This amendment to a federal solicitation provides revisions to past questions and answers, replaces the original statement of work with a revised version, and includes a sign-in sheet from a pre-bid site visit. The solicitation is for a Multiple Award Task Order Contract for construction services at the Wilmington VA Medical Center and Coatesville VA Medical Center. Awards will provide for indefinite delivery, indefinite quantity task orders for a variety of construction projects such as renovations, alterations, and facility construction. The maximum total value of all awards is $100 million over the life of the contracts. Task order minimum and maximum values are $2,000 and $5.5 million respectively. Offerors must be registered service-disabled veteran-owned small businesses. The anticipated release date for the underlying solicitation is January 3, 2018.

VA244-17-R-1057 00005 VA244-17-R-1057 00005.docx

View the file

Other files

File Type Posted
VA244-17-R-1057-008.docx DOCX document
VA244-17-R-1057-00009000.docx DOCX document
VA244-17-R-1057-00008000.docx DOCX document
VA244-17-R-1057-00008001.xls XLS spreadsheet
VA244-17-R-1057-00007000.docx DOCX document
VA244-17-R-1057-00006000.docx DOCX document
VA244-17-R-1057-00005002.pdf PDF
VA244-17-R-1057-00005001.pdf PDF
VA244-17-R-1057-00004000.docx DOCX document
VA244-17-R-1057-00003000.docx DOCX document
VA244-17-R-1057-00002000.docx DOCX document
VA244-17-R-1057-00001000.docx DOCX document
VA244-17-R-1057-00001003.pdf PDF
VA244-17-R-1057-00001001.docx DOCX document
VA244-17-R-1057-00001002.pdf PDF
VA244-17-R-1057-007.pdf PDF
VA244-17-R-1057-003.docx DOCX document
VA244-17-R-1057-005.pdf PDF
VA244-17-R-1057-006.pdf PDF
VA244-17-R-1057-004.xls XLS spreadsheet
VA244-17-R-1057-002.docx DOCX document
VA244-17-R-1057-001.docx DOCX document
VA244-17-R-1057-000.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE

OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

BY

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 00005 03-06-2018 none 00244 Department of Veterans Affairs Network Contracting Office 4

00244 Department of Veterans Affairs Network Contracting Office 4

To all Offerors/Bidders

VA244-17-R-1057

03-06-2018

X x x The purpose of this amendment is to provide:

1. Changes to the content of Amendment One and Amendment Four.

2. Questions and Answers.

3. MATOC sign in roster

This amendment also removes the current Statement of Work, Coatesville Veterans Affairs Medical Center (CVAMC), Flooring Replacement Phase 1, June 22, 2017 from page 9 of 147 of the solicitation and replaces it with a revised Statement of Work, Coatesville Veterans Affairs Medical Center (CVAMC), Flooring Replacement Phase 1, June 22, 2017. Find attached within.

MICHAEL F. WHITE

Contract Officer michael.white9@va.gov Change Amendment 1, Questions and Answers Number 1 -

FROM:

1. Does the complete and final pricing need to be included on the CD submitted or will the hardcopy take precedence?

A. The entire submission, MATOC and SEED project, is required to be submitted as a hard copy and on a CD.

TO:

1. Does the complete and final pricing need to be included on the CD submitted or will the hardcopy take precedence?

A. The pricing for the SEED project is to be submitted as a hard copy and not included on the CD.

Change Amendment 4, Block 14, Sentence 2 -

FROM:

2. Performance, Payment and Bid Bonds are required for the seed project #542-18-107 Flooring Replacement Phase 1.

TO:

2. Performance and Payment Bonds are NOT required with submission of seed project #542-18-107 Flooring Replacement Phase 1 package. A Bid Bond IS required with submission of seed project #542-18-107 Flooring Replacement Phase 1 package.

QUESTIONS AND ANSWERS

1. MATOC Past Performance Questionnaires – Will projects with contract values greater than $5,500,000 be accepted?

A. Yes.

2. Seed Project Past Performance – Is the range of $100,000 to $600,000 for construction costs indicative of the flooring subcontract value or the overall project value?

A. The PP submitted for the Seed Project should reflect a standalone flooring project with a range of $100,000 to $600,000, or an overall project with a flooring subcontract value within the range of $100,000 to $600,000.

3. MATOC Offeror’s Past Performance – Do the submitted projects need to be 100% complete at the time the MATOC solicitation was released? 50% complete? Started?

A. See the solicitation page 86 of 147, 5.2 Section 2 – Past Performance, 5.2.1 Submission Requirements.

4. Will a PPQ Cover Letter template be provided?

A. No.

5. Who should be listed as the Project Owner on the Bid Bond for the seed project? Obviously the Department of Veterans Affairs would be named, but which address? Network Contracting Office 4 or Coatesville VA?

A. Coatesville will be listed for task orders accomplished at the Coatesville VAMC and Wilmington will be listed for task orders accomplished at the Wilmington VAMC.

6. Will scalable drawings of the work area be provided?

A. No.

7. Will another site visit be scheduled?

A. No.

8. When you have time could one of you please email me the slide presentation you ran this AM?

A. The slides are confusing and will not be offered. Refer to the solicitation.

9. Page 94 of 148 section 5.2.1 states VA requests one construction Flooring project that best illustrates contractors prime and subcontractors teams qualifications. Does this project have to be a single trade flooring contract or be part of a larger contract listed as 1 of the 5 past performance projects required on page 86. Please advise.

A. See answer to question number 2 above.

10. Page 86 of 148 section 5.2.1 references past experience to be $2,000-$5.5M within the last 5 years. However on page 94 of 148 section 5.2.1 states to show the team’s construction performance, magnitude between $100,000-$600,000 within the last 3 years. Is the requirement on page 96 referencing specifically to a flooring contract value of $100k-$600k or general experience. This would then contradict the requirement on page 86. Please advise/clarify the intent of the requirement on page 96.

A. Page 86 references the MATOC and page 96 references the seed project.

11. During the tour it was brought up that some of the arrows in the drawing may be shifted. What does that mean?

A. A corrected copy of the SOW will be posted to FBO.

12. We understand that drawings will be reposted via an amendment and assume that this problem will be alleviated?

A. Yes

13. What type of laminate is the VA interested in or would it be preferred that we make that recommendation?

A. Luxury Vinyl Plank INTERLOCKING measuring 6” x 48” each plank equal to or greater than: Philadelphia Commercial Resilient Collection IT’S A SNAP color to be close to a light oak and determined by the COR. Product must have a 10 year commercial warranty and a 3 year installation warranty.

14. Particularly in the area of the hospital where the flooring is buckling (building 1), has a moisture test been conducted? If not, will one be conducted? If there is a moisture problem, will SOW be modified to account for remediation of this problem?

A. No moisture tests have been conducted. Bid accordingly. The SOW mentions sealing with a 3 year installation warranty on page 9 of 10, paragraph 2.

15. Please provide the sign in sheet from the Site Visit A. The sign in sheet is included in this amendment.

See attached document: MATOC Site Visit Sign In.

See attached document: SOW Flooring Replacement Phase 1 - v2.

End of Document