

All newer VA, Joint Commission, national, and international healthcare facility guidelines stress the importance of hygiene, maintenance, and sustainability. This is confirmed with Planetree design parameters as cited throughout VA Design Guides. In order to comply with health, welfare, and hygiene standards, abide by sustainability and maintenance criteria, and to comply with Planetree and VA Design Guides, this must be a priority.

REQUIREMENTS: Contractor shall have knowledge of all aspects pertaining to this SOW and shall perform per the specifications as outlined in the Master Construction Specifications.

Contactor shall:

1) Provide all labor, tools, materials, quality supervision, etc. required to replace approximately 17,128 square feet (ft2) of existing flooring materials including sub-base preparation and cove base.

The contractor shall be mindful of their surroundings due to the fact that this project is located in a high traffic area of the building. Contractor shall be aware of where all their workers are at all times as well as make sure that no tools or equipment are left unattended in the construction area.

Contractor shall make sure that the construction work does not impede on any normal employee and patient traffic patterns during normal working hours (between 7:00 am – 4:30 pm). Portions of this project must be conducted after-hours. Due to the high traffic area, the contractor shall complete a substantial amount of the work after hours and with extensive coordination with the COR.

Work shall begin within ten (10) days of Notice to Proceed (NTP) and completed within ninety (90) days of NTP.

Payment and Performance Bonds are required and the penial sum of each shall be One-hundred percent (100%) of the order price.

2) Contractor is responsible to verify all site conditions prior to performing any work. Contractor shall follow all guidelines and standards, applicable to the task, as described in the Construction Safety Standards (CVAMC specific document) and Master Construction Specifications (VA Technical Information Library https://www.cfm.va.gov/til/spec.asp).

3) Flooring: The flooring replacement shall occur in six (6) buildings, as indicated below, which are throughout the CVAMC campus. Submittals shall be approved by and Contracting Officer (CO) and COR prior to commencing work. Submittals shall consist of detailed materials cut-sheets detailing manufacturers specifications, warranties, recommendations, installation and maintenance instructions, etc.

No installation shall commence until all products are submitted for review and approved by the COR. This floor will not include an integral cove base. Existing rubber cove base will be replaced. All flooring shall be installed in the proper directional pattern if applicable. Appropriate transition strips will be installed throughout where necessary. Minimum standards of workmanship shall be adhered to.

Extensive and compatible sub-floor preparation will include removal of old floor and sub-base where required, install new subfloor repairs and/or level, seal, and warranty for three (3) years. Per the manufacturer’s specifications, the proper transition strips will be installed between different types of flooring. Caulk where necessary. The maximum size of gaps in material is ¼ inch.

Building 1 Executive Suite shall consist of removing the carpet at the first fire door west of the main entrance to building one and continue west until the ‘T’ of the executive offices and continue throughout the remainder of the T’s corridor only. This area is approximately 1,050 ft2. The existing subfloor will be properly scraped, prepared, primed, leveled and underlayment to manufacturer’s specification for installation of the new plank flooring. Approximately 300 linear feet of cove base shall be removed and replaced with a 6” cove base as approved by submittals to the COR. The subfloor shall be leveled for adhering qualities and proper level. A Luxury Vinyl Plank shall be installed approximately 48” x 6” and shall be interlocking with the appropriate underlayment sheeting as required by the manufacturer. Selection of the flooring colors shall be approved by the COR and CO of the CVAMC. Floors shall be interlocking vinyl plank, low maintenance, 10 year commercial warranty. Floors shall be installed in a directional pattern if appropriate.

Building 3 Hallways shall consist of removing the 18” x 12” gray vinyl tile throughout the hallway from the building 1 fire door north through building 3 to the ‘T’ then left and right of the ‘T’ for the remainder of this type of tile to include the medical supply storage closet room B41-3 for a total of approximately 2,250 ft2. The existing subfloor shall be properly scraped, prepared, primed, leveled and underlayment to manufacturer’s specification for installation of the new plank flooring. Approximately 580 linear feet of cove base shall be removed and replaced with a 6” cove base as approved by submittals to the COR. The subfloor shall be leveled for adhering qualities, underlayment and proper level. A Luxury Vinyl Plank shall be installed approximately 48” x 6” and shall be interlocking with the appropriate underlayment sheeting as required by the manufacturer. Selection of the flooring colors shall be approved by the COR and CO of the CVAMC. Floors shall be interlocking vinyl plank, low maintenance, 10 year commercial warranty.

Building 5 Volunteer Services Basement shall consist of removing the carpet in the entire common area to include offices, conference room, foyers, elevator lobby, and hallways for approximately 5,400 ft2. The existing subfloor shall be properly scraped, prepared, primed, leveled and underlayment to manufacturer’s specification for installation of the new plank flooring as in buildings 1 and 3. A Luxury Vinyl Plank shall be installed approximately 48” x 6” and shall be interlocking with the appropriate underlayment sheeting as required by the manufacturer. Selection of the flooring colors shall be approved by the COR and CO of the CVAMC. Floors shall be interlocking vinyl plank, low maintenance, 10 year commercial warranty. A new black 6” cove base shall be installed. Appropriate transition strips shall be installed.

Building 6 Room B12 Basement shall consist of removing the carpet in the entire common area to include reception, offices, foyers, and hallways for approximately 2,280 ft2. The existing subfloor will be properly scraped, prepared, primed, leveled and underlayment to manufacturer’s specification for installation of the new plank flooring as in buildings 1 and building 3. A Luxury Vinyl Plank will be installed approximately 48” x 6” and must be interlocking with the appropriate underlayment sheeting as required by the manufacturer. Selection of the flooring colors shall be approved by the COR and CO of the CVAMC. Floors shall be interlocking vinyl plank, low maintenance, 10 year commercial warranty. A new black 6” cove base will be installed. Appropriate transition strips will be supplied and installed Building 38 Second Floor Hallways shall consist of removing the carpet in the entire common area to include foyers, elevator lobby, and hallways for approximately 3,300 ft2. The existing subfloor will be properly scraped, prepared, primed, leveled and underlayed to manufacturer’s specification for installation of the new plank flooring as in buildings 1 and building 3. A Luxury Vinyl Plank will be installed approximately 48” x 6” and must be interlocking with the appropriate underlayment sheeting as required by the manufacturer. Selection of the flooring colors shall be approved by the COR and CO of the CVAMC. Floors shall be interlocking vinyl plank, low maintenance, 10 year commercial warranty. The existing cove base consists of a permanent masonry faux type painted black and is 5-½” high. A new black 4” cove base will be installed and the existing cove base will be painted to the existing VA color. Appropriate transition strips will be supplied and installed.

Building 39 Room B06 Basement shall consist of removing the carpet in the entire common area to include offices, conference room, foyers, and hallways for approximately 3,000 ft2. The existing subfloor will be properly scraped, prepared, primed, leveled and underlayment to manufacturer’s specification for installation of the new plank flooring as in buildings 1 and building 3. A Luxury Vinyl Plank will be installed approximately 48” x 6” and must be interlocking with the appropriate underlayment sheeting as required by the manufacturer. Selection of the flooring colors shall be approved by the COR and CO of the CVAMC. Floors shall be interlocking vinyl plank, low maintenance, 10 year commercial warranty. A new black 4” cove base will be installed. Appropriate transition strips will be supplied and installed.

4) Walls and Painting: The current wall material meets impact resistant requirements. The contractor is to keep the wall as is. The contractor is responsible to make any repairs or patching necessary if the walls show damage from the contractors. The contractor shall paint all patching on walls and ceilings according to VA guidelines and recommendations where applicable with the project. The contractor shall protect adjacent structures and equipment. Contractor is responsible to repair all other damages caused during this project. The contractor will paint cove base if required to match existing VA integral cove base.

5) Infection and Dust Control: The contractor shall build temporary Infection Control Risk Assessment (ICRA) SOLID barriers at entrances and plastic sheeting in compliance with NFPA 701 as fire retardant yet still allow a functional traffic flow or coordinate this work for after-hours in these sections. The contractor shall use a high-efficiency particulate air (HEPA) filtration device at all times properly sized for the sealed square footage. HEPA devices shall exhaust to the exterior away from pedestrian traffic and in a safe manner. The contractor shall dispose of all residues off-site in strict accordance with all applicable federal, state and local regulations, and log those quantities with recycle receipts for submission to the COR for record. The contractor shall ensure the work site is properly cleaned up when work is complete. Contractor shall use walk-off mats and replace as necessary. Contractor will follow all OSHA safety regulations.

6) Safety and Security: The contractor must provide (2) forms of identification, one of which must be a photo identification (ID) (i.e., valid driver’s license) and will be required to pass a security background check prior to being granted permission to enter the CVAMC facility. The contractor shall acquire temporary day badges from the Operator’s office located in building 1, and it shall be visibly worn daily. The contractor shall verify completion of a Patient Safety, Privacy, and Tool Safety class prior to the start of construction as provided by the COR.

The contractors shall verify that a safety class has been completed as supplied by the COR. The contractors work shall be inspected by the COR and the Safety Committee to be in accordance with safety standards to ensure there are no sharp corners or edges, tamper-proof screws, etc.

The location of this project is often in the high-traffic hallways of the CVAMC, which means that the contractor shall be aware at all times of all of the contracted workers as well as all of the equipment and tools that will be used during the project in order to provide maximum patient safety. The contractor respects at all times the rules applicable to patient privacy and safety.

MINIMUM STANDARDS OF WORKMANSHIP: All work shall be performed in compliance with all federal, state and local laws and regulations. In addition, work will meet equipment’s manufacturer specifications and generally accepted industry standards of good workmanship. All waste materials shall be disposed of by the contractor in compliance with federal, state, and local laws and regulations. Contractors will retain receipts for quantities of material removed for recycling purposes.

No work may proceed by the contractor until all material cut sheets are submitted to the COR for approval. COR will review and submit to the CO. No work may proceed until the CO authorizes. The COR is not authorized to issue a Notice to Proceed.

SITE VISIT: A site visit will be conducted with potential offerees in order to visually compare existing rooms with future project, visually confirm appliances and materials to be used in comparison with existing appliances and materials in order to avoid mistaken installation practices. The reference materials listed below will be cited and confirmed on-site with all perspective offerees. Offerees will receive a briefing on parking, facilities, and patient safety prior to submitting a bid in the event that the proposal will be affected by hospital procedures.

Point of Contacts for this action are Thomas.Bucci@va.gov COR at 610-384-7711 x3218 and Elizabeth.Morin3@va.gov CO at 610-383-0202.

REFERENCES and/or ATTACHMENTS:

· Standard Details PG 18-4

· VA Space Planning Criteria 18-9 for applicable common areas

· Room Finishes, Door and Hardware Schedule 18-14

· VA Master Specification Lists 09 06 00

· Mental Health Environment of Care Checklist

· Design Manuals 18-10

· Master Construction Specification 18-1

· TIL (Technical Information Library) website for all References - https://www.cfm.va.gov/til/index.asp

· Preconstruction Risk Assessment (PCRA) will be provided by the VA (Attachment)

· Floor Plans Seed Project - Flooring Replacement Phase 1 (Attachment)

· Floor Plan 1 Building 1 Executive Suite Hallways

· Floor Plan 2 Building 3 Basement Hallways

· Floor Plan 3 Building 5 Basement Volunteer Services

· Floor Plan 4 Building 6 Room B12 Basement Logistics Suite

· Floor Plan 5 Building 38 Second Floor Hallways

· Floor Plan 6 Building 39 Room B06 Mental Health Suite

MATOC SPECIAL CONTRACT REQUIREMENTS

SCR 1 PURPOSE AND SCOPE

1.1. The purpose of this Multiple-Award Task Order Contract (MATOC) is to provide construction services for a broad range of renovation and construction projects in support of the Wilmington and Coatesville Veterans Affairs Medical Centers (VAMC). The Wilmington VAMC (WVAMC) is located at 1601 Kirkwood Highway, Wilmington DE, 19805 and the Coatesville VAMC (CVAMC) is located at 1400 Blackhorse Hill Road, Coatesville, PA 19320. Task Orders will primarily include Construction, Repair and Maintenance projects that may or may not involve a variety of trades. Work performed under these contracts will include but are not limited to the following general project categories: Construction, repair and alteration of various facilities; interior and exterior renovations, heating and air-conditioning, heating, ventilation, and air conditioning (HVAC) controls, plumbing, fire suppression, interior and exterior electrical and lighting, fire and intrusion alarms, communications, limited utilities, site-work, landscaping, fencing, masonry, roofing, concrete, asphalt paving, painting, storm drainage, limited environmental remediation, concrete and asphalt paving demolition of facilities, construction of new facilities, and other related work.

1.2. As requirements develop, Requests for Quotations/Proposals (RFQ/RFP) for Task Orders will be issued on a competitive or sole source basis, at the Government's discretion. Task Orders will vary in size from $2,000.00 to $5.5 million and will be awarded and issued by the individual Task Orders awarded and administered by duly appointed federal contracting officers.

SCR 2 PERIOD OF SERVICE

2.1. MATOC period of service shall be up to the maximum value of all projects awarded under the MATOCs and will be limited to $100 million in Task Orders or five years.

2.2. Only the Contracting Officer (CO) executing these contracts and any successor CO has the authority to modify the terms and conditions of these contracts.

2.3. Maximum Order. The maximum Task Order limitation is $5.5 million, excluding subsequent in-scope modifications. The Government may combine several projects, as indicated by separate Statements of Work and individual line items, in one Task Order, as required. The Contractor is not obligated to honor:

a) Any order for a single Task Order less than $2,000.00;

b) Any order for a single Task Order in excess of the limit authorized $5.5 million;

c) A series of orders from the same ordering office totaling more than $100 million.

2.4. The Government, at its option, may in a rare case, include projects exceeding $5.5 million; however, Contractors will not be obligated to compete nor required to accept such Task Orders under the general terms of the contract.

2.5. This is not a requirements contract.

SCR 3 ORDERING PROCEDURES FOR COMPETITIVE TASK ORDERS

3.1. Requests for Quotation/Proposals

3.1.1. When the Government requires work under the MATOC, an RFQ or RFP will be issued, as appropriate, normally in the form of a letter “NOTICE OF PROPOSED PROJECT”. Projects will be of varying size and complexity. The request will include information such as a statement of work, guide specifications, drawings, attachments, information pertaining to a site visit and any other requirements for submission (e.g., proposal requirements, price schedule, etc.). Projects may include, but are not limited to, complete plans and specifications for all elements of work or limited specifications. When complete plans and specifications are not provided the VA Master Specifications which can be found at https://www.cfm.va.gov/til/spec.asp will apply for elements of work not addressed by a project specific specification.

3.1.2. The basis of award will be a conforming offer, the price or cost of which may or may not be the lowest. Past performance may be evaluated on work completed under Task Orders under this contract. The basis for award of each Task Order will be stated in the RFQ/RFP. Historically Underutilized Business (HUB)-Zone preference does not apply to Task Orders.

3.1.3. When necessary option line items will be included in the Task Order RFQ/RFP. The task order proposal/quote process is not an Invitation for Bid (IFB). Therefore, additive bid items (ABI) are not applicable to this process. However, work defined in the options of the Task Order RFP/RFQ is normally similar to ABI’s common in the IFB process.

3.1.4. Response to “NOTICE OF PROPOSED PROJECT”

3.1.4.1. Upon receipt of the notification from the CO, the MATOC Contractors shall respond by attending the project on-site conference. The project on-site conference is normally scheduled within five (5) days from issuance of the “NOTICE OF PROPOSED PROJECT”, or two (2) hours under emergency conditions.

3.1.4.2. Notification will be by email. MATOC Contractors shall keep an up-to-date email address on file with the CO at all times. Backup addresses are encouraged. Upon notification the Contractor shall acknowledge receipt of the offering by return email. A CO shall make only one (1) attempt to email a proposal offering to a MATOC Contractor. No other means of notification will be used. The Government will not be responsible for lack of notification(s) for Contractors who fail to maintain current email addresses, or acknowledge offerings.

3.1.4.3. MATOC Contractors will not be reimbursed for proposal preparation, attendance during negotiations, site visits, walk-through or other pre-Task Order costs.

3.1.4.4. In the event that a Task Order is offered in excess of $5.5 million, the Government will follow the guidance with regards to Fair Opportunity to Compete for the Task Order.

SCR 4 TASK ORDER COMPETITION

4.1. Under this contract a wide variety of construction, repair and/or maintenance projects, determined by the CO to be within the scope of this contract, shall be offered to MATOC Task Order Contractors for the purpose of providing a best price or best value proposal. Individual Task Order awards on those projects will be based on competitive bids and proposals received exclusively from MATOC Contractors.

4.2. All eligible MATOC Contractors will be provided a fair opportunity to compete for each project offered under this contract unless the following exceptions apply:

a) The agency’s need for the services or supplies is of such urgency that providing such opportunity to all such Contractors would result in unacceptable delays;

b) Only one such Contractor is capable of providing the services or supplies at the level of quality required because the services or supplies ordered are unique or highly specialized;

c) The task or delivery order should be issued on a sole source basis in the interest of economy or efficiency because it is a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity pursuant to the procedures in this clause to be considered for the original order; or

d) It is necessary to place an order to satisfy a minimum guarantee.

e) The CO may consider such factors that the CO, in the exercise of sound business judgment, believes are relevant to the placement of orders.

4.3. Timely performance by a MATOC Contractor is very important. Failure to prosecute the work diligently in accordance with (IAW) the approved construction schedule for any currently awarded Task Order, will be cause for the CO not to include the Contractor in the competitive fair-opportunity pool for future Task Orders. When the Contractor’s delinquency has been cured, they will be considered for competition in future Task Orders.

SCR 5 SITE VISITS

5.1. Offeror’s attendance at site visits (walk-throughs) is considered vital to preparation of competitive and cost-effective offers, and to understanding the total results desired by the Government. However, failure to attend walk-throughs may not be used as an excuse for omission or miscalculation in offers, and may be taken into consideration in determining a Contractor’s eligibility to participate in future Task Orders.

SCR 6 PROPOSAL CONTENTS

6.1. The basis of award of each Task Order will be stated in the RFQ/RFP. Depending upon the requirements of each Task Order, the Contractor will typically provide a price proposal in response to an RFQ/RFP. Contractors shall respond within the number of calendar days stated in the RFQ/RFP by submitting a proposal to the CO IAW requirements stated in the RFQ/RFP.

6.2. Proposal Pricing Schedules. The Government's payment for the items listed in the Pricing Schedules of individual Task Orders will constitute full compensation to the Contractor for (1) Furnishing all plant, labor, materials, equipment, services, appliances, and supervision necessary, and (2) Performing all operations required to complete the work in conformity with the drawings and specifications. The Contractor shall include in the prices for the items listed in the Pricing Schedule all costs for work in the specifications, whether or not specifically listed in the Pricing Schedule.

6.3. Deviations and Alternate Proposals. Offerors shall specifically identify all deviations from the minimum RFQ/RFP requirements in a cover letter in a section entitled "Alternate Proposal” or “Deviations." This requirement applies for all proposal revisions and Final Proposal Revisions. Proposed alternates/deviations shall specifically address in detail the alternate and rationale for proposing. Alternate solutions and deviations shall include separate pricing information. If an alternate/deviation is proposed, the work as specified in the solicitation must also be priced, and all proposed alternates shall be specifically addressed and expanded upon in the proposal submissions to include separate pricing information.

6.4. The non-price factors and price factors will vary depending on the unique requirements for each Task Order. In addition to price the RFP/RFQ may indicate in the offering other factors (Past Performance and/or Technical Considerations) that will be considered in the evaluation offer.

6.5. Past Performance, within a five (5) year period, on previously awarded Task Orders under the WVAMC and CVAMC MATOC or work on any awards completed for the WVAMC and CVAMC. Past performance will be evaluated in terms of quality, timeliness, management effectiveness or other factors that the CO determines to be relevant to award on a particular Task Order. Technical factors may be considered.

SCR 7 TASK ORDER EVALUATION METHOD AND PROCEDURES

7.1. The Government (CO) in making their decisions in award of any individual Task Order, may consider factors such as Past performance on previously awarded Task Order(s) under the MATOC, and take into consideration, quality and timeliness of work performed, and/or other factors that the CO determines to be relevant to the award of a particular Task Order. The primary non-price factors and price factors will vary depending on the unique requirements for each Task Order. The Government intends to select the most advantageous, responsive, and responsible proposal, price and other factors considered. Each RFQ/RFP will describe the criteria to be utilized in evaluating Task Order proposals.

7.2. Discrepancies in the Evaluation of Offers Submitted in Response to RFQ/RFP’s for Individual Task Orders

7.2.1. For the purpose of initial evaluations of offers proposed for individual Task Orders, the following will be utilized in resolving arithmetic discrepancies found on the face of pricing schedule as submitted by the Offeror: (1) Obviously misplaced decimal points will be corrected; (2) Discrepancy between unit price and extended price, the unit price will govern; (3) Apparent errors in extension of unit prices will be corrected; (4) Apparent errors in addition of lump-sum and extended prices will be corrected.

7.2.2. For purposes of price evaluation, the Government will proceed on the assumption that the Offeror intends the proposed price to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above.

7.2.3. The government has the right to reject any and all offers.

SCR 8 TASK ORDER AWARD DECISION

8.1. Whenever possible, award will be made without discussions.

8.2. If discussions are required, each MATOC Contractor will be requested to provide a final proposal revision, unless eliminated from discussions through the establishment of a competitive range.

8.3. Task Order award will be made based on the best value to the Government IAW the criteria described in the RFQ/RFP. When price is the only factor considered, award will be based on the lowest reasonable price received. Proposals unrealistically high or low in price, when compared to the Government estimate, and market conditions evidenced by other competitive proposals received, may be indicative of an inherent lack of understanding of the solicitation requirements and may result in proposal rejection without discussion.

8.4. The award will be firm fixed-priced Task Order with a specific completion date or performance period.

SCR 9 TASK ORDER ISSUANCE

9.1. Task Orders will be issued on a SF 1442 or other VA specified form. Orders will normally be issued electronically by email but may be placed via mail, telephone, facsimile, or electronic means. If mailed, a Task Order is considered "issued" when the Government deposits the order in the mail. The appropriate issuing, administration, and payment offices will be cited on each Task Order.

9.2. Plans and Specifications: The Contractor will be provided either an electronic copy of the Statement of Work (SOW) or one (1) paper copy of the SOW (with pertinent supplemental specifications and construction drawings as applicable) upon issue of each Task Order. All further reproduction shall be at the Contractor's expense. The Government may provide these as hard copy or as electronic media, such as web postings, email or CD-ROM, at its option.

9.3. Notice to Proceed (NTP) will be issued separately after receipt of acceptable performance and payment bonds. Contractor shall not begin work until the NTP is received.

9.4. Ombudsman: If the Contractor believes it was not fairly considered for a particular Task Order, the Contractor may present the matter to the CO. The Contractor may appeal the explanation or decision of the CO to the Ombudsman. The Task Order contract and Delivery Order Ombudsman for VA is the Associate Deputy Assistant Secretary for Acquisition The name of the Associate Deputy Assistant Secretary for Acquisition by contacting: The office of Acquisitions (049A), VA Central Office, 810 Vermont Ave., NW, Washington, DC 20420.

SCR 10 SOLE SOURCE ORDERS

10.1. Circumstances Permitting Sole Source Orders. All MATOC Contractors will be given a fair opportunity to submit a proposal on projects unless the CO determines:

10.1.1. An urgent need exists and seeking competition would result in unacceptable delay; or

10.1.2. Only one Contractor is capable at the level of quality required because the requirement is unique or highly specialized; or

10.1.3. A sole source is in the interest of economy and efficiency as a logical follow-on to an order already competed.

10.2. An RFQ/RFP will be issued requiring a Contractor response consisting of a detailed cost proposal. Task Order negotiations may be conducted if required.

10.3. Requirement for Cost and Pricing Data (10 U.S.C. § 2306a and 41 U.S.C. § 254b) (Sole Source Task Orders)

10.3.1. Unless an exception applies, or a waiver has been granted, cost or pricing data is required at the threshold (currently $700,000.00). When required the Contractor shall submit to the CO the following in support of any proposal:

10.3.2. Cost or pricing data in the format designated by the CO.

10.3.3. Require any Subcontractor or prospective Subcontractor to submit to the Prime/Contractor, herein known as Contractor, or appropriate Subcontractor tier cost or pricing data in the format designated by the CO.

SCR 11 PROPOSED KEY PERSONNEL AND PROPOSED MINIMUM QUALIFICATIONS OF KEY PERSONNEL AND PROPOSED SUBCONTRACTORS.

11.1. Any proposed key personnel, minimum qualifications for incoming or replacement key personnel, and Subcontractors will be incorporated into the contract resulting from this solicitation and shall be limited to individuals, qualifications, and firms that were specifically identified in the proposal and/or agreed to during discussions, if held. The Contractor shall obtain the CO's written consent before making any substitutions.

SCR 12 GENERAL WAGE DECISIONS.

12.1. Applicable Construction Wage Rate Requirements will be identified for all Task Orders (excluding solely demolition projects) issued under this contract current as of the time of award of the Task Order. Wage Determinations may be found at: http://www.wdol.gov.

12.2. Service Contract Act wage determinations will be issued with the Task Orders for solely demolition projects.

SCR 13EVALUATION OF CONTRACTOR PERFORMANCE

This is the start of the file's text. The full file is on GovTribe.